CN105952151B - A kind of reserving hole hangs die device and its construction method - Google Patents
A kind of reserving hole hangs die device and its construction method Download PDFInfo
- Publication number
- CN105952151B CN105952151B CN201610465516.2A CN201610465516A CN105952151B CN 105952151 B CN105952151 B CN 105952151B CN 201610465516 A CN201610465516 A CN 201610465516A CN 105952151 B CN105952151 B CN 105952151B
- Authority
- CN
- China
- Prior art keywords
- die device
- pair
- reserving hole
- fixation kit
- hangs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
- E04G15/06—Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
- E04G15/063—Re-usable forms
- E04G15/068—Re-usable forms for channels open towards the surface
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
A kind of reserving hole hangs die device and its construction method, utilize a pair of fixation kits and the held tight of vertical duct, during use, two fixation kits are clipped on the pipeline for needing to carry out second pouring concrete preformed hole hole mirror image each other, connecting rod in the interval between each pair U-shaped hangers successively by passing through during use, and coordinate the stop nut at both ends and card junction structure that two fixation kits are mutually permanently connected, the close connection between die device and vertical duct is hung in realization, and top second pouring concrete active force is undertaken by the rigidity of itself and intensity, so sealing property is very good, cement mortar will not seepage, construction surface is smooth bright and clean, improve construction quality, later stage without putting into manual cleaning again;Can not only solve construction and hang mould requirement, and the floorboard reserved opening construction for being not required to pre-buried any material, not destroying building structure, conveniently tear down and reconstruct, being repeatedly used in turn, adapt to building sizes, simple in construction, flexible arrangement, save a large amount of working measure expenses.
Description
Technical field
The present invention relates to the realm of building construction, specifically a kind of preformed hole for hydroelectric project pipeline hoisting die construction
Hang die device and its construction method in hole.
Background technology
It is preformed plate hole that architectural engineering at present passes through structural slab position when constructing agent structure in vertical duct, waits to erect
To the position preformed plate hole hang mould second pouring concrete after the completion of to Pipe installing, but it is simply simple during due to hanging mould
Using being that the technique of steel wire simple coarse is constructed in template, either all rolled over significantly from efficiency or construction quality
Button, especially because hang mould quality problems because the position floor seepage deal with it is even more cumbersome.Tradition hangs mold technique,
Its shortcoming is that technique is simple and crude, first carries out perforate to template, iron wire fixed form, casting cement mortar are used after perforate.Relatively time-consuming,
Take a lot of work, outward appearance is coarse.And existing be recycled in market hangs die worker's tool, its shortcoming is that the compactness of template and sleeve pipe is inadequate, sealing
It can enough ensure, seepage cement mortar be present.Reserved for the hole at corner, it is existing to hang die worker's tool fixation butterfly
Bolt is fixed, it is necessary to changed, not convenient enough.When pour concrete vibrates, due to two pieces splicing hang die worker tool can not be mutual
Phase fixed correction, two pieces are hung mould out-of-flatness, splicing seams spillage, situations such as casting concrete out-of-flatness.
Based on above description, need a kind of new reserving hole badly and hang die device, with solve present in prior art due to
Two pieces are hung mould out-of-flatness, the problem of causing splicing seams spillage, and then cause casting concrete out-of-flatness.
The content of the invention
It is an object of the invention to provide a kind of reserving hole to hang die device and its construction method, to solve existing building work
Journey is existing because two pieces are hung mould out-of-flatness, the problem of causing splicing seams spillage, and then cause casting concrete out-of-flatness.
In order to solve the above technical problems, the present invention uses following technical scheme:
A kind of reserving hole hangs die device, is made up of a pair of fixation kits and connection fastening assembly, wherein, described fixed group
The relative splicing of part in a ring, including horizontal plate member and along the vertically disposed vertical plate of the horizontal plate member inner ring;Vertical
The outside both ends of plate are respectively equipped with a pair of U-shaped hangers, and each pair U-shaped hangers parallel interval distribution, each pair U-shaped on vertical are hung
The mounting groove vertically run through is correspondingly provided with ear;Two pairs of adjacent U-shaped hangers are fastened by connecting after the splicing of each pair fixation kit
Component connects.
For the mounting groove of two pairs of adjacent U-shaped hangers backwards to setting, the cross section of the mounting groove is U-shaped.
The connection fastening assembly is Elastic Bolts fastener, including connecting rod and two stop nuts, two spacing spiral shells
Mother is separately fixed at the both ends of the connecting rod, and two card junction structures and extremely are in series with the connecting rod between the stop nut
A few elastomeric element.
