CN214413585U - Pier greening device - Google Patents

Pier greening device Download PDF

Info

Publication number
CN214413585U
CN214413585U CN202022867055.6U CN202022867055U CN214413585U CN 214413585 U CN214413585 U CN 214413585U CN 202022867055 U CN202022867055 U CN 202022867055U CN 214413585 U CN214413585 U CN 214413585U
Authority
CN
China
Prior art keywords
planting
frame
bridge pier
regular hexahedron
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022867055.6U
Other languages
Chinese (zh)
Inventor
朱美林
王良桂
杨秀莲
陈贡伟
岳远征
施婷婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Forestry University
Original Assignee
Nanjing Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Forestry University filed Critical Nanjing Forestry University
Priority to CN202022867055.6U priority Critical patent/CN214413585U/en
Application granted granted Critical
Publication of CN214413585U publication Critical patent/CN214413585U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The utility model discloses a bridge pier greening device, which comprises a vertical planting mould frame and a planting module; the vertical planting mould frame is formed by combining a plurality of layers of planting frame devices, the whole planting frame device is in a regular hexahedron shape and consists of a regular hexahedron inner wall and a plurality of planting grooves which are arranged outside the inner wall in order, and the inner wall is fixed on a bridge pier; the planting frame device is of a two-half type hollow regular hexahedron structure, the dividing line is the center line of the regular hexahedron, and the joint of the two parts is provided with a button assembly. The two-half type hollow regular hexahedron-shaped planting frame device can be designed and processed into two parts of integral planting frame devices according to the diameter of a pier in advance, then the two-half type planting frame devices are respectively fixed on the pier, and finally the two-half type planting frame devices are spliced through the button assembly; the mode of customizing planting frame device in advance makes the utility model discloses an use more in a flexible way and extensively to reduced the installation degree of difficulty of planting the frame device, improved the efficiency of construction, reduced construction cost.

Description

Pier greening device
Technical Field
The utility model belongs to the technical field of afforestation perpendicularly, concretely relates to afforestation equipment of overpass pier.
Background
The vertical greening is one of the forms of urban three-dimensional greening and can make up for the defects of ground greening. After the urban land is saved, the urban green quantity can be increased, and the ecological benefit can be improved, namely the appearance is attractive. Climbing plants are generally adopted for greening viaduct piers in the market, and inconvenience is easily caused during later maintenance due to the fact that the climbing plants cannot be disassembled. And the planted plants are generally rhamnus davidiana, and the planting of the plant varieties is single. The viaduct occupies a considerable space in a city, so that how to make the greening of the viaduct pier richer is a problem to be solved urgently.
SUMMERY OF THE UTILITY MODEL
The purpose of the invention is as follows: not enough to prior art exists, the utility model aims at providing a afforestation equipment of overpass pier has solved the perpendicular afforestation plant kind of current pier and has richened inadequately and the inconvenient problem of afforestation equipment installation construction.
The technical scheme is as follows: in order to achieve the above purpose, the technical solution adopted by the present invention is as follows:
a bridge pier greening device comprises a vertical planting mould frame and a planting module; the vertical planting mould frame is formed by combining a plurality of layers of planting frame devices, the planting frame devices are in a regular hexahedron shape integrally and are composed of regular hexahedron inner walls and a plurality of planting grooves which are arranged outside the inner walls in order, and the inner walls are fixed on piers.
Furthermore, the planting frame device is of a two-half type hollow regular hexahedron structure, the dividing line is the center line of the regular hexahedron, and a button assembly is arranged at the joint of the two parts.
Furthermore, a round steel structure is arranged at the bottom of the planting groove; each planting groove inclines upwards for a certain angle.
Furthermore, the planting module is arranged in the planting groove, the planting module is of a square structure with an opening on one side and is formed by stainless steel connecting groups, a steel wire mesh frame is arranged on the opening side of the planting module, water permeable holes are formed in the upper portion and the bottom of the planting module, and through holes corresponding to the water permeable holes are formed in the upper portion and the lower portion of the planting groove; planting bags are placed in the planting modules, planting matrixes for planting plants are filled in the planting bags, and green plants are planted in the planting bags.
Further, the diameter of the steel wire net frame is 2 mm.
Further, pier afforestation equipment still includes irrigation system, and irrigation system is including setting up cistern, buret and the shower nozzle in the pier bottom.
Furthermore, the vertical planting mould frame is arranged at the upper part of the reservoir, the water inlet end of the burette is connected into the reservoir, and the water outlet end is provided with a plurality of branch pipes which are respectively connected into the planting bags in each planting module to convey nutrients and water to the planting bags; the spray head is arranged at the top of the bridge pier to spray nutrients and moisture to the plants at the top of the overpass or around the bridge pier, and the water pipe of the spray head is directly connected into the water storage tank or the water inlet end of the burette.
Has the advantages that: compared with the prior art, the utility model has the advantages of it is following: the two-half type hollow regular hexahedron-shaped planting frame device can be designed and processed into two parts of integral planting frame devices according to the diameter of a pier in advance, then the two-half type planting frame devices are respectively fixed on the pier, and finally the two-half type planting frame devices are spliced through the button assembly; the mode of customizing planting frame device in advance makes the utility model discloses an use more in a flexible way and extensively to reduced the installation degree of difficulty of planting the frame device, improved the efficiency of construction, reduced construction cost.
The planting grooves which are arranged in order can plant various plants without mutual influence, the maintenance is more labor-saving and labor-saving, and the light receiving area is larger due to the upward inclined planting grooves; every plants the inslot and independently sets up and plants the module, will plant the bag and place in planting the module, conveniently plant taking out maintenance of bag, can change different plants according to the season of difference.
The setting up of cistern can satisfy the daily watering of green planting among the irrigation system, and the rainwater on the overpass road surface can be collected to the cistern and save, need not or reduce municipal water supply, has practiced thrift the water resource, more green.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a top view of the first embodiment of the present invention, showing the planting frame device in an uncombined state;
FIG. 3 is a top view of the combined planting frame device according to the first embodiment;
FIG. 4 is a schematic structural view of a planting module in the second embodiment;
FIG. 5 is a sectional view of FIG. 1 in the third embodiment.
Detailed Description
The invention will be further elucidated with reference to the drawing.
The utility model discloses a pier afforestation equipment, including planting the die carrier perpendicularly and planting the module.
In the first embodiment, as shown in fig. 1 to 3, the vertical planting formwork is formed by combining a plurality of layers of planting frame devices 1, the planting frame devices 1 are in a regular hexahedron shape as a whole, and are composed of regular hexahedron inner walls and a plurality of planting grooves 2 arranged outside the inner walls in order, the inner walls are made of water-impermeable materials, and the inner walls are fixed on piers a (the piers a in this embodiment are cylindrical).
Further, in order to facilitate installation of the planting frame device 1, the planting frame device 1 is arranged to be of a two-half type hollow regular hexahedron structure, a dividing line is a central line of the regular hexahedron, a button component 4 is arranged at a joint of the two parts and used for connecting the two-half type planting frame device 1 into a whole, the two-half type hollow regular hexahedron-shaped planting frame device 1 can be designed and processed into the planting frame device 1 in advance according to the diameter of a pier a, then the two-half type planting frame device 1 is respectively fixed on the pier a, and finally the planting frame device 1 is spliced through the button component 4.
Further, plant 2 bottoms in groove and be provided with the round steel structure to reinforcing bearing effect, every is planted 2 certain angles of upwards inclining in groove, makes the illumination area of every planting groove 2 bigger.
In the second embodiment, as shown in fig. 4, the planting module 5 is disposed in the planting groove 2, the planting module 5 is a cube structure with an opening on one side, and is formed by a stainless steel connection group, the opening side of the planting module 5, i.e., the outer side viewing portion, is provided with a steel wire mesh frame 6 with a diameter of 2mm, the upper portion and the bottom portion of the planting module 5 are provided with water permeable holes 7, and the upper portion and the lower portion of the planting groove 2 are provided with through holes corresponding to the water permeable holes 7. The planting modules 5 can be selected to have different sizes and specifications according to specific installation conditions.
The upper portion and the bottom of planting module 5 are provided with the hole of permeating water 7 and mainly consider that the piece moisture content is planted on upper portion too much can drip into the piece is planted on the lower part through the hole of permeating water below it (by the module is planted to the lower part above the hole of permeating water and instils into), and the upper and lower relation is the same, for making unnecessary moisture reuse.
Plant the bag in placing in the module 5, plant the inside planting matrix that is used for planting the plant that is equipped with of bag, green plant is planted in planting the bag.
Third embodiment, as shown in fig. 1 and 5, the utility model discloses still include irrigation system, irrigation system is including setting up cistern 3, buret and the shower nozzle (buret and shower nozzle are not shown in the picture) in pier a bottom, plant the die carrier perpendicularly and install on cistern 3 upper portions, and the buret is intake and is held to insert in cistern 3, and the water outlet end sets up a plurality of bleeder and inserts respectively and carry nutrient, moisture to planting the bag in the planting bag in every planting module 5. The spray head is arranged at the top of the bridge pier a to spray nutrients and moisture to the plants at the top of the overpass or around the bridge pier a, and a water pipe of the spray head is directly connected into the reservoir 3 or connected into the water inlet end of the burette.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (7)

1. The utility model provides a pier afforestation equipment which characterized in that: the vertical planting mould frame and the planting module are included; the vertical planting mould frame is formed by combining a plurality of layers of planting frame devices, the planting frame devices are in a regular hexahedron shape integrally and are composed of regular hexahedron inner walls and a plurality of planting grooves which are arranged outside the inner walls in order, and the inner walls are fixed on piers.
2. The bridge pier greening device according to claim 1, wherein: the planting frame device is of a two-half type hollow regular hexahedron structure, a dividing line is a central line of the regular hexahedron, and a button assembly is arranged at a joint of the two parts.
3. The bridge pier greening device according to claim 1, wherein: a round steel structure is arranged at the bottom of the planting groove; each planting groove inclines upwards for a certain angle.
4. The bridge pier greening device according to claim 1, wherein: the planting module is arranged in the planting groove, is of a cube structure with an opening at one side and is formed by stainless steel connecting groups, a steel wire mesh frame is arranged at the opening side of the planting module, water permeable holes are formed in the upper portion and the bottom of the planting module, and through holes corresponding to the water permeable holes are formed in the upper portion and the lower portion of the planting groove; planting bags are placed in the planting modules, planting matrixes for planting plants are filled in the planting bags, and green plants are planted in the planting bags.
5. The pier greening device according to claim 4, wherein: the diameter of the steel wire net frame is 2 mm.
6. The bridge pier greening device according to claim 1, wherein: the bridge pier greening device further comprises an irrigation system, wherein the irrigation system comprises a water storage tank, a burette and a sprayer, and the water storage tank is arranged at the bottom of the bridge pier.
7. The pier greening device according to claim 6, wherein: the vertical planting mould frame is arranged at the upper part of the reservoir, the water inlet end of the burette is connected into the reservoir, and the water outlet end is provided with a plurality of branch pipes which are respectively connected into the planting bags in each planting module to convey nutrients and water to the planting bags; the spray head is arranged at the top of the bridge pier to spray nutrients and moisture to the plants at the top of the overpass or around the bridge pier, and the water pipe of the spray head is directly connected into the water storage tank or the water inlet end of the burette.
CN202022867055.6U 2020-12-02 2020-12-02 Pier greening device Expired - Fee Related CN214413585U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022867055.6U CN214413585U (en) 2020-12-02 2020-12-02 Pier greening device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022867055.6U CN214413585U (en) 2020-12-02 2020-12-02 Pier greening device

Publications (1)

Publication Number Publication Date
CN214413585U true CN214413585U (en) 2021-10-19

Family

ID=78050458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022867055.6U Expired - Fee Related CN214413585U (en) 2020-12-02 2020-12-02 Pier greening device

Country Status (1)

Country Link
CN (1) CN214413585U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855601A (en) * 2022-05-22 2022-08-05 北京工业大学 Pier vertical greening module with rotating and tuning mass vibration reduction functions

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855601A (en) * 2022-05-22 2022-08-05 北京工业大学 Pier vertical greening module with rotating and tuning mass vibration reduction functions

Similar Documents

Publication Publication Date Title
CN201491551U (en) Wall-used vertical greening box
CN100998299B (en) Equipment for automatic water supply for large scale of flower-pot
US7237980B2 (en) System for infiltrating and irrigating water into soil
CN214413585U (en) Pier greening device
CN105746220A (en) PVC pipeline green wall module
CN210580202U (en) Green belt structure
CN111149549A (en) Greening system for automatic water storage and irrigation of sponge city
CN201182113Y (en) Circular arc full automatic water-supply fertilizer-supply flower case
CN201609049U (en) Water plant-growing wall system
CN201690825U (en) Free-irrigation vegetal wall system
CN106069614A (en) A kind of slow release drip irrigation pipe and vertical greening system thereof
CN206559862U (en) A kind of automation light roof greening system utilized circulation more
CN202127683U (en) Serial water-saving irrigation device for planting of plurality of seedlings
CN109168741A (en) retaining wall greening method
CN211267829U (en) Fountain and watering combination device based on landscape design
CN110896778B (en) Afforestation trees transplantation device
CN210263228U (en) Afforestation water storage device
CN211931513U (en) Ecological factory ground greening
CN206024720U (en) Pipe is driped irrigation to slowly -releasing and perpendicular greening system thereof
CN207121986U (en) A kind of municipal rainwater water-storing device
CN202104073U (en) Combined three-dimensional planting device
CN218604153U (en) Afforestation device for garden engineering
CN215380184U (en) Novel multi-functional afforestation pendulum flower device
CN221670505U (en) Ecological building structure
CN218353800U (en) Gardens are with automatic retaining irrigation equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211019

CF01 Termination of patent right due to non-payment of annual fee