CN214272911U - Hydraulic jacking protection frame for assembly type building - Google Patents

Hydraulic jacking protection frame for assembly type building Download PDF

Info

Publication number
CN214272911U
CN214272911U CN202022897219.XU CN202022897219U CN214272911U CN 214272911 U CN214272911 U CN 214272911U CN 202022897219 U CN202022897219 U CN 202022897219U CN 214272911 U CN214272911 U CN 214272911U
Authority
CN
China
Prior art keywords
support
guide rail
wall body
jacking
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022897219.XU
Other languages
Chinese (zh)
Inventor
郝海涛
王大明
李改华
王月阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tosun Technology Development Co ltd
Original Assignee
Beijing Tosun Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Tosun Technology Development Co ltd filed Critical Beijing Tosun Technology Development Co ltd
Priority to CN202022897219.XU priority Critical patent/CN214272911U/en
Application granted granted Critical
Publication of CN214272911U publication Critical patent/CN214272911U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The application relates to the field of building construction devices, in particular to a hydraulic jacking protective frame for an assembly type building, which comprises a plurality of wall-through rods arranged on a wall body in a penetrating way, an attachment support detachably connected with one end of the wall-through rod positioned at the outer side of the wall body, a plurality of guide rails arranged on the attachment support in a sliding way, a jacking support arranged above the attachment support and a protective frame fixedly connected with one side of the guide rails far away from the wall body through bolts, wherein the wall-through rods are arranged along the height direction of the wall body at equal intervals and are arranged in a plurality of rows along the width direction of the wall body, the length direction of the guide rail penetrates through the plurality of attached supports, a hydraulic cylinder for driving the protection frame to lift is vertically arranged between the attached supports and the jacking supports, the pneumatic cylinder upper end is rotated with the jacking device and is connected, and the pneumatic cylinder lower extreme rotates with adhering to the support and being connected, it all with guide rail slip joint to adhere to support and jacking support. This application has the effect that improves protection frame installation effectiveness.

