CN212507005U - Device for decoration suspended ceiling - Google Patents

Device for decoration suspended ceiling Download PDF

Info

Publication number
CN212507005U
CN212507005U CN202020957041.0U CN202020957041U CN212507005U CN 212507005 U CN212507005 U CN 212507005U CN 202020957041 U CN202020957041 U CN 202020957041U CN 212507005 U CN212507005 U CN 212507005U
Authority
CN
China
Prior art keywords
midair
suspension
arm
suspends
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020957041.0U
Other languages
Chinese (zh)
Inventor
尹晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Provincial College of Communications
Original Assignee
Liaoning Provincial College of Communications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Provincial College of Communications filed Critical Liaoning Provincial College of Communications
Priority to CN202020957041.0U priority Critical patent/CN212507005U/en
Application granted granted Critical
Publication of CN212507005U publication Critical patent/CN212507005U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mirrors, Picture Frames, Photograph Stands, And Related Fastening Devices (AREA)

Abstract

The utility model discloses a device is used to fitment furred ceiling, including spout piece, suspended structure and clamping structure, vertical slidable mounting has suspended structure in the spout piece, and suspended structure's bottom installs clamping structure, and suspended structure includes the slider, suspends the arm in midair and suspends the screw rod in midair, and vertical welding has the arm in midair on the bottom surface of slider, and the perpendicular cross sectional shape that suspends the arm in midair is L shape, and suspends the bottom horizontal plane of arm in midair on vertical screw thread run through install suspend the screw rod in midair, suspend the bottom of screw rod in midair and install clamping structure. The utility model discloses when can conveniently install the use fast, be convenient for change the height of furred ceiling according to the furred ceiling demand, improve the connection steadiness to the hanger plate to improve the flexibility of installation effectiveness and regulation.

Description

Device for decoration suspended ceiling
Technical Field
The utility model relates to a fitment furred ceiling technical field especially relates to a device is used to fitment furred ceiling.
Background
The furred ceiling is a decoration of house living environment's top fitment, simple saying, just indicate the decoration of ceiling, be one of the important part of interior decoration, the installation of current decoration engineering furred ceiling aluminum plate fossil fragments support is all through expansion bolts installation, it is comparatively loaded down with trivial details to install, the installation effectiveness is lower, it is inconvenient to adjust in the later stage, current pre-buried spout technique is ripe gradually, traditional expansion bolts's mounting means has been replaced, make things convenient for the later stage to adjust the use, but can not change the height of furred ceiling according to the furred ceiling demand in the current furred ceiling frame, the fixed joint furred ceiling board in later stage is insecure.
Therefore, a device for decorating a ceiling is needed, which can be conveniently and quickly installed and used, and is convenient for changing the height of the ceiling according to the ceiling requirement, so that the connection stability of the hanging plate is improved, and the installation efficiency and the adjustment flexibility are improved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a device is used to fitment furred ceiling aims at improving the height that can not change the furred ceiling according to the furred ceiling demand in the current furred ceiling frame, the insecure problem of joint furred ceiling board in later stage.
The utility model discloses a realize like this:
the utility model provides a fitment is device for furred ceiling, includes the spout piece, suspends structure and centre gripping structure in midair, vertical slidable mounting has suspension structure in the spout piece, and suspension structure's bottom installs centre gripping structure, suspension structure includes the slider, suspends the arm in midair and suspends the screw rod in midair, and vertical welding has suspension arm in midair on the bottom surface of slider, suspension arm's vertical cross sectional shape is L shape, and suspend vertical screw thread on the bottom horizontal plane of arm in midair and run through and install suspension screw rod, suspension structure is installed to suspension screw rod's bottom.
Furthermore, the clamping structure comprises a clamping frame and an insertion rod which are of a U-shaped structure, the upper end and the lower end of the opening end of the clamping frame are both communicated with each other to form insertion holes, and the insertion rod is vertically inserted into the insertion holes of the clamping frame.
And then both ends all link up about the open end through clamping structure and centre gripping frame and have seted up the jack, and vertical grafting has the inserted bar in the jack of centre gripping frame, and convenient location runs through the support hanger plate to the fixed connection suspends the hanger plate in midair.
Furthermore, the top of inserted bar is established and is installed the answer spring, and the bottom welding of answer spring is on the top surface of centre gripping frame.
And then establish through the top cover of inserted bar and install the answer spring, and the bottom welding of answering the spring is on the top surface of centre gripping frame, makes things convenient for the later stage to compress tightly to run through the hanger plate, improves the stability of connecting.
Furthermore, the bottom end of the suspension screw is rotatably provided with a bearing, and the bottom end of the bearing is welded on the top surface of the clamping frame.
And then rotate through the bottom that suspends the screw rod and install the bearing, and the bottom welding of bearing is on the top surface of centre gripping frame, makes things convenient for the later stage to rotate the screw rod that suspends in midair, changes and suspends in midair the height, promotes the stability of adjusting.
Furthermore, a sliding groove is formed in the bottom surface of the sliding groove block, and a positioning hole plate is vertically welded on the top surface of the sliding groove block.
And then seted up the spout on the bottom surface through the spout piece, there is suspension structure through vertical slidable mounting in the spout piece, and then makes things convenient for the later stage according to the installation demand, adjusts suspension structure's relative spacing and distance, and vertical welding has the locating hole board on the top surface of spout piece, utilizes the locating hole board to fix with the reinforcing bar on building roof to convenient integrative spout piece and the wall of pouring.
Further, the sliding block is slidably mounted in a sliding groove of the sliding groove block.
And then seted up the spout on the bottom surface through the spout piece, through vertical slidable mounting in the spout piece have suspension structure, and then make things convenient for the later stage according to the installation demand, adjust suspension structure's relative interval and distance.
Compared with the prior art, the beneficial effects of the utility model are that: when the device for the decoration ceiling is used for quickly installing and connecting the hanging plate, firstly, the sliding groove is arranged on the bottom surface of the sliding groove block, the suspension structure is vertically and slidably arranged in the sliding groove block, and further, the relative distance and the distance of the suspension structure can be conveniently adjusted at the later stage according to the installation requirement, and the positioning pore plate is vertically welded on the top surface of the sliding groove block and is fixed with the reinforcing steel bar of the building roof by utilizing the positioning pore plate, so that the sliding groove block and the wall surface can be conveniently and integrally poured, meanwhile, the suspension arm is vertically welded on the bottom surface of the sliding block in the suspension structure, the vertical cross section of the suspension arm is in an L shape, and the suspension screw is penetratingly arranged on the vertical thread on the horizontal plane at the bottom of the suspension arm, the suspension height can be conveniently adjusted at the later stage according to the installation height, the use flexibility is, vertical grafting has the inserted bar in the jack of centre gripping frame, convenient location runs through the support hanger plate, thereby the hanger plate is suspended in midair to fixed connection, the top cover of inserted bar is established simultaneously and is installed the answer spring, and the bottom welding of answering the spring is on the top surface of centre gripping frame, make things convenient for the later stage to compress tightly and run through the hanger plate, improve the stability of connecting, thereby in the time of can conveniently installing and using fast, be convenient for change the height of furred ceiling according to the furred ceiling demand, improve the connection steadiness to the hanger plate, thereby improve the flexibility of installation effectiveness and regulation.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the exploded structure of the present invention;
fig. 3 is a schematic structural view of a suspension structure and a clamping structure in an embodiment of the present invention;
fig. 4 is a schematic structural diagram of the chute block in the embodiment of the present invention.
In the figure: 1. a chute block; 11. positioning the orifice plate; 2. a suspension structure; 21. a slider; 22. a suspension arm; 23. a suspension screw; 24. a bearing; 3. a clamping structure; 31. a clamping frame; 32. inserting a rod; 33. a return spring.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, 2, 3 and 4, a device for decoration ceiling includes a chute block 1, a suspension structure 2 and a clamping structure 3, the suspension structure 2 is vertically and slidably installed in the chute block 1, the clamping structure 3 is installed at the bottom end of the suspension structure 2, the suspension structure 2 includes a slider 21, a suspension arm 22 and a suspension screw 23, the suspension arm 22 is vertically welded on the bottom surface of the slider 21, the suspension arm 22 has an L-shaped vertical cross section, the suspension screw 23 is vertically threaded on the horizontal surface of the bottom of the suspension arm 22, and the clamping structure 3 is installed at the bottom end of the suspension screw 23.
When the device for decorating the ceiling is used and the ceiling is quickly installed and connected, firstly, a sliding groove is formed in the bottom surface of a sliding groove block 1, a suspension structure 2 is vertically and slidably installed in the sliding groove block 1, the relative distance and distance between the suspension structures 2 can be conveniently adjusted according to installation requirements in the later period, a positioning hole plate 11 is vertically welded on the top surface of the sliding groove block 1 and is fixed with a steel bar of a building roof by using the positioning hole plate 11, so that the sliding groove block 1 and the wall surface can be conveniently and integrally cast, meanwhile, a suspension arm 22 is vertically welded on the bottom surface of a sliding block 21 in the suspension structure 2, the vertical cross section of the suspension arm 22 is in an L shape, a suspension screw 23 is arranged on a horizontal plane at the bottom of the suspension arm 22 in a penetrating mode through vertical threads, the suspension height can be conveniently adjusted according to the installation requirements in the later period, the use flexibility is improved, and then, jacks are formed in, vertical grafting has inserted bar 32 in centre gripping frame 31's the jack, it runs through the support hanger plate to make things convenient for the location, thereby fixed connection suspends the hanger plate in midair, the top cover of inserted bar 32 is established simultaneously and is installed and reply spring 33, and the bottom welding that replies spring 33 is on centre gripping frame 31's top surface, make things convenient for the later stage to compress tightly and run through the hanger plate, the stability of connection is improved, thereby when can make things convenient for quick installation and use, be convenient for change the height of furred ceiling according to the furred ceiling demand, improve the connection steadiness to the hanger plate, thereby improve the flexibility of installation effectiveness and regulation.
Referring to fig. 3, the clamping structure 3 includes a clamping frame 31 having a U-shaped structure and an insertion rod 32, wherein the upper and lower ends of the opening end of the clamping frame 31 are both penetrated by insertion holes, and the insertion rod 32 is inserted into the insertion holes of the clamping frame 31.
And then both ends all link up about the open end through clamping structure 3 and centre gripping frame 31 and have seted up the jack, and vertical grafting has inserted bar 32 in the jack of centre gripping frame 31, and the convenient location runs through the support hanger plate to the fixed connection suspends the hanger plate in midair.
Referring to fig. 3, a return spring 33 is sleeved on the top of the insertion rod 32, and the bottom end of the return spring 33 is welded on the top surface of the clamping frame 31.
And then establish through the top cover of inserted bar 32 and install the answer spring 33, and the bottom welding of answering spring 33 is on the top surface of centre gripping frame 31, makes things convenient for the later stage to compress tightly to run through the hanger plate, improves the stability of connecting.
Referring to fig. 3, the bottom end of the suspension screw 23 is rotatably mounted with a bearing 24, and the bottom end of the bearing 24 is welded on the top surface of the clamping frame 31.
And then install bearing 24 through the bottom rotation of suspension screw 23, and the bottom welding of bearing 24 is on the top surface of centre gripping frame 31, makes things convenient for later stage to rotate suspension screw 23, changes and suspends the height in midair, promotes the stability of adjusting.
Referring to fig. 4, a sliding groove is formed on the bottom surface of the sliding groove block 1, and a positioning hole plate 11 is vertically welded on the top surface of the sliding groove block 1.
And then have seted up the spout on the bottom surface through the spout piece 1, have suspension structure 2 through vertical slidable mounting in the spout piece 1, and then make things convenient for the later stage according to the installation demand, adjust suspension structure 2's relative interval and distance, vertical welding has locating hole board 11 on the top surface of spout piece 1, utilizes locating hole board 11 fixed with the reinforcing bar on building roof to convenient integrative spout piece 1 and the wall of pouring.
Referring to fig. 1, a slider 21 is slidably mounted in a chute of a chute block 1.
And then seted up the spout on the bottom surface through the spout piece 1, there is suspension structure 2 through vertical slidable mounting in the spout piece 1, and then makes things convenient for the later stage according to the installation demand, adjusts suspension structure 2's relative interval and distance.
The working principle is as follows: when the device for decorating the suspended ceiling is used, the suspended ceiling is quickly installed and connected, firstly, a sliding groove is formed in the bottom surface of a sliding groove block 1, a suspension structure 2 is vertically and slidably installed in the sliding groove block 1, the relative distance and distance between the suspension structure 2 can be conveniently adjusted according to installation requirements in the later period, a positioning hole plate 11 is vertically welded on the top surface of the sliding groove block 1 and is fixed with a steel bar of a building roof by using the positioning hole plate 11, so that the sliding groove block 1 and the wall surface can be conveniently and integrally poured, meanwhile, a suspension arm 22 is vertically welded on the bottom surface of a sliding block 21 in the suspension structure 2, the vertical cross section of the suspension arm 22 is in an L shape, a suspension screw 23 is arranged on a horizontal plane at the bottom of the suspension arm 22 in a penetrating mode through vertical threads, the suspension height can be conveniently adjusted according to the requirements of the installation height in the later period, the use flexibility is improved, vertical grafting has inserted bar 32 in centre gripping frame 31's the jack, it runs through the support hanger plate to make things convenient for the location, thereby fixed connection suspends the hanger plate in midair, the top cover of inserted bar 32 is established simultaneously and is installed and reply spring 33, and the bottom welding that replies spring 33 is on centre gripping frame 31's top surface, make things convenient for the later stage to compress tightly and run through the hanger plate, the stability of connection is improved, thereby when can make things convenient for quick installation and use, be convenient for change the height of furred ceiling according to the furred ceiling demand, improve the connection steadiness to the hanger plate, thereby improve the flexibility of installation effectiveness and regulation.
The device that obtains through above-mentioned design has basically satisfied one kind and can conveniently install the use fast, is convenient for change the height of furred ceiling according to the furred ceiling demand, improves the connection steadiness to the hanger plate to improve the use of fitment furred ceiling device of the flexibility of installation effectiveness and regulation, nevertheless original purpose of further perfecting its function, the designer has carried out further improvement to the device.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a device is used to fitment furred ceiling, includes spout piece (1), suspended structure (2) and clamping structure (3), its characterized in that: vertical slidable mounting has suspension structure (2) in chute piece (1), and suspension structure's (2) bottom installs clamping structure (3), suspension structure (2) include slider (21), suspend in midair arm (22) and suspend screw (23) in midair, and vertical welding has suspension arm (22) on the bottom surface of slider (21), the vertical cross sectional shape that suspends arm (22) in midair is L shape, and suspends in midair screw (23) in midair in the vertical screw thread on the bottom horizontal plane of arm (22) and run through and install, clamping structure (3) are installed to the bottom that suspends screw (23) in midair.
2. The device for decorating the suspended ceiling is characterized in that the clamping structure (3) comprises a clamping frame (31) and an inserting rod (32) which are of a U-shaped structure, inserting holes are formed in the upper end and the lower end of the opening end of the clamping frame (31) in a penetrating mode, and the inserting rod (32) is vertically inserted into the inserting holes of the clamping frame (31).
3. A device for finishing a suspended ceiling according to claim 2, wherein the return spring (33) is installed to the top of the insertion rod (32) in a sleeved manner, and the bottom end of the return spring (33) is welded to the top surface of the holding frame (31).
4. A device for finishing a suspended ceiling according to claim 3, wherein the bottom end of the suspension screw (23) is rotatably mounted with a bearing (24), and the bottom end of the bearing (24) is welded to the top surface of the holding frame (31).
5. A device for decorating suspended ceiling according to claim 4, characterized in that the bottom surface of the sliding groove block (1) is provided with a sliding groove, and the top surface of the sliding groove block (1) is vertically welded with a positioning hole plate (11).
6. A device for finishing a suspended ceiling according to claim 5, characterised in that the slider (21) is slidably mounted in a runner of the runner block (1).
CN202020957041.0U 2020-05-31 2020-05-31 Device for decoration suspended ceiling Expired - Fee Related CN212507005U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020957041.0U CN212507005U (en) 2020-05-31 2020-05-31 Device for decoration suspended ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020957041.0U CN212507005U (en) 2020-05-31 2020-05-31 Device for decoration suspended ceiling

