CN211312582U - Tower structure and tower pile foundation adapter - Google Patents

Tower structure and tower pile foundation adapter Download PDF

Info

Publication number
CN211312582U
CN211312582U CN201922039413.1U CN201922039413U CN211312582U CN 211312582 U CN211312582 U CN 211312582U CN 201922039413 U CN201922039413 U CN 201922039413U CN 211312582 U CN211312582 U CN 211312582U
Authority
CN
China
Prior art keywords
tower
pile foundation
connecting piece
foundation
flange plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922039413.1U
Other languages
Chinese (zh)
Inventor
卓佐君
滕才智
陆温琪
钱忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Huaxun Communication Service Co ltd
Original Assignee
Ningbo Huaxun Communication Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Huaxun Communication Service Co ltd filed Critical Ningbo Huaxun Communication Service Co ltd
Priority to CN201922039413.1U priority Critical patent/CN211312582U/en
Application granted granted Critical
Publication of CN211312582U publication Critical patent/CN211312582U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a pole tower type pile foundation adapter, which comprises a tower foot connecting piece used for connecting a pole tower and an adapter part positioned below the tower foot connecting piece; the upper end of the switching part is connected with the tower foot connecting piece through a plurality of first fasteners, and the lower end of the switching part is provided with a tower footing connecting piece and a plurality of second fasteners for connecting a pile foundation. Through the tower foot connecting piece of being connected with the shaft tower and the switching portion of being connected with the pile foundation, this shaft tower class pile foundation switching piece can make full use of current resource realize being connected of shaft tower and pile foundation of the same or different models, simple to operate and be convenient for follow-up maintenance and change to practice thrift investment construction cost, improve economic benefits. The utility model also discloses a shaft tower structure of including above-mentioned pole tower class pile foundation adaptor.

Description

Tower structure and tower pile foundation adapter
Technical Field
The utility model relates to a shaft tower field especially relates to a shaft tower type pile foundation adaptor. Still relate to a shaft tower structure including above-mentioned shaft tower class pile foundation adaptor.
Background
The pole tower structure is widely applied to various industries of modern society, such as a monitoring pole, a light pole, a communication pole, an electric power pole and the like. A tower structure typically comprises a pile foundation fixed to the ground and a tower fixed above the pile foundation.
In the need of urban development, a large number of tower structures are newly built or removed, the tower type of an upper tower needs to be changed according to actual conditions, a newly built pile foundation is damaged artificially, the original stored towers need to be utilized, and the like. However, no matter the tower structure is newly built or the original tower or pile foundation is utilized to build the tower structure, due to the various objective reasons, the bolt holes of the tower and the embedded anchor bolts of the pile foundation in the same construction period have unmatched risks, only the tower and the pile foundation with the same and intact model can be utilized, and the tower and the pile foundation with different models or local damage cannot be applied again, so that great economic waste is caused.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a shaft tower class pile foundation adaptor can couple together the shaft tower and the pile foundation of the same or different models, and its simple to operate just is favorable to follow-up maintenance and change, realizes having the make full use of resource, practices thrift investment construction cost, improves economic benefits. Another object of the utility model is to provide a shaft tower structure including above-mentioned shaft tower class pile foundation adaptor.
In order to achieve the above object, the utility model provides a shaft tower type pile foundation adaptor, include:
a tower foot connecting piece used for connecting a tower;
the adapter part is positioned below the tower foot connecting piece; the upper end of the switching part is connected with the tower foot connecting piece through a plurality of first fasteners, and the lower end of the switching part is provided with a tower footing connecting piece and a plurality of second fasteners for connecting a pile foundation.
Preferably, the upper end of the adapter part is provided with a tower foot connecting flange plate; and a plurality of stiffening rib plates are arranged between the tower foot flange plate for connecting the tower and the tower foundation connecting piece to form a double-layer flange.
Preferably, the tower foot connecting piece is a tower foot flange plate, and the tower foot flange plate is provided with a plurality of first connecting holes; the tower foot connecting flange plate is provided with a plurality of second connecting holes which are used for aligning with the first connecting holes; and two ends of the first fastener penetrating into the first connecting hole and the second connecting hole are respectively locked on the tower foot flange plate and the tower foot connecting flange plate of the connecting tower.
Preferably, the tower footing connecting piece is a concrete foundation flange plate; the concrete foundation flange plate is provided with a plurality of third connecting holes, and the concrete foundation flange plate is provided with a plurality of fourth connecting holes which are used for being aligned with all the third connecting holes one by one.
Preferably, the number of the second connection holes is equal to the number of the first connection holes, and/or the number of the fourth connection holes is equal to the number of the third connection holes.
Preferably, the first fastener is a high-strength bolt; and a steel gasket is arranged between any high-strength bolt and the tower foot connecting piece.
Preferably, the second fastener is specifically an anchor bolt; and foundation bolt positioning plates are arranged between all the foundation bolts and the lower end surface of the tower foundation connecting piece.
The utility model also provides a shaft tower structure, including shaft tower and pile foundation, still include as above shaft tower class pile foundation adaptor.
Compared with the prior art, the utility model provides a shaft tower type pile foundation adapter comprises a tower foot connecting piece and an adapter part; the tower foot connecting piece and the switching part are arranged between the tower and the pile foundation to play a role in connecting the tower and the pile foundation.
The tower foot connecting piece is fixedly connected with the tower; the upper end of the switching part is connected with the tower foot connecting piece through a plurality of first fasteners, and the tower footing connecting piece at the lower end of the switching part is connected with the pile foundation through a plurality of second fasteners.
The pole tower type pile foundation adapter can be used for connecting pole towers and pile foundations of the same or different types, is convenient to install and is beneficial to subsequent maintenance and replacement, so that the original pole towers or pile foundations and partially damaged pole towers or pile foundations are reused, the existing resources are fully utilized, the investment and construction cost is saved, and the economic benefit is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts.
Fig. 1 is the utility model provides a shaft tower class pile foundation adaptor's installation schematic diagram.
The tower comprises a tower body 01, a pile foundation 02, a tower foot connecting piece 1, a connecting part 2, a tower foot connecting piece 21, a tower foot connecting flange plate 22, a stiffening rib plate 23, a first fastening piece 31, a second fastening piece 32, a steel gasket 4 and a foundation bolt positioning plate 5.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In order to make the technical field of the present invention better understand, the present invention will be described in detail with reference to the accompanying drawings and the detailed description.
Referring to fig. 1, fig. 1 is a schematic view illustrating an installation of a pole tower pile foundation adapter according to an embodiment of the present invention.
The utility model provides a shaft tower class pile foundation adaptor, include the switching portion 2 that is used for connecting the tower foot connecting piece 1 of shaft tower 01 and is located the below of tower foot connecting piece 1. The upper end of the adapter part 2 is connected with the tower foot connecting piece 1 through a plurality of first fasteners 31, and the lower end of the adapter part 2 is provided with a tower foundation connecting piece 21 used for connecting the pile foundation 02 and a plurality of second fasteners 32.
The tower foot connecting piece 1 and the tower 01 can be fixedly connected in an assembling mode, for example, the tower 01 is cylindrical, and the middle part of the tower foot connecting piece 1 is provided with a mounting hole for the tower 01 to penetrate; and can also be welded and fixed.
The first fasteners 31 are connected between the upper end of the switching part 2 and the tower foot connecting piece 1, so that the switching part 2 and the tower 01 are fixed; the second fasteners 32 are connected between the tower foundation connecting piece 21 at the lower end of the adapter part 2 and the pile foundation 02, so that the adapter part 2 and the pile foundation 02 are fixed. The upper end of the adapter 2 is matched with the tower foot connecting piece 1, for example, the part of the tower foot connecting piece 1 used for connecting the adapter 2 is matched with the size and shape of the upper end of the adapter 2.
To sum up, the pole tower 01 and the pile foundation 02 which have the same model or different models can be connected by the pole tower type pile foundation adapter piece, so that the original pole tower 01 or the original pile foundation 02 can be fully utilized for construction, the pole tower 01 and the pile foundation 02 can be continuously connected when the pole tower 01 or the pile foundation 02 is partially damaged and still has use value, the smooth construction is ensured, the repeated investment construction is avoided, and the construction cost is saved.
The following describes the pole tower pile foundation adaptor provided by the present invention with reference to the accompanying drawings and embodiments.
In a first embodiment, the adapter part 2 is provided as a double-walled flange. The tower foot connecting flange plate 22 at the upper end of the double-layer flange is fixed with the tower foot connecting piece 1 through a first fastener 31, and the tower foundation connecting piece 21 at the lower end of the double-layer flange is connected with the pile foundation 02 through a second fastener 32.
The tower footing connecting piece 21 is also provided with a flange structure, and the specific shape, size and material of the tower footing connecting piece 21 are specifically arranged according to the types of different pile foundations 02.
A plurality of stiffening rib plates 23 are arranged between the flange plate of the tower foot of the connecting rod tower and the tower footing connecting piece 21, so that the connecting strength of the flange plate of the tower foot of the connecting rod tower and the tower footing connecting piece 21 is improved, and meanwhile, a sufficient installation space is provided for other structural components including all the first fastening pieces 31 and all the second fastening pieces 32. A space is reserved between any two adjacent stiffening ribs 23 for the first fastener 31 and the second fastener 32 to pass through. For example, the middle of the flange plate of the tower foot of the connecting rod tower and the middle of the tower footing connecting piece 21 are fixedly connected through a connecting column, and all the stiffening rib plates 23 extend to the periphery by taking the connecting column as the center.
The shapes and the sizes of the flange plate of the tower foot of the connecting rod tower and the tower footing connecting piece 21 can be the same, so that the processing and the manufacturing of the double-layer flange are simplified; it may also be different, for example, the connecting rod tower foot flange plate is different in shape from the tower foundation connecting piece 21 and the connecting rod tower foot flange plate is either larger or smaller in size than the tower foundation connecting piece 21, but in any case, the connecting rod tower foot flange plate fits the shape and size of the tower foot connecting piece 1, and the tower foundation connecting piece 21 fits the shape and size of the pile foundation 02. It should be noted that the shape and size matching mentioned here is mainly embodied in that the mounting position of the connecting rod tower foot flange plate corresponds to the mounting position of the tower foot connecting piece 1, and the first fastening piece 31 can be assembled to realize the connection, and similarly, the mounting position of the tower base connecting piece 21 corresponds to the mounting position of the pile foundation 02, and the second fastening piece 32 can be assembled to realize the connection.
Above-mentioned setting can improve the suitability of this shaft tower class pile foundation adaptor, for example, when shaft tower 01 that is under construction and the pile foundation 02 that has accomplished the construction are not unmatched, this shaft tower class pile foundation adaptor's tower foot connecting piece 1 and shaft tower 01 fixed connection, and the tower foot connecting piece 21 and the pile foundation 02 fixed connection of double-deck flange, the tower foot connecting piece 1 and the pile foundation 02 fixed connection of connecting shaft tower 01 of rethread double-deck flange's connecting tower foot flange plate 22. Or when the tower 01 is partially damaged, the tower foot connecting piece 1 is used for reconnecting the residual and intact part of the tower 01, and then the tower foot connecting piece 1 is arranged on the connecting tower foot flange plate 22 of the double-layer flange. Of course, the method is also applicable to the connection between the original tower 01 and the newly-poured pile foundation 02 or the connection between the original pile foundation 02 and the newly-built tower 01.
The tower foot connecting piece 1 can be arranged as a tower foot flange plate. The tower foot flange plate is provided with a plurality of first connecting holes; the tower foot flange plate 22 is provided with a plurality of second connecting holes for aligning with the first connecting holes; the two ends of the first fastener 31 penetrating into the first connecting hole and the second connecting hole are respectively locked on the tower foot flange plate and the tower foot connecting flange plate 22.
In a second embodiment, the first fastening member 31 may be provided as a high-strength bolt. Any high-strength bolt is sleeved with a plurality of locking nuts, any high-strength bolt penetrates through the tower foot connecting piece 1 and then penetrates through the upper end of the switching part 2 during installation, and a pair of locking nuts are arranged on two sides of the tower foot connecting piece 1 and two sides of the upper end of the switching part 2 of any high-strength bolt.
The pair of locking nuts realizes the relative fixation of the tower foot connecting piece 1 and the high-strength bolt, the other pair of locking nuts realizes the relative fixation of the upper end of the switching part 2 and the high-strength bolt, the distance between the tower foot connecting piece 1 and the upper end of the switching part 2 can be adjusted by adjusting the distance between the two pairs of locking nuts, namely, the high-strength bolt realizes the fixed connection between the tower foot flange plate and the tower foot flange plate 22 connected with the tower, and the high-strength bolt enables the height between the tower foot flange plate and the tower foot flange plate 22 connected with the tower to be adjustable on the other hand, so that the actual installation height of the tower 01 can be adjusted after the tower 01 is partially damaged and reused, and the installation height of the tower 01 is prevented from being different from the installation heights of other undamaged towers 01.
Of course, in most cases in actual operation, since the range of height adjustment is not obvious relative to the original length of the tower 01, the tower 01 can be regarded as leveling. For example, when the upper end of the adapter part 2 of the connecting pile foundation 02 is not in the horizontal plane, the leveling of the upper end surface of the adapter part 2 can be realized by adjusting part of high-strength bolts among all the high-strength bolts.
In order to improve the connection strength and the rigidity of the connection part, a steel gasket 4 is arranged between any high-strength bolt and the tower foot connecting piece 1, and correspondingly, the steel gasket 4 can also be arranged between any high-strength bolt and the upper end of the switching part 2.
The tower footing connecting member 21 of the adapter part 2 is connected to the pile foundation 02, and in the third embodiment, the second fastening member 32 is specifically configured as an anchor bolt according to the structure of the existing pile foundation 02. Aiming at the original pile foundation 02 and the newly-built tower 01, the foundation bolt is utilized to lock the pile foundation 02 and the tower foundation connecting piece 21, so that original resources can be fully utilized, and simply, the foundation bolt connected with the original pile foundation 02 can be utilized as the foundation bolt in the tower type pile foundation adapter piece, so that repeated investment construction is avoided.
The lower end face of the tower footing connecting piece 21 is attached to the upper end face of the pile foundation 02, the foundation bolt positioning plate 5 is further arranged between the lower end face of the tower footing connecting piece 21 and the pile foundation 02, and all foundation bolts penetrate through the foundation bolt positioning plate 5 to be connected with the pile foundation 02.
The utility model also provides a tower structure, including shaft tower 01 and pile foundation 02, according to the difference of application, shaft tower 01 can be newly-built shaft tower 01, also can be reuse's old shaft tower 01, and similarly, pile foundation 02 can be newly-built pile foundation 02, also can be reuse's old pile foundation 02. Because the improvement point of the tower structure lies in that the tower pile foundation adapter provided by the embodiment is used for connection, and the tower pile foundation adapter is respectively connected with the tower 01 and the pile foundation 02 through the tower foot connecting piece 1 and the adapter part 2, the tower 01 and the pile foundation 02 are not limited to be the tower 01 and the pile foundation 02 with the same structure type, and the tower 01 and the pile foundation 02 with different structure types can be connected after being installed through the tower foot connecting piece 1 and the tower foundation connecting piece 21 at the lower end of the adapter part 2, so that the problem that the tower 01 is not matched with the pile foundation 02 is solved.
It is right above the utility model provides a shaft tower structure and shaft tower class pile foundation adaptor have carried out the detailed introduction. The principles and embodiments of the present invention have been explained herein using specific examples, and the above descriptions of the embodiments are only used to help understand the method and its core ideas of the present invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.

Claims (8)

1. The utility model provides a shaft tower class pile foundation adaptor which characterized in that includes:
a tower foot connecting piece (1) used for connecting a tower (01);
the adapter part (2) is positioned below the tower foot connecting piece (1); the upper end of the adapter part (2) is connected with the tower foot connecting piece (1) through a plurality of first fasteners (31), and the lower end of the adapter part (2) is provided with a tower foundation connecting piece (21) used for connecting a pile foundation (02) and a plurality of second fasteners (32).
2. The pole tower pile foundation adapter according to claim 1, wherein the upper end of the adapter part (2) is provided with a flange plate (22) for connecting a pole tower foot; a plurality of stiffening rib plates (23) are arranged between the tower foot flange plate (22) and the tower foundation connecting piece (21) to form a double-layer flange.
3. The pole tower pile foundation adapter according to claim 2, wherein the tower foot connecting piece (1) is specifically a tower foot flange plate, and the tower foot flange plate is provided with a plurality of first connecting holes; the tower foot connecting flange plate (22) is provided with a plurality of second connecting holes which are aligned with the first connecting holes; the two ends of the first fastener (31) penetrating into the first connecting hole and the second connecting hole are respectively locked on the tower foot flange plate and the tower foot connecting flange plate (22).
4. The tower pile foundation adapter according to claim 3, wherein the tower foundation connecting piece (21) is a concrete foundation flange plate; the concrete foundation flange plate is provided with a plurality of third connecting holes, and the concrete foundation flange plate is provided with a plurality of fourth connecting holes which are used for being aligned with all the third connecting holes one by one.
5. The pole tower pile foundation adapter according to claim 4, wherein the number of the second connection holes is equal to the number of the first connection holes, and/or the number of the fourth connection holes is equal to the number of the third connection holes.
6. The pole tower pile foundation adapter according to claim 1, wherein the first fastening member (31) is a high-strength bolt; and a steel gasket (4) is arranged between any high-strength bolt and the tower foot connecting piece (1).
7. The pole tower pile foundation adapter according to claim 1, wherein the second fastening member (32) is embodied as an anchor bolt; and foundation bolt positioning plates (5) are arranged between all the foundation bolts and the lower end surface of the tower footing connecting piece (21).
8. A tower construction comprising a tower (01) and a pile foundation (02), characterized in that it further comprises a tower-like pile foundation adapter according to any one of claims 1 to 7.
CN201922039413.1U 2019-11-21 2019-11-21 Tower structure and tower pile foundation adapter Expired - Fee Related CN211312582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922039413.1U CN211312582U (en) 2019-11-21 2019-11-21 Tower structure and tower pile foundation adapter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922039413.1U CN211312582U (en) 2019-11-21 2019-11-21 Tower structure and tower pile foundation adapter

Publications (1)

Publication Number Publication Date
CN211312582U true CN211312582U (en) 2020-08-21

Family

ID=72054343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922039413.1U Expired - Fee Related CN211312582U (en) 2019-11-21 2019-11-21 Tower structure and tower pile foundation adapter

Country Status (1)

Country Link
CN (1) CN211312582U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117779821A (en) * 2023-12-29 2024-03-29 上海勘测设计研究院有限公司 Marine anemometer tower foundation structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117779821A (en) * 2023-12-29 2024-03-29 上海勘测设计研究院有限公司 Marine anemometer tower foundation structure

Similar Documents

Publication Publication Date Title
EP1849920B1 (en) Tower adapter, method of producing a tower foundation and tower foundation
CN211312582U (en) Tower structure and tower pile foundation adapter
CN110593301A (en) Prefabricated foundation assembly and assembling method thereof
CN111411642A (en) Ribbed plate type fan foundation
CN213898375U (en) Pole tower in-situ lifting device
CN211285285U (en) Can have enough to meet need construction bracket attachment structure
CN212896443U (en) Assembled steel construction tower machine basis
CN210127028U (en) Gantry crane end well track beam and gantry crane end well track mounting assembly
CN217896554U (en) Be used for pre-buried positioner of different model tower crane foundations
CN102251536A (en) Vertical positioning connecting structure of base frame of tower mast type mechanical equipment
CN220827169U (en) Tower crane attaching device for well
CN219138563U (en) Insert angle steel fixed knot and construct convenient to urgent repair that continues
CN217460654U (en) Ground screw frame construction
CN220868882U (en) Reusable bearing device with assembled structure
CN219586740U (en) Pouring structure of foundation pit side wall
CN218437170U (en) Framework lifting seat for transformer substation and cable terminal station
CN217581524U (en) Assembled can have enough to meet need use type flag platform
CN219653928U (en) Detachable rubber shock insulation support connecting structure
CN112482870B (en) Pole tower in-situ lifting device
CN220414843U (en) Post-pouring strip formwork system
CN219886907U (en) Can turnover assembled steel connection tower crane foundation of use
CN217079763U (en) Steel construction rag bolt group wholly assembles construction system
CN220058564U (en) Reinforcing bar rack supports protector
CN208981318U (en) Template for artificial digging pile
CN207017285U (en) A kind of prefabricated independent column foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200821