CN214302810U - Adjustable hanging cage for pouring construction - Google Patents

Adjustable hanging cage for pouring construction Download PDF

Info

Publication number
CN214302810U
CN214302810U CN202023200394.5U CN202023200394U CN214302810U CN 214302810 U CN214302810 U CN 214302810U CN 202023200394 U CN202023200394 U CN 202023200394U CN 214302810 U CN214302810 U CN 214302810U
Authority
CN
China
Prior art keywords
frame
protective
construction
protective frame
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023200394.5U
Other languages
Chinese (zh)
Inventor
汤琳宇
顾友
黄巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taicang Road And Bridge Engineering Co ltd
Original Assignee
Taicang Road And Bridge Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taicang Road And Bridge Engineering Co ltd filed Critical Taicang Road And Bridge Engineering Co ltd
Priority to CN202023200394.5U priority Critical patent/CN214302810U/en
Application granted granted Critical
Publication of CN214302810U publication Critical patent/CN214302810U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The application relates to an adjustable casting construction hanging cage which comprises two construction frames, wherein a connecting plate is arranged at the upper end of each construction frame, a hook is arranged at the upper end of each connecting plate, a protective frame which slides on the construction frame is arranged at the lower end of each construction frame, a supporting plate used for supporting construction personnel is arranged at the lower end of each protective frame, and the number of the construction frames is two; the protective frame comprises a group of symmetrically arranged protective side frames welded with the construction frame, and a first protective frame and a second protective frame which are arranged between the two protective side frames, wherein one end of the first protective frame is welded with one protective side frame, the other end of the first protective frame is provided with a connecting hole, one end of the second protective frame is welded with the other protective side frame, the other end of the second protective frame is inserted into the connecting hole of the first protective frame, and the first protective frame and the second protective frame are provided with locking pieces; the support plate comprises a support first plate and a support second plate sliding in the support first plate. This application has the effect of the scope of protection of cage is hung in adjustable and promotion construction.