Publications (1)

Publication Number Publication Date
CN212507005U true CN212507005U (en) 2021-02-09

Family

ID=74391872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020957041.0U Expired - Fee Related CN212507005U (en) 2020-05-31 2020-05-31 Device for decoration suspended ceiling

Country Status (1)

Country Link
CN (1) CN212507005U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135043A (en) * 2021-12-13 2022-03-04 中建五局安装工程有限公司 Embedded sliding groove type suspended ceiling mounting structure and construction method
CN114263305A (en) * 2021-12-13 2022-04-01 中建五局安装工程有限公司 Suspended ceiling mounting structure, mounting equipment and construction method for dust-free workshop

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135043A (en) * 2021-12-13 2022-03-04 中建五局安装工程有限公司 Embedded sliding groove type suspended ceiling mounting structure and construction method
CN114263305A (en) * 2021-12-13 2022-04-01 中建五局安装工程有限公司 Suspended ceiling mounting structure, mounting equipment and construction method for dust-free workshop
CN114263305B (en) * 2021-12-13 2023-09-08 中建五局安装工程有限公司 Suspended ceiling mounting structure for dust-free workshop, mounting equipment and construction method

Similar Documents

Publication Publication Date Title
CN212507005U (en) Device for decoration suspended ceiling
CN205444782U (en) Install pendant structure of wall ceramic tile fast
CN212715608U (en) Ceiling keel structure of prefabricated building
CN216904136U (en) Connecting piece for cable bridge
CN215069150U (en) Support base capable of adjusting angle of flagpole
CN215106473U (en) Assembled suspended ceiling leveling system
CN214497975U (en) Mounting structure of hoist and mount wallboard
CN212104709U (en) Building curtain wall with high applicability
CN210532705U (en) Wall hanging structure
CN205276655U (en) Easy dismouting furred ceiling
CN201635228U (en) Novel flash rack ceiling system
CN206815733U (en) A kind of cladding assembled hanging element of ceramic tile
CN202170583U (en) Curtain wall plate back hanging system
CN200994170Y (en) Integrated support
CN216766461U (en) Suspended ceiling structure convenient to installation
CN205296541U (en) Suspended ceiling installation structure
CN214364634U (en) Adjustable hanging piece for mounting assembly type building envelope structural slab
CN209893510U (en) Suspension structure of electric heater
CN217268270U (en) Assembled suspended ceiling leveling system
CN215858510U (en) Fixing clamp for building ceiling integrated board
CN209653289U (en) A kind of metope of adjustable distance mounts frame
CN219120493U (en) Electric lighting lamp installation hanger for factory building
CN215888906U (en) Card inserting structure of assembled aluminum honeycomb ceiling
CN218911906U (en) Install curtain fast
CN214498053U (en) Decoration furred ceiling structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210209