CN214459659U - Integral pier stud reinforcement platform - Google Patents
Integral pier stud reinforcement platform Download PDFInfo
- Publication number
- CN214459659U CN214459659U CN202023029632.0U CN202023029632U CN214459659U CN 214459659 U CN214459659 U CN 214459659U CN 202023029632 U CN202023029632 U CN 202023029632U CN 214459659 U CN214459659 U CN 214459659U
- Authority
- CN
- China
- Prior art keywords
- hinge
- reinforcement
- push plate
- jig frame
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses an integral pier stud reinforcement binding platform, which comprises a square reinforcement jig frame, wherein a positioning groove is arranged at the inner side of the reinforcement jig frame, and reinforcement to be bound is positioned in the positioning groove; the first hinge is fixed on the lower half part of the outer side surface of the steel bar jig frame; a plurality of transverse movable push plates capable of sliding transversely are uniformly arranged on the adjusting ribs, an L-shaped jig frame bracket and a second hinge are arranged above the transverse movable push plates, a horizontal part is used as a fixed fan of the second hinge and falls on the upper surface of the transverse movable push plates, and a bending fan of the second hinge is pushed by the transverse movable push plates, horizontally unfolded and supported below a bending fan unfolded by the first hinge; the internal stress frame of the walking platform falls on the bending fan unfolded by the first hinge. The utility model has the advantages that the bracket is integrally assembled and then is installed, the installation height is lower, the anti-overturning performance is good, and the structure safety is ensured; the disassembly and assembly steps are simplified, the construction time is shortened, and the method has a positive effect on the quality improvement increment of engineering construction.
Description
Technical Field
The utility model relates to a bridge engineering construction equipment field especially relates to an integral pier stud reinforcement platform.
Background
With the development of traffic engineering such as overpasses and viaducts, the proportion of the high pier capping beam structure as a supporting unit of a building pavement is larger and larger in the whole construction, and the high pier construction progress also becomes a main factor influencing the total construction progress. In the construction process of the pier stud used as the coping support, an underground grouting foundation pile is usually formed firstly, and then the pier stud part on the ground is cast and formed section by a slip form construction mode; constructing the pier column part on the ground, binding a columnar reinforcement cage, and then erecting a template for pouring and solidifying; the pier stud has a certain height, and the construction site is usually the construction of setting up the scaffold in full field in order to cooperate the pier stud, and the operation such as reinforcement, template erects, smashes and vibrate is convenient for, but the work progress is more complicated, and efficiency is also than low.
In actual production, the construction of the bridge pier column mostly adopts double-row cross-shaped frame construction, a support needs to be erected around the bridge pier during construction, but the foundation needs to be reinforced under the condition of uneven ground. And if the bridge pier is in the construction condition of mountain land or mud land, the cost of foundation treatment is high, uneven settlement is easy to occur, and the quality control in the pouring process of the bridge pier has great influence. Meanwhile, because the bridge pier columns have a certain height, the double-row derrick erected directly from the ground in the existing construction method also needs a certain height, and has higher requirements on the anti-overturning and anti-bending capabilities of the double-row derrick. Therefore, the existing double-row derrick has the advantages of high safety risk, poor economy and difficulty in guaranteeing construction quality, more consumable materials are needed by adopting the double-row derrick, the construction period is long, the cost budget is invisibly increased, the construction progress of the whole bridge is also influenced, and the pier column reinforcing steel bar platform which can be influenced by a foundation and is convenient to install and disassemble during construction is needed.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the technical problem that actually will solve is: in the existing bridge pier column construction, a support needs to be erected around a pier, but the terrain of a construction site is complex, and the foundation needs to be reinforced when the support is erected. The foundation reinforcement treatment cost is high, uneven settlement is easy to occur usually, the safety risk is large, the economy is poor, the construction quality is guaranteed differently, the material consumption required by the double-row derrick is high usually, the construction period is long, the cost budget is increased invisibly, and the construction progress of the whole bridge is also influenced.
In order to solve the technical problem, the utility model provides an integral pier stud reinforcement binding platform, which comprises a square reinforcement jig frame, wherein a positioning groove is arranged at the inner side of the reinforcement jig frame, and a reinforcement to be bound is positioned in the positioning groove; the first hinge is divided into a fixed fan and a bending fan which is bent downwards, and the fixed fan is connected with the steel bar jig frame; the pier column formwork is characterized by further comprising reserved ribs uniformly fixed on the pier column formwork, wherein the reserved ribs comprise adjusting ribs on the left side and the right side and stabilizing ribs in the middle; a plurality of transverse movable push plates capable of sliding transversely are uniformly arranged on the adjusting ribs, an L-shaped jig frame bracket and a second hinge are arranged above the transverse movable push plates, the vertical part of the jig frame bracket is fixed on the adjusting ribs, the horizontal part of the jig frame bracket is used as a fixed fan of the second hinge and falls on the upper surface of the transverse movable push plates, and a bending fan of the second hinge is pushed by the transverse movable push plates and horizontally unfolded and is supported below the bending fan unfolded by the first hinge; the steel bar jig frame is characterized by further comprising a walking platform arranged on the periphery of the steel bar jig frame, wherein the walking platform comprises an external supporting flat plate and an internal stress frame which are connected with each other, and an adjusting rib through hole and a stabilizing rib through hole through which an adjusting rib and a stabilizing rib penetrate are arranged on the external supporting platform; the internal stressed frame falls on the bending fan unfolded by the first hinge.
Particularly, the transverse movable push plate comprises an L-shaped left push plate and an L-shaped right push plate, the left push plate and the right push plate are oppositely and fixedly connected to form a U-shaped structure, the opening of the U-shaped structure faces outwards and is wrapped at the periphery of the adjusting rib in a half-wrapping mode, and transverse strip-shaped through holes are formed in the left push plate and the right push plate; the adjusting rib is provided with a positioning seat, the positioning seat is inserted into the strip-shaped through hole with room, so that the transverse movable push plate can be pushed inwards, and the occupied strip is inserted into the vacant position in the strip-shaped through hole for locking.
Particularly, bearing rods for connecting adjacent edges of the frame body are arranged at four corners of the lower surface of the internal stressed frame of the walking platform, and the walking platform is placed on the first hinge through the bearing rods.
Particularly, the walking platform and the steel bar framework are provided with three layers in parallel from top to bottom on the reserved ribs, and adjacent layers are connected through stairs.
Particularly, a compression bolt is arranged below the walking platform, and the walking platform is placed on the reserved ribs through the compression bolt.
Particularly, a triangular support fixed on the adjusting rib through a fastening bolt is further arranged below the walking platform.
Particularly, the adjusting rib through hole of the walking platform at the adjusting rib is a square through hole for the transverse movable push plate in a demoulding state to pass through.
The utility model has the advantages that: compared with the existing double-row # -shaped support, the device has higher safety factor, is installed after the support is integrally assembled, has lower installation height, improves the integral anti-overturning performance of the support, and ensures the safety of the structure; when the lifting platform is used, the lifting is directly carried out, the dismounting steps are simplified, the construction time is shortened, the lifting quality increment of engineering construction is more actively influenced, meanwhile, the platform is continuously and repeatedly utilized through lifting, the material loss during the platform erection period can be avoided, the greater economic benefit is obtained, and the construction cost is greatly reduced.
Drawings
Fig. 1 is a schematic view of the overall assembly section structure of the device of the present invention.
Fig. 2 is an enlarged schematic view of a structure in fig. 1.
Fig. 3 is a schematic structural view of the working state of the transverse movable push plate.
Fig. 4 is a schematic top view of the steel bar jig and the walking platform.
Fig. 5 is an enlarged view of the structure at B in fig. 4.
Wherein, the steel bar jig frame-1; a first hinge-11; a positioning recess-12; reserving ribs-2; adjusting ribs-21; a positioning seat-21 a; a stabilizing rib-22; a transverse movable push plate-3; a left push plate-31; a right push plate-32; a strip-shaped through hole-33; -34 facing surface; placeholder bars-35; a jig frame bracket-4; a second hinge-41; a walking platform-5; a regulating rib through hole-51; a bearing rod-52; a stabilizing rib through hole-54; a triangular support-55.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1, 3 and 4, the integral pier stud reinforcement binding platform comprises a square reinforcement jig frame 1, wherein a positioning groove 12 is arranged on the inner side of the reinforcement jig frame 1, and a reinforcement to be bound is positioned in the positioning groove 12; the first hinge 11 is fixed on the lower half part of the outer side surface of the steel bar jig frame 1 and comprises a fixed fan and a bending fan which is bent downwards, and the fixed fan is connected with the steel bar jig frame 1; the pier stud formwork is characterized by further comprising reserved ribs 2 uniformly fixed on the pier stud formwork, wherein the reserved ribs 2 comprise adjusting ribs 21 on the left side and the right side and stabilizing ribs 22 in the middle; a plurality of transverse movable push plates 3 capable of transversely sliding are uniformly arranged on the adjusting ribs 21, L-shaped jig frame brackets 4 and second hinges 41 are arranged above the transverse movable push plates 3, the vertical parts of the jig frame brackets 4 are fixed on the adjusting ribs 21, the horizontal parts of the jig frame brackets are used as fixed fans of the second hinges 41 and fall on the upper surfaces of the transverse movable push plates 3, and the bending fans of the second hinges 41 are pushed by the transverse movable push plates 3 and horizontally unfolded and supported below the bending fans unfolded by the first hinges 11; the steel bar jig is characterized by further comprising a walking platform 5 arranged on the periphery of the steel bar jig 1, wherein the walking platform 5 comprises an external supporting flat plate and an internal stress frame which are connected with each other, and an adjusting rib through hole and a stabilizing rib through hole for an adjusting rib and a stabilizing rib to penetrate through are formed in the external supporting platform; the internal stressed frame falls on the bending fan unfolded by the first hinge.
As a preferred embodiment, the laterally movable push plate 3 includes a left L-shaped push plate 31 and a right L-shaped push plate 32, the left push plate 31 and the right push plate 32 are oppositely and fixedly connected to form a U-shaped structure, an opening of the U-shaped structure faces outward and is half-wrapped around the adjusting rib 21, and the left push plate 31 and the right push plate 32 are both provided with a lateral strip-shaped through hole 33; the adjusting rib 21 is provided with a positioning seat 21a which is inserted into the strip-shaped through hole with a margin, so that the transverse movable push plate can be pushed inwards, and the space occupying strip is inserted into the vacant position in the strip-shaped through hole for locking.
As a preferred embodiment, the walking platform 5 is provided with force bearing rods 52 connecting adjacent edges of the frame body at four corners of the lower surface of the internal force bearing frame, and the walking platform is placed on the first hinge 11 through the force bearing rods 52.
As a preferred embodiment, the walking platform 5 and the steel bar jig 1 are provided with three layers in parallel from top to bottom on the reserved steel bar 2, and adjacent layers are connected through stairs.
As a preferred embodiment, a compression bolt is arranged below the walking platform 5, and the walking platform 5 is placed on the reserved rib 2 through the compression bolt.
In a preferred embodiment, a triangular bracket 55 fixed on the adjusting rib 21 through a fastening bolt is further arranged below the walking platform 5.
As a preferred embodiment, the adjusting rib through hole 51 of the walking platform 5 at the adjusting rib 21 is a square through hole for the transverse movable push plate 3 in the demoulding state to pass through.
The utility model discloses the assembly process of device includes following step:
s1, fixing 12 reserved ribs 2 on a pier stud template in a square shape, wherein each side is provided with three ribs;
s2, assembling a steel bar jig frame 1 and a first hinge 11 on the ground, wherein the first hinge 11 is horizontally fixed on the side surface of the steel bar jig frame 1;
s3, assembling the walking platform 5 on the ground, and fixedly connecting force bearing rods 52 on the adjacent sides of the frame body at four corners of the lower surface of the frame body of the walking platform 5 in the shape of a square frame body;
s4, uniformly arranging a plurality of positioning seats 21a on the left and right sides of the reserved ribs 2 on the left and right sides, namely the adjusting ribs 21, aligning the strip-shaped through holes 33 on the left push plate 31 and the right push plate 32 with the positioning seats 21a under the condition that the opposite surfaces 34 of the left push plate 31 and the right push plate 32 face the outer side of the device, welding and fixing the opposite surfaces 34 of the left push plate 31 and the right push plate 32, pushing the transversely movable push plate 3 after welding to the inner side to keep the working state and push the bending fan of the second hinge 41 flat, and inserting the strip-shaped through holes on the other side of the positioning seats 21a through the occupied strips 35;
s5, fixing an L-shaped jig frame bracket 4 on the upper surface of the transverse movable push plate 3: fixing the vertical surface of the jig frame bracket 4 on the adjusting rib 21 through a pressing bolt and ensuring that a staggered seam is reserved between the fixing section of the second hinge 41 and the fixing section of the first hinge 11;
s6, welding a triangular support 55 at a position corresponding to the adjusting rib 21 below the walking platform 5, and arranging an adjusting rib through hole 51 and a stabilizing rib through hole 54 on the walking platform 5 according to the design positions of the adjusting rib 21 and the stabilizing rib 22, wherein the size of the adjusting rib through hole 51 is slightly larger than that of the transverse movable push plate 3;
s7, hoisting the steel bar jig frame 1, and placing the first hinge 11 on the second hinge 41 in a horizontal unfolding state;
s8, hoisting the walking platform 5, aligning the stabilizing rib through groove 54 of S6 with the stabilizing rib 22, aligning the adjusting rib through hole 51 of S6 with the adjusting rib 21 and slowly lowering, placing the force bearing rod 52 of S3 on the first hinge, fixing a compression bolt on the lower surface of the walking platform 5 to share the dead weight of the walking platform 5, and fixing a triangular bracket 55 on the adjusting rib 21 through a fastening bolt;
s9, after the reinforcement of the current construction section is finished, the reinforcement jig frame 1 and the walking platform 5 are connected through the lifting device, the fastening bolts on the triangular support 55 and the compression bolts below the walking platform 5 are removed, the occupying strips 35 in the transverse movable push plates 3 are taken out, the transverse movable push plates 3 are pushed to a demolding state, the reinforcement jig frame 1 and the walking platform 5 are lifted to the upper side of the next construction position on the reserved ribs 2 through the lifting device, the transverse movable push plates 3 of the next construction position are pushed to a working state and then fixed through the occupying strips 35, the reinforcement jig frame 1 and the walking platform 5 are slowly placed on the second hinges 41 on the transverse movable push plates 3, the first hinges 11 are ensured to be in a horizontal unfolding state, the compression bolts are installed, and the triangular support 55 is fixed through the fastening bolts, and then the reinforcement can be bound again.
The working principle and process of the utility model will be further explained with the attached drawings.
The steel bar jig frame 1 and the walking platform 5 are assembled on the ground respectively, 3 reserved ribs 2 are fixed on each side of four edges of the pier stud template at equal intervals respectively, the fact that the reserved ribs 2 are vertically arranged as a bearing part and a moving track of the whole device is guaranteed, the bottom of the pier stud template is fixed on the pier stud template in a welding mode, and a triangular pyramid-shaped reinforcing base is added to the bottom of the pier stud template, so that the reserved ribs 2 cannot incline or topple over in the using process of the whole device. Then, positioning seats 21a are uniformly and fixedly arranged on the left side surface and the right side surface of the adjusting rib 21 at intervals of about 2m on the adjusting ribs 21 on the two sides, and then the transverse movable push plate 3 is installed and fixed. The mounting method is that the strip-shaped through holes 33 on the left push plate 31 and the right push plate 32 are respectively aligned with the left side positioning seat 21a and the right side positioning seat 21a, after the strip-shaped through holes are combined together, the opposite surfaces 34 on the left push plate 31 and the right push plate 32 are fixed through welding, so that the transverse movable push plate 3 can move left and right on the positioning seats 21a but cannot rotate, then the square strip-shaped occupying strip 35 is inserted into the rest position beside the positioning seats 21a in the strip-shaped through holes 33, and therefore the purpose of fixing the opening of the transverse movable push plate 3 towards the outside is achieved, meanwhile, the occupying strip 35 can also prevent the transverse movable push plate from rotating after the edges of the positioning seats 21a are worn and aged, and potential safety hazards are generated. After the installation of horizontal activity push pedal 3 is accomplished the bed-jig bracket 4 of L shape is placed to the upper surface of horizontal activity push pedal, fix bed-jig bracket 4 on adjusting muscle 21 towards inboard and with the vertical face of bed-jig bracket 4, after the installation of horizontal activity push pedal 3 is accomplished, set up horizontal activity push pedal 3 into operating condition through occupy-place strip 35 with horizontal activity push pedal 3 and push inboard soon for the fan of buckling of second hinge 41 on bed-jig bracket 4 is in the horizontality under the effect of horizontal activity push pedal 3, thereby make horizontal activity push pedal 3 and adjusting muscle 21 undertake reinforcing bar bed-jig 1 and walking platform 5's weight jointly.
At the moment, the steel bar jig frame 1 is lifted by a lifting device, the bending fan of the first hinge 11 is adjusted to be in a horizontal state and then placed on the bending fan of the second hinge 41, the first hinge 11 is in a ring shape surrounding a circle along the outer side of the steel bar jig frame 1, the fixing fan of the first hinge 11 is fixedly connected with the side edge of the steel bar jig frame 1, the second hinge 41 is in a long plate shape with four reserved ribs 2 connected with the same side of the walking platform 5, a staggered joint is guaranteed to be left between the fixing fan of the first hinge 11 and the fixing fan of the second hinge during lifting, and collision between the steel bar jig frame 1 and the jig frame bracket 4 is prevented in the lifting process after the later use; at this time, the weight of the entire reinforcing bar jig 1 is transmitted to the adjusting bar 21 by the first and second hinges 11 and 41 and the L-shaped jig bracket 4. Then, the walking platform 5 is lifted by the hoisting equipment, the adjusting rib through holes 51 are aligned with the adjusting ribs 21, the stabilizing rib through holes 54 are aligned with the stabilizing ribs 22, and the walking platform 5 is slowly inserted into the reserved ribs 2. The lower surface at four corners of the inside atress frame of walking platform 5 all is equipped with the load pole 52 of the adjacent limit of connecting frame body, will fall on first hinge 11 as load pole 52, squeeze into clamp bolt and set up the A-frame 55 in the corresponding position of regulation muscle 21 on reserving muscle 2 through the lower surface at walking platform 5 to divide partial walking platform 5's dead weight with A-frame 55 and regulation muscle 21 through the mode of fastening bolt connection, thereby accomplish setting up of platform.
In this process, a part of the self weight of the traveling platform 5 is transmitted to the adjusting bar 21 through the steel reinforcement jig 1, and the other part is transmitted to the adjusting bar 21 through the hold-down bolt and the triangular bracket 55. Meanwhile, the walking platform 5 is inserted into the reserved ribs 2 through the adjusting rib through holes 51 and the stabilizing rib through holes 54, so that the walking platform 5 can be prevented from deflecting or skewing in the use process, and the safety of constructors is ensured. And adjust muscle through-hole 51 and be located transverse movement push pedal 3 directly over and adjust the size that muscle through-hole 51 slightly is greater than regulation muscle 21, when transverse movement push pedal 3 is in operating condition, the base of U-shaped transverse movement push pedal 3 is located the vertical projection outside of regulation muscle through-hole 51, only when transverse movement push pedal 3 is in the drawing of patterns state, thereby can remove to adjusting in the muscle through-hole 51 vertical projection region and make transverse movement push pedal 3 pass from adjusting muscle through-hole 51 when hoist and mount removal traveling platform 5, guarantee that traveling platform 5 can not blocked by transverse movement push pedal 3. Meanwhile, the positioning recess 12 on the steel bar jig frame 1 can accurately position the steel bars on the pier stud to complete the construction task of steel bar binding. Then connect walking platform 5 and reinforcing bar bed-jig 1 through hoisting equipment, lift by crane it tentatively, then adjust the position of horizontal movable push pedal 3 to the state of drawing of patterns, the slow lifting that lifts by crane of rethread hoisting equipment can realize walking platform and reinforcing bar bed-jig 1 rises in stages.
Treat to carry out concrete placement after the reinforcement of current section pier stud finishes, pour and accomplish back pier stud template and shift up and drive simultaneously and reserve muscle 2 and whole device and together shift up, thereby play the effect of exempting from to demolish, after whole pier stud is whole to be under construction finishes, through lifting by crane equipment in proper order with walking platform 5, reinforcing bar bed-jig 1 hang from reserve muscle 2 can, the loaded down with trivial details process of demolising of current supporting platform has been avoided, construction human resource input has greatly been practiced thrift, the cost is saved.
To sum up, the utility model discloses in the aspect of the cost than current double groined type support, can practice thrift the time of setting up, avoided the step of ground enhancement processing simultaneously for practice thrift construction cost when the construction progress, avoided simultaneously because the ground enhancement processing causes inhomogeneous settlement, avoided the influence of external factor to the pier stud quality, simultaneously because the utility model discloses the device directly erects on the pier stud template, consequently compares in current double groined type support that direct height is lower, and anti-tilt and the ability of toppling are stronger, and degree of safety is also higher. Meanwhile, the manpower investment for erecting the double-row # -shaped support is saved, and the economic benefit is better.
The utility model discloses "connect", "fixed" that appear in the description can be fixed connection, machine-shaping, welding, also can mechanical connection, and particular case understands that above-mentioned term is in the utility model provides a concrete meaning.
In the description of the present invention, the terms "center", "upper", "lower", "horizontal", "inner", "outer", etc., are used, and their designated orientations or positional relationships are only for convenience of description and simplicity of description, but do not indicate or imply that the designated device or element must have a particular orientation, and therefore should not be construed as limiting the present invention.
Finally, it should be noted that: the above embodiments are only used for illustrating the technical solution of the present invention, and not for limiting the same; while the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those skilled in the art that; the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.
Claims (7)
1. An integral pier column reinforcement binding platform is characterized by comprising a square reinforcement jig frame (1), wherein a positioning groove (12) is formed in the inner side of the reinforcement jig frame (1), and a reinforcement to be bound is positioned in the positioning groove (12); the first hinge (11) is fixed on the lower half part of the outer side surface of the steel bar jig frame (1), and is divided into a fixed fan and a bending fan which is bent downwards, and the fixed fan is connected with the steel bar jig frame (1); the pier stud formwork is characterized by further comprising reserved ribs (2) uniformly fixed on the pier stud formwork, wherein the reserved ribs (2) comprise adjusting ribs (21) on the left side and the right side and stabilizing ribs (22) in the middle; a plurality of transverse movable push plates (3) capable of sliding transversely are uniformly arranged on the adjusting ribs (21), L-shaped jig frame brackets (4) and second hinges (41) are arranged above the transverse movable push plates (3), the vertical parts of the jig frame brackets (4) are fixed on the adjusting ribs (21), the horizontal parts of the jig frame brackets are used as fixed fans of the second hinges (41) to fall on the upper surfaces of the transverse movable push plates (3), and the bending fans of the second hinges (41) are pushed by the transverse movable push plates (3) to be horizontally unfolded and supported below the bending fans unfolded by the first hinges (11); the steel bar reinforced plastic frame is characterized by further comprising a walking platform (5) arranged on the periphery of the steel bar reinforced plastic frame (1), wherein the walking platform (5) comprises an external supporting flat plate and an internal stress frame which are connected with each other, and an adjusting rib through hole (51) and a stabilizing rib through hole (54) for the adjusting rib (21) and the stabilizing rib (22) to pass through are arranged on the external supporting platform; the internal stressed frame falls on the bending fan unfolded by the first hinge (11).
2. The integral pier stud reinforcement platform according to claim 1, wherein the transverse movable push plate (3) comprises an L-shaped left push plate (31) and a L-shaped right push plate (32), the left push plate (31) and the right push plate (32) are oppositely and fixedly connected to form a U-shaped structure, the opening of the U-shaped structure faces outwards and is half-wrapped on the periphery of the adjusting rib (21), and transverse strip-shaped through holes (33) are formed in the left push plate (31) and the right push plate (32); the adjusting rib (21) is provided with a positioning seat (21 a), the positioning seat is inserted into the strip-shaped through hole with room, so that the transverse movable push plate can be pushed inwards, and the occupied strip is inserted into the vacant position in the strip-shaped through hole for locking.
3. The integrated pier stud reinforcement platform according to claim 1, characterized in that the walking platform (5) is provided with force bearing rods (52) connecting adjacent edges of the frame body at four corners of the lower surface of the internal force bearing frame, and the walking platform is placed on the first hinge (11) through the force bearing rods (52).
4. The integrated pier column reinforcement binding platform according to claim 3, wherein three layers of the walking platform (5) and the reinforcement jig frame (1) are arranged on the reserved ribs (2) in parallel from top to bottom, and adjacent layers are connected through stairs.
5. The integrated pier stud reinforcement binding platform according to claim 4, wherein a compression bolt is arranged below the walking platform (5), and the walking platform (5) is placed on the reserved rib (2) through the compression bolt.
6. The integrated pier stud reinforcement binding platform according to any one of claims 3 to 5, characterized in that a triangular bracket (55) fixed on the adjusting rib (21) through a fastening bolt is further arranged below the walking platform (5).
7. The integrated pier stud reinforcement binding platform according to claim 1, wherein the adjusting rib through hole (51) of the walking platform (5) at the adjusting rib (21) is a square through hole for the passing of the horizontal movable push plate (3) in a demoulding state.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023029632.0U CN214459659U (en) | 2020-12-16 | 2020-12-16 | Integral pier stud reinforcement platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023029632.0U CN214459659U (en) | 2020-12-16 | 2020-12-16 | Integral pier stud reinforcement platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214459659U true CN214459659U (en) | 2021-10-22 |
Family
ID=78188967
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023029632.0U Active CN214459659U (en) | 2020-12-16 | 2020-12-16 | Integral pier stud reinforcement platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214459659U (en) |
-
2020
- 2020-12-16 CN CN202023029632.0U patent/CN214459659U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107090925A (en) | Reinforced precast reinforced concrete shear wall, structural system and its construction method | |
US20130298496A1 (en) | Method for assembling shell segments for forming tower sections of a hybrid wind turbine tower | |
JP2790986B2 (en) | Bridge pier construction method and construction method | |
CN112458921B (en) | Integral pier stud reinforcement binding platform and erection method | |
CN214459659U (en) | Integral pier stud reinforcement platform | |
CN212582721U (en) | Bearing platform of tower crane for vertical tower of top plate of foundation garage | |
CN210684430U (en) | Main bridge jacking system of large-span tied arch bridge | |
CN110424243A (en) | A kind of Long span Tied-Arch Bridge Main Bridge jack-up system and jack-up construction method | |
CN116335149A (en) | Construction method of small ultra-deep foundation pit by using front-mounted steel support system | |
CN214363595U (en) | Construction elevator foundation | |
CN206052780U (en) | Modular system drops in a kind of contrary sequence method | |
CN211340847U (en) | Precast beam of underground structure in reverse construction method | |
KR100769552B1 (en) | Method of bent construction for temporary bridge | |
CN114134991A (en) | High-rise building construction method with conversion structure | |
CN112554075A (en) | Integrated prefabricated pier stud installation adjustment cast-in-place device and construction method | |
JPH11140892A (en) | Method for excavating ground and method for constructing underground structure using the same | |
CN218714838U (en) | Self-lifting heavy-load construction platform | |
CN111058476A (en) | Beam lowering construction method of underground structure in reverse construction method | |
CN216587680U (en) | Novel well shear wall template installation device | |
CN211421802U (en) | High-rise building construction machinery | |
CN215052169U (en) | Bracket structure based on climb awl | |
CN112813852B (en) | Repairing and reinforcing method for bridge deck subsidence of in-service bridge | |
CN217949119U (en) | Reinforced concrete frame lattice formula tower crane basis | |
CN220336401U (en) | Open caisson operation platform structure | |
CN210163015U (en) | Non-standard width subway station gantry crane track beam structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |