CN208619124U - The tunnel lining trolley end mould of fixed waterstop - Google Patents
The tunnel lining trolley end mould of fixed waterstop Download PDFInfo
- Publication number
- CN208619124U CN208619124U CN201821312622.8U CN201821312622U CN208619124U CN 208619124 U CN208619124 U CN 208619124U CN 201821312622 U CN201821312622 U CN 201821312622U CN 208619124 U CN208619124 U CN 208619124U
- Authority
- CN
- China
- Prior art keywords
- mould
- waterstop
- template
- lining trolley
- tunnel lining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model provides a kind of tunnel lining trolley end mould of fixed waterstop, keeps waterstop quick and easy for installation, while guaranteeing the installation quality of waterstop.A kind of tunnel lining trolley end mould of fixed waterstop, comprising: end mould rotates ear mount, is fixed in tunnel lining trolley template;End head formwork, including upper mould and lower part template, lower part template are rotatablely connected end mould rotation ear mount and upper mould simultaneously, and waterstop is set between upper mould and lower part template;And the lumps of wood, it is connected on upper mould by connecting component;Wherein casting area is collectively formed in the lumps of wood, end head formwork and tunnel lining trolley template.
Description
Technical field
The utility model relates to a kind of tunnel lining trolley equipment, more particularly, to a kind of tunnel-liner of fixed waterstop
Trolley end mould, belongs to technical field of tunnel construction.
Background technique
Present Tunnel Engineering generally uses tunnel lining trolley to carry out concrete pouring construction, in concrete joint before pouring
Position needs to install waterstop, and how quickly and easily installing, fixing waterstop is always one in tunnel lining trolley construction
Road problem.
After waterstop is fixed with reinforcing bar in the prior art, waterstop is directly bent 90 ° with wooden end head formwork by worker,
After the completion of concreting, then waterstop dug out from concrete, the shortcomings that this method: installation operation is time-consuming and laborious, only
The thickness of water band is larger, and installation site is higher, and worker is not easy to bend;Waterstop is easy displacement, installation site inaccuracy;From coagulation
It is easily damaged waterstop when digging out waterstop in soil, deforms waterstop, causes the hidden danger of quality of engineering.
Utility model content
The utility model provides a kind of tunnel lining trolley end mould of fixed waterstop, overcomes in the prior art
Deficiency keeps waterstop quick and easy for installation, while guaranteeing the installation quality of waterstop.
The utility model is achieved through the following technical solutions:
A kind of tunnel lining trolley end mould of fixed waterstop, comprising: end mould rotates ear mount, is fixed on tunnel-liner
On trolley formwork;End head formwork, including upper mould and lower part template, lower part template are rotatablely connected end mould rotation ear mount simultaneously
And upper mould, waterstop are set between upper mould and lower part template;And the lumps of wood, upper mould is connected to by connecting component
On plate;Wherein casting area is collectively formed in the lumps of wood, end head formwork and tunnel lining trolley template.
On the basis of the tunnel lining trolley end mould of above-mentioned fixed waterstop, connecting component include pressing plate, bolt, nut,
Frame pipe and pedestal, pedestal are fixed in lining trolley template, and pressing plate is arranged on the outside of the lumps of wood, and bolt one end is fixed on upper mould
On plate, the other end passes through the lumps of wood and pressing plate is connect with nut;Frame pipe upper end is contacted with pressing plate, and frame pipe lower end and pedestal grafting connect
It connects.
On the basis of the tunnel lining trolley end mould of above-mentioned fixed waterstop, upper mould section is circular arc type structure, and
With a upper connector;Lower part template includes occluding body, ear mount connector and lower connector, be vertically arranged in the middle part of occluding body with
The lower connector of upper connector rotation connection, occluding body lower part is equipped with to be connect with the ear mount of end mould rotation ear mount rotation connection
Body.
On the basis of the tunnel lining trolley end mould of above-mentioned fixed waterstop, lower part template is welded using steel plate.
Utility model has the advantages that
1, fixed waterstop effect is obvious;Waterstop is lived using top end mould and lower part end die clamp, it is fixed, it pours
Displacement is not generated when building concrete, the position for installing waterstop is accurate;
2, the utility model convenient disassembly can be recycled;The loss of timber is reduced, construction cost is saved,
3, the utility model assembles processing with tunnel lining trolley template in processing factory simultaneously, and tightness is good, no spillage
Phenomena such as, concrete joint neat appearance, the hidden danger of quality such as no honeycomb, pitted skin;There is the support of frame pipe at the utility model rear, consolidates
Property is good;
4, operation is light, work efficiency is high, shortens construction period;Pass through the overturning twice of end mould, it can completion stops
The fixation of water band;End mould weight hereinafter, light-weight, can manually be overturn at 10 kilograms, be not necessarily to mechanical-assisted.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this
Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.
Fig. 1 is the utility model side view;
Fig. 2 is the utility model main view;
Fig. 3 is 1 schematic diagram of the utility model process;
Fig. 4 is 2 schematic diagram of the utility model process;
Fig. 5 is 3 schematic diagram of the utility model process;
Fig. 6 is 4 schematic diagram of the utility model process;
Its specific structure include: 1, road lining trolley template, 2 end moulds rotation ear mount, 3 lower part templates, 4 waterstops, on 5
Portion's template, 6 lumps of wood, 7 pressing plates, 8 frame pipes, 9 pedestals.
Specific embodiment
It is illustrated below in conjunction with preferred embodiment of the attached drawing to the utility model, it should be understood that described herein excellent
It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
A kind of tunnel lining trolley end mould of fixed waterstop, including end mould rotate ear mount 2, end head formwork, sealing
Band 4 and the lumps of wood 6.
End mould rotation ear mount 2 be weldingly fixed on 1 flange side of lining trolley template, be equipped with a fixed aperture a, one
A rotational axis hole b.
End head formwork includes upper mould 5 and lower part template 3, and lower part template 3 is rotatablely connected end mould rotation ear mount 2 simultaneously
With upper mould 5, lower part template 3 is used to block the concrete of 4 lower section of waterstop, and upper mould 5 is for fixing waterstop 4 and envelope
The concrete of stifled 4 top of waterstop.
Waterstop 4 is set between upper mould 5 and lower part template 3.
The lumps of wood 6 is connected on upper mould 5 by connecting component, blocks the 5 irregular part in top of upper mould.
Wherein casting area is collectively formed in the lumps of wood 6, end head formwork and tunnel lining trolley template 1.
Connecting component includes pressing plate 7, bolt, nut, frame pipe 8 and pedestal 9, and pedestal 9 is fixed on lining trolley template 1
On, the setting of pressing plate 7 is fixed on upper mould 5 in 6 outside of the lumps of wood, bolt one end, and the other end passes through the lumps of wood 6 and pressing plate 7 and spiral shell
Mother's connection;8 upper end of frame pipe is contacted with pressing plate 7,8 lower end of frame pipe and 9 plug connection of pedestal.
5 section of upper mould is circular arc type structure, facilitates folding, will not be interfered with the concrete newly poured, and have one
A upper connector;Lower part template 3 includes occluding body, ear mount connector and lower connector, is vertically arranged and upper company in the middle part of occluding body
The lower connector of junctor rotation connection, occluding body lower part are equipped with the ear mount connector being rotatablely connected with end mould rotation ear mount 2, ear
Seat connector has and pin hole and axis hole.
Lower part template 3 is welded using steel plate.
It is as follows using the utility model operation process:
Process 1, as shown in figure 3, by 3 axis hole of lower part template and head mould are revolved again after tunnel lining trolley row to operating position
The rotational axis hole b connection of transfer ear seat, the upper connector rotation connection of the lower connector and upper mould 5 of lower part template 3;
Process 2 keeps the fixation of 3 pin hole of lower part template and end mould rotation ear mount 2 small as shown in figure 4, overturning lower part end
Hole a connection, while placing waterstop 4;
Process 3, as shown in figure 5, overturning upper mould 5, compress waterstop 4, prevent from being displaced;
Process 4, as shown in fig. 6, the installation lumps of wood 6, block irregular part other than punching block, while with the fixed company of pressing plate 7
The lumps of wood 6 is connect, the support in 7 outside mounting rack pipe 8 of pressing plate, as cast-in-place concrete;Whole end moulds are installed after-pouring coagulation
Soil.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this
Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art
For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic
It is equivalently replaced.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on,
It should be included within the scope of protection of this utility model.
Claims (4)
1. a kind of tunnel lining trolley end mould of fixed waterstop, characterized by comprising:
End mould rotates ear mount, is fixed in tunnel lining trolley template;
End head formwork, including upper mould and lower part template, lower part template are rotatablely connected end mould rotation ear mount and top simultaneously
Template
Waterstop is set between upper mould and lower part template;With
The lumps of wood is connected on upper mould by connecting component;
Wherein casting area is collectively formed in the lumps of wood, end head formwork and tunnel lining trolley template.
2. fixing the tunnel lining trolley end mould of waterstop according to claim 1, it is characterised in that: connecting component includes
Pressing plate, bolt, nut, frame pipe and pedestal, pedestal are fixed in lining trolley template, and pressing plate is arranged on the outside of the lumps of wood, bolt
One end is fixed on upper mould, and the other end passes through the lumps of wood and pressing plate is connect with nut;Frame pipe upper end is contacted with pressing plate, under frame pipe
End and pedestal plug connection.
3. fixing the tunnel lining trolley end mould of waterstop according to claim 1, it is characterised in that: upper mould section
For circular arc type structure, and there is a upper connector;Lower part template includes occluding body, ear mount connector and lower connector, is blocked
The lower connector with the rotation connection of upper connector is vertically arranged in the middle part of body, occluding body lower part is equipped with and the rotation ear mount rotation of end mould
The ear mount connector of connection.
4. the tunnel lining trolley end mould of the according to claim 1 or 2 or 3 fixed waterstops, it is characterised in that: lower part
Template is welded using steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821312622.8U CN208619124U (en) | 2018-08-15 | 2018-08-15 | The tunnel lining trolley end mould of fixed waterstop |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821312622.8U CN208619124U (en) | 2018-08-15 | 2018-08-15 | The tunnel lining trolley end mould of fixed waterstop |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208619124U true CN208619124U (en) | 2019-03-19 |
Family
ID=65716392
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821312622.8U Active CN208619124U (en) | 2018-08-15 | 2018-08-15 | The tunnel lining trolley end mould of fixed waterstop |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208619124U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110454192A (en) * | 2019-08-30 | 2019-11-15 | 中铁五局集团第五工程有限责任公司 | A kind of Tunnel Second Lining trolley end head formwork |
-
2018
- 2018-08-15 CN CN201821312622.8U patent/CN208619124U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110454192A (en) * | 2019-08-30 | 2019-11-15 | 中铁五局集团第五工程有限责任公司 | A kind of Tunnel Second Lining trolley end head formwork |
CN110454192B (en) * | 2019-08-30 | 2024-10-18 | 中铁五局集团第五工程有限责任公司 | Tunnel secondary lining trolley end template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205935641U (en) | Template formwork system of aluminum alloy shear force wall | |
CN109736353A (en) | Construction method of composite single-side formwork deep foundation pit basement outer wall | |
CN106223516B (en) | ALC steam-pressing aero-concrete batten tilts curtain wall structure and construction method | |
CN109208790A (en) | Circular arc shear wall single side formwork construction method | |
CN103233479B (en) | Method for pouring concrete cup foundation | |
CN106193588A (en) | A kind of method pouring building post-cast strip and pour mould | |
CN208619124U (en) | The tunnel lining trolley end mould of fixed waterstop | |
CN207598259U (en) | A kind of end molding block apparatus for lining trolley filling concrete | |
CN110644676B (en) | Synchronous pouring construction method for preset isolation layer of concrete constructional column | |
CN204899217U (en) | Concrete is vertical to meet template bracket reinforcing apparatus that batch position pour | |
CN205654082U (en) | Half tunnel formwork | |
CN209228033U (en) | Regularization template external corner reinforcing device | |
CN208163928U (en) | A kind of producing device of stiffened column | |
CN212689574U (en) | Plugging structure of cast-in-place concrete wall column template scavenge port | |
CN209228032U (en) | Regularization formwork inside-corner reinforcing device | |
CN210316538U (en) | Aluminum mold supporting system for floor lower extension lintel | |
CN209179537U (en) | A kind of concrete chimney transformation reinforcing column construction formwork | |
CN108104136B (en) | Foundation pit supporting structure and construction method thereof | |
CN207245186U (en) | Basement floor stent | |
CN207091930U (en) | One kind uprises box girder formwork | |
CN206111205U (en) | Two lining mold in tunnel build platform truck and bury waterstop installation fastening head template in with | |
CN219411780U (en) | Anti-leakage combined detachable scaffold wall connecting piece | |
CN210597670U (en) | Integrated aluminum mould hanging mould pouring water-stopping concrete ridge structure | |
CN219710363U (en) | Anti-floating supporting die structure of water collecting well | |