CN214305614U - Suspender support mounting device - Google Patents
Suspender support mounting device Download PDFInfo
- Publication number
- CN214305614U CN214305614U CN202120314119.1U CN202120314119U CN214305614U CN 214305614 U CN214305614 U CN 214305614U CN 202120314119 U CN202120314119 U CN 202120314119U CN 214305614 U CN214305614 U CN 214305614U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- fixed
- screw
- suspender support
- chassis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a suspender support mounting device, which comprises a pre-buried base and a suspender support, wherein the pre-buried base comprises a chassis, a through hole is arranged in the middle of the chassis, a sleeve is fixed at the through hole, a thread structure is arranged in the sleeve, a connecting pipe is fixed above the sleeve, and a fixed disc is fixed at the top end of the connecting pipe; the suspender support comprises a screw, the upper part of the screw extends into the through hole of the chassis and is in threaded fit with the sleeve, a fastening nut is arranged on the screw, and a mounting part is arranged below the screw. The height of the suspender support can be adjusted through the screw rod, expansion bolts do not need to be driven, the construction is convenient and fast, no environmental pollution is caused, the high-altitude operation time is reduced, the reworking operation is reduced, the labor is saved, the suspender support is neat and attractive after completion, and the suspender support has strong practicability and popularization.
Description
Technical Field
The utility model belongs to the technical field of the construction, in particular to jib support installation device.
Background
In the building electromechanical installation, especially in the indoor finish decoration work progress, when gallows construction such as all kinds of water supply and drainage pipe, air conditioner ventilation equipment and decoration, need to squeeze into expansion bolts to the floor and fix the jib support, because of the pre-buried electric pipeline complicacy in the floor, the return circuit is various, need avoid the pipeline when executing and beating expansion bolts, thereby lead to jib support arrange inhomogeneous, it is pleasing to the eye, and inevitably can destroy the spool of pre-buried earlier in the concrete floor and the electric wire that the later stage penetrated, seriously influence the appearance quality of concrete, increase the work load of later stage reprocess spool and electric wire, mistake work, and the spool later stage that blocks up also can only adopt bright piping, influence pleasing to the eye more.
Disclosure of Invention
The utility model aims at solving the above problem, provide a simple structure, need not to execute and beat the installation device that expansion bolts fixed jib support.
Therefore, the technical scheme of the utility model is that: a boom stand mounting apparatus, characterized in that: the embedded base comprises a chassis, a through hole is formed in the middle of the chassis, a sleeve is fixed at the through hole, a threaded structure is arranged in the sleeve, a connecting pipe is fixed above the sleeve, and a fixed disc is fixed at the top end of the connecting pipe; the suspender support comprises a screw, the upper part of the screw extends into the through hole of the chassis and is in threaded fit with the sleeve, a fastening nut is arranged on the screw, and a mounting part is arranged below the screw.
Preferably, the fixed disk is of a circular structure, and the diameter of the fixed disk is more than 2 times of the outer diameter of the sleeve.
Preferably, a plurality of mounting holes are arranged on the chassis.
During construction, the embedded base is fixed to the corresponding position of the template, the position is retested after civil construction steel bar construction is finished, concrete is poured, the embedded base is completely located in the concrete, the template is then detached, the screw of the suspender support is screwed into the sleeve, and the suspender support is fixed through the fastening nut, so that installation of the suspender support is completed. The diameter of fixed disk is greater than 2 times of sleeve external diameter, can strengthen the holistic tensile strength of pre-buried base, guarantees jib support's fastness.
The utility model discloses in burying the concrete in advance with the base of jib support, in the jib support only need the sleeve of screw in base can, need not to beat expansion bolts, jib support accessible screw rod height-adjusting, and can change the jib support of isostructure according to the demand, it is convenient to be under construction, and no environmental pollution has reduced the high altitude construction time again, has reduced the operation of doing over again simultaneously, has saved the manual work, and the jib support is neat pleasing to the eye after the completion, has stronger practicality and popularization nature.
Drawings
The following detailed description is made with reference to the accompanying drawings and embodiments of the present invention
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is the construction schematic diagram of the utility model.
Labeled as: the steel plate concrete formwork comprises a fixed plate 1, a connecting pipe 2, a sleeve 3, a mounting hole 4, a circular chassis 5, a fastening nut 6, a suspender support 7, a screw rod 71, a mounting ring 72, a formwork 8, concrete 9 and iron nails 10.
Detailed Description
See the drawings. The suspender support mounting device comprises an embedded base and a suspender support 7, wherein the embedded base is positioned in concrete, and the suspender support is positioned on the outer side; the embedded base comprises a circular base plate 5, a through hole is formed in the middle of the circular base plate 5, and a plurality of mounting holes 4 are formed in the circumference of the circular base plate; a sleeve 3 is fixed at the through hole, a thread structure is arranged in the sleeve, a connecting pipe 2 is fixed above the sleeve 3, a round fixing disc 1 is fixed at the top end of the connecting pipe 2, the diameter of the fixing disc 1 is more than 2 times of the outer diameter of the sleeve 3, and the integral tensile strength of the embedded base can be ensured; the suspender support 7 comprises a screw rod 71, the upper part of the screw rod extends into the through hole of the chassis and is in threaded fit with the sleeve, a fastening nut 6 is arranged on the screw rod, and a mounting ring 72 is arranged below the screw rod. During the in-service use, can change the jib support of isostructure according to the demand, the screw rod below can set up the installed part of other structures, is applicable to different scenes.
During construction, lofting and positioning are carried out on the position of a suspender support to be installed on the template through construction drawings, the embedded base is fixed on the corresponding position of the template 8 through the cooperation of the iron nails 10 and the mounting holes 4, the position is retested after civil engineering steel bar construction is finished, concrete is poured, the iron nails fixed on the chassis are removed after maintenance is finished, and the template is removed. At the moment, the embedded base is completely positioned in the concrete 9, the length of the installed suspender support can be properly adjusted only by screwing the screw rod 71 into the sleeve, and finally, the suspender support is installed at a fixed length by using the fastening nut 6.
Claims (3)
1. A boom stand mounting apparatus, characterized in that: the embedded base comprises a chassis, a through hole is formed in the middle of the chassis, a sleeve is fixed at the through hole, a threaded structure is arranged in the sleeve, a connecting pipe is fixed above the sleeve, and a fixed disc is fixed at the top end of the connecting pipe; the suspender support comprises a screw, the upper part of the screw extends into the through hole of the chassis and is in threaded fit with the sleeve, a fastening nut is arranged on the screw, and a mounting part is arranged below the screw.
2. A boom support mounting apparatus as claimed in claim 1, wherein: the fixed disk is of a circular structure, and the diameter of the fixed disk is 2 times larger than the outer diameter of the sleeve.
3. A boom support mounting apparatus as claimed in claim 1, wherein: the chassis is provided with a plurality of mounting holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120314119.1U CN214305614U (en) | 2021-02-04 | 2021-02-04 | Suspender support mounting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120314119.1U CN214305614U (en) | 2021-02-04 | 2021-02-04 | Suspender support mounting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214305614U true CN214305614U (en) | 2021-09-28 |
Family
ID=77833029
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120314119.1U Active CN214305614U (en) | 2021-02-04 | 2021-02-04 | Suspender support mounting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214305614U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2024082574A1 (en) * | 2022-10-19 | 2024-04-25 | 中建科工集团有限公司 | Pre-embed device for electromechanical pipeline support hanger |
-
2021
- 2021-02-04 CN CN202120314119.1U patent/CN214305614U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2024082574A1 (en) * | 2022-10-19 | 2024-04-25 | 中建科工集团有限公司 | Pre-embed device for electromechanical pipeline support hanger |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN214305614U (en) | Suspender support mounting device | |
CN101624871A (en) | Instrumental operation platform for shear wall formwork of elevator shaft | |
CN204081445U (en) | To encorbelment i iron anchor device | |
CN105507573A (en) | Method for mounting external cantilever scaffolds made of shape steel | |
CN110863644A (en) | Novel turnover tool type beam side connecting wall piece fixing device and method | |
CN204492134U (en) | Be convenient to the height scaffolding installed | |
CN106862842A (en) | It is multi-functional without code pin mounting tool | |
CN205134546U (en) | But quick detachable I -steel built -in fitting of encorbelmenting of cyclic utilization | |
CN201447862U (en) | Instrumental operating platform used for elevator shaft shear wall shuttering erection | |
CN206289864U (en) | Colony's short column installs supporting apparatus | |
CN212407781U (en) | Energy-concerving and environment-protective type is hanger for construction | |
CN204756170U (en) | Pre -buried formula mechanical connection pipeline support | |
CN209637224U (en) | A kind of assembled wall | |
CN211873507U (en) | Net rack bolt ball support connecting system | |
CN219886552U (en) | Upright post structure of steel bridge | |
CN211007761U (en) | Building support connection structure | |
CN214302247U (en) | Flower basket cantilever frame structure | |
CN205617827U (en) | Exempt from supporting steel plate and consolidate adjustable compressing device | |
CN216239024U (en) | Wall connecting piece | |
CN210239351U (en) | Protection network for ecological agriculture | |
CN217631371U (en) | Building embedded part | |
CN110965575A (en) | Foundation bolt mounting and fixing tool and method for equipment foundation | |
CN204879048U (en) | Novel pipeline support | |
CN220978799U (en) | Wall post mistake proofing platform leakage subassembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |