CN214493421U - Bolt and nut packing device - Google Patents

Bolt and nut packing device Download PDF

Info

Publication number
CN214493421U
CN214493421U CN202023192347.0U CN202023192347U CN214493421U CN 214493421 U CN214493421 U CN 214493421U CN 202023192347 U CN202023192347 U CN 202023192347U CN 214493421 U CN214493421 U CN 214493421U
Authority
CN
China
Prior art keywords
bolt
workbench
nut
welded
storage hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023192347.0U
Other languages
Chinese (zh)
Inventor
姚惠芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jieke Power Machinery Equipment Co ltd
Original Assignee
Shenyang Jieke Power Machinery Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jieke Power Machinery Equipment Co ltd filed Critical Shenyang Jieke Power Machinery Equipment Co ltd
Priority to CN202023192347.0U priority Critical patent/CN214493421U/en
Application granted granted Critical
Publication of CN214493421U publication Critical patent/CN214493421U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Container Filling Or Packaging Operations (AREA)

Abstract

The utility model discloses a bolt and nut packing device, which relates to the technical field of metal element packing, and comprises a workbench and a bearing bottom frame welded at the bottom of the workbench, wherein a vertical frame is welded at the front end of the top of the workbench, a bolt storage hopper and a nut storage hopper are fixedly installed on the vertical frame from left to right in sequence, blanking pipelines are respectively welded at the bottom of the bolt storage hopper and the nut storage hopper, two discharging mechanisms are respectively arranged at one side of each blanking pipeline, a first conveying belt is installed at the rear end of the top of the workbench through a mounting groove and a fixing frame, a reserved through hole is formed at the front end of the mounting groove, and the reserved through hole is arranged on the workbench and is positioned at the bottoms of the two blanking pipelines; the utility model discloses, with bolt and nut's feeding, packing and ejection of compact integration installation, easy operation and packing process continuity are good, therefore bolt and nut packing machining efficiency improves greatly.

Description

Bolt and nut packing device
Technical Field
The utility model relates to a metal component packing technical field, in particular to bolt and nut packing plant.
Background
The nut is a nut, and is a part for fastening together with a bolt or a screw, and is a necessary element for all production and manufacturing machines. Nuts can be classified into carbon steel, stainless steel, non-ferrous metal (such as copper) and other types according to different materials. A bolt is a mechanical part and is a cylindrical threaded fastener matched with a nut.
The step of bolt and nut packaging is the last step in the production flow of bolts and nuts, and the machined and formed workpieces are wrapped by a packaging machine and are packaged in boxes for sale. Bolt and nut packing plant in the prior art separately sets up feed arrangement, packagine machine structure and storage device, and the structure is heavy, it is big to take up space, and the power consumption is high, and the operation is more inconvenient, and bolt and nut packing machining efficiency is comparatively low.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a bolt and nut packing plant can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a bolt and nut packaging device comprises a workbench and a bearing bottom frame welded at the bottom of the workbench, wherein the front end of the top of the workbench is welded with a vertical frame, a bolt storage hopper and a nut storage hopper are fixedly installed on the vertical frame from left to right in sequence, blanking pipelines are respectively welded at the bottom of the bolt storage hopper and the nut storage hopper, one side of each of the two blanking pipelines is provided with a discharging mechanism, the rear end of the top of the workbench is provided with a first conveying belt through a mounting groove and a fixing frame, the front end of the mounting groove is provided with a reserved through hole, the reserved through hole is formed in the workbench and is positioned at the bottom of the two blanking pipelines, an L-shaped mounting frame is welded at the central position of the bottom of the workbench, a packaging box lifting mechanism is fixedly installed on the L-shaped mounting frame, a hanging frame is also welded at the front end of the workbench, and a second conveying belt is fixedly installed at the bottom of the hanging frame, and the tail end of the second conveying belt is positioned at the front end of the packaging box lifting mechanism.
Preferably, discharge mechanism includes the pneumatic cylinder, and the pneumatic cylinder passes through the mounting bracket to be installed in unloading pipeline one side, the welding of pneumatic cylinder one side tailpiece of the piston rod end has the picture peg, and the picture peg cartridge in the unloading pipeline.
Preferably, packing carton hoist mechanism includes small-size electric lift pole, and small-size electric lift pole fixed mounting in L shape mount frame top, the welding of small-size electric lift pole top lift end has the crane, and the crane front side welding has the baffle.
Preferably, the top of one side of the reserved penetrating opening is further provided with an L-shaped baffle, and the L-shaped baffle is welded to the top of the workbench.
Preferably, the tail end of the second conveying belt is located at the front end of the lifting frame.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses, carry packing carton to packing carton hoist mechanism department through conveyer belt two, and packing carton hoist mechanism promotes the packing carton on the crane, finally pass and reserve the bottom that the mouth stops at two unloading pipelines, discharge mechanism on the steerable two unloading pipelines of staff opens, so that the bolt is deposited the nut in the hopper and the nut is deposited the nut blowing to the packing carton in the hopper, wait to load the nut and the bolt of specific quantity in the packing carton, discharge mechanism on the timely control two unloading pipelines closes, and close the packing carton top cap and put into conveyer belt one, carry the ejection of compact after accomplishing bolt and nut packing, finally realize whole bolt and nut packaging process feeding, packing and ejection of compact integration, easy operation and packaging procedure continuity are good, therefore bolt and nut packing machining efficiency improves greatly.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Figure 2 is the utility model discloses a crane and baffle connection diagram.
Fig. 3 is a top view of the working table of the present invention.
Fig. 4 is the internal structure diagram of the blanking pipeline of the utility model.
In the figure: 1. a work table; 2. a first conveying belt; 3. a hanger; 4. a blanking pipeline; 5. the nut storage hopper; 6. a bolt storage hopper; 7. erecting a frame; 8. an L-shaped baffle plate; 9. an L-shaped mounting bracket; 10. a small electric lifter; 11. a lifting frame; 12. a baffle plate; 13. a second conveying belt; 14. a load-bearing chassis; 15. reserving a through hole; 16. a hydraulic cylinder; 17. and (4) inserting plates.
Detailed Description
The present invention will be described in further detail with reference to the drawings, wherein like elements are designated by like reference numerals, wherein the terms "front", "rear", "left", "right", "upper" and "lower", "bottom" and "top" used in the following description refer to the orientation in the drawings, and the terms "inner" and "outer" refer to the orientation toward or away from the geometric center of a particular element, respectively.
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a bolt and nut packing device comprises a workbench 1 and a bearing bottom frame 14 welded at the bottom of the workbench 1, wherein a vertical frame 7 is welded at the front end of the top of the workbench 1, a bolt storage hopper 6 and a nut storage hopper 5 are fixedly installed on the vertical frame 7 from left to right in sequence, blanking pipelines 4 are respectively welded at the bottoms of the bolt storage hopper 6 and the nut storage hopper 5, discharging mechanisms are respectively arranged at one sides of the two blanking pipelines 4, a first conveying belt 2 is installed at the rear end of the top of the workbench 1 through a mounting groove and a fixing frame, a reserved through hole 15 is arranged at the front end of the mounting groove, the reserved through hole 15 is arranged on the workbench 1 and is positioned at the bottoms of the two blanking pipelines 4, an L-shaped mounting frame 9 is welded at the center position of the bottom of the workbench 1, and a packing box lifting mechanism is fixedly installed on the L-shaped mounting frame 9, the front end of the workbench 1 is further welded with a hanging bracket 3, a second conveying belt 13 is fixedly mounted at the bottom of the hanging bracket 3, and the tail end of the second conveying belt 13 is located at the front end of the packaging box lifting mechanism.
Referring to fig. 1 and 4, in order to facilitate the bolt storage hopper 6 and the bolt storage hopper 5 to appropriately discharge from the respective bottom discharge pipe 4, the discharging mechanism includes a hydraulic cylinder 16, the hydraulic cylinder 16 is installed on one side of the discharge pipe 4 through an installation frame, an insertion plate 17 is welded to a piston rod end on one side of the hydraulic cylinder 16, and the insertion plate 17 is inserted into the discharge pipe 4.
Referring to fig. 1, in order to lift the packing box conveyed on the second conveying belt 13 for performing bolt and nut packing operation by using the same, the packing box lifting mechanism includes a small electric lifting rod 10, the small electric lifting rod 10 is fixedly installed on the top of the L-shaped mounting frame 9, a lifting frame 11 is welded at the lifting end of the top of the small electric lifting rod 10, and a baffle plate 12 is welded on the front side of the lifting frame 11.
Referring to fig. 1 and 3, in order to prevent the bolt and nut discharged from the discharging pipe 4 from scattering toward the back side of the packing box, an L-shaped baffle 8 is further disposed at the top of one side of the reserved through hole 15, and the L-shaped baffle 8 is welded to the top of the workbench 1.
Referring to fig. 1, in order to facilitate the accurate transportation of the package box transported on the second conveyor belt 13 to the lifting frame 11 on the top of the small electric lifting rod 10, the tail end of the second conveyor belt 13 is located at the front end of the lifting frame 11.
The working principle is as follows: the second conveying belt 13 is started to convey the packaging box placed on the second conveying belt to the packaging box lifting mechanism, the small electric lifting rod 10 of the packaging box lifting mechanism works to lift the packaging box on the lifting frame 11, finally the packaging box passes through the reserved penetrating openings 15 to stay at the bottoms of the two blanking pipelines 4, and after the lifting frame 11 goes upwards, the baffle 12 at the front end of the lifting frame can shield the next packaging box to prevent the next packaging box from sliding off from the two tail ends of the second conveying belt; afterwards, the staff can control the hydraulic cylinders 16 on the two discharging pipelines 4 to pull the inserting plate 17 so as to open the two discharging pipelines 4, so that the nuts in the bolt storage hopper 6 and the nut storage hopper 5 are placed into the packaging box, when the specific number of nuts and bolts are loaded in the packaging box, the staff can control the hydraulic cylinders 16 on the two discharging pipelines 4 in time to pull the inserting plate 17 so as to close the two discharging pipelines 4, the top cover of the packaging box is closed and placed on the first conveying belt 2, and finally the discharging operation is carried out after the bolts and the nuts are packaged.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a bolt and nut packing plant, includes workstation (1) to and weld in the bearing chassis (14) of workstation (1) bottom, its characterized in that: the front end of the top of the workbench (1) is welded with a vertical frame (7), a bolt storage hopper (6) and a nut storage hopper (5) are sequentially and fixedly installed on the vertical frame (7) from left to right, blanking pipelines (4) are respectively welded at the bottoms of the bolt storage hopper (6) and the nut storage hopper (5), one sides of the two blanking pipelines (4) are respectively provided with a discharging mechanism, a first conveying belt (2) is installed at the rear end of the top of the workbench (1) through a mounting groove and a fixing frame, a reserved penetrating opening (15) is formed in the front end of the mounting groove, the reserved penetrating opening (15) is arranged on the workbench (1) and is located at the bottoms of the two blanking pipelines (4), an L-shaped mounting frame (9) is welded at the center position of the bottom of the workbench (1), a packaging box lifting mechanism is fixedly installed on the L-shaped mounting frame (9), and a hanger (3) is welded at the front end of the workbench (1), and a second conveying belt (13) is fixedly installed at the bottom of the hanging bracket (3), and the tail end of the second conveying belt (13) is located at the front end of the packaging box lifting mechanism.
2. The bolt and nut packing apparatus according to claim 1, wherein: discharge mechanism includes pneumatic cylinder (16), and pneumatic cylinder (16) install in unloading pipeline (4) one side through the mounting bracket, the welding of pneumatic cylinder (16) one side tailpiece of the piston rod end has picture peg (17), and picture peg (17) cartridge in unloading pipeline (4).
3. The bolt and nut packing apparatus according to claim 1, wherein: packing carton hoist mechanism includes small-size electric lift pole (10), and small-size electric lift pole (10) fixed mounting in L shape mounting bracket (9) top, the welding of small-size electric lift pole (10) top lift end has crane (11), and crane (11) front side welding has baffle (12).
4. The bolt and nut packing apparatus according to claim 1, wherein: the top of one side of the reserved penetrating opening (15) is further provided with an L-shaped baffle (8), and the L-shaped baffle (8) is welded to the top of the workbench (1).
5. The bolt and nut packing apparatus according to claim 1, wherein: the tail end of the second conveying belt (13) is positioned at the front end of the lifting frame (11).
CN202023192347.0U 2020-12-27 2020-12-27 Bolt and nut packing device Expired - Fee Related CN214493421U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023192347.0U CN214493421U (en) 2020-12-27 2020-12-27 Bolt and nut packing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023192347.0U CN214493421U (en) 2020-12-27 2020-12-27 Bolt and nut packing device

Publications (1)

Publication Number Publication Date
CN214493421U true CN214493421U (en) 2021-10-26

Family

ID=78210663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023192347.0U Expired - Fee Related CN214493421U (en) 2020-12-27 2020-12-27 Bolt and nut packing device

Country Status (1)

Country Link
CN (1) CN214493421U (en)

Similar Documents

Publication Publication Date Title
CN205383430U (en) Aerating device is transported to vertical gas cylinder
CN214493421U (en) Bolt and nut packing device
CN114713734A (en) Automatic material collecting equipment
CN211253964U (en) Automatic unloader that goes up of two groups of trays
CN216037446U (en) Automatic unloading transfer box
CN216889140U (en) Biomass stokehold wood chip bin
CN206511466U (en) A kind of new type carting station
CN205972509U (en) Single track hangs container
CN114802854A (en) Automatic stacker for lead-acid storage battery
CN108820921B (en) Heavy-duty robot for multilayer storage and transportation of bulk materials
CN207158267U (en) Buffer gear
CN209455443U (en) A kind of container sorting storage robot
CN209455479U (en) A kind of bucket elevator
CN219928028U (en) Automatic partial shipment equipment of cold heading product
CN210097920U (en) Automatic broken feed system of handling round package
CN217203372U (en) Paper products processing cooling modular system
CN206033143U (en) Location hook assembly and have device's electrode shell transportation equipment
CN210234129U (en) Automatic self-locking box folding machine
CN205312523U (en) Welding rod that automatic package system of welding rod used concentrates automatic arrangement to align conveyor
CN217200148U (en) Automatic arrange treating material stock machine that expects to accomodate
CN210283355U (en) Recycling solid waste resource packing device
CN219857708U (en) Automatic packaging system
CN220431392U (en) Loading attachment of multiple type structure
CN203830617U (en) Feeding platform of thread rolling machine
CN215932439U (en) Automatic production line for processing curtain wall aluminum profile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211026

CF01 Termination of patent right due to non-payment of annual fee