CN214491631U CN202023063957.0U CN202023063957U CN214491631U CN 214491631 U CN214491631 U CN 214491631U CN 202023063957 U CN202023063957 U CN 202023063957U CN 214491631 U CN214491631 U CN 214491631U
Authority
CN
China
Prior art keywords
pushing assembly
connector
water knockout
knockout drum
hot melt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023063957.0U
Other languages
Chinese (zh)
Inventor
戴佳佳
朱波宇
杨成祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Qingxin Environmental Engineering Technology Co ltd
Original Assignee
Yancheng Qingxin Environmental Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yancheng Qingxin Environmental Technology Co ltd filed Critical Yancheng Qingxin Environmental Technology Co ltd
Priority to CN202023063957.0U priority Critical patent/CN214491631U/en
Application granted granted Critical
Publication of CN214491631U publication Critical patent/CN214491631U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model relates to a water knockout drum processing equipment field specifically is a mounting device of connector of hot melt water knockout drum, include: the device comprises a first pushing assembly, a second pushing assembly and a pressurizing cylinder, wherein the first pushing assembly and the second pushing assembly are respectively fixedly arranged on the left side and the right side of the upper end of an operation platform; a baffle is arranged on the outer side of the operating platform, and a pressure applying cylinder is fixedly arranged at the top end in the baffle; the installation device of the connector of the hot melt water knockout drum can install and fix the parts of the water knockout drum together in a hot melt mode, has high automation degree, not only accelerates the production efficiency of the water knockout drum, but also has no problems of improper assembly, liquid overflow, difficult later maintenance and great maintenance difficulty of the water knockout drum formed by processing.

Description

Installation device of connector of hot melt water knockout drum
Technical Field
The utility model relates to a water knockout drum processing equipment field specifically is a mounting device of connector of hot melt water knockout drum.
Background
The water distributor and the water collector are water distributing and collecting devices used for connecting water supply and return water of heating pipes in a water system, and are divided into a water distributor and a water collector according to the inlet return water, so the water distributor and the water collector are called as water distributors.
Parts of the water separator in the prior art are connected by using traditional threads and are assembled and fastened manually, and the production process has the defects of long production time and low assembly efficiency; in addition, when the part is threaded, the internal thread and the external thread have machining errors, the assembled finished product has the problems of improper assembly, liquid overflow and the like, and the later maintenance and repair difficulty is increased.
To the problem in the above-mentioned background art, the utility model aims at providing a hot melt water knockout drum's installation device of connector.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an installation device of connector of hot melt water knockout drum to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a mounting device for a connector of a hot melt water diverter, comprising: the device comprises a first pushing assembly, a second pushing assembly and a pressurizing cylinder, wherein the first pushing assembly and the second pushing assembly are respectively fixedly arranged on the left side and the right side of the upper end of an operation platform; the outer side of the operation platform is provided with a baffle, the top end inside the baffle is fixedly provided with a pressing cylinder, and the lower end of the pressing cylinder is provided with a part adsorption device.
As a further aspect of the present invention: the first pushing assembly comprises a first cylinder body, a first electric telescopic rod and a first sliding block, the first cylinder body is fixedly installed on a first installation plate, and the first installation plate is fixedly installed on the operation platform through bolts; one end of the first cylinder body is provided with a first electric telescopic rod, one end of the first electric telescopic rod is provided with a first sliding block, and the first sliding block is provided with a heating device; and starting the first cylinder body, wherein the first cylinder body pushes the first sliding block to slide on the operation platform through the first electric telescopic rod, so that the pushing displacement of the heating device is realized.
As a further aspect of the present invention: the second pushing assembly comprises a second sliding block, a second electric telescopic rod and a second cylinder body, the second cylinder body is fixedly installed on a second installation plate, the second installation plate is fixedly installed on the operation table through bolts, one end of the second cylinder body is connected with the second sliding block through the second electric telescopic rod, the second sliding block is slidably installed on the operation table, and a placing tool is arranged on the second sliding block and used for placing the connector or the water distributor; and starting the second cylinder body, and pushing the second sliding block to slide and displace on the operation platform through the second electric telescopic rod by the second cylinder body.
Compared with the prior art, the beneficial effects of the utility model are that:
the installation device of the connector of the hot melt water knockout drum can install and fix the parts of the water knockout drum together in a hot melt mode, has high automation degree, not only accelerates the production efficiency of the water knockout drum, but also has no problems of improper assembly, liquid overflow, difficult later maintenance and great maintenance difficulty of the water knockout drum formed by processing.
Drawings
In order to illustrate the technical solutions in the embodiments of the present invention more clearly, the drawings that are needed in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention.
Fig. 1 is a schematic structural diagram of a mounting device of a connector of a hot-melt water separator according to an embodiment of the present invention.
Fig. 2 is a schematic diagram illustrating an operation principle of a mounting device of a connector of a hot-melt water separator according to an embodiment of the present invention.
Fig. 3 is a schematic structural diagram of a connector of a hot-melt water separator according to an embodiment of the present invention.
In the figure: the device comprises a reinforcing rib 1, a supporting leg 2, a baffle 3, an operation platform 4, a bolt 5, a first mounting plate 6, a first cylinder body 7, a first electric telescopic rod 8, a first sliding block 9, a heating device 10, a pressure cylinder 11, a part adsorption device 12, a connector 13, a second sliding block 14, a second electric telescopic rod 15, a second cylinder body 16, a second mounting plate 17, a connector body 18, a water pipe 19 and a water separator 20.
Detailed Description
In order to make the technical problem, technical solution and advantageous effects to be solved by the present invention more clearly understood, the following description is given in conjunction with the accompanying drawings and embodiments to illustrate the present invention in further detail. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Examples
Referring to fig. 1, in an embodiment of the present invention, an installation apparatus for a connector of a hot-melt water separator includes: the part adsorption device comprises a first pushing assembly, a second pushing assembly and a part adsorption device 12, wherein the first pushing assembly and the second pushing assembly are respectively installed and fixed on the left side and the right side of the upper end of an operation platform 4, a heating device 10 is arranged on the first pushing assembly, supporting legs 2 are arranged on the left side and the right side of the lower end of the operation platform 4, and the bottom ends of the supporting legs 2 on the left side and the right side are connected and fixed through reinforcing ribs 1; a baffle 3 is arranged on the outer side of the operating platform 4, a pressure cylinder 11 is fixedly installed at the top end inside the baffle 3, a part adsorption device 12 is arranged at the lower end of the pressure cylinder 11, and the part adsorption device 12 is the prior art and is not further explained herein;
when the mounting device of the connector of the hot-melt water separator is used, the second pushing assembly is started firstly, the second pushing assembly pushes and displaces the connector 13 to the position right below the part adsorption device 12, then the pressing cylinder 11 is started, the pressing cylinder 11 operates to lift the part adsorption device 12, the part adsorption device 12 generates adsorption force to adsorb the connector 13 and then rises, and at the moment, the second pushing assembly is recovered to the initial state; starting the first pushing assembly, pushing the heating device 10 by the first pushing assembly to move to a position right below the part adsorption device 12, starting the pressing cylinder 11 again at the moment, enabling the pressing cylinder 11 to operate to push the part adsorption device 12 to descend, enabling the connector 13 adsorbed at the lower end of the part adsorption device 12 to be close to the heating device 10 for hot melting, enabling the part adsorption device 12 to be lifted after the bottom end of a water pipe 19 in the middle of a connector body 18 of the connector 13 is hot melted, and enabling the first pushing assembly to recover to the initial state; then the water separator 20 is placed on the second pushing assembly and then pushed and displaced to the bottom end of the connector 13 in the hot melting state, the pressure applying cylinder 11 pushes the water service pipe 19 inside the connector 13 to be extruded and hot-melted with the water separator 20 to be connected together, finally the second pushing assembly is restored to the initial state, the part adsorption device 12 cancels the adsorption force, and the connector 13 and the water separator 20 which are connected together automatically fall off and are recovered.
Further, the first pushing assembly comprises a first cylinder 7, a first electric telescopic rod 8 and a first sliding block 9, the first cylinder 7 is fixedly installed on a first installation plate 6, and the first installation plate 6 is fixedly installed on the operation table 4 through bolts; one end of the first cylinder body 7 is provided with a first electric telescopic rod 8, one end of the first electric telescopic rod 8 is provided with a first sliding block 9, and the first sliding block 9 is provided with a heating device 10; starting first cylinder body 7, first cylinder body 7 promotes first slider 9 through first electric telescopic handle 8 and slides on operation platform 4 and move, realizes heating device 10's propelling movement displacement.
Furthermore, the second pushing assembly comprises a second sliding block 14, a second electric telescopic rod 15 and a second cylinder body 16, the second cylinder body 16 is fixedly installed on a second installation plate 17, the second installation plate 17 is fixedly installed on the operation table 4 through a bolt 5, one end of the second cylinder body 16 is connected with the second sliding block 14 through the second electric telescopic rod 15, the second sliding block 14 is slidably installed on the operation table 4, and a placing tool is arranged on the second sliding block 14 and used for placing the connector 13 or the water separator 20; and starting the second cylinder 16, and pushing the second sliding block 14 to slide and displace on the workbench 4 by the second cylinder 16 through the second electric telescopic rod 15.
In the description of the present invention, unless otherwise expressly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (3)

1. A mounting device for a connector of a hot melt water separator, comprising: the part conveying device comprises a first pushing assembly, a second pushing assembly, an operation table (4) and a part adsorption device (12), wherein the first pushing assembly and the second pushing assembly are respectively installed and fixed on the left side and the right side of the upper end of the operation table (4), the first pushing assembly is provided with a heating device (10), the left side and the right side of the lower end of the operation table (4) are provided with supporting legs (2), and the bottom ends of the supporting legs (2) on the left side and the right side are fixedly connected through reinforcing ribs (1); a baffle (3) is arranged on the outer side of the operating platform (4), a pressing cylinder (11) is fixedly installed at the top end inside the baffle (3), and a part adsorption device (12) is arranged at the lower end of the pressing cylinder (11).
2. The mounting device for a connector of a hot melt water knockout vessel according to claim 1, wherein: the first pushing assembly comprises a first cylinder body (7), a first electric telescopic rod (8) and a first sliding block (9), the first cylinder body (7) is fixedly installed on a first installation plate (6), and the first installation plate (6) is fixedly installed on the operation table (4) through bolts; one end of the first cylinder body (7) is provided with a first electric telescopic rod (8), one end of the first electric telescopic rod (8) is provided with a first sliding block (9), and the first sliding block (9) is provided with a heating device (10).
3. The mounting device for a connector of a hot melt water knockout vessel according to claim 1, wherein: the second propelling movement subassembly includes second slider (14), second electric telescopic handle (15) and second cylinder body (16), second cylinder body (16) installation is fixed on second mounting panel (17), second mounting panel (17) are fixed on operation platform (4) through bolt (5) installation, second slider (14) are connected through second electric telescopic handle (15) to second cylinder body (16) one end, second slider (14) slidable mounting is on operation platform (4), be equipped with on second slider (14) and place the frock.
CN202023063957.0U 2020-12-18 2020-12-18 Installation device of connector of hot melt water knockout drum Active CN214491631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023063957.0U CN214491631U (en) 2020-12-18 2020-12-18 Installation device of connector of hot melt water knockout drum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023063957.0U CN214491631U (en) 2020-12-18 2020-12-18 Installation device of connector of hot melt water knockout drum

Publications (1)

Publication Number Publication Date
CN214491631U true CN214491631U (en) 2021-10-26

Family

ID=78209088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023063957.0U Active CN214491631U (en) 2020-12-18 2020-12-18 Installation device of connector of hot melt water knockout drum

Country Status (1)

Country Link
CN (1) CN214491631U (en)

Similar Documents

Publication Publication Date Title
CN208379037U (en) Automatically lower on-hook
CN214491631U (en) Installation device of connector of hot melt water knockout drum
CN203308813U (en) Hydraulic power station of movable waster compression station
CN106180444A (en) A kind of spring automatic production line
CN206104722U (en) Bullet strip automation line
CN209409342U (en) A kind of nylon pipe joint automatic installation apparatus
CN202985039U (en) Automatic feeding device of column-shaped part assembly
CN206898741U (en) A kind of bent plate selling sheet assembles device
CN102198464A (en) Steel tie rod molding press
CN211554296U (en) Universal positioning and crimping device for electric energy meter
CN209698887U (en) A kind of Pneumatic hydraulic element pressure utility fixtures
CN204053931U (en) A kind of door for automobile touches switch dress rubber sleeve device
CN203843409U (en) Centering mechanism for welding pipe fittings and end covers of silencing barrels of automobiles
CN216429743U (en) Novel automobile heat insulation plate connecting support
CN206337012U (en) The bottle placer bottle support mechanism of composite protein beverage production
CN209969301U (en) Nested formula bellows forming die that opens and shuts
CN208866708U (en) A kind of automatic blow pressure machine of solenoid valve
CN213632687U (en) Vacuum power-assisted brake system test bench capable of automatically exhausting
CN204975835U (en) Return bend type tail pipe welds frock
CN220769839U (en) Hydraulic device convenient to installation
CN214025597U (en) Hydraulic device convenient to disassemble and used for manufacturing wheel hub
CN213767227U (en) Automatic hot-melting processing system for notebook keyboard
CN209477651U (en) A kind of automatic impaction tooling
CN203236192U (en) Four-column type ballast pressing and buckling machine
CN209481167U (en) A kind of mechanical automation implantation structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220725

Address after: 101405 Beijing city Huairou District Bohai town Huai Sha Road No. 536

Patentee after: Beijing Qingxin Environmental Engineering Technology Co.,Ltd.

Address before: 224000 room 728, building 1, south of photovoltaic road and east of Jingliu Road, Nanyang Town, Tinghu District, Yancheng City, Jiangsu Province (8)

Patentee before: YANCHENG QINGXIN ENVIRONMENTAL TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right