CN214462670U - Building floor concrete placement operation rack is built in room - Google Patents

Building floor concrete placement operation rack is built in room Download PDF

Info

Publication number
CN214462670U
CN214462670U CN202120567161.4U CN202120567161U CN214462670U CN 214462670 U CN214462670 U CN 214462670U CN 202120567161 U CN202120567161 U CN 202120567161U CN 214462670 U CN214462670 U CN 214462670U
Authority
CN
China
Prior art keywords
fixedly connected
mounting
sides
fixed connection
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120567161.4U
Other languages
Chinese (zh)
Inventor
杜博文
赵腾飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202120567161.4U priority Critical patent/CN214462670U/en
Application granted granted Critical
Publication of CN214462670U publication Critical patent/CN214462670U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a floor concrete placement operation rack is built in room relates to the room and builds equipment technical field, comprising a base plate, bottom plate bottom both sides set up the installation leg, bottom plate one side both sides hydraulic telescoping post, hydraulic telescoping capital portion fixed connection installation section of thick bamboo, installation section of thick bamboo top fixed connection roof, roof one side fixed connection fixed block, fixed block both sides fixed connection fixed column, fixed column one end slip cup joint the installation piece, installation piece top fixed connection installation shell, the installation shell is the U-shaped structure, the lead screw is connected to the installation shell internal rotation, and lead screw one end screw thread cup joints the sliding block, sliding block top fixed connection grip ring, grip ring lateral wall set up fastening screw, and device structure principle reasonable in design, the operation is convenient, and the practicality is high.

Description

Building floor concrete placement operation rack is built in room
Technical Field
The utility model relates to a building equipment technical field, specifically be building floor concrete placement operation rack in room.
Background
The concrete pouring of the building floor adopts a concrete cast-in-place mode, wherein the cast-in-place mode is that a template is built on site, reinforcing steel bars are installed on the template, then concrete is poured on the template, then the template is removed, and the cast-in-place layer is compared with the prefabricated floor, so that the integrity and the shock resistance of the building can be enhanced, and the bearing capacity is higher. Meanwhile, the heat insulation and sound insulation waterproof coating has certain advantages in the aspects of heat insulation, sound insulation, water resistance and the like.
Some houses that are using at present are built with the effect of pouring operation frame board and can only start the support, can only carry out simple lift adjustment, but at the in-process of actual building construction, operating personnel need hand-held pouring pipeline, constantly removes at the operation frame and pours the operation, and not only work efficiency is lower, and comparatively hard, and the security is relatively poor simultaneously, and general operation frame can not widen the operation width in a flexible way, and application range is less, and the practicality is not high.
SUMMERY OF THE UTILITY MODEL
The utility model provides a floor concrete placement operation rack is built in room has solved the problem that goes out among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
building floor concrete placement operation rack is built in room, comprising a base plate, bottom plate bottom both sides set up the installation leg, bottom plate one side both sides fixed connection hydraulic stretching post, the hydraulic stretching capital portion fixed connection installation section of thick bamboo, installation section of thick bamboo top fixed connection roof, roof one side fixed connection fixed block, fixed block both sides fixed connection fixed column, fixed column one end slip cup joint the installation piece, installation piece top fixed connection installation shell, installation shell are the U-shaped structure, installation shell internal rotation connects the lead screw, and lead screw one end screw thread cup joints the sliding block, sliding block top fixed connection grip ring, grip ring lateral wall set up fastening screw.
As a preferred technical scheme of the utility model, bottom plate one side fixed connection biax motor, the bottom plate lateral wall fixed connection locating piece of biax motor both sides, the output shaft tip fixed connection drive post of biax motor, drive post one side is rotated with the locating piece lateral wall and is connected, roof bottom fixed connection erection column, erection column bottom both sides are rotated and are connected driven gear, and the fixed cover of drive post one end on one side of driven gear connects drive gear, and drive gear is connected with the driven gear meshing transmission.
As a preferred technical scheme of the utility model, driven gear one side fixed connection fixed axle, the articulated transfer line of fixed axle tip, the transfer line is kept away from the articulated fly leaf of connecting of fixed axle one end, fly leaf and erection column sliding connection, the articulated gangbar of connecting in fly leaf both sides, gangbar one end is connected with the installation piece is articulated.
As a preferred technical scheme of the utility model, roof both sides sliding connection backup pad, backup pad are L shape structure, the articulated hydraulic telescoping rod that connects in backup pad bottom, hydraulic telescoping rod keep away from backup pad one end and install a lateral wall and articulate and be connected.
As an optimized technical scheme of the utility model, the grip ring is high rigidity metal material.
The utility model discloses have following useful part: the device structural principle reasonable in design, the operation is convenient to use, when using, place the position of pouring in needs with the device, then will pour the shower nozzle and fix on the grip ring, then start the flexible post of hydraulic pressure and carry out the regulation of operation height, then start the biax motor, under drive gear and driven gear's effect, it reciprocates to drive the fly leaf through the drive rod transmission, reciprocating motion about the head of pouring in driving the installation shell under the effect of gangbar, the realization is to the even work of pouring of concrete, carry out the centre gripping through setting up the grip ring and pour, workman's both hands have been liberated, the great reduction of working strength, pour more even simultaneously, it is higher to pour work efficiency, and the device can be nimble regulation pour the scope, the practicality is higher, application scope is wider.
Drawings
Fig. 1 is a schematic structural diagram of a concrete pouring operation rack main body of a building floor slab.
FIG. 2 is a schematic structural view of the side of the top plate in the concrete pouring work bench of the building floor.
Fig. 3 is a schematic structural diagram of a driven gear in a concrete pouring operation rack of a building floor.
In the figure: 1. a base plate; 2. a drive column; 3. positioning blocks; 4. a drive gear; 5. mounting a column; 6. a double-shaft motor; 7. a driven gear; 8. a fixed shaft; 9. a transmission rod; 10. a hydraulic telescopic column; 11. mounting the cylinder; 12. a hydraulic telescopic rod; 13. a support plate; 14. fixing a column; 15. mounting a shell; 16. mounting blocks; 17. a clamp ring; 18. a top plate; 19. a fixed block; 20. a slider; 21. a linkage rod; 22. a screw rod; 23. a movable plate.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
It should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of describing the present invention and simplifying the description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
Example 1
Referring to fig. 1-3, a building floor concrete casting operation rack comprises a bottom plate 1, wherein mounting legs are arranged on two sides of the bottom plate 1, two sides of one side of the bottom plate 1 are fixedly connected with a hydraulic telescopic column 10, a mounting cylinder 11 is fixedly connected with the top of the hydraulic telescopic column 10, a top plate 18 is fixedly connected with the top of the mounting cylinder 11, a fixed block 19 is fixedly connected with one side of the top plate 18, fixed columns 14 are fixedly connected with two sides of the fixed block 19, one end of each fixed column 14 is slidably sleeved with a mounting block 16, the top of the mounting block 16 is fixedly connected with a mounting shell 15, the mounting shell 15 is of a U-shaped structure, a lead screw 22 is rotatably connected in the mounting shell 15, one end of the lead screw 22 is in threaded sleeve connection with a sliding block 20, the top of the sliding block 20 is fixedly connected with a clamping ring 17, a fastening screw is arranged on the side wall of the clamping ring 17, and the clamping ring 17 is used for fixing the end of a casting pipeline.
1 one side fixed connection double-shaft motor 6 of bottom plate, 1 lateral wall fixed connection locating piece 3 of bottom plate of 6 both sides of double-shaft motor, the output shaft tip fixed connection drive post 2 of double-shaft motor 6, 2 one sides of drive post rotate with 3 lateral walls of locating piece to be connected, 18 bottom fixed connection erection columns 5 of roof, 5 bottom both sides of erection column are rotated and are connected driven gear 7, and the fixed cover of 2 one end of drive post of driven gear 7 one side connects drive gear 4, and drive gear 4 is connected with driven gear 7 meshing transmission.
One side of the driven gear 7 is fixedly connected with a fixed shaft 8, the end part of the fixed shaft 8 is hinged with a transmission rod 9, one end, far away from the fixed shaft 8, of the transmission rod 9 is hinged with a movable plate 23, the movable plate 23 is connected with the mounting column 5 in a sliding mode, two sides of the movable plate 23 are hinged with linkage rods 21, and one end of each linkage rod 21 is hinged with the mounting block 16.
The two sides of the top plate 18 are slidably connected with the supporting plate 13, the supporting plate 13 is of an L-shaped structure, the bottom end of the supporting plate 13 is hinged with the hydraulic telescopic rod 12, and one end, away from the supporting plate 13, of the hydraulic telescopic rod 12 is hinged with the side wall of the mounting cylinder 11.
Example 2
Referring to fig. 1-3, the other contents of the present embodiment are the same as embodiment 1, except that: the clamping ring 17 is made of high-hardness metal materials, and can be kept stable and not deformed when the pouring pipeline is driven to move.
The utility model discloses in the implementation process, when using, place the position of pouring in needs with the device, then will pour the shower nozzle and fix on the grip ring 17, then start the flexible post 10 of hydraulic pressure and carry out the regulation of operation height, then start biax motor 6, under drive gear 4 and driven gear 7's effect, it reciprocates to drive fly leaf 23 through the transmission of transfer line 9 transmission, drive the head of pouring left and right sides reciprocating motion in installation shell 15 under the effect of gangbar 21, the realization is to the even work of pouring of concrete, carry out the centre gripping through setting up grip ring 17 and pour, workman's both hands have been liberated, the great reduction of working strength, pour more even simultaneously, it is higher to pour work efficiency, and the device can be nimble regulation pour the scope, the practicality is higher, application scope is wider.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The building floor concrete pouring operation rack comprises a bottom plate (1) and is characterized in that, the mounting legs are arranged on two sides of the bottom plate (1), two ends of one side of the bottom plate (1) are fixedly connected with hydraulic telescopic columns (10), the top of each hydraulic telescopic column (10) is fixedly connected with a mounting cylinder (11), the top of the mounting cylinder (11) is fixedly connected with a top plate (18), one side of the top plate (18) is fixedly connected with a fixed block (19), two sides of the fixed block (19) are fixedly connected with fixed columns (14), one ends of the fixed columns (14) are slidably sleeved with mounting blocks (16), the tops of the mounting blocks (16) are fixedly connected with mounting shells (15), and the mounting shells (15) are of U-shaped structures, the mounting shell (15) is rotatably connected with a screw rod (22), one end of the screw rod (22) is in threaded connection with a sliding block (20), the top of the sliding block (20) is fixedly connected with a clamping ring (17), and a fastening screw is arranged on the side wall of the clamping ring (17).
2. The building floor concrete pouring operation rack according to claim 1, characterized in that a double-shaft motor (6) is fixedly connected to one side of the bottom plate (1), a positioning block (3) is fixedly connected to the side wall of the bottom plate (1) on two sides of the double-shaft motor (6), a driving column (2) is fixedly connected to the end portion of an output shaft of the double-shaft motor (6), one side of the driving column (2) is rotatably connected to the side wall of the positioning block (3), a mounting column (5) is fixedly connected to the bottom of the top plate (18), two sides of the bottom end of the mounting column (5) are rotatably connected to a driven gear (7), a driving gear (4) is fixedly sleeved at one end of the driving column (2) on one side of the driven gear (7), and the driving gear (4) is in meshing transmission connection with the driven gear (7).
3. The building floor concrete pouring operation rack according to claim 2, wherein one side of the driven gear (7) is fixedly connected with a fixed shaft (8), the end part of the fixed shaft (8) is hinged with a transmission rod (9), one end, far away from the fixed shaft (8), of the transmission rod (9) is hinged with a movable plate (23), the movable plate (23) is connected with the mounting column (5) in a sliding mode, two sides of the movable plate (23) are hinged with linkage rods (21), and one end of each linkage rod (21) is hinged with the mounting block (16).
4. The building floor concrete pouring operation rack according to claim 3, characterized in that two sides of the top plate (18) are slidably connected with support plates (13), each support plate (13) is of an L-shaped structure, the bottom ends of the support plates (13) are hinged and connected with hydraulic telescopic rods (12), and one ends of the hydraulic telescopic rods (12) far away from the support plates (13) are hinged and connected with the side walls of the installation cylinders (11).
5. The house building floor concrete pouring work bench according to claim 3 or 4, characterized in that the clamp ring (17) is of a high hardness metal material.
CN202120567161.4U 2021-03-19 2021-03-19 Building floor concrete placement operation rack is built in room Expired - Fee Related CN214462670U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120567161.4U CN214462670U (en) 2021-03-19 2021-03-19 Building floor concrete placement operation rack is built in room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120567161.4U CN214462670U (en) 2021-03-19 2021-03-19 Building floor concrete placement operation rack is built in room

Publications (1)

Publication Number Publication Date
CN214462670U true CN214462670U (en) 2021-10-22

Family

ID=78157474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120567161.4U Expired - Fee Related CN214462670U (en) 2021-03-19 2021-03-19 Building floor concrete placement operation rack is built in room

Country Status (1)

Country Link
CN (1) CN214462670U (en)

Similar Documents

Publication Publication Date Title
CN214462670U (en) Building floor concrete placement operation rack is built in room
CN214834723U (en) Wall body internal corner concrete placement setting device
CN213115488U (en) Building templates fixed stay frock convenient to use
CN211647206U (en) A remove handling frame for building engineering
CN214738026U (en) Tool type anti-floating anchor rod steel bar fixing tool
CN117166750A (en) Clamping device of concrete baffle for building
CN217096279U (en) Bent cap skeleton welding robot
CN215667038U (en) 180-degree overturning frame for large prefabricated part
CN207377574U (en) A kind of movable trestle inverted arch template
CN216516899U (en) Constructional engineering aluminium membrane construction template fastener
CN215107301U (en) Floor pouring support device
CN211736503U (en) Support frame for construction machinery
CN214195596U (en) Fixing device of intelligent building beam column manufacturing equipment
CN211850832U (en) Constructional column concrete casting template
CN211873855U (en) Anti-tilting device for building construction template
CN211201165U (en) Concrete constructional column template positioner
CN207892232U (en) A kind of venthole hydraulic telescopic type template
CN218969782U (en) Steel-concrete composite beam wet joint pouring template
CN213115630U (en) Aluminum template supports connecting device
CN220247588U (en) Hanging die device for house building engineering construction
CN217967598U (en) Steel bar positioning structure of reinforced concrete prefabricated part for architectural design
CN210134452U (en) Hang mould bottom sprag device
CN217290207U (en) Fixing device for shearing and bending reinforcing steel bar
CN217107409U (en) High-pressure pump convenient to dismouting
CN216552055U (en) Can improve equipment stand concrete foundation typical forms of construction benefit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211022