The connecting rod pass through successively in the interval between each pair U-shaped hangers and with both ends stop nut and card
Two fixation kits are mutually permanently connected by junction structure.
The card junction structure is slidably connected in connecting rod, and card junction structure is strip, column or tubulose, its vertically communicated card
It is connected in the mounting groove of each pair U-shaped hangers.
The elastomeric element is spring, is connected between stop nut and card junction structure.
Being horizontally disposed with the medial surface of the vertical plate has at least one elongated, connection sealing strip chute.
Reinforcing ring is vertically installed with along the horizontal plate member inner ring.
Correction card is provided with one of fixation kit of two fixation kit joints, one end of the correction card is consolidated
The medial end of the reinforcing ring of the fixation kit is scheduled on, the other end is connected to another fixation in the relative splicing of two fixation kits
The medial end of the reinforcing ring of component, the design of correction card, realize the accurate docking of each pair fixation kit.
Rectangular ring or circular rings after the relative splicing of each pair fixation kit.
The sealing strip is the adhesive tape of EPDM ethylene propylene diene rubber materials, and the head end of its cross section is rounded, positioned at vertical
The inner side of plate, the chute of tail end and vertical plate agree with, in grafting and chute.
The fixation kit is made of ABS plastic material.
A kind of reserving hole described in application hangs the construction method of die device, comprises the following steps that:
Step 1, each pair fixation kit is clipped in the pipe for needing to carry out second pouring concrete preformed hole hole mirror image each other
On road.
Step 2, each pair fixation kit is spliced relatively using correction card.
Step 3, adjust card junction structure, card junction structure is connected on the mounting groove of adjacent U-shaped hangers, complete to fix
Component docks.
Step 4, carry out concreting.
Step 5, elasticity of compression part make card junction structure depart from the mounting groove of U-shaped hangers, complete reserving hole and hang die device
Dismounting.
This programme has the beneficial effect that:
The reserving hole that this programme provides hangs die device using a pair of fixation kits and the held tight of vertical duct, uses
When, two fixation kits are clipped on the pipeline for needing to carry out second pouring concrete preformed hole hole mirror image each other, solid at two
Component is determined with respect to when splicing, and the connecting rod for connecting fastening assembly sequentially passes through two pairs of adjacent U-shaped hangers, then coordinates both ends
Stop nut and elastomeric element are fixed with each other by two fixation kits, and in the structure, each pair U-shaped hangers is connecting rod
Provide one it is vertical on it is spacing, while mounting groove provides spacing in level for card junction structure, and both coordinate realization to hang
Close connection between die device and vertical duct, and top second pouring concrete is undertaken by the rigidity of itself and intensity and acted on
Power, so sealing property is very good, cement mortar will not seepage, construction surface is smooth bright and clean, improves construction quality, the later stage is without again
Put into manual cleaning;Can not only solve construction and hang mould requirement, and be not required to pre-buried any material, do not destroy building structure, conveniently
The floorboard reserved opening construction that tear down and reconstruct, can be repeatedly used in turn, adapt to building sizes, simple in construction, flexible arrangement,
Save a large amount of working measure expenses.
Brief description of the drawings
Fig. 1 is that reserving hole provided by the invention hangs the axle surveys view that die device is in disassembled form.
Fig. 2 is that reserving hole provided by the invention hangs the axle surveys view that die device is in assembled state.
Fig. 3 is that reserving hole provided by the invention hangs the top view that die device is in disassembled form.
Fig. 4 is that reserving hole provided by the invention hangs the top view that die device is in assembled state.
Fig. 5 is the front view that reserving hole provided by the invention hangs die device.
Fig. 6 is the right view that reserving hole provided by the invention hangs die device.
Fig. 7 is the inner section that reserving hole provided by the invention hangs die device.
Fig. 8 is the partial enlarged drawing that reserving hole provided by the invention hangs die device.
Fig. 9 is that reserving hole provided by the invention hangs the sealing strip of die device and the attachment structure schematic diagram of vertical plate.
Figure 10 is the use state diagram that reserving hole provided by the invention hangs die device.
Figure 11 is the attachment structure schematic diagram that reserving hole provided by the invention hangs die device and pipeline.
Figure 12 is the attachment structure schematic diagram that reserving hole provided by the invention hangs die device and reserved opening.
Figure 13 is that reserving hole provided by the invention hangs die device use state cross-sectional view.
Reference:
1- horizontal plate members;The vertical plates of 2-;3-U shape hangers;4- connection fastening assemblies;5- reinforcing rings;6- correction cards;7- is close
Strip of paper used for sealing;8- pipelines;9- holes;10- agent structures;
31- mounting grooves;
41- stop nuts;42- card junction structures;43- elastomeric elements.
Embodiment
The present invention is described in further detail below by specific examples of the implementation combination accompanying drawing.
As shown in Figures 1 to 9, this reserving hole hangs die device, is made up of a pair of fixation kits and connection fastening assembly,
Wherein, the relative splicing of the fixation kit in a ring, including horizontal plate member 1 and vertically disposed along the horizontal plate member inner ring
Vertical plate 2;A pair of U-shaped hangers 3 is respectively equipped with the outside both ends of vertical plate, each pair U-shaped hangers is parallel vertical
It is spaced apart, the mounting groove 31 vertically run through is correspondingly provided with each pair U-shaped hangers;Adjacent two couple after the splicing of each pair fixation kit
U-shaped hangers 31 is connected by connecting fastening assembly 4.
Shown in Figure 8, the mounting groove of two pairs of adjacent U-shaped hangers is set backwards, and the cross section of the mounting groove is U
Shape.
Shown in Figure 8, the connection fastening assembly 4 is Elastic Bolts fastener, including connecting rod and two spacing spiral shells
Mother 41, two stop nuts 41 are separately fixed at the both ends of the connecting rod, are gone here and there in the connecting rod between the stop nut 41
It is associated with two card junction structures 42 and at least one elastomeric element 43.
When hanging die device using reserving hole, two fixation kits are clipped in mirror image each other needs progress second pouring to mix
On the pipeline for coagulating native reserving hole, two fixation kits are fixedly connected by two connecting rods, and connecting rod also rises simultaneously
To the effect for preventing fixation kit edge deformation.The connecting rod is successively by passing through and matching somebody with somebody in the interval between each pair U-shaped hangers
Two fixation kits are mutually permanently connected by the stop nut and card junction structure for closing both ends;The card junction structure is slidably connected at company
On extension bar, card junction structure is strip, column or tubulose, its vertically communicated is connected in the mounting groove of each pair U-shaped hangers;The bullet
Property part be spring, be connected between stop nut and card junction structure.
Being horizontally disposed with the medial surface of the vertical plate has at least one elongated, connection sealing strip 7 chute.It is described close
Strip of paper used for sealing 7 is the adhesive tape of EPDM ethylene propylene diene rubber materials, and the head end of its cross section is rounded, positioned at the inner side of vertical plate, tail
End is agreed with, in grafting and chute with the chute of vertical plate, and it is convenient to change, also with excellent elastic and incompressible morphotropism,
Asepsis environment-protecting, excellent physiological inertia.Can also be other materials but the material of adhesive tape is not limited to EPDM.
Reinforcing ring is vertically installed with along the horizontal plate member inner ring, two the one of of fixation kit joint fix
Correction card is provided with component, one end of the correction card is fixed on the medial end of the reinforcing ring of the fixation kit, the other end
The medial end of the reinforcing ring of another fixation kit is connected in the relative splicing of two fixation kits, the design of correction card is real
The accurate docking of each pair fixation kit is showed.
Rectangular ring or circular rings after the relative splicing of each pair fixation kit;The fixation kit uses ABS plastic material
It is made.
The reserving hole hangs construction of the die device suitable for reserved holes of pipes closure second pouring concrete form, and pipe hole
The closure in hole.In use, two fixation kits are clipped in mirror image each other on the pipeline for needing to carry out second pouring, below to tool
Body process for using is described:
Referring to shown in Figure 10 to Figure 13, step 1, each pair fixation kit is clipped in mirror image each other to be needed to carry out secondary pour
On the pipeline for noting concrete preformed hole hole, the wherein plane of fixation kit is close to floor lower surface and is stuck on pipe upwards.
Step 2, each pair fixation kit is spliced relatively using correction card.
Step 3, connection fastening assembly tighten together fixation kit:Adjust card junction structure, be connected to card junction structure
On the mounting groove of adjacent U-shaped hangers, fixation kit docking is completed.
Step 4, carry out concreting:Concrete is poured into reserved hole 9 on after installation, compacting is smeared
It is flat.
Step 5, trip spring connects fastening assembly after concrete setting, removes reserving hole and hangs die device:Compress bullet
Property part card junction structure is departed from the mounting groove of U-shaped hangers, complete reserving hole and hang the dismounting of die device.
The reserving hole provided using this programme is hung die device and had the advantages that:
1st, speed of application is fast, and construction procedure is simple, quick and easy for installation, improves efficiency of construction times, saves artificial.
2nd, sealing property is very good, cement mortar will not seepage, construction surface is smooth bright and clean, improves construction quality, the later stage without
Manual cleaning etc. need to be put into again.
3rd, reserving hole hangs die device and preferably uses ABS plastic material, ABS plastic material, its impact resistance, chemically-resistant medicine
The features such as moral character and excellent electrical properties, product size are stable, can be repeatedly used, indeformable, not aging, save material.
4th, due to pre-buried without iron wire between fixation kit inwall and concrete, concrete setting is collapsible die, fixation kit
It can be recycled.
The structure of the mounting groove 31 is not limited to such scheme, can also use following proposal:The mounting groove
3131 be circular groove, and the both ends of two stop nuts 41 or connecting rod are respectively arranged with corresponding with the circular groove of respective side
Manhole, by the way that two fixation kits interfix one through the screw of mutual corresponding circular groove and manhole
Rise.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies
Change, equivalent substitution, improvement etc., should be included in the scope of the protection.
Claims (10)
1. a kind of reserving hole hangs die device, it is characterised in that:It is made up of a pair of fixation kits and connection fastening assembly, wherein,
The fixation kit is relative to be spliced in a ring, including horizontal plate member(1)Erected with along the horizontal plate member inner ring is vertically disposed
Straight panel part(2);In vertical plate(2)Outside both ends be respectively equipped with a pair of U-shaped hangers(3), each pair U-shaped hangers(3)Perpendicular
Upward parallel interval distribution, each pair U-shaped hangers(3)On be correspondingly provided with the mounting groove vertically run through(31);Each pair fixation kit is spelled
Connect rear two pairs of adjacent U-shaped hangers(3)By connecting fastening assembly(4)Connection.
2. reserving hole according to claim 1 hangs die device, it is characterised in that:Two pairs of adjacent U-shaped hangers(3)'s
Mounting groove(31)Backwards to setting, the mounting groove(31)Cross section be U-shaped.
3. reserving hole according to claim 2 hangs die device, it is characterised in that:The connection fastening assembly(4)For bullet
Property bolt fastener, including connecting rod and two stop nuts(41), two stop nuts(41)It is separately fixed at the connection
The both ends of bar, the stop nut(41)Between connecting rod on be in series with two card junction structures(42)With at least one elastic portion
Part(43).
4. reserving hole according to claim 3 hangs die device, it is characterised in that:The connecting rod is successively by each pair U-shaped
Hangers(3)Between interval in pass through and coordinate the stop nut at both ends(41)With card junction structure(42)By two fixation kits
It is mutually permanently connected.
5. reserving hole according to claim 4 hangs die device, it is characterised in that:The card junction structure(42)The company of slip
It is connected in connecting rod, card junction structure(42)For strip, column or tubulose, its vertically communicated be connected to each pair U-shaped hangers(3)Peace
Tankage(31)It is interior.
6. reserving hole according to claim 5 hangs die device, it is characterised in that:The elastomeric element(43)For spring,
It is connected to stop nut(41)With card junction structure(42)Between.
7. the reserving hole according to claim 1 to 6 any one hangs die device, it is characterised in that:The vertical plate
(2)Medial surface on be horizontally disposed with and have at least one elongated, connection sealing strip(7)Chute.
8. reserving hole according to claim 7 hangs die device, it is characterised in that:It is vertical along the horizontal plate member inner ring
It is provided with reinforcing ring(5).
9. reserving hole according to claim 8 hangs die device, it is characterised in that:Two fixation kit joints are wherein
Correction card is provided with one fixation kit(6), the correction card(6)One end be fixed on the reinforcing ring of the fixation kit(5)
Medial end, the other end two fixation kits are relative splice when be connected to the reinforcing ring of another fixation kit(5)Inner side
End.
10. a kind of reserving hole using described in claim 9 hangs the construction method of die device, it is characterised in that specific steps
It is as follows:
Step 1, each pair fixation kit is clipped in the pipeline for needing to carry out second pouring concrete preformed hole hole mirror image each other
On;
Step 2, utilize correction card(6)By the relative splicing of each pair fixation kit;
Step 3, adjust card junction structure(42), by card junction structure(42)It is connected to adjacent U-shaped hangers(3)Mounting groove(31)
On, complete fixation kit docking;
Step 4, carry out concreting;
Step 5, elasticity of compression part(43)Make card junction structure(42)Depart from U-shaped hangers(3)Mounting groove(31), complete reserved
Hole hangs the dismounting of die device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610465516.2A CN105952151B (en) | 2016-06-24 | 2016-06-24 | A kind of reserving hole hangs die device and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610465516.2A CN105952151B (en) | 2016-06-24 | 2016-06-24 | A kind of reserving hole hangs die device and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105952151A CN105952151A (en) | 2016-09-21 |
CN105952151B true CN105952151B (en) | 2018-01-05 |
Family
ID=56903701
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610465516.2A Expired - Fee Related CN105952151B (en) | 2016-06-24 | 2016-06-24 | A kind of reserving hole hangs die device and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105952151B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107246147A (en) * | 2017-07-26 | 2017-10-13 | 中建六局土木工程有限公司 | A kind of method of vertical duct sealing hole |
CN116575704B (en) * | 2023-05-17 | 2024-04-16 | 中国十七冶集团有限公司 | Portable sleeve lifting die combined device and use method |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003074183A (en) * | 2001-09-06 | 2003-03-12 | Senji Yamashita | Implement and method for forming vertical hole for inserting piping |
CN2539797Y (en) * | 2002-04-11 | 2003-03-12 | 陈伟明 | Special-purpose clamping mould for fast blocking-up provided pipe hole |
CN201080700Y (en) * | 2007-07-26 | 2008-07-02 | 邢进良 | Pipeline reserved hole dedicated pouring chuck |
CN201206331Y (en) * | 2008-04-22 | 2009-03-11 | 王步有 | Pipe packaging mold |
CN102127968B (en) * | 2011-01-17 | 2013-01-09 | 湖南省第五工程有限公司 | Method for grouting floor slab bushing hole reservation preembedding die and grouting die |
JP6191950B2 (en) * | 2013-06-27 | 2017-09-06 | 株式会社創考テクノ | Shielding device and method of manufacturing composite structure |
CN205857714U (en) * | 2016-06-24 | 2017-01-04 | 中国建筑第二工程局有限公司 | A kind of reserving hole hangs die device |
-
2016
- 2016-06-24 CN CN201610465516.2A patent/CN105952151B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN105952151A (en) | 2016-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206625428U (en) | Floor closed system is poured after a kind of pipe well | |
CN105952151B (en) | A kind of reserving hole hangs die device and its construction method | |
CN106958313A (en) | Floor closed system and its construction method are poured after a kind of pipe well | |
CN206000175U (en) | Template and the flexible overlap joint component between casting concrete | |
CN107246147A (en) | A kind of method of vertical duct sealing hole | |
CN205857714U (en) | A kind of reserving hole hangs die device | |
CN204609293U (en) | Portablely locate buttress casting mold | |
CN210483035U (en) | Reserved sleeve die for reserved hole of prefabricated laminated slab | |
CN209469000U (en) | Truss and truss aluminium alloy tunnel form for aluminum alloy mould plate | |
CN208056107U (en) | A kind of combined steel formwork support system | |
CN110629787A (en) | Core mold for pipe gallery pouring and construction method | |
CN204983655U (en) | Reserved pipe cover of floor poling hole | |
CN212506410U (en) | Template reinforcing structure at chamfer of bottom plate | |
CN208949921U (en) | Waterstop fixing mould | |
CN207647181U (en) | A kind of wall hangs mould template reinforcing device | |
KR101492818B1 (en) | Circle Steel Outside Form Assembly Apparatus | |
CN210562705U (en) | Finished post-pouring belt | |
CN109162371B (en) | Fixing structure of externally-adhered rubber water stop and construction method thereof | |
CN208323726U (en) | Contain molding die in side | |
CN209323958U (en) | Dismountable aluminum alloy mould plate | |
CN206903186U (en) | Adjustable detachable wall-connecting device of scaffold | |
CN204530754U (en) | Diaphragm wall support changing structure for use | |
CN205063329U (en) | Leak protection device of fountain concrete placement mould | |
CN205531285U (en) | Scaffold frame is encorbelmented shaped steel and is reserved bolt hole and establish structure | |
CN216865967U (en) | Combined type hanging die for toilet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180105 |
|
CF01 | Termination of patent right due to non-payment of annual fee |