Description

Hydraulic jacking protection frame for assembly type building
Technical Field
The application relates to the field of building construction devices, in particular to a hydraulic jacking protection frame for an assembly type building.
Background
The high-altitude operation belongs to the operation with higher danger and higher operation difficulty in the field of building construction, and the construction efficiency of the high-altitude operation is increasingly emphasized along with the improvement of the living standard of people and the continuous progress of social science and technology.
The climbing formwork is a formwork commonly used for high-altitude operation, is attached to a building structure, ascends layer by layer along with building construction, mostly takes a wall embedded part as a bearing body and takes a hydraulic oil cylinder as power, and a climbing formwork body climbs along a guide rail. The truss is an important component in the climbing formwork frame body, is a plane or space structure which is composed of straight rods and generally has triangular units, and a truss rod piece mainly bears axial tension or pressure.
SUMMERY OF THE UTILITY MODEL
In order to improve the efficiency of protection frame installation, this application provides a hydraulic pressure jacking protection frame for assembly type structure.
The application provides a pair of hydraulic jacking protection frame for assembly type structure adopts following technical scheme:
the utility model provides an assembly type is hydraulic pressure jacking protection frame for building, including wear to establish a plurality of on the wall body wear the wall pole, can dismantle and connect and be located the attached support of wall body outside one end at wearing the wall pole, slide to set up many guide rails on attached support, set up at the jacking support of attached support top and keep away from the protective frame of wall body one side at the guide rail through bolt fixed connection, a plurality of wears the wall pole along the direction of height equidistance setting of wall body and be provided with the multiseriate along the width direction of wall body, the length direction of guide rail passes a plurality of attached supports, adhere to the pneumatic cylinder that the vertical drive protection frame that is provided with goes up and down between support and the jacking support, the pneumatic cylinder upper end rotates with the jacking device to be connected, the pneumatic cylinder lower extreme with adhere to the support and rotate to be connected, it all with guide rail slip joint to adhere to support and jacking support.
Through adopting above-mentioned technical scheme, the hydraulic pressure jacking protection frame that this application set up, when being under construction to the external side of wall, the staff can be earlier with wearing the wall pole and adhering to the support mounting on the wall body, then subaerial to protection frame and guide rail splice the equipment, the back is accomplished in the equipment, wear to establish the guide rail on adhering to the support and on the jacking support, install the pneumatic cylinder at last between adhering to support and jacking support, for the climbing of protection frame provides power, adopt the mounting means of assembled, the installation effectiveness of protection frame has been improved greatly.
Optionally, a plurality of layers of horizontally arranged construction platforms are arranged in the protective frame.
Through adopting above-mentioned technical scheme, the construction platform of setting can supply the staff at the in-process of carrying out the construction to the wall body, provides the space of standing to the multilayer construction platform that sets up can let more staff carry out the simultaneous construction to the wall body, has improved the efficiency of work.
Optionally, a protective net is arranged on the outer side of the protective frame, which is far away from the wall body.
Through adopting above-mentioned technical scheme, the protection network that sets up can provide necessary protection to staff's safety, prevents that the staff from falling from the high altitude.
Optionally, a protection plate is arranged between the construction platform at the lowest layer in the protection frame and the wall, and one side, close to the wall, of the construction platform is detachably connected with a protection fence.
Through adopting above-mentioned technical scheme, the guard plate of setting can prevent that the staff from stepping on the sky and dropping from the gap between protective frame and the wall body, and the rail guard of setting can prevent that the staff from dropping from the protection frame.
Optionally, the wall penetrating rod comprises a horizontally arranged fixing rod, a connecting seat detachably connected to one end of the fixing rod and a clamping piece detachably connected to the other end of the fixing rod.
Through adopting the above technical scheme, the quick detach formula pole of wearing wall that this application set up, when using, the staff pierces through the wall body with the one end of dead lever, the one end that makes the dead lever is located the wall body outside, one end is located the wall body inboard in addition, the connecting seat with climb the attached support joint on the die carrier, set up the one end of keeping away from the connecting seat at the dead lever with joint spare at last, thereby to wear the wall pole to fix on the wall body, this pole of wearing wall of setting, the installation with dismantle convenient and fast, do not need the preselection to wear the setting of wall pole in the wall body, the efficiency of dismantling and installing the pole of wearing wall is improved.
Optionally, it includes the fixing base and the symmetry setting a pair of first clamp in the fixing base both sides that are connected with the pole of wearing the wall to adhere to the support, the guide rail is the I shape, and the guide rail extends along the moving direction who climbs the die carrier, two first clamp sets up relatively, forms the slide that supplies the guide rail to pass between the two, and first clamp cooperatees the joint with the guide rail, the guide rail can slide and peg graft in the slide.
Through adopting above-mentioned technical scheme, the attached support that this application set up, after climbing the die carrier and rising one end distance, fixes climbing the die carrier, prevents that climbing the die carrier from droing on the attached support after receiving the effect of gravity to the attached support that sets up can play the effect of direction to climbing the lift of die carrier, prevents that climbing the die carrier from taking place the skew.
Optionally, the fixing base includes the double-deck board that a pair of symmetry set up, be provided with the certain distance between the double-deck board, the one end and the double-deck board fixed connection of first clamp, two the vertical setting of double-deck board, the position department fixedly connected with fixed axle that just is close to the upper end between the two double-deck board, the fixed axle passes two double-deck boards, two the double-deck board is close to the lower extreme and with the position department fixedly connected with connecting plate of fixed axle homonymy.
Through adopting above-mentioned technical scheme, the fixed axle and the connecting plate that set up make adhere to the support and connect into whole, have increased the joint strength who adheres to the support to the convenience passes through the fixed axle joint with the fixing base on wearing the wall pole, it is also more convenient with the dismantlement with being connected of wearing the wall pole to adhere to the support.
Optionally, the jacking support includes that the setting is attaching to the support top and being located the mounting bracket and the symmetry setting of guide rail one side at a pair of second clamp of mounting bracket both sides, the one end and the mounting bracket fixed connection of second clamp, two second clamps set up relatively to two second clamps and guide rail slip joint.
Through adopting above-mentioned technical scheme, the jacking support that sets up can make the die carrier of climbing upward movement under drive arrangement's effect, and the second clamp that sets up can with the guide rail chucking, prevent that the guide rail from breaking away from with the jacking support at the in-process that rises.
Optionally, all be provided with the mounting between the inside and two double-deck boards of mounting bracket, the mounting sets up between two double-deck boards and the inside turning block of mounting bracket, fixes a plurality of fixed block and the baffle of fixed connection between two double-deck boards inside and fixed connection at the mounting bracket on guide rail orientation fixing base side, a plurality of including rotating the length direction equidistance setting of fixed block along the guide rail, the mutual joint of turning block and fixed block, the one end and the baffle butt of fixed block are kept away from to the turning block.
Through adopting above-mentioned technical scheme, when the guide rail rises, the turning block can rotate, and after the guide rail goes up and down to accomplish, the fixed block can the butt on the turning block, under the effect of baffle, the turning block can not take place to rotate to make the guide rail fix on adhering to the support, after the mould frame that climbs goes up and down to accomplish, the mounting that sets up can be fixed the mould frame that climbs, prevents to climb the mould frame and fall from the eminence, causes the casualties.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
FIG. 2 is a schematic view of a wall penetrating pole embodying the present application;
FIG. 3 is a schematic view of an embodiment of the present application embodying an attachment bracket and anchor;
FIG. 4 is a schematic diagram of a jacking seat and a fixing member according to an embodiment of the present application.
Description of reference numerals: 1. a wall penetrating rod; 11. fixing the rod; 12. a connecting seat; 121. a fixing plate; 122. a clamping and connecting plate; 13. a clamping piece; 2. attaching a support; 21. a fixed seat; 22. a first clamp; 23. a fixed shaft; 24. a connecting plate; 25. clamping a shaft; 3. a guide rail; 4. jacking a support; 41. a mounting frame; 42. a second clamp; 5. a hydraulic cylinder; 6. a roller; 7. a fixing member; 71. rotating the block; 72. a fixed block; 73. a baffle plate; 8. a protective frame; 81. a construction platform; 82. a protective net; 83. a protection plate; 84. a guard rail.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses hydraulic jacking protection frame for assembly type structure. Referring to fig. 1, the protection frame includes that the level wears to establish a plurality of on the wall body and wears wall pole 1, can dismantle the attached support 2 of connection in the 1 one end of wearing wall pole, many guide rails 3 that set up along the wall body direction of height, the setting is at the jacking support 4 of attaching support 2 top and keep away from the protective frame 8 on the wall body side at guide rail 3 through bolt fixed connection, it is inside that 1 one end of wearing wall pole is located the wall body, wear the other one end of wall pole 1 to be located the wall body outside and with attach support 2 and be connected, a plurality of wears the even setting of direction of height along the wall body of wall pole 1, and be provided with the multiseriate along the width direction of wall body, many guide rails 3 set up along the width direction of wall body, and guide rail 3 is vertical to pass and to attach support 2 and jacking support 4, it slides the joint with guide rail 3 to attach support 2 and jacking support 4.
Referring to fig. 1 and 2, a plurality of hydraulic cylinders 5 corresponding to the guide rails 3 are arranged between the wall and the guide rails 3 in the width direction of the wall, the length direction of the hydraulic cylinders 5 is the same as that of the guide rails 3, the hydraulic cylinders 5 are located between the jacking supports 4 and the attachment supports 2, the upper ends of the hydraulic cylinders 5 are rotatably connected with the jacking supports 4, the lower ends of the hydraulic cylinders 5 are rotatably connected with the attachment supports 2, and when the protection frame is driven to move upwards, the hydraulic cylinders 5 stretch and control the guide rails 3 to move upwards, so that the protection frame is lifted.
Wear wall pole 1 including the level setting and pass the dead lever 11 of wall body, set up in dead lever 11 one end and be located the connecting seat 12 in the wall body outside and set up in dead lever 11 other one end and be located the inboard joint spare 13 of wall body, connecting seat 12 and joint spare 13 all can be dismantled with dead lever 11 and be connected, at the one end fixedly connected with joint of dead lever 11, the joint is the round platform type, the one end of dead lever 11 and the big end fixed connection of joint. The clamping piece 13 can prevent the wall penetrating rod 1 from falling off from the wall under the action of external force.
