Prior art keywords
plate
pipeline
butt
butt joint
steel sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022208038.1U
Other languages
Chinese (zh)
Inventor
林永怀
丁彧
陈宁
徐昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN202022208038.1U priority Critical patent/CN214330014U/en
Application granted granted Critical
Publication of CN214330014U publication Critical patent/CN214330014U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a floor pipeline entrance to a cave block structure, include: the water-stopping steel plate is pre-buried around the concrete at the opening, the water-stopping steel plate extends out of the concrete at the opening, the supporting net rack is erected on the water-stopping steel plate and can be used for a pipeline to pass through, the butt joint plate is arranged at the bottom of the support net rack, the butt joint plate is clamped at the outer side of the pipeline, the support net rack comprises a plurality of frame vertical rods which are arranged in parallel, the plurality of frame vertical rods are connected through a plurality of supporting rods, a plurality of inner holes are formed in the length direction of the frame vertical rods, clamping heads are arranged at two ends of the frame vertical rods, clamping heads are arranged at one ends of the supporting rods, the inner holes are used for the supporting rods to pass through, the clamping heads are clamped at the outer side of the water stop steel plate, the end parts of the supporting rods are positioned at the upper part of the water stop steel plate, the frame vertical rods are provided with a plurality of hooks which extend downwards, the socket is arranged at the position corresponding to the hook of the butt joint plate, and the socket is connected with or separated from the hook, so that the technical problems that steel bars need to be planted for hole plugging and a hole with a large size is difficult to plug in the prior art are solved.

Description

Floor pipeline entrance to a cave block structure
Technical Field
The utility model belongs to the technical field of the building, especially, relate to a floor pipeline entrance to a cave block structure.
Background
In the construction engineering construction, often can be because of keeping somewhere interim pipeline or carrying out water and electricity fire-fighting construction and leave a large amount of floor pipeline entrance to a cave and need the shutoff, the tradition utilizes the iron wire to hang the mould device that hangs of plywood and carries out the shutoff, and is very laborious and time-consuming, and because of the reinforcement mode, can not be applicable to the entrance to a cave slightly bigger. Meanwhile, the later-stage bar planting is often needed in construction to connect the plate bars in the original floor, or the condition that the steel bars are not connected also exists, so that the forming quality and integrity of the concrete are greatly influenced. And the waterproof effect after construction is poor for the pipeline openings with waterproof requirements in toilets and the like. One set of system can not be applicable to pipeline entrance to a cave shutoff and general entrance to a cave shutoff simultaneously, has the limitation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a floor pipeline entrance to a cave plugging structure solves among the above-mentioned prior art entrance to a cave shutoff and needs to carry out the difficult technical problem who blocks up in the great entrance to a cave of bar planting and size.
The utility model provides a technical scheme that its technical problem adopted is:
a floor slab pipeline opening block structure, includes: stagnant water steel sheet, support rack and buttcover plate, stagnant water steel sheet is pre-buried around entrance to a cave concrete, stagnant water steel sheet stretches out entrance to a cave concrete, the support rack sets up on stagnant water steel sheet, the support rack can supply the pipeline to pass through, buttcover plate sets up in support rack bottom, the buttcover plate joint is in the pipeline outside, the support rack includes a plurality of parallel arrangement's frame pole, a plurality of frame pole connect through a plurality of bracing pieces, frame pole length direction has a plurality of holes, frame pole both ends have the chuck, bracing piece one end has the chuck, the hole supplies the bracing piece to pass, the chuck joint is in the stagnant water steel sheet outside, the bracing piece tip is located stagnant water steel sheet upper portion, frame pole has a plurality of downwardly extending's couple, buttcover plate has the socket with couple position department of correspondence, the socket is connected with or separated from the hook.
The utility model discloses a floor pipeline entrance to a cave block structure, the buttcover plate includes: the first butt joint plate and the second butt joint plate are L-shaped plates which are matched with each other, the second butt joint plate is provided with a groove, the first butt joint plate is provided with a tenon, and the groove is matched with the tenon.
The utility model discloses a floor pipeline entrance to a cave block structure, be provided with the cab apron between first butt joint board and the second butt joint board, it is hyperbola column structure to cross the cab apron, cross the hole that forms between cab apron and the second butt joint board and supply the pipeline to pass.
The utility model discloses a floor pipeline entrance to a cave block structure, the junction of first butt joint board and second butt joint board realizes dismantling through the connection structure of evagination bolt and slot and is connected.
The utility model discloses a floor pipeline entrance to a cave block structure, it is provided with waterproof rubber circle with pipeline contact department to cross cab apron and second butt joint board.
The utility model discloses a floor pipeline entrance to a cave block structure, the socket has L form cavity, L form cavity supplies the couple to stretch into and hooks the butt-joint plate.
The utility model discloses a floor pipeline entrance to a cave block structure, L form cavity top has open-top, open-top articulates there is first elasticity soft board, first elasticity soft board tip articulates there is second elasticity soft board, first elasticity soft board is close to second elasticity soft board one side bottom and is provided with the spring, spring and L form cavity bottom surface contact.
The utility model discloses the beneficial effect who produces is: the utility model provides a floor pipeline entrance to a cave block structure, through the combination of putting up pole setting and bracing piece, can adapt to not unidimensional entrance to need not to plant the muscle, simultaneously through the setting that sets up the butt joint board, can adapt to various operating modes, if have the condition of pipeline or no pipeline, and the waterproof infiltration ability of entrance to a cave that has greatly increased of pre-buried stagnant water steel sheet, its wholeness is good, and is firm reliable, but direct concreting has also improved the quality behind the entrance to a cave concrete shaping.
Drawings
The invention will be further explained with reference to the drawings and examples, wherein:
fig. 1 is a schematic diagram of an embodiment of the present invention;
fig. 2 is a top view of an embodiment of the invention;
FIG. 3 is a cross-sectional view of AA in FIG. 2;
FIG. 4 is a view of BB in FIG. 2;
FIG. 5 is a schematic view of an erection rod according to an embodiment of the present invention;
FIG. 6 is a schematic view of a docking plate according to an embodiment of the present invention;
fig. 7 is a partial enlarged view of a socket according to an embodiment of the present invention;
FIG. 8 is a schematic view of the hook and socket assembly of the embodiment of the present invention;
fig. 9 is a schematic view of a docking plate without a transition plate according to an embodiment of the present invention;
fig. 10 is a schematic view of a support bar according to an embodiment of the present invention;
fig. 11 is a state diagram of the butt plate according to the embodiment of the present invention when there is a pipe.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
As shown in fig. 1 to 11, a floor slab pipeline opening plugging structure includes: stagnant water steel sheet 7, support rack and buttcover plate, stagnant water steel sheet 7 is pre-buried around entrance to a cave concrete 13, stagnant water steel sheet 7 stretches out entrance to a cave concrete 13, the support rack sets up on stagnant water steel sheet 7, the support rack can supply pipeline 12 to pass through, the buttcover plate sets up in the support rack bottom, the buttcover plate joint is in the pipeline 12 outside, the support rack includes a plurality of parallel arrangement's frame pole 2, a plurality of frame pole 2 connect through a plurality of bracing pieces 3, frame pole 2 length direction has a plurality of holes 4, frame pole 2 both ends have chuck 5, bracing piece 3 one end has the chuck, hole 4 supplies bracing piece 3 to pass, chuck 5 joint is in stagnant water steel sheet 7 outside, bracing piece 3 tip is located stagnant water steel sheet 7 upper portion, frame pole 2 has a plurality of downwardly extending's couple 6, the corresponding position of the butt joint plate and the hook 6 is provided with a socket 11, and the socket 11 is connected with or separated from the hook 6.
In a preferred embodiment of the present invention, the butt-joint plate includes: the first butt plate 7 and the second butt plate 9 are L-shaped plates which are matched with each other, the second butt plate 9 is provided with a groove, and the first butt plate 7 is provided with a tenon which is matched with the groove.
The utility model discloses a preferred embodiment, be provided with between first butt plate 7 and the second butt plate 9 and cross cab apron 8, it is hyperbola column structure to cross cab apron 8, cross and form the hole that supplies pipeline 12 to pass between cab apron 8 and the second butt plate 9.
In the preferred embodiment of the present invention, the connection between the first butt plate 7 and the second butt plate 9 is detachable via the connection structure of the outer convex pin and the slot 10.
In the preferred embodiment of the present invention, the contact between the transition plate 8 and the second butt plate 9 and the pipeline 12 is provided with a waterproof rubber ring.
In the preferred embodiment of the present invention, the socket 11 has an L-shaped cavity 17, and the L-shaped cavity 17 is used for the hook 6 to extend into and hook the butt plate.
The utility model discloses a preferred embodiment, L form cavity 17 top has the open-top, the open-top articulates there is first elasticity soft board 15, first elasticity soft board 15 tip articulates there is second elasticity soft board 16, first elasticity soft board 15 is close to second elasticity soft board 16 one side bottom and is provided with spring 14, spring 14 and the contact of L form cavity 17 bottom surface.
The working process is as follows: when the hole is reserved for construction, firstly, water stop steel plates 1 are buried in the edges of hole concrete 13, after a pipeline 12 of the hole is installed, the erecting rods 2 are arranged in the hole in parallel according to the distance, two ends of each erecting rod 2 are provided with clamping heads 5, the middle of each erecting rod 2 is provided with a plurality of inner holes 4 and vertically downward hooks 6, and the exposed water stop steel plates 1 are clamped by the clamping heads 5 at two ends of each erecting rod 2 for fixing; then, the straight tail end of the supporting rod 3 sequentially and vertically penetrates through an inner hole 4 of the frame upright rod 2, then the frame is erected on the exposed water-stopping steel plate 1, and the chuck 5 at the other end also clamps the exposed water-stopping steel plate 1 for fixing to form a supporting net frame; and selecting a butt joint plate with a forming size according to the size of a pipeline 12, wherein the butt joint front end of the first butt joint steel plate 7 and the butt joint front end of the second butt joint steel plate 9 are semicircular arcs, inserting an outward protruding bolt of the first butt joint steel plate 7 into a slot 10 of the second butt joint steel plate 9, inserting the outward protruding bolt into the semicircular mutual butt joint steel plate to wrap the pipeline 12, adjusting the angle and the position, inserting the butt joint plate upwards, ensuring that the hook 6 of each frame upright rod 2 is in butt joint and fastening with a socket 11 on the butt joint plate, and at the moment, the device is in a first state. To the entrance to a cave shutoff that contains the pipeline such as bathroom pipeline and water and electricity fire control pipeline, can increase the rubber circle at pipeline 12 and butt joint board kneck, improve waterproof performance, the support grid structure that erects pole 2 and bracing piece 3 and form wholly through connecting stagnant water steel sheet 1 and primary structure, need not carry out bar planting and later stage reinforcement connection, can directly pour the concrete. And after the concrete is molded and reaches the strength, reversely separating the butt plate from the lower part of the hole, recovering materials, knocking out the exposed hook 6, and performing antirust treatment. And for the pipeline openings needing to be removed at the later stage such as concrete pump pipes, temporary fire pipelines and the like, the first butt joint steel plate 7 can be continuously inserted into the second butt joint steel plate 9 to two front-end semicircular plates to complete overlapping after the pipeline 12 is removed, so that an integral rectangular butt joint plate is formed, the second state is realized at the moment, and the openings are also in a completely closed state. Can be used as a mold sealing device for pipeline openings and common openings at the same time.
The connection process of the hook 6 and the socket 11 on the butt-joint steel plate is shown, when the butt-joint plate is butted with the hook 6 upwards, the first elastic soft plate 15 is pressed to be elastically deformed, the L-shaped cavity 17 is opened downwards, the hook 6 touches the second elastic soft plate 16, and the hook slides into the L-shaped cavity 17 to be fixed due to the elastic deformation, and the first elastic soft plate 15 is acted by the spring 14 to be restored to the original state to seal the opening, so that soil residues are prevented from flowing in when concrete is poured; when the pouring is finished and the steel plate needs to be removed, the butt plate is pushed out obliquely, and the hook 6 presses the second elastic soft plate 16 and slides out along the upper part.
This structure safe and reliable, intensity is high, and is applicable in pipeline entrance to a cave and the rectangle entrance to a cave of no pipeline, and the support rack forms wholly through connecting stagnant water steel sheet 1 and primary structure, need not plant muscle and later stage reinforcement connection, can directly pour the concrete, and the wholeness is good, and waterproof performance is high, and the construction is simple and convenient.
In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplification of the description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art. In addition, in the description of the present invention, "a plurality" means two or more unless otherwise specified.
It will be understood that modifications and variations can be made by persons skilled in the art in light of the above teachings and all such modifications and variations are considered to be within the scope of the invention as defined by the following claims.

Claims (7)

1. The utility model provides a floor pipeline entrance to a cave block structure which characterized in that includes: stagnant water steel sheet, support rack and buttcover plate, stagnant water steel sheet is pre-buried around entrance to a cave concrete, stagnant water steel sheet stretches out entrance to a cave concrete, the support rack sets up on stagnant water steel sheet, the support rack can supply the pipeline to pass through, buttcover plate sets up in support rack bottom, the buttcover plate joint is in the pipeline outside, the support rack includes a plurality of parallel arrangement's frame pole, a plurality of frame pole connect through a plurality of bracing pieces, frame pole length direction has a plurality of holes, frame pole both ends have the chuck, bracing piece one end has the chuck, the hole supplies the bracing piece to pass, the chuck joint is in the stagnant water steel sheet outside, the bracing piece tip is located stagnant water steel sheet upper portion, frame pole has a plurality of downwardly extending's couple, buttcover plate has the socket with couple position department of correspondence, the socket is connected with or separated from the hook.
2. A floor tunnel portal blocking structure of claim 1, wherein said butt plate comprises: the first butt joint plate and the second butt joint plate are L-shaped plates which are matched with each other, the second butt joint plate is provided with a groove, the first butt joint plate is provided with a tenon, and the groove is matched with the tenon.
3. A floor slab pipe hole plugging structure according to claim 2, wherein a transition plate is arranged between said first butt plate and said second butt plate, said transition plate is in a hyperbolic structure, and a hole for a pipe to pass through is formed between said transition plate and said second butt plate.
4. A floor slab pipe hole plugging structure as recited in claim 3, wherein said first butt joint plate and said second butt joint plate are detachably connected by a connection structure of an outer convex pin and a slot.
5. A floor slab pipeline hole plugging structure according to claim 3, wherein a waterproof rubber ring is provided at the contact part of said transition plate and said second butt plate with the pipeline.
6. A floor tunnel portal block structure of claim 1, wherein said spigot has an L-shaped cavity into which a hook extends and hooks a butt plate.
7. A floor slab pipeline hole plugging structure according to claim 6, wherein said L-shaped cavity top has a top opening, said top opening is hinged with a first flexible elastic plate, said first flexible elastic plate end is hinged with a second flexible elastic plate, said first flexible elastic plate is provided with a spring at the bottom of one side close to said second flexible elastic plate, said spring is in contact with the bottom surface of said L-shaped cavity.
CN202022208038.1U 2020-09-30 2020-09-30 Floor pipeline entrance to a cave block structure Active CN214330014U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022208038.1U CN214330014U (en) 2020-09-30 2020-09-30 Floor pipeline entrance to a cave block structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022208038.1U CN214330014U (en) 2020-09-30 2020-09-30 Floor pipeline entrance to a cave block structure

Publications (1)

Publication Number Publication Date
CN214330014U true CN214330014U (en) 2021-10-01

Family

ID=77876305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022208038.1U Active CN214330014U (en) 2020-09-30 2020-09-30 Floor pipeline entrance to a cave block structure

Country Status (1)

Country Link
CN (1) CN214330014U (en)

Similar Documents

Publication Publication Date Title
CN109736353A (en) Construction method of composite single-side formwork deep foundation pit basement outer wall
CN109322505A (en) A kind of roofing reserved opening concrete plugging device and preparation method thereof
CN110778105A (en) Clear water formwork and construction process thereof
CN214330014U (en) Floor pipeline entrance to a cave block structure
CN208934007U (en) A kind of connection structure of pipe gallery
CN207525779U (en) A kind of assembly type pipe gallery pattern foundation pit supporting structure of recycling and structure external mold composite structure
CN205875202U (en) Cast -in -place frame tunnel formwork system of high water content ultra -soft soil box multi -chambered
CN105952151B (en) A kind of reserving hole hangs die device and its construction method
CN112440068B (en) Support frame for welding cement pipe steel reinforcement framework
CN211183333U (en) Prefabricated assembled cable pit
CN209129413U (en) A kind of roofing reserved opening concrete plugging device
CN113152876A (en) Wall connecting piece for scaffold and mounting method thereof
CN209959259U (en) Water stop belt positioning and fastening plug board device for tunnel trolley lining construction
CN210053152U (en) Freely adjust line box
CN208309615U (en) A kind of hole top row ditch of foundation pit
CN208323726U (en) Contain molding die in side
CN210658211U (en) A hydrophobic means for hydraulic engineering
CN208619124U (en) The tunnel lining trolley end mould of fixed waterstop
CN106436773B (en) A kind of bottom plate and exterior wall junction are constructed typified form bracket
CN214364889U (en) Embedded screw rod outer wall is wall spare even
CN205857158U (en) A kind of prestressed concrete grooved sheet pile
CN205857714U (en) A kind of reserving hole hangs die device
CN215407439U (en) Windowsill bears down on one strutting arrangement
CN115110992A (en) Tunnel drainage system construction method
CN216042584U (en) Assembled building production mould convenient to open and shut

Legal Events