CN214271698U - 0# piece high mound bracket pre-compaction structure - Google Patents
0# piece high mound bracket pre-compaction structure Download PDFInfo
- Publication number
- CN214271698U CN214271698U CN202021289838.4U CN202021289838U CN214271698U CN 214271698 U CN214271698 U CN 214271698U CN 202021289838 U CN202021289838 U CN 202021289838U CN 214271698 U CN214271698 U CN 214271698U
- Authority
- CN
- China
- Prior art keywords
- bracket
- pier body
- pier
- opposite
- bailey
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model relates to a 0# block high pier bracket prepressing structure, 3 brackets are arranged on the other side of a pier body opposite to a bracket along the transverse direction of the pier body at equal intervals, 3 Bailey beams are arranged on the top of the pier body, one end of each Bailey beam extends to the upper part of each bracket, and the other end of each Bailey beam extends to the upper part of the bracket; two rows of anchoring rods are transversely arranged at the top of the pier body along the pier body, the lower end of each anchoring rod is anchored in the concrete of the pier body, two rows of anchoring rods, which are opposite to the corbels and the pier top, at the top of the bailey beam are respectively provided with a shoulder pole beam, and the upper end of each anchoring rod penetrates through the shoulder pole beam and is in threaded connection with an anchoring nut; each bracket and the carrying pole beam are oppositely pulled through two pull rods; two jacks are arranged on the bracket opposite to the bottom of each Bailey beam. The utility model discloses the construction risk is low, and the pre-compaction load loading is accurate.
Description
Technical Field
The utility model belongs to the technical field of the high mound construction of bridge, a structure that carries out the pre-compaction to the bracket when adopting the bracket to carry out the higher 0# piece construction of pier shaft is related to.
Background
In the construction of a continuous beam bridge, a 0# block with a high pier body is generally constructed by adopting a bracket. The bracket all needs the pre-compaction before 0# piece concrete placement to eliminate the inelastic deformation of bracket, improve the security of bracket. The method comprises the steps of hoisting the pre-pressed load onto the bracket by using a crane, hoisting the pre-pressed load off the bracket after pre-pressing is finished, and hoisting the stacked load off the bracket, so that the process is complicated, the consumed time is long, the cost is high, and for high-pier brackets, the high-altitude hoisting can increase the construction risk; in addition, to the bracket that only sets up in pier shaft one side, pile and carry the pre-compaction in-process and can lead to pier shaft both sides atress unbalanced, cause harmful effects to the pier shaft structure.
Disclosure of Invention
The utility model aims at providing a carry out not enough that the bracket pre-compaction exists to current heap year method, provide a structure that carries out the bracket pre-compaction with the help of reaction frame, reduce construction risk and cost.
The technical scheme of the utility model as follows:
the utility model provides a 0# piece high mound bracket pre-compaction structure, the bracket is installed in pier shaft one side, its characterized in that: 3 brackets are arranged on the other side of the pier body opposite to the bracket at equal intervals along the transverse direction of the pier body, 3 Bailey beams are arranged at the top of the pier body, one end of each Bailey beam extends to the position above each bracket, and the other end of each Bailey beam extends to the position above the bracket; two rows of anchoring rods are transversely arranged at the top of the pier body along the pier body, the lower end of each anchoring rod is anchored in the concrete of the pier body, two rows of anchoring rods, which are opposite to the bracket and the pier top, at the top of the Bailey beam are respectively provided with a shoulder-pole beam, and the upper end of each anchoring rod penetrates through the shoulder-pole beam at the top of the Bailey beam opposite to the upper end of each anchoring rod and is in threaded connection with a fixing nut; each bracket and the shoulder pole beam at the top of the Bailey beam opposite to the bracket are oppositely pulled through two pull rods; two jacks are arranged on the bracket and are opposite to the bottom of each Bailey beam.
Compared with the conventional preloading method, the utility model mainly has the following advantages:
(1) the operation process is simple, the construction speed is high, and the cost is low;
(2) the overhead hoisting operation is reduced, and the construction risk is reduced;
(3) the stress on the two sides of the pier body is balanced, which is beneficial to protecting the pier body structure.
Drawings
Fig. 1 is a schematic elevation structure of the present invention;
FIG. 2 is a side view of the present invention with a bracket disposed;
fig. 3 is a side view of the utility model on one side of the bracket.
Detailed Description
As shown in fig. 1, 2 and 3, a 0# construction bracket 1 is installed on one side of a pier body 2, 3 corbels 3 are arranged on the other side of the pier body 2 opposite to the bracket 1 at equal intervals along the transverse direction of the pier body, 3 bailey beams 4 are arranged at the top of the pier body, one end of each bailey beam 4 extends to the upper part of each corbel 3, and the other end of each bailey beam 4 extends to the upper part of the bracket 1; two rows of anchoring rods 5 are transversely arranged at the top of the pier body 2 along the pier body, the lower end of each anchoring rod 5 is anchored in concrete of the pier body 2, two rows of anchoring rods, which are opposite to the corbels and the pier top, at the top of the bailey beam 4 are respectively provided with a shoulder pole beam 6, and the upper end of each anchoring rod 5 penetrates through the shoulder pole beam 6 at the top of the bailey beam opposite to the upper end of the anchoring rod 5 and is in threaded connection with a fixing nut; each bracket 3 and a shoulder pole beam 6 at the top of the Bailey beam 4 opposite to the bracket are oppositely pulled through two pull rods 7; two jacks 8 are arranged on the bracket 1 and right opposite to the bottom of each Bailey beam 4.
Claims (1)
1. The utility model provides a 0# piece high mound bracket pre-compaction structure, the bracket is installed in pier shaft one side, its characterized in that: 3 brackets are arranged on the other side of the pier body opposite to the bracket at equal intervals along the transverse direction of the pier body, 3 Bailey beams are arranged at the top of the pier body, one end of each Bailey beam extends to the position above each bracket, and the other end of each Bailey beam extends to the position above the bracket; two rows of anchoring rods are transversely arranged at the top of the pier body along the pier body, the lower end of each anchoring rod is anchored in the concrete of the pier body, two rows of anchoring rods, which are opposite to the bracket and the pier top, at the top of the Bailey beam are respectively provided with a shoulder-pole beam, and the upper end of each anchoring rod penetrates through the shoulder-pole beam at the top of the Bailey beam opposite to the upper end of each anchoring rod and is in threaded connection with a fixing nut; each bracket and the shoulder pole beam at the top of the Bailey beam opposite to the bracket are oppositely pulled through two pull rods; two jacks are arranged on the bracket and are opposite to the bottom of each Bailey beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021289838.4U CN214271698U (en) | 2020-07-02 | 2020-07-02 | 0# piece high mound bracket pre-compaction structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021289838.4U CN214271698U (en) | 2020-07-02 | 2020-07-02 | 0# piece high mound bracket pre-compaction structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214271698U true CN214271698U (en) | 2021-09-24 |
Family
ID=77804719
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021289838.4U Active CN214271698U (en) | 2020-07-02 | 2020-07-02 | 0# piece high mound bracket pre-compaction structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214271698U (en) |
-
2020
- 2020-07-02 CN CN202021289838.4U patent/CN214271698U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106812328B (en) | The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer | |
CN201217861Y (en) | Assembly integral precast concrete shear wall | |
CN101603338A (en) | Assembly integrated precast concrete shear wall and job practices | |
CN103233588B (en) | With the shift method of raft foundation building | |
CN203487664U (en) | Prefabricated concrete filled wall suspension type flexible connection | |
CN103061514B (en) | Long-span steel structure corridor construction method | |
CN204456110U (en) | A kind of anchor jacked pile seals pilework fast | |
CN214271698U (en) | 0# piece high mound bracket pre-compaction structure | |
CN203636994U (en) | Energy-saving type lifting system based on concrete mixing | |
CN105781210B (en) | A kind of conical tower and its tool section assist punching construction method for lifting whole | |
CN203284126U (en) | Simple composite gantry high-altitude weight hoisting device | |
CN106193284B (en) | The installation method and mounting structure of large span space drop level continuous truss frame | |
CN211081056U (en) | A displacement device that is used for heavy roof structure of heavy slope to slide construction | |
CN209367703U (en) | A kind of novel tower crane type crane | |
CN103185682A (en) | Loading method for axial forces of pre-stressed pipe pile | |
CN203359725U (en) | Adjustable elevator buffer pier | |
CN203613462U (en) | Prefabricated bracket system | |
CN202440211U (en) | Counter-weight frame for frameless lift | |
CN201605799U (en) | Large-scale net rack suspension cable mounting platform | |
CN210122826U (en) | Jacking formula carbon cloth reinforced structure | |
CN209367605U (en) | A kind of crane beam for crane | |
CN108894111B (en) | Integral hoisting device and hoisting method for heavy steel anchor beam and steel corbel | |
CN102704592B (en) | Damping control method for existing frame structure | |
CN202346553U (en) | Counterweight framework of elevator | |
CN202072414U (en) | Wind resistant device of cable loading crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |