CN210086888U - Newly-added shear wall structure for reinforcing old building frame beam - Google Patents

Newly-added shear wall structure for reinforcing old building frame beam Download PDF

Info

Publication number
CN210086888U
CN210086888U CN201920597993.3U CN201920597993U CN210086888U CN 210086888 U CN210086888 U CN 210086888U CN 201920597993 U CN201920597993 U CN 201920597993U CN 210086888 U CN210086888 U CN 210086888U
Authority
CN
China
Prior art keywords
shear wall
newly
frame beam
reinforcing mesh
original frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920597993.3U
Other languages
Chinese (zh)
Inventor
李映君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhong'an Construction Engineering Co Ltd
Original Assignee
Shandong Zhong'an Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhong'an Construction Engineering Co Ltd filed Critical Shandong Zhong'an Construction Engineering Co Ltd
Priority to CN201920597993.3U priority Critical patent/CN210086888U/en
Application granted granted Critical
Publication of CN210086888U publication Critical patent/CN210086888U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model provides a new shear wall structure for reinforcing old building frame beams, which comprises an original frame beam, a new shear wall reinforcing mesh, connecting ribs and a new shear wall; newly-added shear wall reinforcing mesh is embedded in the top surface and the bottom surface of the original frame beam; the bottom end of the newly-added shear wall reinforcing mesh is embedded into the top surface of the original frame beam, and the top end of the newly-added shear wall reinforcing mesh is bent towards two sides and then embedded into the original frame beam on the upper layer; connecting ribs are arranged in the original frame beam, the connecting ribs are arranged in two rows, extend through the original frame beam to a position between the upper layer of newly-increased shear wall reinforcing mesh and the lower layer of newly-increased shear wall reinforcing mesh, the two ends of each connecting rib are in a hook shape, and hook tips of the connecting ribs on the two sides are opposite; and the newly-added shear wall is poured on the newly-added shear wall reinforcing mesh and the connecting ribs.

Description

Newly-added shear wall structure for reinforcing old building frame beam
Technical Field
The utility model relates to a building reinforcement field especially relates to a consolidate newly-increased shear wall structure of old building frame roof beam.
Background
Many buildings built by adopting old-edition specifications seriously do not meet the requirements of the existing specifications on the earthquake resistance and load of the buildings, are damaged and structurally deformed to a certain extent after being used for a long time and foundation settlement and deformation, and need to be repaired and reinforced to meet the use requirements and ensure the safety of lives and properties. The old building restoration reinforcement engineering needs longer construction cycle, and influences the building normal use in the work progress, if the construction is improper, lead to aggravating the condition such as the building damages or not up to standard after the completion easily moreover and take place.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's defect and not enough, provide a consolidate new increase shear wall structure of old building frame roof beam, this structure is consolidated old building frame roof beam through new increase shear wall, and structural rigidity is strong, and antidetonation and bearing capacity satisfy the requirement. And the construction is simple and convenient.
In order to achieve the above object, the utility model adopts the following technical scheme: a newly-added shear wall structure for reinforcing an old building frame beam comprises an original frame beam, a newly-added shear wall reinforcing mesh, connecting ribs and a newly-added shear wall; original floor slabs are built on two sides of the top of the original frame beam, and newly-added shear wall reinforcing mesh is buried in the top surface and the bottom surface of the original frame beam; the bottom end of the newly-added shear wall reinforcing mesh is embedded into the top surface of the original frame beam, and the top end of the newly-added shear wall reinforcing mesh is bent towards two sides and then embedded into the original frame beam on the upper layer; tie bars are arranged between the newly-added shear wall reinforcing steel bar meshes, and two ends of each tie bar are tensioned between the newly-added shear wall reinforcing steel bar meshes on two sides in a hook shape and are welded and connected; the newly-added shear wall reinforcing mesh is welded and connected with additional tie bars at the bending position of the bottom surface of the original frame beam, and the additional tie bars are welded between the newly-added shear wall reinforcing meshes on the two sides; connecting ribs are arranged in the original frame beam, the connecting ribs are arranged in two rows, extend through the original frame beam to a position between the upper layer of newly-increased shear wall reinforcing mesh and the lower layer of newly-increased shear wall reinforcing mesh, the two ends of each connecting rib are in a hook shape, and hook tips of the connecting ribs on the two sides are opposite; and the newly-added shear wall is poured on the newly-added shear wall reinforcing mesh and the connecting ribs.
Preferably, a slope part corresponding to the bent part of the reinforcing mesh of the newly-added shear wall is arranged between the bottom surfaces of the original frame beams at the top end of the newly-added shear wall, and the slope ratio of the slope part is 6: 1.
the utility model has the advantages that: this structure is consolidated old building frame roof beam through newly-increased shear force wall, and structural rigidity is strong, and antidetonation and bearing capacity satisfy the requirement. And the construction is simple and convenient.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the principles of the invention.
Fig. 1 is a schematic view of a structure of a newly added shear wall.
Wherein: 1 is an original frame beam, 11 is an original floor, 2 is a newly-added shear wall reinforcing mesh, 21 is a tie bar, 22 is an additional tie bar, 3 is a connecting bar, and 4 is a newly-added shear wall.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in the figure, the newly-added shear wall structure for reinforcing the old building frame beam comprises an original frame beam 1, a newly-added shear wall reinforcing mesh 2, connecting ribs 3 and a newly-added shear wall 4; original floor boards 11 are built on two sides of the top of the original frame beam 1, and newly-added shear wall reinforcing mesh 2 is buried on the top surface and the bottom surface of the original frame beam 1; the bottom end of the newly-added shear wall reinforcing mesh 2 is embedded into the top surface of the original frame beam 1, and the top end of the newly-added shear wall reinforcing mesh 2 is bent towards two sides and then embedded into the original frame beam 1 on the upper layer; the tie bars 21 are arranged between the newly-added shear wall reinforcing steel bar meshes 2, and two ends of each tie bar 21 are fastened between the newly-added shear wall reinforcing steel bar meshes 2 on two sides in a hook shape and are welded and connected; the newly-added shear wall reinforcing mesh 2 is welded and connected with additional tie bars 22 at the bending positions of the bottom surface of the original frame beam 1, and the additional tie bars 22 are welded between the newly-added shear wall reinforcing meshes 2 on the two sides; the original frame beam 1 is internally provided with connecting ribs 3, the connecting ribs 3 are arranged in two rows, the connecting ribs 3 penetrate through the original frame beam 1 and extend to the position between the upper layer and the lower layer of the newly-increased shear wall reinforcing mesh 2, two ends of each connecting rib 3 are in a hook shape, and hook tips of the connecting ribs 3 on two sides are opposite; and the newly-added shear wall 4 is poured on the newly-added shear wall reinforcing mesh 2 and the connecting ribs 3.
In specific implementation, a slope part corresponding to the bent part of the reinforcing mesh 2 of the newly added shear wall is arranged between the bottom surfaces of the original frame beams 1 at the top ends of the newly added shear walls 4, and the slope ratio of the slope part is 6: 1.
in actual operation, concrete is poured in the horn mouth formed in the bottom of the original frame beam 1, the joint surfaces of new and old concrete at the bottom of the original frame beam 1 are roughened, an interface agent is brushed for treatment, and the new and old concrete are required to be tightly combined.

Claims (2)

1. The utility model provides a reinforce newly-increased shear wall structure of old building frame roof beam which characterized in that: the novel shear wall comprises an original frame beam, a newly-added shear wall reinforcing mesh, connecting ribs and a newly-added shear wall; original floor slabs are built on two sides of the top of the original frame beam, and newly-added shear wall reinforcing mesh is buried in the top surface and the bottom surface of the original frame beam; the bottom end of the newly-added shear wall reinforcing mesh is embedded into the top surface of the original frame beam, and the top end of the newly-added shear wall reinforcing mesh is bent towards two sides and then embedded into the original frame beam on the upper layer; tie bars are arranged between the newly-added shear wall reinforcing steel bar meshes, and two ends of each tie bar are tensioned between the newly-added shear wall reinforcing steel bar meshes on two sides in a hook shape and are welded and connected; the newly-added shear wall reinforcing mesh is welded and connected with additional tie bars at the bending position of the bottom surface of the original frame beam, and the additional tie bars are welded between the newly-added shear wall reinforcing meshes on the two sides; connecting ribs are arranged in the original frame beam, the connecting ribs are arranged in two rows, extend through the original frame beam to a position between the upper layer of newly-increased shear wall reinforcing mesh and the lower layer of newly-increased shear wall reinforcing mesh, the two ends of each connecting rib are in a hook shape, and hook tips of the connecting ribs on the two sides are opposite; and the newly-added shear wall is poured on the newly-added shear wall reinforcing mesh and the connecting ribs.
2. The add-on shear wall structure for reinforcing an old building frame beam as set forth in claim 1, wherein: a section of slope part corresponding to the bent part of the reinforcing mesh of the newly-added shear wall is arranged between the bottom surfaces of the original frame beams at the top end of the newly-added shear wall, and the slope ratio of the slope part is 6: 1.
CN201920597993.3U 2019-04-28 2019-04-28 Newly-added shear wall structure for reinforcing old building frame beam Expired - Fee Related CN210086888U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920597993.3U CN210086888U (en) 2019-04-28 2019-04-28 Newly-added shear wall structure for reinforcing old building frame beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920597993.3U CN210086888U (en) 2019-04-28 2019-04-28 Newly-added shear wall structure for reinforcing old building frame beam

Publications (1)

Publication Number Publication Date
CN210086888U true CN210086888U (en) 2020-02-18

Family

ID=69476339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920597993.3U Expired - Fee Related CN210086888U (en) 2019-04-28 2019-04-28 Newly-added shear wall structure for reinforcing old building frame beam

Country Status (1)

Country Link
CN (1) CN210086888U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115467552A (en) * 2022-09-27 2022-12-13 北京建工四建工程建设有限公司 Concrete pouring construction method for newly-added shear wall under existing beam in house construction engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115467552A (en) * 2022-09-27 2022-12-13 北京建工四建工程建设有限公司 Concrete pouring construction method for newly-added shear wall under existing beam in house construction engineering
CN115467552B (en) * 2022-09-27 2023-10-24 北京建工四建工程建设有限公司 Concrete pouring construction method for newly-added shear wall under existing beam in house construction engineering

Similar Documents

Publication Publication Date Title
CN105715068B (en) Existing brick mix structure shock isolating pedestal underpinning structure and its construction method
CN104060761B (en) U-shaped steel concrete combination beam and construction method thereof
CN105569224A (en) Concrete-filled steel tube edge restraint overlapping integrated shear wall and preparing and installation methods thereof
CN204060020U (en) A kind of Reinforced Concrete Reinforcement structure
CN109653350B (en) Mixed reinforcement embedded low-prestress dry beam column node and method
CN103195259A (en) Foam concrete prefabricated slab and method for reinforcing concrete structure by same
CN106088657A (en) Reinforcing structure of empty bucket wall and construction method thereof
CN210086888U (en) Newly-added shear wall structure for reinforcing old building frame beam
CN108360690B (en) Column cap connection reinforced beam slab structure
CN108643395B (en) Prefabricated assembly type prestress self-resetting shear wall structure and construction method thereof
KR101358878B1 (en) Reinforcement member and girder using the same
CN111749364B (en) Assembled composite wall based on C-shaped steel and construction method thereof
CN219548480U (en) Existing building structure beam column node anchor reinforcing apparatus
CN210032720U (en) Reinforced structure of old building frame corner post
CN216338993U (en) Longitudinal joint for steel-UHPC (ultra high performance concrete) assembled pi-shaped combination beam
CN216840803U (en) Temporary support structure for replacing shear wall concrete
CN105888282B (en) A kind of seismic reinforcing structure and method that big hole is opened for transformer station's masonry wall
CN211714180U (en) Assembled concrete frame structure
CN112575891B (en) Low-seismic-loss beam column node based on waveform BFRP connecting plate
CN104675138A (en) Method and structure for reinforcing modified sound-insulation and noise-reduction slab balcony
CN114635503A (en) Fair-faced concrete wall flexibly connected with concrete frame column and construction method
CN104878756A (en) Sand-filling hollow structure based cast-in-place special-shaped pile construction method
CN208717939U (en) A kind of efficiently molding building hoist foundation structure
CN207998964U (en) The assembled floorslab with bars of reserved anchor hole and horse tooth trough overlap edge construction
CN105113636A (en) Connecting structure of crane beam and bracket and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200218

CF01 Termination of patent right due to non-payment of annual fee