Connecting seat 12 is including being the fixed plate 121 and the joint board 122 of symmetry and perpendicular fixed connection in fixed plate 121 both sides of rectangle, connecting seat 12 is the U type, dead lever 11 is close to the one end of joint and can dismantle with connecting seat 12 and be connected, dead lever 11 passes fixed plate 121, and the joint can the joint on fixed plate 121, the one end that fixed plate 121 was kept away from to joint board 122 extends towards the direction of adhering to support 2, and the bayonet socket has all been seted up at the both ends that joint board 122 is close to fixed plate 121 one side, the bayonet socket of setting can with adhere to support 2 joint, make the staff can convenient and fast be connected to on adhering to support 2 with connecting seat 12, and at the in-process of dismantling, also can be very convenient will adhere to support 2 and pull down from connecting seat 12.
Referring to fig. 2 and 3, the attachment support 2 includes a fixed seat 21 connected to the wall penetrating rod 1 and a pair of first clamps 22 symmetrically and fixedly connected to two sides of the fixed seat 21, the first clamps 22 are C-shaped, the guide rail 3 is i-shaped, the two first clamps 22 are oppositely arranged, a slide for the guide rail 3 to pass through is formed between the two first clamps 22, the two first clamps 22 are slidably arranged with the guide rail 3, the two first clamps 22 are clamped with the guide rail 3, and the arranged first clamps 22 can prevent the guide rail 3 from falling off the attachment support 2; fixing base 21 includes the double-deck board that a pair of symmetry set up, be provided with the certain distance between the double-deck board, the one end and the double-deck board fixed connection of first clamp 22, the vertical setting of two double-deck board, and one side fixedly connected with that the upper end just kept away from first clamp 22 between two double-deck board crosses the fixed axle 23 of two double-deck boards, on two double-deck boards and with the fixed axle 23 position department fixedly connected with connecting plate 24 of homonymy, the fixed axle 23 and the connecting plate 24 that set up make adhere to support 2 and connect into whole, the joint strength who adheres to support 2 has been increased.
Be provided with card axle 25 at two double-deck board lower extremes and near the position department of connecting plate 24, card axle 25 crosses two double-deck boards, and card axle 25 can dismantle with two double-deck boards and be connected, two joint board 122 set up between the double-deck board, and bayonet socket and the fixed axle 23 joint of joint board 122 upper end, bayonet socket and the card axle 25 joint of joint board 122 lower extreme, on connecting plate 24 and relative with the position of joint board 122 seted up let the position mouth, when needs will attach to support 2 and dismantle from wearing wall pole 1, the staff takes card axle 25 out from fixing base 21 earlier, then through letting the position mouth, will wear wall pole 1 and take off from attaching to support 2.
Referring to fig. 2 and 4, the jacking support 4 includes a mounting bracket 41 disposed directly above the attaching support 2 and a pair of second clamps 42 symmetrically disposed on both sides of the mounting bracket 41, the two second clamps 42 are disposed oppositely, the second clamps 42 have the same structure as the first clamps 22, the guide rail 3 can pass through the two second clamps 42, and the two second clamps 42 are slidably connected to the guide rail 3.
Further, the one side that is close to guide rail 3 at the double-deck board lower extreme and the one end that fixing base 21 was kept away from to first clamp 22 and the both ends of second clamp 42 all rotate and be connected with gyro wheel 6, the gyro wheel 6 of setting all with guide rail 3 butt, when guide rail 3 along adhering to the gliding in-process of support 2, the gyro wheel 6 of setting can reduce guide rail 3 and adhere to the frictional force between the support 2 to make the more smooth that the climbing formwork rises.
The fixing parts 7 are arranged between the mounting frame 41 and the two double-layer plates, each fixing part 7 comprises a rotating block 71 which is rotatably arranged in the mounting frame 41 and is rotatably arranged between the two double-layer plates, a plurality of fixing blocks 72 which are fixedly connected to the side surface of the guide rail 3 facing the fixing seat 21 and a baffle 73 which is fixedly connected between the two double-layer plates and in the mounting frame 41, the plurality of fixing blocks 72 are equidistantly arranged along the length direction of the guide rail 3, the arranged rotating block 71 can only rotate in a single direction, one end of the rotating block 71 is clamped with the fixing block 72, the other end of the rotating block 71 is abutted against the baffle 73, when the hydraulic cylinder 5 drives the climbing frame to ascend, the hydraulic cylinder 5 pushes the jacking support 4, the rotating block 71 abuts against the fixing block 72 to jack the guide rail 3, so that the climbing frame ascends, and in the process that the hydraulic cylinder 5 retracts the rotating block 71, the lifting support 4 moves towards the direction of the attached support 2, in the process that the jacking support 4 moves along the guide rail 3, the rotating block 71 attached to the support 2 abuts against the fixed block 72, so that the climbing formwork is prevented from falling.
Referring to fig. 1 and 2, a plurality of layers of construction platforms 81 are arranged in a protective frame 8, the construction platforms 81 are horizontally arranged, the construction platforms 81 are connected in the protective frame 8 through bolts, when the construction is carried out, workers can firstly install the construction platforms 81 in the protective frame 8 on the ground, then the protective frame 8 is integrally installed on a guide rail 3, the installation efficiency is high, and the labor amount of the workers is reduced, the arranged construction platforms 81 can provide standing space for the workers in the process of constructing a wall body, and the arranged plurality of layers of construction platforms 81 can enable more workers to simultaneously construct the wall body, so that the work efficiency is improved; the protective net 82 is arranged on the outer side of the protective frame 8 far away from the guide rail 3, when workers construct a wall at high altitude, the arranged protective net 82 can provide necessary protection for the safety of the workers, and the workers are prevented from falling from the high altitude; a protection plate 83 is arranged between the lowest layer construction platform 81 in the protection frame 8 and the wall body, one side of the protection plate 83 is connected with the protection frame 8 through bolts, the other side of the protection plate 83 is abutted to the outer surface of the wall body, and the protection plate 83 can prevent workers from stepping empty and falling from a gap between the protection frame 8 and the wall body when the workers pass through the vehicle for constructing the surface of the wall body; the guard rail 84 is installed on one side, facing the wall, of the upper surface of the construction platform 81, the guard rail 84 is connected to the protection frame 8 through bolts, and in the construction process, the arranged guard rail 84 can prevent workers from falling off the protection frame.