Description

Adjustable hanging cage for pouring construction
Technical Field
The application relates to the field of construction hanging cages, in particular to an adjustable pouring hanging cage.
Background
When building construction is carried out, construction operation is often required to be carried out at high altitude, and transportation equipment during operation at high altitude is the construction hanging cage.
Chinese patent with publication No. CN211524026U discloses a casting construction hanging cage, which comprises a first U-shaped connecting plate, two main supporting rods, a second U-shaped connecting plate and a bottom frame, wherein the tops of the inner sides of the two main supporting rods are welded together, the top ends of the two main supporting rods are respectively fixedly connected with the two sides of the inner arm of the first U-shaped connecting plate, the bottom ends of the inner sides of the two main supporting rods and the bottom ends of the two sides of the inner arm of the second U-shaped connecting plate are respectively movably connected with the two ends of the two sides of the bottom frame through pin shafts, a plurality of connecting rods are arranged between the two main supporting rods and the second U-shaped connecting plate, the two ends of the plurality of connecting rods are respectively movably connected with the bottoms of the outer sides of the two main supporting rods and the two sides of the second U-shaped connecting plate through pin shafts, supporting plates are fixedly welded inside the bottom frame, fixing rods are welded at the tops of the two main supporting rods, and fixing rings are fixedly connected with the top ends of the fixing rods through supporting rods, the fixed ring is fixedly connected with one end of the steel wire rope, the other end of the steel wire rope is fixedly connected with the top end of the second U-shaped connecting plate, and the steel wire rope can be drawn and pulled to store the construction hanging cage.
In view of the above-mentioned related technologies, the inventor believes that when different buildings are constructed, the size requirements of the used construction hanging cage are different, and the construction hanging cage needs to be frequently replaced, so that the construction is inconvenient.
SUMMERY OF THE UTILITY MODEL
Use the convenience of construction string cage when promoting the construction, this application provides a cage is hung in construction of pouring with adjustable.
The application provides a casting construction hangs cage with adjustable adopts following technical scheme:
an adjustable casting construction hanging cage comprises a scaffold, wherein a connecting plate is arranged at the upper end of the scaffold, a hook for hanging the construction hanging cage is arranged at the upper end of the connecting plate, a protective frame is arranged at the lower end of the scaffold, a supporting plate for supporting constructors is arranged at the lower end of the protective frame, two scaffolds are arranged, the two scaffolds are connected at the lower surface of the connecting plate in a sliding manner, and a sliding groove for the sliding of the scaffold is formed in one surface, close to the scaffold, of the connecting plate; the protective frame comprises a group of symmetrically arranged protective side frames welded with a construction frame, and a first protective frame and a second protective frame which are arranged between the two protective side frames, wherein one end of the first protective frame is welded with one protective side frame, the other end of the first protective frame is provided with a connecting hole, one end of the second protective frame is welded with the other protective side frame, the other end of the second protective frame is inserted into the connecting hole of the first protective frame, and the first protective frame and the second protective frame are provided with locking pieces; the support plate comprises a support first plate and a support second plate sliding in the support first plate.
Through adopting above-mentioned technical scheme, the protection scope during construction can be adjusted to the cage is hung in the construction, and the power of opposite direction is executed to two protection side bearer, and the construction frame slides at the spout inner wall, and the second between two protection side bearers slides in the connecting hole inner wall department that first protection was seted up, supports the second board and slides in supporting the first board to realize that the construction hangs the protection area grow of cage, can be applicable to the construction equipment in different environment.
Optionally, the locking member includes a plurality of fixing screws in threaded connection with the surface of the second protection frame, and the surface of the outer wall of the first protection frame is provided with a plug hole for connecting the fixing screws with the second protection frame in threaded connection.
Through adopting above-mentioned technical scheme, cage is hung in the construction after the regulation distance, inserts fixing screw and locates spliced eye inner wall department, and fixing screw protects a threaded connection with the second to the second after will sliding protects a fixed, has increased the construction and has hung the connection stability of cage.
Optionally, a magnetic part is arranged at one end of the second protection frame, which is inserted into the connecting hole of the first protection frame, and an adsorption part magnetically attracted with the magnetic part is arranged at the end wall of the connecting hole.
Through adopting above-mentioned technical scheme, when the cage was accomodate in the construction, the second protected the frame and slided and accomodate, and the magnetism spare of second protected the frame tip passes through magnetism effort inter attraction with the absorption piece of connecting hole end wall to can accomplish fast accomodating of second protected the frame, and further promote stability.
Optionally, a stabilizing component is arranged between one of the protective side frames and the first protective frame, and a stabilizing component is also arranged between the other protective side frame and the second protective frame; the stabilizing assembly comprises reinforcing rods connected with the first protective frame and the protective side frame, and the reinforcing rods are also arranged between the second protective frame and the other protective side frame.
Through adopting above-mentioned technical scheme, the setting of firm subassembly has promoted the protection side bearer and has protected the first support, the second protects the connection stability between the frame, has effectively promoted the holistic stability of cage is hung in the construction.
Optionally, the stabilizing assembly further comprises connecting pieces arranged at two ends of the stabilizing assembly and a positioning rod inserted in the connecting pieces and in threaded connection with the first protection frame and the second protection frame.
Through adopting above-mentioned technical scheme, will stabilize through the locating lever and realize dismantling the connection between subassembly and first guardrail and protection side bearer, second guardrail and the protection side bearer to made things convenient for the change to the subassembly that stabilizes, promoted the convenience of use of the subassembly that stabilizes.
Optionally, two be provided with firm pole between the scaffold, firm pole both ends are connected with two relative lateral wall faces of scaffold, firm pole includes first connecting rod and second connecting rod, first connecting rod is established with the second connecting rod cover and is connected, first connecting rod is provided with the connecting piece with second connecting rod junction.
Through adopting above-mentioned technical scheme, the joint strength between two scaffolds has been promoted to the firm pole that sets up between the scaffold to promote the connection stability between the scaffold, effectively promoted the holistic connection stability of cage is hung in the construction.
Optionally, the connecting piece is including setting up in the adapter sleeve of first connecting rod keep away from rather than welded scaffold one end, adapter sleeve and first connecting rod surface threaded connection.
Through adopting above-mentioned technical scheme, when first connecting rod and second connecting rod were inserted and are established, the inner wall and the first connecting rod outer wall threaded connection of adapter sleeve one end, the inner wall and the second connecting rod outer wall surface threaded connection of the adapter sleeve other end to the holistic connection stability of firm pole has been promoted.
Optionally, first connecting rod is kept away from rather than welded scaffold one end and is provided with the toper crown plate, the toper crown plate includes two toper reinforcing pieces, toper reinforcing piece inner wall and the laminating of second connecting rod outer wall, toper reinforcing piece outer wall and the laminating of adapter sleeve inner wall.
Through adopting above-mentioned technical scheme, when the connecting sleeve is connected first connecting rod and second connecting rod, the adapter sleeve inner wall offsets with the toper crown plate, screws up the adapter sleeve, has effectively promoted the laminating degree of conicity crown plate with the second connecting rod outer wall to the connection stability between the firm pole has been promoted.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the construction frame of the construction hanging cage slides on the lower surface of the support plate, the first protection frame is connected with the second protection frame in a sliding manner, the second support frame slides in the first support frame, opposite forces are respectively applied to the two opposite protection side frames, and the protection range of the whole construction hanging cage can be enlarged so as to adapt to different construction conditions;
2. the first protective frame and the protective side frame, and the second protective frame and the protective side frame are respectively provided with a stabilizing component, and the stabilizing components effectively improve the overall connection stability of the construction hanging cage;
3. the stability pole that sets up between two scaffold has promoted the fixity between the scaffold.
Drawings
Fig. 1 is an overall schematic view of an adjustable casting construction hanging cage according to an embodiment of the present application.
Fig. 2 is a specific schematic diagram showing the connection relationship between the scaffold and the connection plate in the embodiment of the present application.
FIG. 3 is an exploded view of the embodiment of the present application showing the connection of the stabilizer bar.
Fig. 4 is a sectional view showing the connection relationship of the protection frame in the embodiment of the present application.
Description of reference numerals: 1. a scaffold; 2. a connecting plate; 3. hooking; 4. a chute; 5. a protective frame; 51. a protective side frame; 52. a first protective frame; 53. a second protective frame; 6. connecting holes; 7. a locking member; 71. fixing the screw rod; 72. fixing a nut; 8. inserting holes; 9. a magnetic member; 10. an adsorbing member; 11. a stabilizing assembly; 111. a reinforcing rod; 112. connecting sheets; 113. positioning a rod; 12. a stabilizing rod; 121. a first link; 122. a second link; 13. a connecting member; 131. connecting sleeves; 132. a conical ring plate; 1321. a tapered reinforcing sheet; 14. a support plate; 141. supporting a first plate; 142. supporting the second plate.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses cage is hung in construction of pouring with adjustable. Referring to fig. 1 and 2, a cage is hung in watering construction with adjustable includes scaffold 1, scaffold 1 upper end is provided with connecting plate 2, connecting plate 2 is close to the surface of scaffold 1 one side and offers the spout 4 that supplies scaffold 1 to slide, scaffold 1 can slide along the horizontal direction in spout 4 is inside, scaffold 1 lower extreme is for the protection frame 5 with scaffold 1 welded, protection frame 5 includes first protection frame 52 and second protection frame 53, protection frame 5 still includes the protection side bearer 51 with first protection frame 52 and second protection frame 53 round pin hub connection.
Referring to fig. 1, the stabilizing assemblies 11 are disposed between the first protective frame 52, the second protective frame 53 and the protective side frame 51, each stabilizing assembly 11 includes a reinforcing rod 111, a connecting piece 112 and a positioning rod 113, and the reinforcing rods 111 are disposed between the first protective frame 52, the second protective frame 53 and the protective side frame 51 in an inclined manner; when the first protection frame 52 is connected with the reinforcing rod 111 between the protection frames 5, the connecting sheet 112 of the reinforcing rod 111 is attached to the lower wall surface of one first protection frame 52, the connecting sheet 112 at the other end of the reinforcing rod 111 is attached to the upper wall surface of one first protection frame 52 adjacent to the first protection frame 52, the connecting sheet 112 at the center of the reinforcing rod 111 is attached to the side wall surface of the first protection frame 52, at this time, the connecting sheet 112 is connected with the first protection frame 52 and the protection side frame 51 by the positioning rod 113, and the connecting sheet 112 is further connected with the second protection frame 53 and the protection side frame 51 by the positioning rod 113, so that the connection stability between the protection side frame 51 and the first protection frame 52 and the second protection frame 53 is enhanced.
Referring to fig. 1, a support plate 14 is welded to the lower end of the protection frame 5, the support plate 14 is welded to the lower end of the protection side frame 51, the support plate 14 includes a first support plate 141 and a second support plate 142 sliding inside the first support plate 141, and when the protection frame 5 is stretched to increase the construction protection range, the second support plate 142 slides inside the first support plate 141, so that the working range of the support plate 14 is synchronously expanded.
Referring to fig. 2 and 3, a stabilizing rod 12 is disposed between two scaffolds 1, the stabilizing rod 12 includes a first connecting rod 121 having one end welded to a sidewall of one scaffold 1 and a second connecting rod 122 having one end welded to a sidewall of the other scaffold 1, a diameter of the second connecting rod 122 is slightly smaller than a diameter of the first connecting rod 121, and the second connecting rod 122 is inserted into the first connecting rod 121.
Referring to fig. 3, a connecting member 13 is arranged between the first connecting rod 121 and the second connecting rod 122, the connecting member 13 includes a connecting sleeve 131, an inner wall of one end of the connecting sleeve 131 is in threaded connection with a surface of an outer wall of the first connecting rod 121, one end of the first connecting rod 121, which is far away from a scaffold 1 welded thereto, is integrally formed with a conical annular plate 132, the conical annular plate 132 is composed of two conical reinforcing pieces 1321, and a surface of an inner wall of the conical reinforcing piece 1321 is attached to a surface of an outer wall of the second connecting rod 122; the connecting stability between the two construction frames 1 is improved by the connecting piece 13.
Referring to fig. 4, the first protection frame 5 and the second protection frame 53 are provided with locking pieces 7, one end of the first protection frame 52 close to the second protection frame 53 is provided with a connecting hole 6, the second protection frame 53 is inserted into the connecting hole 6, the outer wall surface of the first protection frame 52 is symmetrically provided with a plurality of inserting holes 8, the inner wall of each inserting hole 8 is inserted with the locking piece 7 in threaded connection with the second protection frame 53, and each locking piece comprises a fixed screw 71 and a fixed nut 72; the magnetic part 9 is embedded in one end of the second protection frame 53 inserted into the connecting hole 6, and the adsorption part 10 which is magnetically attracted with the magnetic part 9 at one end of the first protection frame 52 is embedded in the end wall surface of one end of the connecting hole 6 far away from the second protection frame 53.
The implementation principle of cage is hung in construction of pouring with adjustable this application embodiment does:
when the construction protection range of the construction hanging cage is adjusted, the connecting sleeve 131 on the outer wall of the stabilizing rod 12 is rotated, so that the second connecting rod 122 can move, then the fixing screw 71 in the inserting hole 8 is rotated and disassembled out of the second protecting frame 53 and the first protecting frame 52, force is applied to the two ends in opposite directions at the same time, at the moment, the upper end of the construction frame 1 slides on the inner wall of the sliding groove, the second connecting rod 122 slides on the inner wall of the inserting hole of the first connecting rod 121, the second protecting frame 53 slides on the inner wall of the connecting hole 6 of the first protecting frame 52, and the supporting second plate 142 slides inside the supporting first plate 141; after the required construction range is adjusted, the connecting sleeve 131 is screwed down, the fixing screw 71 is rotated to the inside of the inserting hole 8, the first protective frame 52 and the second protective frame 53 are fixed, the adjustment of the construction frame 1 is completed, and the application universality of the construction hanging cage is effectively improved.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a cage is hung in construction of pouring with adjustable, includes scaffold (1), scaffold (1) upper end is provided with connecting plate (2), connecting plate (2) upper end is provided with and is used for hanging couple (3) of establishing the construction and hanging the cage, scaffold (1) lower extreme is provided with protection frame (5), protection frame (5) lower extreme is provided with backup pad (14) that are used for supporting constructor, its characterized in that: the construction frames (1) are arranged in two numbers, the two construction frames (1) are connected at the lower surface of the connecting plate (2) in a sliding manner, and one surface of the connecting plate (2) close to the construction frames (1) is provided with a sliding groove (4) for the sliding of the construction frames (1); the protective frame (5) comprises a group of symmetrically arranged protective side frames (51) welded with a construction frame (1), a first protective frame (52) and a second protective frame (53) which are arranged between the two protective side frames (51), one end of the first protective frame (52) is welded with one protective side frame (51), a connecting hole (6) is formed in the other end of the first protective frame (52), one end of the second protective frame (53) is welded with the other protective side frame (51), the other end of the second protective frame (53) is inserted into the connecting hole (6) of the first protective frame (52), and locking pieces (7) are arranged on the first protective frame (52) and the second protective frame (53); the supporting plate (14) comprises a supporting first plate (141) and a supporting second plate (142) sliding in the supporting first plate (141).
2. The adjustable casting construction hanging cage of claim 1, wherein: the locking piece (7) comprises a plurality of fixing screws (71) which are in threaded connection with the surface of the second protective frame (53), and the outer wall surface of the first protective frame (52) is provided with inserting holes (8) for the fixing screws (71) to be in threaded connection with the second protective frame (53).
3. The adjustable casting construction hanging cage of claim 2, wherein: one end of the second protection frame (53) inserted into the connecting hole (6) of the first protection frame (52) is provided with a magnetic part (9), and the end wall of the connecting hole (6) is provided with an adsorption part (10) which is magnetically attracted with the magnetic part (9).
4. The adjustable casting construction hanging cage of claim 1, wherein: a stabilizing component (11) is arranged between one protective side frame (51) and the first protective frame (52), and a stabilizing component (11) is also arranged between the other protective side frame (51) and the second protective frame (53); the stabilizing assembly (11) comprises a reinforcing rod (111) connected with the first protective frame (52) and the protective side frame (51), and the reinforcing rod (111) is also arranged between the second protective frame (53) and the other protective side frame (51).
5. The adjustable casting construction hanging cage of claim 4, wherein: the stabilizing assembly (11) further comprises connecting pieces (112) arranged at two ends of the stabilizing assembly (11) and positioning rods (113) inserted into the connecting pieces (112) and in threaded connection with the first protective frame (52) and the second protective frame (53).
6. The adjustable casting construction hanging cage of claim 1, wherein: two be provided with between scaffold (1) firm pole (12), firm pole (12) both ends are connected with the relative lateral wall face of two scaffold (1), firm pole (12) include first connecting rod (121) and second connecting rod (122), first connecting rod (121) are established with second connecting rod (122) cover and are connected, first connecting rod (121) are provided with connecting piece (13) with second connecting rod (122) junction.
7. The adjustable casting construction hanging cage of claim 6, wherein: connecting piece (13) are including setting up in first connecting rod (121) keep away from adapter sleeve (131) rather than welded scaffold frame (1) one end, adapter sleeve (131) and first connecting rod (121) surface threaded connection.
8. The adjustable casting construction hanging cage of claim 7, wherein: first connecting rod (121) are kept away from rather than welded scaffold (1) one end and are provided with toper crown plate (132), toper crown plate (132) include two toper reinforcing pieces (1321), toper reinforcing piece (1321) inner wall and the laminating of second connecting rod (122) outer wall, toper reinforcing piece (1321) outer wall and the laminating of adapter sleeve (131) inner wall.
CN202023200394.5U 2020-12-25 2020-12-25 Adjustable hanging cage for pouring construction Active CN214302810U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023200394.5U CN214302810U (en) 2020-12-25 2020-12-25 Adjustable hanging cage for pouring construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023200394.5U CN214302810U (en) 2020-12-25 2020-12-25 Adjustable hanging cage for pouring construction

Publications (1)

Publication Number Publication Date
CN214302810U true CN214302810U (en) 2021-09-28

Family

ID=77864107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023200394.5U Active CN214302810U (en) 2020-12-25 2020-12-25 Adjustable hanging cage for pouring construction

Country Status (1)

Country Link
CN (1) CN214302810U (en)

Similar Documents

Publication Publication Date Title
US9199830B2 (en) Hoisting apparatus and method of use
US9890545B1 (en) Erection system
CN207245138U (en) Boat scaffold adjustable in pitch
CN210918320U (en) Suspension device for high-altitude construction of building
CN214302810U (en) Adjustable hanging cage for pouring construction
CN209786629U (en) Auxiliary device for replacing tension glass insulator of power transmission line
CN211373580U (en) High accuracy ground settlement data monitoring devices
CN211048690U (en) Command stand for engineering management
CN214885324U (en) Liftable support for construction engineering construction
CN211597633U (en) Scaffold for building engineering that can install fast
CN115326039A (en) Device for keeping engineering survey mark post vertical in real time and using method thereof
CN213271571U (en) Assembled antidetonation gallows
CN209242469U (en) A kind of boat frame hoisting structure
CN210448025U (en) Portable badminton net rack
CN216849122U (en) Platform guiding device
CN219671104U (en) Detachable suspension cage for overhead working construction in narrow space
CN214808290U (en) Football training apparatus
CN110644772A (en) Aluminum alloy scaffold connecting device
CN210467203U (en) Social security payment bulletin board
CN220336518U (en) Building engineering construction protector
CN217298638U (en) Rail guard is used in overpass construction
CN214834512U (en) Springboard support for building construction
CN209398365U (en) A kind of strictive drill derrick that well head work area is big
CN216690375U (en) Template supporting beam device for building engineering
CN216603859U (en) Safety belt hanging device for disassembling and assembling oil drilling derrick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant