Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022875745.6U
Other languages
Chinese (zh)
Inventor
王春冉
杜治衡
姜浩
谢连仲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 5 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 5 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 5 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 5 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN202022875745.6U priority Critical patent/CN214401793U/en
Application granted granted Critical
Publication of CN214401793U publication Critical patent/CN214401793U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a deep foundation pit concrete pouring chute, which comprises a steel sheet pile of an enclosure structure, a primary chute and a secondary chute; the first-level chute is connected with the enclosure structure steel sheet pile through the clamping ring, the first-level chute can rotate up and down along the joint of the clamping ring, the second-level chute is connected with the first-level chute through the rotating shaft assembly, and the second-level chute can rotate 360 degrees along the horizontal plane of the joint. The utility model discloses a deep basal pit concrete placement chute adopts the cooperation of first, second grade chute rotatory in grades to use, can guarantee the concrete and construct in succession, ensures concrete placement construction quality.

Description

Deep foundation pit concrete pouring chute
Technical Field
The utility model relates to a deep basal pit concrete placement chute belongs to the concrete placement field.
Background
Conventional deep foundation pit concrete placement is mostly the pumping, mostly is day pump or ground pump. When the pumping equipment fails and cannot be repaired in time, the concrete pouring construction is interrupted, concrete cannot be poured continuously, and construction quality problems such as cold joints, faults and the like are easily caused.
Disclosure of Invention
Problem to above-mentioned prior art exists, the utility model provides a deep basal pit concrete placement is rotatory chute in grades guarantees the concrete continuous construction, ensures concrete placement construction quality.
In order to achieve the purpose, the deep foundation pit concrete pouring chute comprises an enclosure structure steel sheet pile, a first-stage chute and a second-stage chute;
the first-level chute is connected with the enclosure structure steel sheet pile through the clamping ring, the first-level chute can rotate up and down along the joint of the clamping ring, the second-level chute is connected with the first-level chute through the rotating shaft assembly, and the second-level chute can rotate 360 degrees along the horizontal plane of the joint.
Further, the rotating shaft assembly comprises an upper rotating shaft, an upper channel steel, a lower rotating shaft and a lower channel steel; go up the channel-section steel and install the bottom at the one-level chute, go up pivot horizontal installation and just can follow the axis rotation of last pivot in last channel-section steel, the one end vertical welding of pivot is on last pivot down, and the elliptical aperture that the other end passed last channel-section steel bottom is connected with lower channel-section steel, and gasket and nut are installed with the tip that lower channel-section steel is connected to lower pivot down, open at the both ends of channel-section steel down has the second grade chute connecting hole.
Furthermore, the upper channel steel is welded at the bottom of the first-stage chute.
Furthermore, the first-level chute is formed by processing section steel, and the second-level chute is of a wood structure.
Furthermore, the inclination angle of the first-stage chute is 27-36 degrees, and the inclination angle of the second-stage chute is 15-26 degrees.
Compared with the prior art, the utility model discloses a deep basal pit concrete placement chute adopts the cooperation of one, the second grade chute of rotation in grades to use, can guarantee the concrete and construct in succession, ensures concrete placement construction quality.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the junction between the first-stage chute and the second-stage chute of the present invention;
in the figure: 1. the concrete transportation vehicle comprises a crawler crane, 2, a concrete transportation vehicle, 3, an enclosure structure steel sheet pile, 4, a first-stage chute, 5, a second-stage chute, 6, an upper rotating shaft, 7, an upper channel steel, 8, a lower rotating shaft, 9, a nut, 10, a gasket, 11, a lower channel steel, 12 and a second-stage chute connecting hole.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clear, the present invention is further described in detail below. It should be understood, however, that the description herein of specific embodiments is only intended to illustrate the invention and not to limit the scope of the invention.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs, and the terms used herein in the specification of the present invention are for the purpose of describing particular embodiments only and are not intended to limit the present invention.
As shown in fig. 1 and 2, the deep foundation pit concrete pouring chute comprises an enclosure structure steel sheet pile 3, a primary chute 4 and a secondary chute 5; the one-level chute 4 is connected with the enclosure structure steel sheet pile 3 through the snap ring, the one-level chute 4 can rotate from top to bottom along the snap ring joint, the second-level chute 5 is connected with the one-level chute 4 through the rotating shaft assembly, and the second-level chute 5 can rotate 360 degrees along the horizontal plane of the joint.
As a modification of the embodiment, the rotating shaft assembly comprises an upper rotating shaft 6, an upper channel steel 7, a lower rotating shaft 8 and a lower channel steel 11;
go up the bottom of channel-section steel 7 welding at one-level chute 4, go up 6 horizontal installation of pivot and can follow the axis rotation of last pivot 6 in last channel-section steel 7, the one end vertical welding of pivot 8 is on last pivot 6 down, and the elliptical aperture of the other end extension going up 7 bottoms of channel-section steel is connected with lower channel-section steel 11, and gasket 10 and nut 9 are installed to the tip that lower pivot 8 and lower channel-section steel 11 are connected, open at the both ends of channel-section steel 11 down has second grade chute connecting hole 12.
The utility model discloses utilize shaped steel as one-level chute 4, light-duty timber structure as second grade chute 5. The two-stage chute is connected through the rotating shaft component. Because second grade chute 5 adopts the wooden structure of lightweight, the manual work can be rotatory, and the convenience is better, and the work efficiency is higher.
When the chute is used, the first-stage chute 4 is lifted by the crawler crane 1 and is matched with the concrete transport vehicle 2 to transport concrete, the top end of the first-stage chute 4 is connected with the enclosure structure steel sheet pile 3 through a clamping ring to form hinged connection, and the first-stage chute 4 can be ensured to rotate up and down under the condition of ensuring safety and stability; the upper end of the second-stage chute 5 is connected with the lower end of the first-stage chute 4 through a rotating shaft assembly, and the second-stage chute 5 can rotate 360 degrees in the horizontal plane. The first-stage chute 4 is adjustable up and down, the second-stage chute 5 is adjustable in level, and the chute structure is graded and rotated, so that the coverage range of chute pouring is greatly enlarged.
The processing parameters of the chute need to be determined according to the width and the depth of the foundation pit, and the chute angle needs to be determined according to the slump, the workability and other performances of the concrete. The construction conditions and chute parameters which are successfully applied to the casting process of the concrete of the bottom plate of the river bottom of the Kanapu river under the project S1 segment EJD-6 in the great harbor of Bengal at present are as follows:
the depth of the foundation pit is 7.7m, and the horizontal maximum coverage range of the chute is 17.5 m. The concrete strength grade is C50P10, and the slump is 200 +/-20 mm. The length of the first-stage chute is 10m, the U750X 250 type steel sheet pile (when no available resource exists, the steel sheet pile is processed by section steel), and the chute angle is 27-36 degrees.
The length of the secondary chute is 6m, the batten and the multilayer board are nailed, and the use angle is 15-26 degrees. The efficiency of pouring concrete by the chute is about 40 m/h.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modification, equivalent replacement or improvement made within the spirit and principle of the present invention should be included in the present invention.

Claims (5)

1. The deep foundation pit concrete pouring chute comprises an enclosure structure steel sheet pile (3), and is characterized by further comprising a first-stage chute (4) and a second-stage chute (5);
one-level chute (4) are connected with envelope steel sheet pile (3) through the snap ring, and one-level chute (4) can be followed the snap ring junction and rotated from top to bottom, second grade chute (5) are connected through pivot subassembly with one-level chute (4), and 360 rotations can be made along the junction horizontal plane in second grade chute (5).
2. The deep foundation pit concrete pouring chute according to claim 1, characterized in that the rotating shaft assembly comprises an upper rotating shaft (6), an upper channel (7), a lower rotating shaft (8) and a lower channel (11);
go up channel-section steel (7) and install the bottom at one-level chute (4), go up pivot (6) horizontal installation and can follow the axis rotation of last pivot (6) in last channel-section steel (7), the one end vertical welding of lower pivot (8) is on last pivot (6), and the elliptical hole that the other end passed last channel-section steel (7) bottom is connected with lower channel-section steel (11), and gasket (10) and nut (9) are installed to tip that lower pivot (8) and lower channel-section steel (11) are connected, open at the both ends of lower channel-section steel (11) has second grade chute connecting hole (12).
3. The deep foundation pit concrete pouring chute according to claim 2, characterized in that the upper channel (7) is welded to the bottom of the primary chute (4).
4. The deep foundation pit concrete pouring chute according to claim 1, characterized in that the primary chute (4) is formed by processing section steel, and the secondary chute (5) is of a wood structure.
5. The deep foundation pit concrete pouring chute according to claim 1, characterized in that the inclination angle of the primary chute (4) is 27-36 degrees and the inclination angle of the secondary chute (5) is 15-26 degrees.
CN202022875745.6U 2020-12-04 2020-12-04 Deep foundation pit concrete pouring chute Active CN214401793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022875745.6U CN214401793U (en) 2020-12-04 2020-12-04 Deep foundation pit concrete pouring chute

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022875745.6U CN214401793U (en) 2020-12-04 2020-12-04 Deep foundation pit concrete pouring chute

Publications (1)

Publication Number Publication Date
CN214401793U true CN214401793U (en) 2021-10-15

Family

ID=78036224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022875745.6U Active CN214401793U (en) 2020-12-04 2020-12-04 Deep foundation pit concrete pouring chute

Country Status (1)

Country Link
CN (1) CN214401793U (en)

Similar Documents

Publication Publication Date Title
CN106438212B (en) A kind of folding spelling formula tubbiness tower
US8678455B2 (en) Lifting fitting
US8904738B2 (en) Wind turbine tower supporting structure
CN109610851A (en) A kind of assembled moulding bed and its construction method of curved surface truss
CN103216103A (en) Pre-deformation construction method for mounting oblique-arc-shaped combined steel-structured column of annular roof
CN112538856A (en) Deep basal pit concrete placement chute
CN214401793U (en) Deep foundation pit concrete pouring chute
CN204590598U (en) A kind of readily removable inner corner trim unit for aluminum alloy mould plate system
CN108383016A (en) Assembling steel construction tower crane platform and its construction method
CN205346632U (en) Pipe truss lifting device
CN217602273U (en) Double-layer steel pipe structure for steel pipe tower
CN204139694U (en) Inner wall belt strengthens the steel pipe king-post of structure
KR102045025B1 (en) Roundness Maintaining Device of Large Cylindrical Structure and Manufacturing Method Thereof
CN211368353U (en) Steel trestle steel pipe pile concrete abutment
CN206337654U (en) A kind of beam-column connection structure of steel-structure factory building
CN209618732U (en) Weight tower crane conversion section
CN111962549B (en) Anti-overturning construction method for existing tower crane under working condition of adjacent foundation pile
CN212176534U (en) Inspection shaft design template
CN211312582U (en) Tower structure and tower pile foundation adapter
CN204715362U (en) A kind of deep foundation ditch embedded column base bracing frame
CN110469130B (en) Pipe truss girder and pipe truss column flange plate mounting die and mounting method
CN202954578U (en) Structure for connecting tilted stair with rest platform of prefabricated assembled detachable type foundation pit ladder
CN208378255U (en) Assembling steel construction tower crane platform
CN113062348A (en) Concrete foundation structure of tower crane
CN111779347A (en) Door-shaped guyed tower leg reinforcing device and reinforcing method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant