CN214271715U - Special die block of wet joint construction of iron bridge floor is striden to public - Google Patents

Special die block of wet joint construction of iron bridge floor is striden to public Download PDF

Info

Publication number
CN214271715U
CN214271715U CN202023177098.8U CN202023177098U CN214271715U CN 214271715 U CN214271715 U CN 214271715U CN 202023177098 U CN202023177098 U CN 202023177098U CN 214271715 U CN214271715 U CN 214271715U
Authority
CN
China
Prior art keywords
template
iron wire
pvc pipe
square timber
wet joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023177098.8U
Other languages
Chinese (zh)
Inventor
李进超
赵省建
施小虎
张兴海
冯建庭
张宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Third Engineering Group Third Engineering Co ltd
China Railway No 3 Engineering Group Co Ltd
Third Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway Third Engineering Group Third Engineering Co ltd
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Third Engineering Group Third Engineering Co ltd, China Railway No 3 Engineering Group Co Ltd filed Critical China Railway Third Engineering Group Third Engineering Co ltd
Priority to CN202023177098.8U priority Critical patent/CN214271715U/en
Application granted granted Critical
Publication of CN214271715U publication Critical patent/CN214271715U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

A bottom die special for construction of a wet joint of a highway-span iron bridge floor belongs to the technical field of erection of a wet joint construction template of a bridge. The utility model discloses a template, a plurality of first square timber, a plurality of second square timber, template both ends symmetry sets up two hole two, be provided with first PVC pipe in the hole two respectively, wear to be equipped with the second iron wire in the first PVC pipe, the one end of second iron wire is passed hole two with the first square timber of template bottom is connected, the other end and the gentle rope of second iron wire are connected, be provided with a plurality of holes one in the template, the template through first iron wire with the second square timber is connected, first iron wire overcoat is equipped with third PVC pipe. The utility model discloses simple structure, installation and demolish safe quick, can be under the contactless contact net equipment condition, the safe seam template of tearing open the dehumidification fast has reduced the operation degree of difficulty, has improved the efficiency of construction.

Description

Special die block of wet joint construction of iron bridge floor is striden to public
Technical Field
The utility model belongs to the technical field of the wet seam construction template of bridge is established, specifically speaking is a public special die block of crossing the wet seam construction of iron bridge face.
Background
After the prefabricated box girder is erected, a seam of about 80cm exists between adjacent beam piece flange plates, the seam is called as a wet seam, in the bridge deck system construction of a cross-over electrified railway business line, the wet seam construction part is positioned above contact network equipment, and the contact network equipment is easy to contact and damage when a formwork is dismantled, so that the formwork fixing device capable of safely and quickly dismantling the wet seam formwork is urgently needed.
Disclosure of Invention
The utility model aims at overcoming the above-mentioned not enough and providing a simple structure, installation and demolish safe quick public special die block of iron bridge floor wet joint construction of striding.
The utility model discloses a template, a plurality of parallel arrangement are at the first square timber of template bottom, a plurality of parallel arrangement at the second square timber at case roof beam top, template both ends symmetry sets up two holes two, be provided with first PVC pipe in the hole two respectively, wear to be equipped with the second iron wire in the first PVC pipe, the one end of second iron wire is passed hole two with the first square timber of template bottom is connected, the other end and the gentle rope of second iron wire are connected, be provided with a plurality of holes one in the template, the template through first iron wire with the second square timber is connected, first iron wire overcoat is equipped with third PVC pipe.
And the first iron wire penetrates through the first hole to connect and fix the first square wood, the second square wood and the template.
And a plurality of second PVC pipes are symmetrically arranged on the template.
The first PVC pipe, the second PVC pipe and the third PVC pipe are PVC pipes with different diameters.
The width of the template is larger than that of the wet joint, and the widths of the first square timber and the second square timber are larger than that of the template.
The utility model has the advantages that:
firstly, the structure is simple, the installation and the removal are safe and quick, and the wet joint template can be safely and quickly removed under the condition of not contacting with contact network equipment, so that the operation difficulty is reduced, and the construction efficiency is improved;
second, the utility model discloses well all wet seam templates prop up to tear open and concreting all go on in blockading the point, and the security is high.
Drawings
Fig. 1 is a front view of the present invention;
FIG. 2 is a top view of FIG. 1;
FIG. 3 is a left side sectional view of FIG. 1;
fig. 4 is a schematic view of the installation structure of the present invention;
fig. 5 is a schematic view of the dismantling structure of the present invention.
In the figure: 1-template, 2-first square wood, 3-second square wood, 4-first hole, 5-wet joint, 6-second hole, 7-first iron wire, 8-first PVC pipe, 9-second PVC pipe, 10-third PVC pipe, 11-second iron wire, 12-flexible rope, 13-contact net, 14-rail and 15-box girder.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and examples.
Referring to fig. 1-5, the utility model discloses a template 1, a plurality of parallel arrangement are at first square timber 2 of template 1 bottom, a plurality of parallel arrangement at the second square timber 3 at 15 tops of case roof beam, 1 both ends symmetry of template sets up two hole two 6, all be provided with first PVC pipe 8 in the hole two 6, wear to be equipped with second iron wire 11 in the first PVC pipe 8, the one end of second iron wire 11 is passed hole two 6 with the first square timber 2 of template 1 bottom is connected, the other end and the flexible rope 12 of second iron wire 11 are connected, be provided with a plurality of holes 4 on the template 1, template 1 through first iron wire 7 with second square timber 3 is connected, first iron wire 7 overcoat is equipped with third PVC pipe 10. And the first iron wire 7 penetrates through the first hole 4 to fixedly connect the first square wood 2, the second square wood 3 and the template 1. And a plurality of second PVC pipes 9 are symmetrically arranged on the template 1. The first PVC pipe 8, the second PVC pipe 9 and the third PVC pipe 10 are PVC pipes with different diameters. The width of the formwork 1 is larger than that of the wet joint 5, and the widths of the first square timber 2 and the second square timber 3 are both larger than that of the formwork 1.
The utility model discloses a theory of operation is: firstly, a template 1 is manufactured, a first hole 4 and a second hole 6 are drilled in the template 1, a first iron wire 7 is used for binding the template 1 and a first batten 2 together through the first hole 4, a second iron wire 11 is used for binding one end of the second hole 6 on the batten 3, and the other end of the second hole 8 is used for binding a flexible rope 12; the two ends of the combined template 1 are suspended by flexible ropes 12 and are placed between a contact net 13 and a prefabricated box girder 15 from a position of a wet joint 5 far away from the contact net 13, the combined template stops moving to the position right above the contact net 13 along the direction of the box girder 15, and a first iron wire 7 penetrates into a third PVC pipe 10 to connect and fix a first batten 2, a second batten 3 and the template 1;
then binding the annular ribs, pouring concrete, and fixing the second PVC pipe 9 on the template 1 before pouring the concrete so as to facilitate later-stage template removal;
removing the template: put subaerially along first PVC pipe 8 with flexible rope 12 and second iron wire 11, strike template 1 through second PVC pipe 9, make template 1 and concrete surface separation, alone dragging the flexible rope down in the same direction on the circuit, slowly transfer the flexible rope of template 1 opposite side on the bridge, until falling by ground rail 14.
The above description of the present invention does not limit the scope of the present invention. Any other corresponding changes and modifications made according to the technical idea of the present invention should be included in the scope of the claims of the present invention.

Claims (5)

