CN214497975U - Mounting structure of hoist and mount wallboard - Google Patents

Mounting structure of hoist and mount wallboard Download PDF

Info

Publication number
CN214497975U
CN214497975U CN202022705329.1U CN202022705329U CN214497975U CN 214497975 U CN214497975 U CN 214497975U CN 202022705329 U CN202022705329 U CN 202022705329U CN 214497975 U CN214497975 U CN 214497975U
Authority
CN
China
Prior art keywords
hanging
adjusting
wallboard
sliding groove
mounting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202022705329.1U
Other languages
Chinese (zh)
Inventor
丁欣欣
丁泽成
王文广
周东珊
姜凯庭
余广
高宇臻
林显杨
董陆慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN202022705329.1U priority Critical patent/CN214497975U/en
Application granted granted Critical
Publication of CN214497975U publication Critical patent/CN214497975U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a mounting structure for hoisting wall boards, which comprises a hanging chute with adjustable height, a keel supporting bar and a wall board clamping device; the height-adjustable hanging chute comprises an adjusting hanging head and a hanging chute which are rotatably connected; the adjusting hanging head comprises a hanging plate, an adjusting rod and a mounting seat; the adjusting rod is arranged on the adjusting hanging head and is abutted against the hanging sliding groove, so that the rotating angle of the adjusting hanging head and the hanging sliding groove can be fixed; the bottom of the hanging sliding chute is provided with a through T-shaped slideway along a long shaft; the keel supporting bar is arranged on the side surface of the hanging sliding groove; the top of the wallboard clamping device is in sliding connection with the hanging sliding groove, and the bottom of the wallboard clamping device is provided with a clamping groove. The utility model discloses a mounting structure of hoist and mount wallboard, at the prefabricated on-the-spot installation of mill, and use the hoist and mount to break away from the roughness requirement of ground and wall, use fossil fragments to support, bearing capacity is strong.

Description

Mounting structure of hoist and mount wallboard
Technical Field
The utility model belongs to the decoration field, concretely relates to mounting structure of hoist and mount wallboard.
Background
Wallboard installation generally falls into two modes: the traditional construction mode has serious field pollution, high noise and low installation efficiency in the traditional installation and assembly installation; taking conventional wallboard installation as an example, traditional installation form does not have too much requirement to ground, directly lay the subsides on the institute wall can, but need the daub to absorb the error of wall unevenness, just can produce environmental pollution in the work progress. If the common assembly type installation is adopted, although the environmental pollution and the noise can be greatly reduced, the method still has the following disadvantages: the assembled wallboard is installed as an example, because the wallboard installation mainly depends on the bearing effect of the ground to the wallboard, so whether to level ground just has very high requirement, so when using assembled part article, need make level again to the ground of unevenness and handle, make level to ground promptly in the civil engineering work process, nevertheless so the actual completion quality still can't guarantee. Although the invention patent with the publication number of CN104929297A uses a combined ceiling structure, the structure is complex, and the ceiling is supported by the combined ceiling structure, so the safety factor is low.
SUMMERY OF THE UTILITY MODEL
Based on the above-mentioned shortcoming and insufficiency that exist among the prior art, one of the objects of the present invention is to solve at least one or more of the above-mentioned problems existing in the prior art, in other words, one of the objects of the present invention is to provide a mounting structure of a hoisting wall panel that satisfies one or more of the above-mentioned needs.
In order to achieve the purpose of the utility model, the utility model adopts the following technical scheme:
the utility model provides a mounting structure of hoist and mount wallboard which characterized in that includes:
the height-adjustable hanging sliding chute, the keel supporting bar and the wallboard clamping device are arranged on the wall body;
the height-adjustable hanging chute comprises an adjusting hanging head and a hanging chute which are rotatably connected; the adjusting hanging head comprises a hanging plate, an adjusting rod and a mounting seat; the hanging plate is fixedly connected with the mounting seat; the middle part of the hanging plate is provided with a rotating shaft base which is folded and protrudes downwards, the rotating shaft base is attached to the outer wall of the hanging sliding groove, and is provided with corresponding rotating shaft holes which are penetrated by a rotating shaft; the adjusting rod is arranged on the adjusting hanging head and is abutted against the hanging sliding groove, so that the rotating angle of the adjusting hanging head and the hanging sliding groove can be fixed; the bottom of the hanging sliding chute is provided with a through T-shaped slideway along a long shaft;
the keel supporting bar is arranged on the side surface of the hanging sliding groove;
the top of the wallboard clamping device is in sliding connection with the hanging sliding groove, and the bottom of the wallboard clamping device is provided with a clamping groove.
According to the utility model discloses an in the preferred embodiment, the regulation hole has been seted up on the hang-mounting board, it is the screw rod to adjust the pole, through adjust the adjustable spiro union of hole in adjust the hole.
In a preferred embodiment according to the invention, the adjusting lever is provided with a rotary handle.
In a preferred embodiment of the present invention, the hanging sliding groove is provided with a semicircular sinking groove at a position where the hanging sliding groove is attached to the rotating shaft base, and the rotating shaft base sinks into the sinking groove and can freely rotate therein.
In a preferred embodiment according to the present invention, the keel support strip covers the spindle base and the sink groove; the pivot runs through fossil fragments support bar, pivot base and heavy groove simultaneously.
In a preferred embodiment according to the present invention, the keel support strip is provided with a long circular hole extending vertically, and the keel support strip is fixed to the side of the chute body through the long circular hole.
In a preferred embodiment according to the present invention, the mounting seat comprises a hanger seat vertically mounted on the hanger plate.
In a preferred embodiment according to the present invention, the mounting seat comprises a mounting hole transversely arranged on the top of the hanging plate.
In a preferred embodiment of the present invention, the cross section of the T-shaped chute is a T-shape with downwardly extending slits at both ends of the top.
Compared with the prior art, the utility model, beneficial effect is:
the installation structure of the hoisting wallboard of the utility model is installed in the factory prefabrication site, the installation efficiency is high, and the site is pollution-free; the hoisting fixation is adopted to cancel the strong correlation that the wall surface is leveled by the ground, so that the requirement on the ground flatness is avoided, the ground slope finding is convenient, and the top frame can be adjusted to ensure that the top surface is straight after the slope finding; the flatness of the hanging wallboard mainly depends on the height of the hanging rod, and the hanging wallboard is completely separated from the strong correlation of the ground and does not require the flatness of the ground; the wall surface and the ceiling bear the load at the same time, so that the safety coefficient is high; the wallboard is slidably connected into the hoisting piece through the clamping piece, so that the wallboard is fast to install and convenient to disassemble; the ceiling has abundant top space, a hoisting structure can be hidden after finishing decoration, and the joint part of a hoisting wall surface and the top surface is closed; the integral installation effect is easy to guarantee, and the hoisting installation quality is high.
Drawings
Fig. 1 is a schematic structural diagram of an installation structure of a hoisting wallboard in embodiment 1 of the present invention;
fig. 2 is a side view of a mounting structure for hoisting wall panels according to embodiment 1 of the present invention;
fig. 3 is a structural diagram of an adjusting hanging head of a mounting structure for hoisting wall boards according to embodiment 1 of the present invention;
fig. 4 is a structural diagram of an adjusting rod of a mounting structure for hoisting wall boards according to embodiment 1 of the present invention;
fig. 5 is a structural diagram of a hanging chute of an installation structure for hoisting wall boards according to embodiment 1 of the present invention;
fig. 6 is a structural view of a keel supporting bar of a mounting structure for hoisting wall boards according to embodiment 1 of the present invention;
fig. 7 is a structural diagram of a wallboard clamping device of a mounting structure for hoisting wallboards in embodiment 1 of the present invention.
Detailed Description
In order to more clearly illustrate the embodiments of the present invention, the following description will explain embodiments of the present invention with reference to the accompanying drawings. It is obvious that the drawings in the following description are only examples of the invention, and that for a person skilled in the art, other drawings and embodiments can be obtained from these drawings without inventive effort.
Example 1: as shown in fig. 1 and 2, according to the utility model discloses a mounting structure of hoist and mount wallboard, its major structure comprises regulation hanging head 1, hanging spout 2 and fossil fragments support bar 3. The structure of the adjusting hanging head is shown in fig. 3, which is a strip-shaped main body, the middle part of which is provided with a columnar hanging rod seat 11 with threads inside, a hanging rod can be screwed into the hanging rod seat, and the adjusting hanging head is suspended under a ceiling so as to realize the hanging separated from the ground. The positions on the middle line of the adjusting hanging head, which are away from the two ends 1/4, are respectively provided with two adjusting holes, wherein the penetrating type screw joint is provided with an adjusting rod 12, and the structure of the adjusting rod is shown in figure 4 and is a screw rod with a hexagonal socket at the top end. The two sides of the middle part of the adjusting hanging head are provided with rotating shaft bases which are folded and protrude downwards, the tail ends of the rotating shaft bases are semicircular, and rotating shaft holes are formed in the circle center positions.
Hanging dress spout 2 As the structure figure 5 shows, for there is the open-ended bar of T shape bottom, has semicircular heavy groove 21 in hanging dress spout middle section side and pivot base assorted position, heavy groove diameter is greater than pivot base end diameter, and the degree of depth is greater than pivot base thickness, and the heavy groove centre of a circle department opens the shaft hole that has a perfect understanding, and when will adjusting the head of hanging dress and hanging dress spout and match, the pivot can run through pivot base and hang the shaft hole on the dress spout and will adjust the head of hanging dress and hang the dress spout and rotate and be connected. The bottom end of the adjusting rod 12 is tightly abutted to the hanging sliding groove, the screw rod can be screwed to sink through the hexagonal groove in the top end, and the included angle between the adjusting rod and the hanging head is changed and adjusted by abutting against the hanging sliding groove. The bottom of the hanging sliding groove is also provided with a T-shaped slideway which penetrates through the hanging sliding groove along the long axis of the hanging sliding groove, and the cross section of the T-shaped slideway is in a T shape, wherein two ends of the top of the T-shaped slideway are provided with downwardly extending openings.
The keel support bar 3 is in an L-shaped long bar structure as shown in fig. 6, and two long round holes and a rotating shaft hole are formed in one side of the keel support bar. The connection mode of the hanging and installing chute is shown in figures 1 and 2, the keel support strip is fixed on the side face of the hanging and installing chute through the oblong hole, when the keel support strip is fixed, the middle position of the keel support strip can cover the rotating shaft base and the sinking groove, the rotating shaft penetrates through the keel support strip, the hanging and installing chute and the rotating shaft hole in the middle of the adjusting hanging pile head to rotatably connect the keel support strip, the hanging and installing chute and the sinking groove, and the fixed angle of the keel support strip can be adjusted through the oblong hole.
The structure of the wallboard clamping device is as shown in fig. 7, and the wallboard clamping device is integrally formed by extrusion, wherein the upper half part is a sliding rail part, and the lower half part is a clamping part; the cross section of the slide rail part corresponds to the shape of a slide rail at the bottom of a hung slide rail, the clamping part at the lower half part is provided with two side walls with opposite positions, a wallboard can be clamped between the two side walls, three fastening holes are uniformly distributed on one side wall, and the fastening holes are formed by counter bores so as to ensure the attractiveness. After the wallboard centre gripping was between the both sides wall, twisted the screw in fastening hole to die the wallboard lock, later with slide rail portion cunning insert hang dress in the T type slide of spout.
When the actual wallboard is installed, insert the jib that has the screw thread earlier and hang the device wholly under the ceiling behind the jib seat, change the angle of dress spout for adjusting the dress head of hanging through changing the degree of depth of each regulation pole screw in to make the dress spout of hanging keep the level, thereby the fossil fragments support bar also closely supports on the house fossil fragments horizontally through changing the angle of self for the dress spout of hanging through the height of change screw on the slotted hole, provides and supports steadily. After the wallboard is inserted into the wallboard clamping device, the screw is screwed into the fastening hole to lock the wallboard, and then the wallboard clamping device is connected into the hanging device sliding groove in a sliding mode to complete the hoisting of the wallboard. If the installation is needed, the hoisting structure can be hidden, and the opening is closed at the joint of the hoisting wall surface and the top surface. The device integrally breaks away from the requirement on the ground flatness through the arrangement, so that the hoisting can be always kept smooth, and the installation process is convenient and fast, and the structure is simple.
Example 2: according to the utility model discloses an in another embodiment of a but height-adjusting's hanging dress spout, adjust and hang dress headtop portion and still have two bulges of equipartition, be equipped with the mounting hole towards the wall on the bulge, transversely run through by the screw. So arrange and to use horizontal mounting hole to hoist and mount to the wall when the jib hoists the ceiling, use the common bearing of wall and furred ceiling, factor of safety is higher.
Other structures can refer to embodiment 1.
Example 3: in another embodiment of a hanging sliding chute according to the present invention, the top end of the adjusting rod is not recessed with a hexagon socket, but is provided with a protruding handle having a horizontal elongated shape, and the adjusting rod can be twisted by a human hand without using an installation tool.
Other structures can refer to embodiment 1.
It should be noted that the above embodiments can be freely combined as necessary. The foregoing has been a detailed description of the preferred embodiments and principles of the present invention, and it will be apparent to those skilled in the art that variations may be made in the specific embodiments based on the concepts of the present invention, and such variations are considered as within the scope of the present invention.

Claims (9)

1. The utility model provides a mounting structure of hoist and mount wallboard which characterized in that includes:
the height-adjustable hanging sliding chute, the keel supporting bar and the wallboard clamping device are arranged on the wall body;
the height-adjustable hanging chute comprises an adjusting hanging head and a hanging chute which are rotatably connected; the adjusting hanging head comprises a hanging plate, an adjusting rod and a mounting seat; the hanging plate is fixedly connected with the mounting seat; the middle part of the hanging plate is provided with a rotating shaft base which is folded and protrudes downwards, the rotating shaft base is attached to the outer wall of the hanging sliding groove, and is provided with corresponding rotating shaft holes which are penetrated by a rotating shaft; the adjusting rod is arranged on the adjusting hanging head and is abutted against the hanging sliding groove, so that the rotating angle of the adjusting hanging head and the hanging sliding groove can be fixed; the bottom of the hanging sliding chute is provided with a through T-shaped slideway along a long shaft;
the keel supporting bar is arranged on the side surface of the hanging sliding groove;
the top of the wallboard clamping device is in sliding connection with the hanging sliding groove, and the bottom of the wallboard clamping device is provided with a clamping groove.
2. The mounting structure of hoisting wallboard of claim 1, wherein the hanging plate is provided with an adjusting hole, the adjusting rod is a screw rod, and the screw rod is adjustably screwed in the adjusting hole through the adjusting hole.
3. A mounting structure for hanging wall board as claimed in claim 2, wherein said adjusting lever is mounted with a rotary handle.
4. The mounting structure of a hanging wallboard as claimed in claim 1, wherein the hanging sliding groove is provided with a semicircular sinking groove at a position where it is attached to the rotating shaft base, and the rotating shaft base sinks into the sinking groove and can freely rotate therein.
5. The installation structure of hoisting wall board according to claim 4, wherein the keel support strip covers the rotating shaft base and the sinking groove; the pivot runs through fossil fragments support bar, pivot base and heavy groove simultaneously.
6. The installation structure of a hoisting wallboard according to claim 1, wherein the keel support strip is provided with a vertically elongated slotted hole, and the keel support strip is fixed on the side surface of the chute body through the slotted hole.
7. A mounting structure for lifting wall panels as claimed in claim 1, wherein said mounting seats comprise hanger seats vertically mounted on the hanger plate.
8. A mounting structure for hanging up wall board according to claim 1, wherein said mounting seat comprises mounting holes transversely arranged on the top of the hanging up plate.
9. A mounting structure for hanging wall board as claimed in claim 1, wherein the cross section of the T-shaped slideway is T-shaped with downwardly extending slits at both ends of the top.
CN202022705329.1U 2020-11-20 2020-11-20 Mounting structure of hoist and mount wallboard Withdrawn - After Issue CN214497975U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022705329.1U CN214497975U (en) 2020-11-20 2020-11-20 Mounting structure of hoist and mount wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022705329.1U CN214497975U (en) 2020-11-20 2020-11-20 Mounting structure of hoist and mount wallboard

