CN214245847U - Subside post-cast strip structure sealed in advance - Google Patents
Subside post-cast strip structure sealed in advance Download PDFInfo
- Publication number
- CN214245847U CN214245847U CN202023083701.6U CN202023083701U CN214245847U CN 214245847 U CN214245847 U CN 214245847U CN 202023083701 U CN202023083701 U CN 202023083701U CN 214245847 U CN214245847 U CN 214245847U
- Authority
- CN
- China
- Prior art keywords
- post
- cast strip
- concrete
- steel
- advance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a subside post-cast strip confined structure in advance. The post-cast strip concrete beam comprises I-shaped steel, a post-cast strip concrete beam and post-cast strip concrete; a post-cast strip template supporting system is arranged below the post-cast strip concrete beam; the upper part of the post-cast strip is sealed by adopting a steel plate, the steel yield performance is reasonably utilized, the influence of the settlement load of the main structure on the basement roof is offset, the post-cast strip is sealed by the steel plate, then a waterproof protective layer is constructed, the garden load construction condition can be met, the increase of the maintenance cost of cracking and water seepage caused by the uneven settlement of the main structure at the post-cast strip part of the basement roof is also avoided, the self-leveling micro-expansion concrete is reasonably utilized, the post-cast strip concrete is poured by using the pre-reserved concrete pouring steel pipe, the strength of the post-cast strip concrete can be ensured to meet the design requirement, and the compactness of the internal concrete of the post-cast strip can be ensured.
Description
Technical Field
The utility model belongs to the technical field of the construction technology and specifically relates to a subside post-cast strip confined structure in advance.
Background
In recent years, it has been comparatively extensive a marketing means that promotes real estate sales volume to construct basement roof gardens and pipe network in advance as the show area, but in gardens show area work progress, often because the major structure subsides still not stable yet, subsides post-cast strip and can not seal in advance, leads to the gardens show area can not fully demonstrate comprehensively, and the bandwagon effect that produces does not reach the effect that the developer expects, and the mode of handling usually is two kinds generally:
the utility model provides a, the local post-cast strip that directly influences garden construction pours in advance and seals, though garden construction advances to the field in advance, and gardens show area effect reaches anticipated effect, nevertheless major structure subsides and inevitably leads to this position post-cast strip concrete fracture infiltration, and the fracture scope is not limited to post-cast strip position, and the position scope of mending leakage in the future is big, need carry out the concrete leakage many times even and mend, and the antiseep is with high costs, and the corruption influence of a large amount of infiltration of concrete structure to the reinforcing bar is great.
Secondly, lay the steel sheet in post-cast strip position, reserve the waterproofing position after, directly carry out the garden construction after accomplishing the waterproof and protective layer construction of peripheral basement roof, later stage major structure subsides stably the back, excavate again and construct gardens and the pipe network of accomplishing, uncover post-cast strip steel sheet, clear up post-cast strip construction joint back, pour post-cast strip concrete, do water-proofing and protective layer again, will dig out the gardens show area and the pipe network secondary construction of destruction and resume. Although the method avoids water seepage repair of a post-cast strip, the entering excavation of large machinery in the garden display area increases the additional garden site damage and maintenance, earthwork excavation, pipe network and secondary construction cost, and the cost also includes the safe and civilized construction cost in the process.
Therefore, the traditional construction method for closing the post-cast strip in advance cannot meet the modern construction requirements.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model aims at providing a can solve the tradition and subside the unable in time confined difficult problem of post-cast strip because of gardens construction of advancing to the field in advance, also for reducing gardens and pipe network secondary construction, basement roof infiltration repair have practiced thrift a large amount of construction cost subside post-cast strip closed structure in advance.
The utility model discloses a realize through following technical scheme:
a structure for closing a settlement post-cast strip in advance comprises I-shaped steel, a post-cast strip concrete beam and post-cast strip concrete; a post-cast strip template supporting system is arranged below the post-cast strip concrete beam; the post-cast strip template support system comprises: the bottom template of the post-cast strip and the bottom template support of the post-cast strip are arranged; the I-shaped steel is pre-buried to the middle of the post-cast strip concrete beam; a post-cast strip concrete slab is arranged above the post-cast strip concrete beam; the post-cast strip concrete is poured into the post-cast strip concrete slab through a steel pipe; a water stop steel plate is arranged in the post-cast strip concrete slab; a steel plate is arranged above the post-cast strip concrete plate; the middle part of the steel plate is connected with the steel pipe; and a waterproof layer is arranged above the steel plate.
Further, the longitudinal spacing of the steel pipes is not more than 4 m.
Furthermore, the steel plate and the steel pipe are in butt welding, and the steel plate and the post-cast strip concrete slab are welded by steel bars.
Further, the I-steel is 18 in size.
Further, the height of the top of the steel pipe is 200mm higher than the elevation of the finished garden surface, and the upper opening of the steel pipe is sealed by an adhesive tape.
Further, the post-cast strip concrete is self-leveling concrete.
The utility model has the advantages that:
construction convenience, the installation is simple, and the efficiency of construction is high, adopts high performance self-leveling concrete pouring post-cast strip, guarantees closely knit degree, satisfies standard impervious requirement, reduces the adverse effect that traditional approach closed in advance and subsides post-cast strip and cause, and the construction in gardens show area is accomplished in all-round, also brings very big profit for construction unit marketing development work.
Drawings
Fig. 1 is a schematic structural plane view of the present invention, which is used for sealing a post-cast strip in advance.
Fig. 2 is a sectional view of a structure 1-1 of the utility model, which is closed in advance by a settlement post-cast strip.
Fig. 3 is a sectional view of a structure 2-2 of the utility model, wherein the post-cast strip is closed in advance.
Shown in the figure: 1-a steel pipe; 2-I-steel; 3-post-pouring the strip concrete beam; 4-post-pouring a bottom template of the strip; 5-supporting a template at the bottom of the post-cast strip; 6-steel plate; 7-waterproof layer; 8-post-cast strip concrete slab; 9-post-cast strip concrete; 10-water stop steel plate.
Detailed Description
The invention will be further described with reference to the accompanying drawings.
As shown in fig. 1-3, the structure of the utility model for closing a settlement post-cast strip in advance comprises an i-steel 2, a post-cast strip concrete beam 3 and post-cast strip concrete 9; a post-cast strip template supporting system is arranged below the post-cast strip concrete beam 3; the post-cast strip template support system comprises: a post-cast strip bottom template 4 and a post-cast strip bottom template support 5; the I-shaped steel 2 is pre-embedded to the middle part of the post-cast strip concrete beam 3; a post-cast strip concrete slab 8 is arranged above the post-cast strip concrete beam 3; the post-cast strip concrete 9 is poured into the post-cast strip concrete slab 8 through the steel pipe 1; a water stop steel plate 10 is arranged in the post-cast strip concrete plate 8; a steel plate 6 is arranged above the post-cast strip concrete plate 8; the middle part of the steel plate 6 is connected with the steel pipe 1; and a waterproof layer 7 is arranged above the steel plate 6.
Further, the longitudinal distance between the steel pipes 1 is not more than 4 m.
Further, the steel plate 6 and the steel pipe 1 are in butt welding, and the steel plate 6 and the post-cast strip concrete plate 8 are in steel bar welding.
Further, the I-steel 2 is 18 in type.
Further, the height of the top of the steel pipe 1 is 200mm higher than the elevation of the finished garden surface, and the upper opening is sealed by an adhesive tape.
Further, the post-cast strip concrete 9 is self-leveling concrete.
The utility model discloses a concrete implementation step:
A. disconnecting the post-cast strip formwork support systems and arranging the post-cast strip formwork support systems below the post-cast strip concrete beam 3;
B. embedding No. 18I-steel 2 in the middle of the post-cast strip beam, and anchoring two ends of the post-cast strip beam into the concrete beam;
C. manufacturing a 5 mm-thick settled post-cast strip closed steel plate 6 according to the modulus, and reserving a circular hole to be welded and connected with the steel pipe 1;
D. after the beam plate concrete 3 is poured, the waterproof layer 7 is carried out, the waterproof layer 7 and the protective layer are constructed in a large area after construction, and the garden construction unit carries out the construction in advance;
E. after the garden soil covering construction is finished, temporarily removing the post-cast strip bottom template 4 and the post-cast strip bottom template support 5 after the main structure is settled stably, and chiseling construction joints from the bottom to clean up;
F. and pouring post-cast strip concrete 9 from the position of the steel pipe 1, fully vibrating the bottom template by adopting a vibrating rod, and finally cutting off the steel pipe 1 extending out of the soil covering surface.
The above embodiments are merely illustrative of the technical concept and features of the present invention, and the purpose thereof is to enable those skilled in the art to understand the contents of the present invention and to implement the same, and not to limit the protection scope of the present invention.
Claims (6)
1. The utility model provides a subside post-cast strip structure closed in advance which characterized in that: the post-cast strip concrete beam comprises I-shaped steel (2), a post-cast strip concrete beam (3) and post-cast strip concrete (9); a post-cast strip template supporting system is arranged below the post-cast strip concrete beam (3); the post-cast strip template support system comprises: a post-cast strip bottom template (4) and a post-cast strip bottom template support (5); the I-shaped steel (2) is pre-buried to the middle part of the post-cast strip concrete beam (3); a post-cast strip concrete slab (8) is arranged above the post-cast strip concrete beam (3); the post-cast strip concrete (9) is poured into the post-cast strip concrete slab (8) through the steel pipe (1); a water stop steel plate (10) is arranged in the post-cast strip concrete plate (8); a steel plate (6) is arranged above the post-cast strip concrete plate (8); the middle part of the steel plate (6) is connected with the steel pipe (1); and a waterproof layer (7) is arranged above the steel plate (6).
2. The structure for closing the post-settling strip in advance as claimed in claim 1, wherein: the longitudinal distance between the steel pipes (1) is not more than 4 m.
3. The structure for closing the post-settling strip in advance as claimed in claim 1, wherein: the steel plate (6) and the steel pipe (1) are in butt welding, and the steel plate (6) and the post-cast strip concrete plate (8) are in steel bar welding.
4. The structure for closing the post-settling strip in advance as claimed in claim 1, wherein: the I-shaped steel (2) is 18 in type.
5. The structure for closing the post-settling strip in advance as claimed in claim 1, wherein: the top of the steel pipe (1) is higher than the elevation of the garden finished surface by 200mm, and the upper opening is sealed by an adhesive tape.
6. The structure for closing the post-settling strip in advance as claimed in claim 1, wherein: the post-cast strip concrete (9) is self-leveling concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023083701.6U CN214245847U (en) | 2020-12-21 | 2020-12-21 | Subside post-cast strip structure sealed in advance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023083701.6U CN214245847U (en) | 2020-12-21 | 2020-12-21 | Subside post-cast strip structure sealed in advance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214245847U true CN214245847U (en) | 2021-09-21 |
Family
ID=77741120
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023083701.6U Active CN214245847U (en) | 2020-12-21 | 2020-12-21 | Subside post-cast strip structure sealed in advance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214245847U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112343091A (en) * | 2020-12-21 | 2021-02-09 | 中国建筑第四工程局有限公司 | Subside post-cast strip structure sealed in advance |
CN114016552A (en) * | 2021-11-18 | 2022-02-08 | 中铁十二局集团建筑安装工程有限公司 | Pre-sealing construction method for basement roof settlement post-cast strip |
CN114622589A (en) * | 2021-12-21 | 2022-06-14 | 浙江省建筑设计研究院 | Building structure construction method using high-ductility concrete belt to replace settlement post-cast belt |
-
2020
- 2020-12-21 CN CN202023083701.6U patent/CN214245847U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112343091A (en) * | 2020-12-21 | 2021-02-09 | 中国建筑第四工程局有限公司 | Subside post-cast strip structure sealed in advance |
CN114016552A (en) * | 2021-11-18 | 2022-02-08 | 中铁十二局集团建筑安装工程有限公司 | Pre-sealing construction method for basement roof settlement post-cast strip |
CN114622589A (en) * | 2021-12-21 | 2022-06-14 | 浙江省建筑设计研究院 | Building structure construction method using high-ductility concrete belt to replace settlement post-cast belt |
CN114622589B (en) * | 2021-12-21 | 2024-05-31 | 浙江省建筑设计研究院 | Construction method for building structure by replacing sedimentation post-pouring belt with high-ductility concrete belt |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214245847U (en) | Subside post-cast strip structure sealed in advance | |
US11143027B2 (en) | Rectangular working well with preset pipe jacking hole and sliding back wall in water-rich stratum and construction method thereof | |
CN112343091A (en) | Subside post-cast strip structure sealed in advance | |
CN207144538U (en) | A kind of underground structure top board reserving hole temporary plugging structure | |
CN105544607A (en) | Exterior-covered waterproof construction method for subway station side walls with hanging plate girders | |
CN211113772U (en) | Post-cast strip structure for top plate of underground chamber | |
CN105350581A (en) | Advanced sealing structure for basement top slab settlement post-cast strips | |
CN106812131B (en) | A kind of permanent sheet pile underground structure and its construction method | |
CN209179021U (en) | Foundation pit row pile supporting system | |
JP4206165B2 (en) | Temporary deadline construction method | |
CN207211188U (en) | Outer wall of underground structure HCMW engineering methods overlap wall | |
CN107246030A (en) | Construction method based on steel sheet pile device for plugging | |
CN112127390A (en) | Construction process for simply plugging outer wall reserved sleeve in underground structural area | |
CN106088758A (en) | A kind of double-deck assembled underground granary | |
CN208009473U (en) | The integrated concrete pipe gallery in braced wall corridor | |
CN107940102A (en) | Underground raw water pipe protection construction method | |
CN108005119A (en) | The integrated concrete pipe gallery in braced wall corridor and its installation method | |
CN109742715B (en) | Arrangement structure of electric power pipe trench after transition and modification and electric power pipe trench transition and modification method | |
CN212104150U (en) | Steel sleeve construction structure for treating piping of foundation pit exploration hole by drainage grouting method | |
CN207661217U (en) | Underground raw water pipe protection structure | |
CN106088762A (en) | The prefabricated assembled circular underground granary of a kind of insertion slot type encased steel plate | |
CN217352609U (en) | Municipal manhole anti-sedimentation reinforcing structure for soft soil foundation | |
CN116876571A (en) | Construction method for pre-closing post-pouring belt of basement roof | |
CN211948320U (en) | Structure of steel pipe square and round transition section | |
CN115199814B (en) | Construction process of oblique-crossing pipe-jacking receiving end |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |