CN214350771U - Device for quick alignment of chemical tower equipment - Google Patents

Device for quick alignment of chemical tower equipment Download PDF

Info

Publication number
CN214350771U
CN214350771U CN202120113001.2U CN202120113001U CN214350771U CN 214350771 U CN214350771 U CN 214350771U CN 202120113001 U CN202120113001 U CN 202120113001U CN 214350771 U CN214350771 U CN 214350771U
Authority
CN
China
Prior art keywords
equipment
alignment
chemical tower
tower equipment
longeron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120113001.2U
Other languages
Chinese (zh)
Inventor
刘胜峰
娄战士
张永昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Eleventh Chemical Construction Co Ltd
Original Assignee
China Eleventh Chemical Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Eleventh Chemical Construction Co Ltd filed Critical China Eleventh Chemical Construction Co Ltd
Priority to CN202120113001.2U priority Critical patent/CN214350771U/en
Application granted granted Critical
Publication of CN214350771U publication Critical patent/CN214350771U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a device is used in quick alignment of chemical tower class equipment, including the jacking system, the jacking system sets up at the support inboard, the support includes the roof, roof fixed connection is on the longeron, the longeron sets up at the stull both ends, sliding connection has the lifting rod on the stull. The utility model discloses simple structure, it is convenient that the installation is dismantled, can effectively accomplish tower equipment alignment work and improve the quick device for alignment of chemical tower equipment of alignment efficiency.

Description

Device for quick alignment of chemical tower equipment
Technical Field
The utility model belongs to the technical field of equipment fixing, in particular to quick alignment of chemical tower class equipment is with device.
Background
In the project construction, to in petrochemical construction, chemical plant especially tower equipment installation back of taking one's place often can appear inclining, causes the not up to standard phenomenon of straightness that hangs down, often adopts the sledgehammer to strike the steel wedge among the prior art and carries out the alignment, strikes with the manual work, and is longer with the time spent, and the crane is because of the unable unhook of long-time, increases construction cost, in addition, because of the manual work uses the hammer to strike, has certain object and strikes safe risk. Therefore, the device for quickly aligning the chemical tower equipment is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a simple structure, it is convenient that the installation is dismantled, can effectively accomplish the quick device for alignment of chemical tower equipment of tower equipment alignment work and improvement alignment efficiency.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a quick device for alignment of chemical tower class equipment, includes the jacking system, the jacking system sets up at the support inboard, the support includes the roof, roof fixed connection is on the longeron, the longeron sets up at the stull both ends, sliding connection has the lifting rod on the stull.
Be provided with the pillar on the longeron, pillar one end fixed connection is on the longeron, and other end fixed connection is on the roof.
The middle part of the top plate is provided with a step-shaped through hole, and the upper end of the jacking device is movably clamped in the through hole.
The end part of the hoisting rod is of a wedge-shaped structure.
The jacking device is a jack.
And two ends of the support are fixed by welding.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the device is simple in structure and convenient to manufacture, utilizes the lever principle, saves time and labor, and effectively improves the installation efficiency of tower equipment;
2. the jack is used for providing jacking force for the equipment, so that the jacking force of the equipment can be effectively achieved, the manpower is saved, and the universality is high;
3. the bracket can be made of conventional channel steel and conventional materials, so that the bracket can be recycled, and the cost is saved;
4. the cross brace is arranged, when the alignment is carried out, the lifting rod can be slightly knocked, so that the lifting rod moves in the horizontal direction, and the horizontal fine adjustment is carried out on the alignment.
In addition, the device is convenient to install, safe and reliable, and is easy to operate when in use, so that the manpower is greatly saved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a left side view of the structure of the present invention;
FIG. 3 is a first schematic view of the present invention in use;
fig. 4 is a schematic view of the usage state of the present invention.
Detailed Description
Referring to fig. 1-4, a quick device for alignment of chemical tower equipment, including jacking system 2, jacking system 2 sets up in support 1 inboard, and support 1 includes roof 11, and roof 11 fixed connection is on longeron 13, and longeron 13 sets up at stull 12 both ends, and sliding connection has a jack rod 14 on stull 12. The bracket 1 can adopt a conventional channel steel. The number of the wales 12 is plural, and two wales may be used. The cross brace 12 is provided so that when aligned, the lifting rod 14 can be slightly knocked so that the lifting rod 14 moves in a horizontal direction, making fine horizontal adjustments to the alignment.
The longitudinal beam 13 is provided with a strut 15, one end of the strut 15 is fixedly connected to the longitudinal beam 13, and the other end of the strut 15 is fixedly connected to the top plate 11. The provision of the struts 15 enhances the overall strength of the stent 1.
A step-shaped through hole is arranged in the middle of the top plate 11, and the upper end of the jacking device 2 is movably clamped in the through hole. Set up the through-hole, multiplicable roof 11 wraps up jacking device 2 to jacking device 2's area of contact for when jacking device 2 rose, improved the stability of roof 11 motion.
The lifting rods 14 end in a wedge-shaped configuration. The provision of the wedge formation facilitates insertion of the lifting rod 14 into the bottom end of the tower-like equipment skirt 31.
The jacking device 2 is a jack. The jack is a screw jack.
Both ends of the strut 15 are fixed by welding.
When the device is used, the chemical device tower equipment 3 is installed in place, then equipment verticality alignment is carried out on the center of the tower through the theodolite, and if the equipment verticality alignment exceeds the installation standard requirement, the equipment alignment is needed to reach the installation standard requirement. The device is arranged on a tower equipment foundation 5, the low point of a skirt 31 of the tower equipment is found, then the device is moved, a lifting rod 14 is inserted into the low point of the skirt 31, a spiral jack pressure rod 21 is pressed, a jack jacks up a top plate 11, the top plate 11 drives a jacking device 2 to lift up the low point, at the moment, a steel sizing block 4 installed below the skirt 31 is drawn out until the center of the tower coincides with the cross center line of a theodolite, the alignment deviation requirement is met, and the pressure rod 21 is stopped being pressed; then finding the high point of the skirt seat 31 of the tower equipment, moving the device, inserting the lifting rod 14 into the high point of the skirt seat 31, jacking by using a jack, extracting the steel sizing block 4 installed below the skirt seat 31, pressing the screw type jack pressure rod 21, allowing the jack to fall down, driving the top plate 11 to fall down, allowing the high point to fall down, and stopping pressing the pressure rod 21 until the center of the tower is coincided with the cross center line of the theodolite to meet the alignment deviation requirement; can rise or fall through spiral jack screw rod to the stress point of rising or whereabouts point symmetric position is the original point, utilizes the pole principle, by jack lift force, overcomes equipment gravity, and after arriving alignment position, installation equipment steel parallels 4, spiral jack screw rod puts down, and equipment bears equipment weight by steel parallels 4, and extraction element accomplishes the alignment task.

Claims (6)

1. The utility model provides a quick device for alignment of chemical tower class equipment, includes jack-up device, its characterized in that: the jacking device is arranged on the inner side of the support, the support comprises a top plate, the top plate is fixedly connected to the longitudinal beam, the longitudinal beam is arranged at two ends of the cross arm, and the cross arm is connected with a lifting rod in a sliding mode.
2. The device for rapidly aligning the chemical tower equipment as claimed in claim 1, wherein: be provided with the pillar on the longeron, pillar one end fixed connection is on the longeron, and other end fixed connection is on the roof.
3. The device for rapidly aligning the chemical tower equipment as claimed in claim 2, wherein: the middle part of the top plate is provided with a step-shaped through hole, and the upper end of the jacking device is movably clamped in the through hole.
4. The device for rapidly aligning the chemical tower equipment as claimed in claim 3, wherein: the end part of the hoisting rod is of a wedge-shaped structure.
5. The device for rapidly aligning the chemical tower equipment as claimed in claim 4, wherein: the jacking device is a jack.
6. The device for rapidly aligning the chemical tower equipment as claimed in claim 5, wherein: and two ends of the support are fixed by welding.
CN202120113001.2U 2021-01-15 2021-01-15 Device for quick alignment of chemical tower equipment Active CN214350771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120113001.2U CN214350771U (en) 2021-01-15 2021-01-15 Device for quick alignment of chemical tower equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120113001.2U CN214350771U (en) 2021-01-15 2021-01-15 Device for quick alignment of chemical tower equipment

Publications (1)

Publication Number Publication Date
CN214350771U true CN214350771U (en) 2021-10-08

Family

ID=77957389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120113001.2U Active CN214350771U (en) 2021-01-15 2021-01-15 Device for quick alignment of chemical tower equipment

Country Status (1)

Country Link
CN (1) CN214350771U (en)

Similar Documents

Publication Publication Date Title
CN105863362A (en) Deviation rectifying device for inclined transmission tower
CN214350771U (en) Device for quick alignment of chemical tower equipment
CN201083018Y (en) Mobile multipurpose fast mounting scaffold
CN209740490U (en) Lifting appliance suitable for lowering reinforcement cages with different diameters
CN203238967U (en) Large steel structure frame whole lifting device
CN217325056U (en) Self-stabilizing device for building single pier column cantilever bent cap by core-piercing rod method
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN112030996B (en) A construction platform for foundation ditch crown beam upper portion
CN211421883U (en) Prestressed tensioning jack lifting device
CN212715005U (en) Combined building pile foundation
CN203361170U (en) Supporting upright column pile for building foundation pit support
CN112096097A (en) Steel stand straightness adjusting device that hangs down
CN206385540U (en) A kind of pile press machine
CN213448504U (en) A construction platform for foundation ditch crown beam upper portion
CN217948794U (en) Device that supplementary cast-in-place box girder roof board horizontal prestressing force construction jack hung
CN214302944U (en) Steel stand straightness adjusting device that hangs down
CN110921507B (en) Steel column lifting stability control support and lifting method
CN220666221U (en) Precast pile construction equipment
CN212101754U (en) Tower crane base
CN220664557U (en) Tool capable of rapidly accommodating and extracting thick cable
CN210828558U (en) High-strength cement telegraph pole
CN216007027U (en) Seamless steel pipe concrete cushion cap combination formula tower crane foundation structure
CN211200387U (en) Static pressure precast pile stop gear
CN215717407U (en) Control structure for adjusting verticality of upright post of light steel structure
CN215212282U (en) Supporting structure for elevator shaft operating platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant