CN211949553U - Construction stabilizer bar - Google Patents

Construction stabilizer bar Download PDF

Info

Publication number
CN211949553U
CN211949553U CN202020393066.2U CN202020393066U CN211949553U CN 211949553 U CN211949553 U CN 211949553U CN 202020393066 U CN202020393066 U CN 202020393066U CN 211949553 U CN211949553 U CN 211949553U
Authority
CN
China
Prior art keywords
plate
steel
holes
steel plate
matched
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020393066.2U
Other languages
Chinese (zh)
Inventor
王怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing Heze Enterprise Management Service Co ltd
Original Assignee
Jiaxing Heze Enterprise Management Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Heze Enterprise Management Service Co ltd filed Critical Jiaxing Heze Enterprise Management Service Co ltd
Priority to CN202020393066.2U priority Critical patent/CN211949553U/en
Application granted granted Critical
Publication of CN211949553U publication Critical patent/CN211949553U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a construction stabilizer bar, which comprises a steel plate, wherein a support plate is welded on the left side of the steel plate, four through holes are annularly arranged on the surface of the support plate, a movable plate is matched with the support plate, two first through holes matched with the through holes are annularly arranged on the surface of the movable plate, bolts are assembled between the through holes and the first through holes, and a clamp plate is welded on the side of the movable plate away from the support plate and is matched with the first clamp plate; this product can be connected between with the scaffold, increases joint strength and stability between scaffold and the building body.

Description

Construction stabilizer bar
Technical Field
The utility model relates to a construction stabilizer bar.
Background
When the outer wall construction is carried out, such as operations of tile pasting, painting and the like, a scaffold needs to be built outside the outer wall, the scaffold is utilized to provide climbing and relying, and the outer wall construction is convenient.
However, when the outer wall is constructed, the scaffold is shaken when the construction height of the scaffold is too high, so that the scaffold needs to be reinforced. The stability of above-mentioned fixed mode is relatively poor, can only avoid the scaffold frame to fall down outwards, can not prevent the scaffold frame to fall down inwards.
Based on the problem, the construction stabilizer bar can be connected with a scaffold, and the connection strength and the stability between the scaffold and a building body are improved.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide one kind can with be connected between the scaffold, increase the joint strength between scaffold and the building body and the construction stabilizer bar of stability.
In order to solve the above problem, the utility model adopts the following technical scheme:
a building construction stabilizer bar comprises a steel plate, wherein a support plate is welded on the left side of the steel plate, four through holes are annularly formed in the surface of the support plate, the aperture of each through hole is 8-12 mm, and a movable plate is matched with the support plate; the support plate and the movable plate are both made of galvanized steel plates, two first through holes matched with the through holes are annularly arranged on the plate surface of the movable plate, the aperture of each first through hole is consistent with that of each through hole, bolts are assembled between the through holes and the first through holes, a clamp plate is welded on one side, away from the support plate, of the movable plate, the clamp plate is matched with a first clamp plate, the first bolts are matched between the clamp plate and the first clamp plate, and a clamping hole for fixing a scaffold steel pipe is formed between the clamp plate and the first clamp plate; the wall-mounted steel plate is characterized by further comprising a first steel plate connected with a wall, wherein two clamping plates are arranged on the left side of the first steel plate, the steel plate is assembled between the two clamping plates, a second bolt is matched between the clamping plates and the steel plate, more than two second bolts are arranged, the steel plate is provided with a strip-shaped groove used for penetrating through the second bolt, and the second bolt can slide along the transverse direction of the strip-shaped groove in a loose state; a plurality of bolt holes are drilled in the plate surface of the first steel plate.
Preferably, the first steel plate is specially provided with a sliding sleeve, a screw is screwed in the outer part of the sliding sleeve, the screw abuts against the first steel plate after being screwed in, at the moment, the sliding sleeve and the first steel plate are fixed, a first clamping plate is welded on the outer wall of the sliding sleeve, the first clamping plate is L-shaped, a clamping opening matched with a bearing wall or a brick wall is formed between the first clamping plate and the first steel plate, and the first screw is screwed in the outer side of the first clamping plate; above-mentioned structure is to the side position department that first steel sheet is the wall just in time, need not to drill on the wall this moment, only need through the cooperation of first splint and first steel sheet can with fixed between the wall.
Preferably, the steel plate and the first steel plate are galvanized steel plates, and the thickness of the steel plates is 3 mm-6 mm; the galvanized steel sheet has enough strength and better corrosion resistance, and can be used for a long time.
Preferably, the steel plates are respectively attached to the front and rear clamping plates.
Preferably, the clamping plate and the first steel plate are of a cast integral structure.
The reinforcing method of the product comprises the following steps:
at first, with clamp plate and first clamp plate effect on the scaffold steel pipe, when to the standpipe, rotatory to vertical state with clamp plate and first clamp plate, the through-hole is provided with 4, consequently, clamp plate and first clamp plate have vertical and horizontal two kinds of states adjustable, can carry out reasonable regulation to vertical steel pipe and horizontal steel pipe, and the adaptability is stronger. After the fixing is finished, the clamping plate is pulled towards the right side until the first steel plate abuts against the wall, and at the moment, expansion screws are driven into the bolt holes and screwed into the wall. And then, tightening the second bolt, and fixing the steel plate and the clamping plate after the second bolt is tightened, thereby finishing the reinforcement.
The utility model has the advantages that: this product when the installation, can carry out reasonable regulation according to the standpipe or violently manage, satisfy the installation needs, according to the interval of scaffold frame and wall, the position of accessible adjusting steel sheet and splint is adjusted, and the regulation mode is diversified, can satisfy the installation needs, and with be connected the back between the wall, has better stability, avoids the scaffold frame to rock, increases construction safety, the structure of this product is comparatively simple, and the cost is comparatively cheap, is fit for using widely.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a top view of the present invention;
FIG. 2 is a top view of a steel plate;
FIG. 3 is a left side view of the mounting plate;
fig. 4 is a right side view of the movable plate.
Detailed Description
All of the features disclosed in this specification, or all of the steps in any method or process so disclosed, may be combined in any combination, except combinations of features and/or steps that are mutually exclusive.
Any feature disclosed in this specification (including any accompanying claims, abstract and drawings), may be replaced by alternative features serving equivalent or similar purposes, unless expressly stated otherwise. That is, unless expressly stated otherwise, each feature is only an example of a generic series of equivalent or similar features.
In the description of the present invention, it is to be understood that the terms "one end", "the other end", "the outside", "upper", "inside", "horizontal", "coaxial", "central", "end", "length", "outer end", etc. indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, in the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise explicitly specified or limited, the terms "set", "coupled", "connected", "penetrating", "plugging", and the like are to be understood in a broad sense, and may be, for example, fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Referring to fig. 1, 2, 3 and 4, the stabilizer bar for building construction includes a steel plate 1, a support plate 2 is welded to the left side of the steel plate 1, four through holes 201 are annularly arranged on the plate surface of the support plate 2, the aperture of each through hole 201 is 8mm, and a movable plate 3 is matched with the support plate 2; the diameters of the support plate 2 and the movable plate 3 are consistent, the thicknesses of the support plate 2 and the movable plate 3 are consistent, the support plate 2 and the movable plate 3 are made of galvanized steel plates, two first through holes 301 matched with the through holes 201 are annularly arranged on the plate surface of the movable plate 3, the aperture of each first through hole 301 is consistent with that of each through hole 201, bolts 44 are assembled between the through holes 201 and the first through holes 301, a clamp plate 4 is welded on one side, away from the support plate 2, of the movable plate 3, the clamp plate 4 is matched with a first clamp plate 5, a first bolt 6 is matched between the clamp plate 4 and the first clamp plate 5, and a clamping hole 7 for fixing a scaffold steel pipe is formed between the clamp plate 4 and the first clamp plate 5; the steel plate structure is characterized by further comprising a first steel plate 8 connected with a wall, two clamping plates 9 are arranged on the left side of the first steel plate 8, the steel plate 1 is assembled between the two clamping plates 9, a second bolt 901 is matched between the clamping plates 9 and the steel plate 1, two second bolts 901 are arranged, the steel plate 1 is provided with a strip-shaped groove 101 used for penetrating through the second bolt 901, and the second bolt 901 can slide along the transverse direction of the strip-shaped groove 101 in a loosened state; a plurality of bolt holes (not shown) are drilled in the plate surface of the first steel plate 8, and the hole diameter of each bolt hole is 8 mm.
In a preferred embodiment of the present invention, the first steel plate 8 is specially provided with a sliding sleeve 811, a screw 812 is screwed into the outside of the sliding sleeve 811, the screw 812 supports against the first steel plate 8 after being screwed in, at this time, the sliding sleeve 811 and the first steel plate 8 are fixed, a first clamp plate 813 is welded on the outer wall of the sliding sleeve 811, the first clamp plate 813 is L-shaped, a clamp opening 814 for matching a bearing wall or a brick wall is formed between the first clamp plate 813 and the first steel plate 8, and a first screw 815 is screwed into the outer side of the first clamp plate 813; above-mentioned structure is to the side position department that first steel sheet is the wall just in time, need not to drill on the wall this moment, only need through the cooperation of first splint and first steel sheet can with fixed between the wall.
In a preferred embodiment of the present invention, the steel plate 1 and the first steel plate 8 are galvanized steel plates, and have a thickness of 4 mm; the galvanized steel sheet has enough strength and better corrosion resistance, and can be used for a long time.
In one preferred embodiment of the present invention, the steel plate 1 is attached to the front and rear sides of the clamping plate 9.
In a preferred embodiment of the present invention, the clamping plate 9 and the first steel plate 8 are cast integrally.
The reinforcing method of the product comprises the following steps:
at first, with clamp plate and first clamp plate effect on the scaffold steel pipe, when to the standpipe, rotatory to vertical state with clamp plate and first clamp plate, the through-hole is provided with 4, consequently, clamp plate and first clamp plate have vertical and horizontal two kinds of states adjustable, can carry out reasonable regulation to vertical steel pipe and horizontal steel pipe, and the adaptability is stronger. After the fixing is finished, the clamping plate is pulled towards the right side until the first steel plate abuts against the wall, and at the moment, expansion screws are driven into the bolt holes and screwed into the wall. And then, tightening the second bolt, and fixing the steel plate and the clamping plate after the second bolt is tightened, thereby finishing the reinforcement.
The utility model has the advantages that: this product when the installation, can carry out reasonable regulation according to the standpipe or violently manage, satisfy the installation needs, according to the interval of scaffold frame and wall, the position of accessible adjusting steel sheet and splint is adjusted, and the regulation mode is diversified, can satisfy the installation needs, and with be connected the back between the wall, has better stability, avoids the scaffold frame to rock, increases construction safety, the structure of this product is comparatively simple, and the cost is comparatively cheap, is fit for using widely.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a construction stabilizer bar, includes a steel sheet, its characterized in that: the left side of the steel plate is welded with a support plate, four through holes are annularly formed in the surface of the support plate, a movable plate is matched with the support plate, two first through holes matched with the through holes are annularly formed in the surface of the movable plate, bolts are assembled between the through holes and the first through holes, a clamp plate is welded on the side, away from the support plate, of the movable plate, the clamp plate is matched with a first clamp plate, a first bolt is matched between the clamp plate and the first clamp plate, and a clamping hole for fixing a scaffold steel pipe is formed between the clamp plate and the first clamp plate; the wall-mounted steel plate is characterized by further comprising a first steel plate connected with a wall, wherein two clamping plates are arranged on the left side of the first steel plate, the steel plate is assembled between the two clamping plates, a second bolt is matched between the clamping plates and the steel plate, more than two second bolts are arranged, the steel plate is provided with a strip-shaped groove used for penetrating through the second bolt, and the second bolt can slide along the transverse direction of the strip-shaped groove in a loose state; a plurality of bolt holes are drilled in the plate surface of the first steel plate.
2. The construction stabilizer bar of claim 1, wherein: the utility model discloses a brick wall, including first steel sheet, sliding sleeve, first splint, the outside screw in of sliding sleeve has the screw, the screw supports after the screw in first steel sheet, this moment the sliding sleeve with it is fixed between the first steel sheet, the welding of outer wall department of sliding sleeve has first splint, first splint are L shape, first splint with form the double-layered mouth that presss from both sides that cooperation bearing wall or brick wall were used between the first steel sheet, the outside screw in of first splint has first screw.
3. The construction stabilizer bar of claim 1, wherein: the steel plate and the first steel plate are galvanized steel plates, and the thickness of the galvanized steel plates ranges from 3mm to 6 mm.
4. The construction stabilizer bar of claim 1, wherein: the steel plates are respectively attached to the clamping plates on the front side and the rear side.
5. The construction stabilizer bar of claim 1, wherein: the clamping plate and the first steel plate are of a cast integrated structure.
CN202020393066.2U 2020-03-25 2020-03-25 Construction stabilizer bar Expired - Fee Related CN211949553U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020393066.2U CN211949553U (en) 2020-03-25 2020-03-25 Construction stabilizer bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020393066.2U CN211949553U (en) 2020-03-25 2020-03-25 Construction stabilizer bar

Publications (1)

Publication Number Publication Date
CN211949553U true CN211949553U (en) 2020-11-17

Family

ID=73185665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020393066.2U Expired - Fee Related CN211949553U (en) 2020-03-25 2020-03-25 Construction stabilizer bar

Country Status (1)

Country Link
CN (1) CN211949553U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814351A (en) * 2021-01-04 2021-05-18 邓维记 Lifting construction equipment hanging point device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814351A (en) * 2021-01-04 2021-05-18 邓维记 Lifting construction equipment hanging point device

Similar Documents

Publication Publication Date Title
CN211949553U (en) Construction stabilizer bar
CN205955173U (en) Modular link wall spare subassembly
CN213575927U (en) Portable automatic locking fixing device for pipeline laying
CN214364845U (en) Adjustable positioning pile of overhanging scaffold
CN217000827U (en) Connecting assembly for mounting and fixing scaffold steel plate net
CN209799349U (en) Easily-installed and easily-disassembled building template
CN212613463U (en) Wall stainless steel installing the system with adjustable
CN210685084U (en) Assembled partition wall system that shock resistance is strong
CN210032258U (en) Steel frame structure for mounting curved curtain wall
CN219471512U (en) Wall connecting device for scaffold
CN112196205A (en) Assembled tensioning structure of wallboard and installation method thereof
CN213115792U (en) Construction safety device
CN214062009U (en) Simple to operate's integral buckle structure and antidetonation gallows
CN112302328A (en) Steel safety vertical net fixing frame for building scaffold
CN212358755U (en) Support arrangement for when stone material curtain hangs wall installation
KR200275103Y1 (en) fixing structure of slab support pipe for building
CN219993076U (en) Cross-position adjusting and protecting device for outer frame of disc buckle
CN215720032U (en) Special bolt assembly for tower crane
CN218509004U (en) I-steel anchor clamps and I-steel connection structure
CN210127634U (en) Building primary and secondary fossil fragments claw formula high-speed joint fixed knot constructs
CN216740821U (en) Reinforcing and pressing device for steel plate for opening masonry wall
CN218117226U (en) Back ridge clamp for fixing reverse ridge template
CN216616837U (en) Aluminum mould K board reinforcing apparatus
CN213836996U (en) Mounting base in steel construction engineering house
CN215443137U (en) Supporting structure of construction assembled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201117