The implementation principle of the hydraulic jacking protection frame for the fabricated building in the embodiment of the application is as follows: when the wall body needs to be constructed, the worker presets the wall penetrating rod 1 and installs on the wall body, then the attachment support 2 is fixed on the wall penetrating rod 1, the protection frame 8 and the guide rail 3 are installed on the ground, the protection net 82 and the protection guard rail 84 are installed on the protection frame 8, then the protection frame 8 is hoisted, the guide rail 3 sequentially penetrates the attachment support 2 and the jacking support 4 from below, the guide rail 3 is slidably clamped on the attachment support 2 and the jacking support 4, and finally the hydraulic cylinder 5 is installed between the attachment support 2 and the jacking support 4.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. The utility model provides a hydraulic jacking protection frame for assembly type structure which characterized in that: comprises a plurality of wall penetrating rods (1) arranged on a wall body in a penetrating way, an attachment support (2) detachably connected with one end of the wall penetrating rod (1) positioned at the outer side of the wall body, a plurality of guide rails (3) arranged on the attachment support (2) in a sliding way, a jacking support (4) arranged above the attachment support (2) and a protective frame (8) fixedly connected with one side of the guide rails (3) far away from the wall body through bolts, wherein the plurality of wall penetrating rods (1) are arranged at equal intervals along the height direction of the wall body and are provided with a plurality of rows along the width direction of the wall body, the length direction of the guide rails (3) penetrates through the plurality of attachment supports (2), a hydraulic cylinder (5) for driving the protective frame to lift is vertically arranged between the attachment supports (2) and the jacking support (4), the upper end of the hydraulic cylinder (5) is rotatably connected with a jacking device, and the lower end of the hydraulic cylinder (5) is rotatably connected with the attachment support (2), and the attachment support (2) and the jacking support (4) are in sliding clamping connection with the guide rail (3).
2. The hydraulic jacking protection frame for the fabricated building according to claim 1, wherein: a plurality of layers of horizontally arranged construction platforms (81) are arranged in the protective frame (8).
3. The hydraulic jacking protection frame for the fabricated building according to claim 1, wherein: and a protective net (82) is arranged on the outer side of the protective frame (8) far away from the wall body.
4. The hydraulic jacking protection frame for the fabricated building according to claim 1, wherein: a protection plate (83) is arranged between the construction platform (81) at the lowest layer in the protection frame (8) and the wall body, and a protection fence (84) can be detachably connected to one side, close to the wall body, of the construction platform (81).
5. The hydraulic jacking protection frame for the fabricated building according to claim 1, wherein: the wall penetrating rod (1) comprises a fixing rod (11) which is horizontally arranged, a connecting seat (12) which is detachably connected to one end of the fixing rod (11) and a clamping piece (13) which is detachably connected to the other end of the fixing rod (11).
6. The hydraulic jacking protection frame for the fabricated building according to claim 1, wherein: adhere to support (2) and include fixing base (21) and the symmetry of being connected with wall-penetrating rod (1) and set up a pair of first clamp (22) in fixing base (21) both sides, guide rail (3) are the I shape, and guide rail (3) extend along the moving direction who climbs the die carrier, two first clamp (22) set up relatively, form the slide that supplies guide rail (3) to pass between the two, first clamp (22) and guide rail (3) joint that cooperatees, guide rail (3) can slide and peg graft in the slide.
7. The hydraulic jacking protection frame for the fabricated building according to claim 6, wherein: fixing base (21) include the double-deck board that a pair of symmetry set up, be provided with the certain distance between the double-deck board, the one end and the double-deck board fixed connection of first clamp (22), two the vertical setting of double-deck board just is close to position department fixedly connected with fixed axle (23) of upper end between the two double-deck board, fixed axle (23) pass two double-deck board, two the double-deck board is close to the lower extreme and with position department fixedly connected with connecting plate (24) of fixed axle (23) homonymy.
8. The hydraulic jacking protection frame for the fabricated building according to claim 1, wherein: jacking support (4) set up a pair of second clamp (42) in mounting bracket (41) both sides including setting up in attaching to support (2) top and being located mounting bracket (41) and the symmetry of guide rail (3) one side, the one end and mounting bracket (41) fixed connection of second clamp (42), two second clamps (42) set up relatively to two second clamps (42) and guide rail (3) slip joint.
9. The hydraulic jacking protection frame for the fabricated building according to claim 8, wherein: all be provided with mounting (7) between mounting bracket (41) inside and two double-deck boards, mounting (7) including rotate set up between two double-deck boards and mounting bracket (41) inside turning block (71), fix guide rail (3) towards a plurality of fixed block (72) and fixed connection on fixing base (21) side inside and fixed connection baffle (73) between two double-deck boards at mounting bracket (41), a plurality of the length direction equidistance setting of guide rail (3) is followed to fixed block (72), turning block (71) and fixed block (72) joint each other, the one end and baffle (73) butt of fixed block (72) are kept away from to turning block (71).
CN202022897219.XU 2020-12-04 2020-12-04 Hydraulic jacking protection frame for assembly type building Active CN214272911U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022897219.XU CN214272911U (en) 2020-12-04 2020-12-04 Hydraulic jacking protection frame for assembly type building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022897219.XU CN214272911U (en) 2020-12-04 2020-12-04 Hydraulic jacking protection frame for assembly type building

Publications (1)

Publication Number Publication Date
CN214272911U true CN214272911U (en) 2021-09-24

Family

ID=77778911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022897219.XU Active CN214272911U (en) 2020-12-04 2020-12-04 Hydraulic jacking protection frame for assembly type building

Country Status (1)

Country Link
CN (1) CN214272911U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113931429A (en) * 2021-10-14 2022-01-14 北京城建亚泰建设集团有限公司 Integral lifting construction operation platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113931429A (en) * 2021-10-14 2022-01-14 北京城建亚泰建设集团有限公司 Integral lifting construction operation platform

Similar Documents

Publication Publication Date Title
CN105537898A (en) Tool for assembling reinforcing steel mesh cages
CN214272911U (en) Hydraulic jacking protection frame for assembly type building
CN111236613A (en) Protection platform for building construction and use method thereof
CN110714611A (en) Light climbing formwork steel frame system
CN211736309U (en) Building climbing frame lifting device
CN106703509B (en) Suspension type fence hoisting equipment and hoisting method thereof
CN208856718U (en) A kind of saddle climbing type workbench
CN202380721U (en) Hydraulic self-elevating climbing system
CN216662305U (en) Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform
CN214658688U (en) Efficient creeping formwork equipment for variable cross-section creeping formwork construction
CN113896124A (en) Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform, installation process and climbing method thereof
CN114314375A (en) Internal climbing type tower crane supporting device and climbing method
CN209874468U (en) Construction hydraulic pressure template climbing device
CN209924409U (en) Wall-attached self-climbing electric lifting platform
CN110453836B (en) Oblique glass curtain wall mounting system and mounting method
CN210134364U (en) Bridge construction device
CN214272912U (en) Hydraulic jacking protection type climbing system
CN209872184U (en) Automatic jacking and positioning device for standard knot of tower crane
CN207499419U (en) For the monolithic climbing form system of huge column construction
CN112627487A (en) Climbing frame attachment structure suitable for decorative constructional column
CN111021702A (en) Lifting scaffold unit
CN214498374U (en) Support arrangement for climb die carrier and wall body
CN214169902U (en) Attachment device for climbing formwork and wall
CN110593584A (en) Self-lifting unloading platform system for attached floor slab and lifting method thereof
CN215854964U (en) High-altitude operation platform of assembled tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant