CN214364845U - Adjustable positioning pile of overhanging scaffold - Google Patents

Adjustable positioning pile of overhanging scaffold Download PDF

Info

Publication number
CN214364845U
CN214364845U CN202022902843.4U CN202022902843U CN214364845U CN 214364845 U CN214364845 U CN 214364845U CN 202022902843 U CN202022902843 U CN 202022902843U CN 214364845 U CN214364845 U CN 214364845U
Authority
CN
China
Prior art keywords
plate
clamp plate
clamping
clamping section
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022902843.4U
Other languages
Chinese (zh)
Inventor
张�杰
廖达京
房彬
龚晟
熊小华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN202022902843.4U priority Critical patent/CN214364845U/en
Application granted granted Critical
Publication of CN214364845U publication Critical patent/CN214364845U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a scaffold frame adjustable spud pile encorbelments, including be fixed in anchor clamps body and the rigid coupling on the frame I-steel top flange of encorbelmenting for the clamping in the gag lever post of anchor clamps body top. This adjustable spud pile can press from both sides tightly the realization to the last flange of the frame I-steel of encorbelmenting and fix to realize spacingly with the help of the gag lever post, satisfy the demand of stacking of steel pipe, avoid damaging the frame I-steel of encorbelmenting simultaneously, and adjustable spud pile can also demolish and have enough to meet the need the use.

Description

Adjustable positioning pile of overhanging scaffold
Technical Field
The utility model relates to a building field, in particular to scaffold adjustable spud encorbelments.
Background
With the rapid development of urban construction, the number of high-rise and super high-rise buildings is continuously increased, the construction environment is more and more complex, and in order to meet the requirements of structural construction and external decoration construction, the cantilever type steel pipe fastener external scaffold is widely applied due to the characteristics of wide adaptability, strong bearing capacity, convenience in erection and detachment and the like, and the cantilever type scaffold is provided with I-shaped steel. At present, the conventional method for placing steel pipes on cantilever frames of high-rise buildings is to weld 200mm reinforcing steel bar heads on the end parts of I-shaped steel, welding operation is needed, the cantilever I-shaped steel is damaged after welding, and treatment is needed in the later period.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a scaffold frame adjustable spud pile encorbelments, this adjustable spud pile can press from both sides tightly to the last flange of the frame I-steel of encorbelmenting and realize fixing, avoids damaging the frame I-steel of encorbelmenting.
In order to achieve the above object, the utility model provides a scaffold frame adjustable spud encorbelment, include be used for the clamping be fixed in the anchor clamps body and the rigid coupling on the I-steel top flange of encorbelment frame in the gag lever post of anchor clamps body top.
Optionally, the clamp body includes punch holder and lower plate, the first end of punch holder is equipped with U type slot, the second end of punch holder with the lower plate all sets up the fixed orifices, the punch holder with the lower plate pass through fastening bolt the fixed orifices is connected.
Optionally, the limiting rod is a steel pipe, and the steel pipe is welded above the upper clamping plate.
Optionally, the steel pipe is arranged at two ends of the upper clamp plate, and the fixing hole in the upper clamp plate is arranged in the steel pipe close to the second end of the upper clamp plate.
Optionally, the clamp body comprises an upper clamp plate and a pair of lower clamp plates which are used for respectively matching with two ends of the upper clamp plate to clamp the upper flange of the cantilever I-shaped steel;
the two ends of the upper clamping plate and the pair of lower clamping plates are provided with fixing holes, and the upper clamping plate is connected with the lower clamping plates through fastening bolts and the fixing holes.
Optionally, the lower clamping plate comprises a first clamping section, a third clamping section and a second clamping section for connecting the first clamping section and the third clamping section;
the first clamping section and the third clamping section are parallel to the upper clamping plate, and the second clamping section is in downward bending transition connection with the first clamping section and the third clamping section in an arc shape.
Optionally, the clamp body comprises an upper clamp plate and a compression bolt, two ends of the upper clamp plate are provided with U-shaped grooves with notches arranged oppositely, and an upper side plate or a lower side plate of each U-shaped groove is provided with a screw hole matched with the compression bolt.
Optionally, the protective pad is arranged in the U-shaped groove.
Compared with the prior art, the utility model provides a scaffold frame adjustable spud encorbelments includes that anchor clamps body and rigid coupling are at anchor clamps body top gag lever post, through setting up this scaffold frame adjustable spud encorbelments respectively at the both ends on the frame I-steel top flange of encorbelmenting, realizes spacing to stacking the steel pipe in the scaffold frame I-steel top of encorbelmenting with the help of the gag lever post at both ends. And the clamping mode is adopted to replace the traditional welding fixation, so that the I-shaped steel of the cantilever frame is prevented from being damaged.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts.
Fig. 1 is a schematic view of an adjustable spud of an overhanging scaffold according to a first embodiment of the present invention;
fig. 2 is a schematic view of an adjustable spud of an overhanging scaffold according to a second embodiment of the present invention;
fig. 3 is a schematic view of an adjustable spud of a cantilever scaffold provided by the third embodiment of the present invention.
Wherein:
1-upper clamping plate, 2-lower clamping plate, 3-fastening bolt, 4-compression bolt, 5-limiting rod, 6-U-shaped groove and 7-protective backing plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In order to make the technical field of the present invention better understand, the present invention will be described in detail with reference to the accompanying drawings and the detailed description.
Please refer to fig. 1 to 3, fig. 1 is a schematic diagram of the adjustable spud of the cantilever scaffold provided by the first embodiment of the present invention, fig. 2 is a schematic diagram of the adjustable spud of the cantilever scaffold provided by the second embodiment of the present invention, fig. 3 is a schematic diagram of the adjustable spud of the cantilever scaffold provided by the third embodiment of the present invention.
The utility model provides a scaffold frame adjustable spud that encorbelments includes anchor clamps body and gag lever post 5, and gag lever post 5 is fixed in anchor clamps body top gag lever post 5, and the anchor clamps body is used for the clamping on the frame I-steel top flange of encorbelmenting. Set up respectively at the both ends on the I-steel top flange of encorbelmenting through a pair of anchor clamps body, realize spacing to stacking the steel pipe in the I-steel top of encorbelmenting with the help of the gag lever post 5 at both ends. And the mode that adopts the clamping replaces traditional welded fastening, has avoided the damage to encorbelment frame I-steel, and above-mentioned adjustable spud pile of scaffold frame of encorbelmenting accessible anchor clamps body is dismantled, conveniently has enough to meet the need the use.
The utility model provides a in the first embodiment, specifically as shown in FIG. 1, the adjustable spud of scaffold that encorbelments frame includes anchor clamps body and gag lever post 5, and the anchor clamps body includes punch holder 1 and lower plate 2, and gag lever post 5 sets up the top at punch holder 1 perpendicularly. The first end of the upper clamping plate 1 is provided with a U-shaped groove 6, and the notch of the U-shaped groove 6 is horizontally arranged; the second end of punch holder 1 and lower plate 2 all set up and run through the fixed orifices, and punch holder 1 and lower plate 2 pass through fastening bolt 3, fixed orifices and connect. When encorbelmenting scaffold frame adjustable spud pile installation, U type slot 6 is used for colluding in the one side of encorbelmenting the frame I-steel top flange, through with punch holder 1 remove to suitable position after, screw up fastening bolt 3, utilize punch holder 1 and lower plate 2 to press from both sides tightly fixedly to the opposite side of encorbelmenting the frame I-steel top flange.
Alternatively, the limiting rod 5 is fixed above the upper splint 1 by welding, and the limiting rod 5 may be provided as one and welded in the middle of the upper splint 1. Obviously, the stop rods 5 may be provided in two sets, and when the stop rods 5 are provided in two sets, the two sets of stop rods 5 are respectively provided at both ends above the upper clamping plate 1. The limiting rod 5 can be made of a steel pipe, correspondingly, a fixing hole is formed in the steel pipe close to the second end of the upper clamping plate 1, a fastening nut can be fixed on the inner periphery of the steel pipe, and therefore after the fastening bolt 3 is screwed down, the fastening bolt 3 is hidden in the steel pipe.
The utility model provides a second kind of embodiment, specifically as shown in FIG. 2, the adjustable spud of scaffold that encorbelments frame includes anchor clamps body and gag lever post 5, and the anchor clamps body includes punch holder 1 and lower plate 2, and gag lever post 5 sets up the top at punch holder 1 perpendicularly. The lower splint 2 specifically sets up to a pair of, and the fixed orifices has all been seted up to the both ends of punch holder 1 and a pair of lower splint 2, and the anchor clamps body carries out the clamping with the help of lower splint 2, fastening bolt 3 and the fixed orifices at the both ends of punch holder 1 to the both ends on the I-steel top flange of encorbelmenting fixedly.
When the clamp body is installed, firstly, the fastening bolts 3 connected with the two ends of the upper clamping plate 1 and the lower clamping plate 2 are loosened, then the upper clamping plate 1 and the lower clamping plate 2 are arranged on the upper flange of the I-shaped steel of the cantilever frame in a sliding mode, and the fastening bolts 3 at the two ends are fastened respectively after the upper clamping plate 1 is moved to the preset position.
The utility model provides a third embodiment, specifically as shown in FIG. 3, the adjustable spud of scaffold that encorbelments frame includes the anchor clamps body, and the anchor clamps body includes punch holder 1 and clamp bolt 4, and 5 vertical welding of gag lever post are at the middle part of 1 up end of punch holder. The upper clamping plate 1 and the upper flange of the cantilever frame I-shaped steel are arranged in the same width approximately, two ends of the upper clamping plate 1 are provided with U-shaped grooves 6 with notches arranged oppositely, one side plate of the upper side plate or the lower side plate of each U-shaped groove 6 is provided with a through screw hole, and a compression bolt 4 is connected in each screw hole.
When carrying out the installation of scaffold frame adjustable spud pile of encorbelmenting, at first manual clamp bolt 4, with punch holder 1 through 6 alignment of U type slot encorbelments frame I-steel top flange slide-on dress, punch holder 1 removes the back that targets in place, through screwing up clamp bolt 4 for clamp bolt 4's end acts on the bottom surface or the top surface of encorbelmenting frame I-steel top flange, realizes encorbelmenting the fixed of frame I-steel relatively.
Further, in order to reduce the damage to the I-shaped steel of the cantilever frame, a protective backing plate 7 is further arranged in the U-shaped groove 6, and the protective backing plate 7 can be welded with the tail end of the compression bolt 4 to play a role in preventing the compression bolt 4 from being lost.
The utility model provides a fourth embodiment, scaffold adjustable spud that encorbelments includes anchor clamps body and gag lever post 5, and the one end of punch holder 1 of anchor clamps body sets up the form that compresses tightly into U type slot 6 and the cooperation of clamp bolt 4, and the other end sets up the form that punch holder 1 and lower plate 2 connect through fastening bolt 3. In addition, the clamp body can be hooked by a single-side U-shaped groove 6, and the single-side U-shaped groove 6 is fixed in a manner of being matched with the compression bolt 4.
For optimizing above-mentioned embodiment, improve the tight reliability of clamp of overhanging scaffold adjustable spud, have the anchor clamps body of lower plate 2, its lower plate 2 includes first clamping section, the third clamping section parallel with the bottom surface of punch holder 1, still includes the second clamping section of the transition connection third clamping section of buckling downwards with the circular arc by first clamping section. The bottom surfaces of the first clamping section and the upper clamping plate 1 are attached, and the bottom surfaces of the third clamping section and the upper clamping plate 1 are arranged in parallel, so that the attachment area of the lower clamping plate 2 and the bottom surface of the upper flange of the cantilever frame I-shaped steel is effectively increased.
It should be noted that, in this specification, relational terms such as first and second are used only to distinguish one entity from another entity, and do not necessarily require or imply any actual relationship or order between the entities, nor is the fixture body limited to the structure described in the above embodiments.
It is right above the utility model provides a scaffold adjustable spud encorbelments has carried out detailed introduction. The principles and embodiments of the present invention have been explained herein using specific examples, and the above descriptions of the embodiments are only used to help understand the method and its core ideas of the present invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.

Claims (5)

1. An adjustable positioning pile of an overhanging scaffold is characterized by comprising a clamp body and a limiting rod (5), wherein the clamp body is used for clamping and fixing an I-shaped steel upper flange of the overhanging scaffold, and the limiting rod is fixedly connected above the clamp body;
the clamp body comprises an upper clamp plate (1) and a lower clamp plate (2), a U-shaped groove (6) is formed in the first end of the upper clamp plate (1), fixing holes are formed in the second end of the upper clamp plate (1) and the lower clamp plate (2), and the upper clamp plate (1) is connected with the lower clamp plate (2) through fastening bolts (3) and the fixing holes;
or the like, or, alternatively,
the clamp body comprises an upper clamp plate (1) and a pair of lower clamp plates (2) which are respectively matched with two ends of the upper clamp plate (1) to clamp the upper flange of the I-shaped steel of the cantilever frame;
fixing holes are formed in both ends of the upper clamping plate (1) and the pair of lower clamping plates (2), and the upper clamping plate (1) is connected with the lower clamping plates (2) through fastening bolts (3) and the fixing holes;
or the like, or, alternatively,
the clamp body comprises an upper clamp plate (1) and a compression bolt (4), wherein two ends of the upper clamp plate (1) are provided with U-shaped grooves (6) with opposite notches, and screw holes matched with the compression bolt (4) are formed in an upper side plate or a lower side plate of each U-shaped groove (6).
2. The adjustable spud of cantilever scaffold according to claim 1, characterized in that, the gag lever post (5) is a steel pipe, and the steel pipe welds in the top of punch holder (1).
3. The adjustable spud of cantilever scaffold according to claim 2, wherein when the U-shaped groove (6) is formed at the first end of the upper clamp plate (1), the steel pipes are respectively disposed at both ends of the upper clamp plate (1), and the fixing hole of the upper clamp plate (1) is opened in the steel pipe close to the second end of the upper clamp plate (1).
4. The adjustable spud of cantilever scaffold according to any one of claims 1 to 3, wherein the lower splint (2) comprises a first clamping section, a third clamping section and a second clamping section connecting the first clamping section and the third clamping section;
the first clamping section and the third clamping section are parallel to the upper clamping plate (1), and the second clamping section is in transition connection with the first clamping section and the third clamping section in a downward bending mode in an arc shape.
5. The adjustable spud for overhanging scaffold according to claim 1, further comprising a protective backing plate (7) disposed in the U-shaped groove (6).
CN202022902843.4U 2020-12-04 2020-12-04 Adjustable positioning pile of overhanging scaffold Expired - Fee Related CN214364845U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022902843.4U CN214364845U (en) 2020-12-04 2020-12-04 Adjustable positioning pile of overhanging scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022902843.4U CN214364845U (en) 2020-12-04 2020-12-04 Adjustable positioning pile of overhanging scaffold

Publications (1)

Publication Number Publication Date
CN214364845U true CN214364845U (en) 2021-10-08

Family

ID=77982746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022902843.4U Expired - Fee Related CN214364845U (en) 2020-12-04 2020-12-04 Adjustable positioning pile of overhanging scaffold

Country Status (1)

Country Link
CN (1) CN214364845U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016719A (en) * 2021-11-16 2022-02-08 中建八局第二建设有限公司 Sliding positioning seat of overhanging bearing frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016719A (en) * 2021-11-16 2022-02-08 中建八局第二建设有限公司 Sliding positioning seat of overhanging bearing frame

Similar Documents

Publication Publication Date Title
CN110700585A (en) Formwork reinforcing system structure and construction process thereof
CN211736345U (en) Basement outer wall unilateral template strutting arrangement
CN214364845U (en) Adjustable positioning pile of overhanging scaffold
CN209353708U (en) Upper anti-bank template reinforcing device
CN216840624U (en) Vertical back of body of pulling-on piece formula aluminum alloy template is stupefied convenient to installation
CN109779021B (en) Building steel structure node
CN213573018U (en) Template clamp for building
CN210459646U (en) Steel construction assembled wallboard node
CN201567683U (en) Side-sway resistant end face tightening temporary connecting joint structure
CN204456871U (en) A kind of square tube clamp device
CN211949553U (en) Construction stabilizer bar
CN210917759U (en) Construction locking device for building steel structure
CN208934117U (en) A kind of connecting structure of assembled Steel Reinforced Concrete Special-Shaped Columns and beams of concrete
CN112302328A (en) Steel safety vertical net fixing frame for building scaffold
CN208267120U (en) A kind of steel I-beam connection steel construction
CN216740821U (en) Reinforcing and pressing device for steel plate for opening masonry wall
CN217001013U (en) Reinforcement type prevents building structure that topples
CN221168702U (en) But quick connect's aluminum alloy template mosaic structure
CN213653752U (en) Ready-package steel construction
CN219410575U (en) T-shaped beam bridge deck wet joint formwork structure
CN220620445U (en) Steel structure beam column
CN217949353U (en) Steel square tube connection is with frock of convenient regulation
CN211775092U (en) Assembled building reinforced concrete member
CN116181105B (en) Detachable beam column node reinforcement member
CN216973729U (en) Steel structure node connecting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211008

CF01 Termination of patent right due to non-payment of annual fee