Publications (1)

Publication Number Publication Date
CN214497975U true CN214497975U (en) 2021-10-26

Family

ID=78206482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022705329.1U Withdrawn - After Issue CN214497975U (en) 2020-11-20 2020-11-20 Mounting structure of hoist and mount wallboard

Country Status (1)

Country Link
CN (1) CN214497975U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112443058A (en) * 2020-11-20 2021-03-05 浙江亚厦装饰股份有限公司 Mounting structure and mounting method for hoisting wall board

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112443058A (en) * 2020-11-20 2021-03-05 浙江亚厦装饰股份有限公司 Mounting structure and mounting method for hoisting wall board
CN112443058B (en) * 2020-11-20 2024-06-21 浙江亚厦装饰股份有限公司 Mounting structure and mounting method of hoisting wallboard

Similar Documents

Publication Publication Date Title
CN214497975U (en) Mounting structure of hoist and mount wallboard
CN210395967U (en) Building exterior finish decorative board mounting structure
CN214785243U (en) Light steel keel convenient for ceiling installation
CN210177780U (en) High light gauge steel of security
CN216196255U (en) Assembled decorative wallboard structure
CN214497989U (en) Hanging sliding groove with adjustable height
CN212507005U (en) Device for decoration suspended ceiling
CN112443058A (en) Mounting structure and mounting method for hoisting wall board
CN214615182U (en) Adjusting hanging head
CN217517927U (en) Drop level furred ceiling structure
CN213868520U (en) Light steel keel frame with stable structure for indoor suspended ceiling
CN212336452U (en) Full glass curtain wall suspended structure
CN214329540U (en) Double-deck molding furred ceiling system of indoor metal sheet
CN112459305B (en) Hanging sliding groove with adjustable height
CN212137033U (en) Photovoltaic lightning combiner box installing support
CN204781500U (en) Stone material curtain pendant bolt regulation mechanism
CN211899147U (en) Unit curtain wall switching system easy for small space side hanging three-dimensional adjustment
CN212012005U (en) Environment-friendly crane span structure that antidetonation effect is good
CN206289817U (en) The mounting structure of curtain wall in a kind of adjustable stone material room
CN210536212U (en) Bracket arm for cable bridge and cable bridge with same
CN216305241U (en) Wall dalle hangs device futilely
CN219671827U (en) Keel support for building decoration
CN219992822U (en) Assembly type energy-saving curtain wall mounting assembly
CN216766461U (en) Suspended ceiling structure convenient to installation
CN211257652U (en) House decoration pendant installation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20211026

Effective date of abandoning: 20240621

AV01 Patent right actively abandoned

Granted publication date: 20211026

Effective date of abandoning: 20240621