CN110984396A - Rear-mounted anchor net and operation method thereof - Google Patents

Rear-mounted anchor net and operation method thereof Download PDF

Info

Publication number
CN110984396A
CN110984396A CN201911350276.1A CN201911350276A CN110984396A CN 110984396 A CN110984396 A CN 110984396A CN 201911350276 A CN201911350276 A CN 201911350276A CN 110984396 A CN110984396 A CN 110984396A
Authority
CN
China
Prior art keywords
anchor
arc body
upper chord
lower arc
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201911350276.1A
Other languages
Chinese (zh)
Inventor
肖斯昕
肖斯熔
肖纹籛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Gulou Wenying Construction Engineering Co Ltd
Original Assignee
Fuzhou Gulou Wenying Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Gulou Wenying Construction Engineering Co Ltd filed Critical Fuzhou Gulou Wenying Construction Engineering Co Ltd
Priority to CN201911350276.1A priority Critical patent/CN110984396A/en
Publication of CN110984396A publication Critical patent/CN110984396A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/383Connection of concrete parts using adhesive materials, e.g. mortar or glue
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/388Separate connecting elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention relates to a rear anchoring net piece and an operation method thereof. The rear anchoring net sheet comprises a longitudinal anchoring strip and a transverse anchoring strip; the front end of the longitudinal anchor tying strip is an anchor tying end, and the transverse anchor tying strip is transversely arranged on the rear part of the longitudinal anchor tying strip; the anchor end of the longitudinal anchor strip comprises a lower arc body which is not smaller than a semicircle, an arc convex rib and a barb are arranged on the lower arc body, the lower arc body is matched with the upper chord arc body, the upper chord arc body is also provided with the arc convex rib and the barb, and the lower arc body and the upper chord arc body are wedged in the mounting hole through a wedge body. The operation method comprises the following steps: the method comprises the steps of marking a drilling position on a component, drilling according to the installation size, cleaning and wetting holes, installing an anchoring end with cement paste, and pushing a wedge body between a lower arc body and an upper chord arc body through a tool to compact the anchoring end in the hole. The post-anchored mesh disclosed by the invention not only enhances the tension, but also can be integrally anchored with a wall body, and can meet the requirements of different wall body anchor ties.

Description

Rear-mounted anchor net and operation method thereof
Technical Field
The invention relates to the field of buildings, in particular to a rear-mounted anchor net and an operation method thereof.
Background
The wall body of the building engineering is mostly formed by building blocks, and a plurality of building blocks need to be anchored with a main framework (such as a reinforced concrete column) of the building so as to meet the integral requirement of earthquake resistance. Most of the current anchorages are realized by reserving tie bars during the construction of the main frame. The scheme has the problems that:
(1) the positions of reserved steel bars are often not matched with the positions of seams of materials used for the masonry;
(2) when a wall body is built, the connecting end of the reserved steel bar is often required to be bent at a right angle, so that the bending difficulty is high, the bearing deformation is easy to cause, the corresponding building joint is increased, and more problems are caused;
(3) reserved ribs need to drill hole positions in a pouring template, and the hole positions are often the main reason for causing slurry leakage around the ribs;
(4) drilling out the hole site of reserving the muscle on pouring the template, can directly harm the template face, bring very adverse effect to the follow-up use of template.
(5) The reserved ribs cannot be made into a hook shape in advance, so that the anchoring tension of the reserved ribs in the building is reduced;
(6) the anchoring force of the reinforcement in the mortar joint is reserved, and the bonding force of mortar around the reinforcement is far smaller than the anchoring force of the reinforcement in concrete when the mortar joint is smaller, so that the performance of the building material is difficult to exert.
Disclosure of Invention
In view of the defects of the prior art, the invention provides the rear anchoring net piece and the operation method thereof.
The technical scheme of the invention is as follows: a postposition anchor net sheet comprises at least two longitudinal anchor strips and a plurality of transverse anchor strips; the front ends of the longitudinal anchor tying strips are anchor tying ends which are arranged in the mounting holes, and the plurality of transverse anchor tying strips are transversely arranged on the rear parts of the longitudinal anchor tying strips; the anchor end of the longitudinal anchor strip comprises a lower arc body which is not smaller than a semicircle, an arc convex rib and a barb are arranged on the lower arc surface of the lower arc body, the lower arc body is matched with the upper chord arc body, the upper arc surface of the upper chord arc body is also provided with the arc convex rib and the barb, and the lower arc body and the upper chord arc body are wedged in the mounting hole through a wedge body.
Preferably, the lower arc body and the upper chord arc body are provided with a plurality of barbs, the barbs at the front end are larger, and the barbs at the rear end are smaller. The front end is the end extending into the deep part of the hole and is the front end, and the rear end is the end extending into the shallow part of the hole and is the rear end.
Preferably, the plurality of transverse anchoring strips are transversely welded to the rear parts of the longitudinal anchoring strips in an up-down staggered manner.
The operation method of the rear anchoring net piece comprises the following steps:
(1) according to the anchor seam position of the wall body, marking a drilling hole position on the component;
(2) drilling according to the mounting size of the anchor end of the rear anchor net sheet;
(3) cleaning and moistening the holes;
(4) installing an anchor end with cement slurry;
(5) the wedge body is pushed into the space between the lower arc body and the upper chord arc body through a tool, so that the anchor knot end is extruded in the hole, and at the moment, the arc convex ribs and the barbs of the lower arc body and the upper chord arc body are extruded into the hole wall.
The invention has the beneficial effects that: according to the invention, the traditional pre-embedded anchoring mode is changed into a mode of firstly forming the component and then drilling and anchoring, so that the anchoring tension can be enhanced, the rear anchoring net piece can be integrally anchored with the wall, the mortar binding force is greatly improved, and the requirements of different wall body pulling knots are met. The post-anchored mesh can be produced industrially, has high quality and less field labor, and is favorable for industrialization.
Drawings
FIG. 1 is a schematic view of the rear anchor net in the embodiment.
FIG. 2 is a schematic plan view of the rear anchoring net in the embodiment.
In the figure: 1-longitudinal anchor bar 2-transverse anchor bar 3-reinforced concrete member 3.1-mounting hole;
1.1-lower arc body 1.2-arc convex rib 1.3-barb 1.4-upper chord arc body 1.5-wedge body.
Detailed Description
In order to explain technical contents, structural features, and objects and effects of the present invention in detail, the following detailed description is given with reference to the accompanying drawings in conjunction with the embodiments.
As shown in fig. 1 to 2, the rear anchor net of the present invention comprises two longitudinal anchor bars 1 and three transverse anchor bars 2; the front ends of the longitudinal anchor bars 1 are anchor ends, the anchor ends are installed in mounting holes 3.1 of the reinforced concrete members 3, the two longitudinal anchor bars 1 are parallel to each other, the three transverse anchor bars are also parallel to each other and are transversely welded to the rear portions of the two longitudinal anchor bars 1 in an up-down staggered manner, as shown in fig. 2, one transverse anchor bar is above the longitudinal anchor bars, and the two transverse anchor bars are below the longitudinal anchor bars, so that a longitudinal and transverse grid structure is formed.
As shown in fig. 1 to 2, the anchoring end of the longitudinal anchoring strip 1 includes a lower arc body 1.1 not smaller than a semicircle, a lower arc surface of the lower arc body 1.1 is provided with an arc-shaped convex rib 1.2 and a barb 1.3, the lower arc body 1.1 is matched with an upper chord arc body 1.4, an upper arc surface of the upper chord arc body 1.4 is also provided with an arc-shaped convex rib 1.2 and a barb 1.3, and the lower arc body 1.1 and the upper chord arc body 1.4 are wedged tightly in the mounting hole of the reinforced concrete member through a wedge body 1.5. When the reinforced concrete member is wedged tightly, the arc-shaped convex ribs 1.2 and the barbs 1.3 can be tightly cut into the inner wall surface of the mounting hole 3.1 of the reinforced concrete member 3, so that the binding force is improved.
As shown in fig. 1 to 2, there are a plurality of barbs 1.3 on the lower arc body 1.1 and the upper chord arc body 1.4, and the barb 1.3 at the front end is larger, and the barb 1.3 at the rear end is smaller. The front end is the end extending into the deep part of the hole and is the front end, and the rear end is the end extending into the shallow part of the hole and is the rear end.
The longitudinal anchor strips 1 and the transverse anchor strips 2 can be iron strips or metal strips, and are preferably flat.
The operation method of the rear anchoring net piece comprises the following steps:
(1) according to the anchor seam position of the wall body, marking a drilling hole position on the reinforced concrete member 3;
(2) drilling according to the mounting size of the anchor end of the post-anchor net sheet, wherein the aperture of the mounting hole is smaller than the overall size of the anchor end after assembly, so that wedging and anchoring can be performed through a wedge body;
(3) cleaning the mounting hole 3.1 of the reinforced concrete member 3, and wetting the mounting hole 3.1 of the reinforced concrete member 3 with water;
(4) installing the anchor end of the longitudinal anchor strip 1 with cement slurry;
(5) the wedge body 1.5 is pushed into the space between the lower arc body 1.1 and the upper chord arc body 1.4 through a tool, so that the anchor end is extruded in the mounting hole 3.1, and at the moment, the arc convex ribs and the barbs of the lower arc body and the upper chord arc body are extruded into the hole wall.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (4)

1. The utility model provides a rearmounted anchor net piece which characterized in that: comprises at least two longitudinal anchor bars and a plurality of transverse anchor bars; the front ends of the longitudinal anchor tying strips are anchor tying ends which are arranged in the mounting holes, and the plurality of transverse anchor tying strips are transversely arranged on the rear parts of the longitudinal anchor tying strips; the anchor end of the longitudinal anchor strip comprises a lower arc body which is not smaller than a semicircle, an arc convex rib and a barb are arranged on the lower arc surface of the lower arc body, the lower arc body is matched with the upper chord arc body, the upper arc surface of the upper chord arc body is also provided with the arc convex rib and the barb, and the lower arc body and the upper chord arc body are wedged in the mounting hole through a wedge body.
2. The post-anchor mesh of claim 1, wherein: the lower arc body and the upper chord arc body are provided with a plurality of barbs, the barbs at the front end are larger, and the barbs at the rear end are smaller.
3. The post-anchor mesh of claim 1, wherein: the plurality of transverse anchor bars are transversely welded on the rear parts of the longitudinal anchor bars in an up-down staggered manner.
4. A method of operating a post-anchor mesh as in claim 1, comprising the steps of:
(1) according to the anchor seam position of the wall body, marking a drilling hole position on the component;
(2) drilling according to the mounting size of the anchor end of the rear anchor net sheet;
(3) cleaning and moistening the holes;
(4) installing an anchor end with cement slurry;
(5) the wedge body is pushed into the space between the lower arc body and the upper chord arc body through a tool, so that the anchor knot end is extruded in the hole, and at the moment, the arc convex ribs and the barbs of the lower arc body and the upper chord arc body are extruded into the hole wall.
CN201911350276.1A 2019-12-24 2019-12-24 Rear-mounted anchor net and operation method thereof Withdrawn CN110984396A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911350276.1A CN110984396A (en) 2019-12-24 2019-12-24 Rear-mounted anchor net and operation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911350276.1A CN110984396A (en) 2019-12-24 2019-12-24 Rear-mounted anchor net and operation method thereof

Publications (1)

Publication Number Publication Date
CN110984396A true CN110984396A (en) 2020-04-10

Family

ID=70075011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911350276.1A Withdrawn CN110984396A (en) 2019-12-24 2019-12-24 Rear-mounted anchor net and operation method thereof

Country Status (1)

Country Link
CN (1) CN110984396A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111230163A (en) * 2020-04-14 2020-06-05 福州鼓楼卓穆尼奥科技有限公司 Automatic chucking double-end turning fixture device

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4475856A (en) * 1979-12-21 1984-10-09 Telefonaktiebolaget L M Ericsson Expansion screw with an expansion sleeve having an outer cylindrical surface and regions of greater and lesser wall thickness
CN1063325A (en) * 1991-10-17 1992-08-05 朱友山 Prestressed thin reinforced net sheet is used for the earthquake-resistant building method of setting up defences
JPH10331827A (en) * 1997-05-28 1998-12-15 Takeshige Shimonohara Anchor body
CA2353728A1 (en) * 1998-12-01 2000-06-08 Cobra Fixations Cie Ltee - Cobra Anchors Co. Ltd. Wedge anchor for concrete
CN2455799Y (en) * 2000-12-28 2001-10-24 肖纹篯 Rear-installed wall anchor tightener
CN1395025A (en) * 2002-04-29 2003-02-05 东北大学 Full-length multi-point wedge-expanded pipe seam anchor bar
US20030159377A1 (en) * 2002-02-22 2003-08-28 Marshall Frederick S. Cable end wedge lock
CN1515803A (en) * 2003-01-07 2004-07-28 末广系统株式会社 Anchor bolt and mounting method thereof
US20070245678A1 (en) * 2006-03-31 2007-10-25 Doug Bonelli Adjustable cross-tie for construction of walls
CN203365767U (en) * 2013-07-12 2013-12-25 南京德乐科技股份有限公司 Arc-shaped clamp wedge-type anchoring piece
CN204001270U (en) * 2014-07-24 2014-12-10 冠鲁建设股份有限公司 A kind of reinforced concrete wall and masonry wall syndeton
CN206091083U (en) * 2016-10-20 2017-04-12 哈尔滨理工大学 Strengthening rib of infilled wall drawknot muscle
CN207633535U (en) * 2017-12-07 2018-07-20 沈阳卫德住宅工业化科技有限公司 A kind of sandwich heat preservation Side fascia needle-like stainless steel heat preservation tension member
KR102019956B1 (en) * 2018-10-22 2019-09-11 홍석희 Bulb Anchor by synchronizing the expansion and tightness, and construction method using it
CN110462228A (en) * 2017-03-27 2019-11-15 费希尔厂有限责任两合公司 The arragement construction and fixed system of anchor bolt in anchor hole

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4475856A (en) * 1979-12-21 1984-10-09 Telefonaktiebolaget L M Ericsson Expansion screw with an expansion sleeve having an outer cylindrical surface and regions of greater and lesser wall thickness
CN1063325A (en) * 1991-10-17 1992-08-05 朱友山 Prestressed thin reinforced net sheet is used for the earthquake-resistant building method of setting up defences
JPH10331827A (en) * 1997-05-28 1998-12-15 Takeshige Shimonohara Anchor body
CA2353728A1 (en) * 1998-12-01 2000-06-08 Cobra Fixations Cie Ltee - Cobra Anchors Co. Ltd. Wedge anchor for concrete
CN2455799Y (en) * 2000-12-28 2001-10-24 肖纹篯 Rear-installed wall anchor tightener
US20030159377A1 (en) * 2002-02-22 2003-08-28 Marshall Frederick S. Cable end wedge lock
CN1395025A (en) * 2002-04-29 2003-02-05 东北大学 Full-length multi-point wedge-expanded pipe seam anchor bar
CN1515803A (en) * 2003-01-07 2004-07-28 末广系统株式会社 Anchor bolt and mounting method thereof
US20070245678A1 (en) * 2006-03-31 2007-10-25 Doug Bonelli Adjustable cross-tie for construction of walls
CN203365767U (en) * 2013-07-12 2013-12-25 南京德乐科技股份有限公司 Arc-shaped clamp wedge-type anchoring piece
CN204001270U (en) * 2014-07-24 2014-12-10 冠鲁建设股份有限公司 A kind of reinforced concrete wall and masonry wall syndeton
CN206091083U (en) * 2016-10-20 2017-04-12 哈尔滨理工大学 Strengthening rib of infilled wall drawknot muscle
CN110462228A (en) * 2017-03-27 2019-11-15 费希尔厂有限责任两合公司 The arragement construction and fixed system of anchor bolt in anchor hole
CN207633535U (en) * 2017-12-07 2018-07-20 沈阳卫德住宅工业化科技有限公司 A kind of sandwich heat preservation Side fascia needle-like stainless steel heat preservation tension member
KR102019956B1 (en) * 2018-10-22 2019-09-11 홍석희 Bulb Anchor by synchronizing the expansion and tightness, and construction method using it

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111230163A (en) * 2020-04-14 2020-06-05 福州鼓楼卓穆尼奥科技有限公司 Automatic chucking double-end turning fixture device
CN111230163B (en) * 2020-04-14 2020-09-15 江苏星晨高速电机有限公司 Automatic chucking double-end turning fixture device

Similar Documents

Publication Publication Date Title
CN206174146U (en) Assembly type structure's assembly node
CN204645268U (en) A kind of infilled wall tie bar built-in fitting
CN113202219B (en) Fully prefabricated assembled steel-concrete composite floor system and design calculation method
CN206503150U (en) A kind of basalt composite reinforcing material anchor lattice beam retaining structure
CN105133830A (en) Formwork reinforcing system replacing wood with steel and construction technology thereof in external wall construction
CN207211444U (en) A kind of mounting clip pieces coordinated with groove and tognue type Light trabses
CN112796514A (en) Masonry corner constructional column template shaping and reinforcing device and construction method
CN214614813U (en) Steel wire mesh grouting material curb plate exempts from to tear open mould steel bar truss superimposed shear wall
CN110984396A (en) Rear-mounted anchor net and operation method thereof
CN210563363U (en) Pouring template without tie bar hole
CN208777758U (en) A kind of steel roof truss lower boom reinforcing device
CN108442545B (en) Middle-buried rubber water stop clamp, clamping system and construction method thereof
CN200985510Y (en) Anchored exterior-protected construction
CN215978589U (en) Masonry structure's prefabricated wallboard reinforced structure
CN104975714B (en) Construction method for reserved hidden bracket template of concrete floor of factory building
CN204940845U (en) A kind of with the formwork reinforcement system of steel generation wood
CN103938731B (en) Combination joint of prefabricated concrete beam and round concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars
CN201343827Y (en) Clamping strip and clamping mesh skeleton
CN211898422U (en) Prefabricated high-strength waist beam with narrow fertilizer groove of foundation pit
CN210086888U (en) Newly-added shear wall structure for reinforcing old building frame beam
CN111910794A (en) Prefabricated wall structure connected by soft cables
CN211774620U (en) Horizontal component reinforcing bar location embedded groove
CN220928238U (en) Connection structure of steel bar truss floor carrier plate and concrete shear wall
CN212562004U (en) Wall steel skeleton mounted on ground beam
CN205617415U (en) Shaped steel integrated configuration floor equipment foundations

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20200410