1. The utility model provides a public special die block of iron bridge floor wet joint construction of striding which characterized in that: including template (1), a plurality of parallel arrangement in first square timber (2) of template (1) bottom, a plurality of parallel arrangement at second square timber (3) at case roof beam (15) top, template (1) both ends symmetry sets up two hole two (6), be provided with first PVC pipe (8) in hole two (6) respectively, wear to be equipped with second iron wire (11) in first PVC pipe (8), the one end of second iron wire (11) is passed hole two (6) with first square timber (2) of template (1) bottom are connected, the other end and the gentle rope (12) of second iron wire (11) are connected, be provided with a plurality of holes (4) on template (1), template (1) through first iron wire (7) with second square timber (3) are connected, first iron wire (7) overcoat is equipped with third PVC pipe (10).
2. The special bottom die for wet joint construction of the public-span iron bridge deck according to claim 1, wherein the special bottom die comprises: the first iron wire (7) penetrates through the first hole (4) to fixedly connect the first square wood (2), the second square wood (3) and the template (1).
3. The special bottom die for wet joint construction of the public-span iron bridge deck according to claim 1 or 2, wherein the special bottom die comprises: and a plurality of second PVC pipes (9) are symmetrically arranged on the template (1).
4. The special bottom die for wet joint construction of the public-span iron bridge deck according to claim 3, wherein the special bottom die comprises: the first PVC pipe (8), the second PVC pipe (9) and the third PVC pipe (10) are PVC pipes with different diameters.
5. The special bottom die for wet joint construction of the public-span iron bridge deck according to claim 4, wherein the special bottom die comprises: the width of the template (1) is larger than that of the wet joint, and the widths of the first square timber (2) and the second square timber (3) are larger than that of the template (1).
CN202023177098.8U 2020-12-25 2020-12-25 Special die block of wet joint construction of iron bridge floor is striden to public Active CN214271715U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023177098.8U CN214271715U (en) 2020-12-25 2020-12-25 Special die block of wet joint construction of iron bridge floor is striden to public

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023177098.8U CN214271715U (en) 2020-12-25 2020-12-25 Special die block of wet joint construction of iron bridge floor is striden to public

Publications (1)

Publication Number Publication Date
CN214271715U true CN214271715U (en) 2021-09-24

Family

ID=77784408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023177098.8U Active CN214271715U (en) 2020-12-25 2020-12-25 Special die block of wet joint construction of iron bridge floor is striden to public

Country Status (1)

Country Link
CN (1) CN214271715U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114263119A (en) * 2021-12-28 2022-04-01 中铁六局集团石家庄铁路建设有限公司 Construction method for bridging machine to span railway
CN114263119B (en) * 2021-12-28 2024-04-23 中铁六局集团石家庄铁路建设有限公司 Bridge girder erection machine cross-railway girder erection construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114263119A (en) * 2021-12-28 2022-04-01 中铁六局集团石家庄铁路建设有限公司 Construction method for bridging machine to span railway
CN114263119B (en) * 2021-12-28 2024-04-23 中铁六局集团石家庄铁路建设有限公司 Bridge girder erection machine cross-railway girder erection construction method

Similar Documents

Publication Publication Date Title
CN101476294B (en) Mounting method for underbeam segment of large-stride steel box girder stayed-cable bridge
CN106429883A (en) Tower crane foundation used for bridge construction
CN109025103A (en) Light steel grating concrete folding stair
CN214271715U (en) Special die block of wet joint construction of iron bridge floor is striden to public
CN206844679U (en) A kind of overhanging type discharging platform is connected system with structural steel beam
CN112177309A (en) Assembled protection platform used in building elevator shaft
CN206090617U (en) Novel assembled piping lane
CN108842933B (en) Tower crane opening blocking method
CN209244242U (en) A kind of fixed device of half tool-type U-bolt of the shaped steel suspension scaffolding
CN208501465U (en) A kind of windproof double deck steel truss girder
CN110453689A (en) A kind of physa hole inwall template construction system and construction method
US1591907A (en) Collapsible and portable core form
CN110396932A (en) A kind of wet joint template peace of bridge jointing formula tears circulator and its construction method open
CN208250928U (en) A kind of steel and wood composite template
CN212296237U (en) Side slope drilling trolley
CN204982628U (en) Horizontal drawing cable bridge
CN106522566A (en) Roof steel truss slipping rail and dismounting and installing method thereof
CN107587638A (en) Steel bar truss floor support plate and combined type floor support plate
CN104195954B (en) Overhead column erection without scaffolding platform and erection method thereof
CN208803364U (en) Using the steel girder bridge joint structure of rivet interlacement
CN207597269U (en) The cable arrangement constructed by cross for the whole hole of steel reinforced concrete combination beam
CN207209786U (en) The cast-in-place boom support monoblock type automatic disassembling device of falsework
CN206636239U (en) A kind of suspension installation system for being used to install interlayer girder steel
CN205557343U (en) Only tower of curve pair all alone cable -stay bridge template for king -tower
CN206319622U (en) A kind of roof system steel truss sliding rail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant