CN214233296U - Dust fall dust pelletizing system of job site is built in room - Google Patents
Dust fall dust pelletizing system of job site is built in room Download PDFInfo
- Publication number
- CN214233296U CN214233296U CN202022707667.9U CN202022707667U CN214233296U CN 214233296 U CN214233296 U CN 214233296U CN 202022707667 U CN202022707667 U CN 202022707667U CN 214233296 U CN214233296 U CN 214233296U
- Authority
- CN
- China
- Prior art keywords
- construction site
- wind
- nozzle
- dust
- hoop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Nozzles (AREA)
Abstract
The utility model relates to a job site dust fall dust pelletizing system is built in room, including delivery pipe, wind-break wall and many spray pipes, the wind-break wall is piled up in job site border department, and the delivery pipe passes through supporting device to be installed in the wind-break wall and through working shaft and cistern intercommunication, and the delivery pipe has connected gradually spray pipe, nozzle, is provided with a plurality of nozzle on the nozzle, a plurality of nozzle mutually independent and the nozzle is flat shape each other. Adopt the technical scheme of the utility model, the wind-break wall has blockked the natural wind that gets into in the mining area, avoid the raise dust, water in the pond is extracted through the working shaft carries out the dust fall to the job site through nozzle blowout slice splash, the job site environment has been improved, the delivery pipe passes through the supporting device clamping, convenient to detach and installation, can also adjust the splash direction of spraying, the splash size also can be adjusted through adjusting the spray pipe flow, through the catch basin, rivers are collected to the cistern and cyclic utilization in addition, the water resource utilization efficiency has been promoted.
Description
Technical Field
The utility model belongs to the construction engineering field especially relates to a job site dust fall dust pelletizing system is built in room.
Background
On the construction site, various large-scale mechanical equipment is widely used for construction at present, a large amount of dust cannot be generated in the construction process, and the air flow is continuously diffused to the periphery, so that the environment around the construction site is seriously polluted, and the normal life of surrounding residents is influenced. In order to prevent dust generated in the construction site from spreading to the peripheral area, the dust is firstly separated from the area outside the construction site, and then dust removal is performed by using dust removal equipment.
For example, chinese patent CN201620858131.8 discloses a construction dust removing device, which comprises a trolley, wherein a spraying device and a suction device are sequentially arranged on the trolley along the advancing direction of the trolley; the injection device comprises a storage tank, a hollow spray pipe, a material conveying pipe and a feeding pump, wherein the material conveying pipe is used for communicating the storage tank with the hollow spray pipe; the suction device comprises a support frame and a suction barrel fixed on the support frame, one end of the suction barrel, which is far away from the injection device, is provided with a suction port, and the other end of the suction barrel is provided with a suction fan, so that the dust removal effect is improved. However, in the dust removing device for construction, the dust on the construction site is prevented from affecting the peripheral area to the maximum extent, and the dust on the construction site is not only effectively removed, but also strictly controlled to spread to the peripheral area along the atmospheric air flow. Therefore, an effective dust settling system is the key to reduce the influence of dust on the peripheral area of a construction site.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a job site dust fall dust pelletizing system is built in room.
The utility model discloses a following technical scheme can realize.
The utility model provides a construction site dust fall dust pelletizing system is built in room, including delivery pipe, wind-break wall and many spray pipes, the wind-break wall is through excavating the construction site in the earth and rocky side pile up in construction site border department and form, the delivery pipe pass through supporting arrangement install in on the wind-break wall and through working shaft and cistern intercommunication, the cistern is through excavating the formation behind the earth and rocky side in the construction site, the one end of spray pipe with supply pipe connection and intercommunication, the other end fixedly connected with nozzle of spray pipe, be provided with a plurality of nozzle on the nozzle, a plurality of nozzle mutual independence and the nozzle is flat shape.
The main view projection of the spray opening is rectangular, waist-round or a quadrangle formed by two arc line segments which are parallel to each other and two straight line segments which are parallel to each other.
The spray opening aspect ratio is greater than 5.
The number of the spray outlets is 3-5.
The height of the wind-break wall is 1 m-2.2 m.
And the spray pipe is also connected with a flow regulating valve for regulating the flow of water flow passing through the spray pipe.
The supporting device comprises a bearing hoop, an embracing clamp hoop, a hinge pin, a hinge screw and a lock nut, wherein the bearing hoop is fixedly connected with an insert pin rod in the wind shielding wall, open slots are arranged at both ends of the bearing hoop and the embracing clamp hoop, both ends of the hinge pin are respectively hinged with the open slot at one end of the bearing hoop and the open slot at one end of the embracing clamp hoop, the open slot at the other end of the bearing hoop is hinged with the hinge screw, the lock nut is screwed on the hinge screw, and when the hinge screw is sleeved in the open slot at the other end of the embracing clamp hoop and the bearing hoop, the corresponding open slot of the embracing clamp hoop are enabled to be tightly locked through the lock nut, the bearing hoop and the embracing clamp hoop encircle the periphery of the water supply pipe.
The length of the pin rod is more than 20 cm.
The pin rod is in an inverted cone shape with a large upper end and a small lower end.
And a water collecting ditch is also dug in the construction site, is arranged between the edge of the construction site and the inner wall of the wind-break wall and is communicated with the reservoir.
The beneficial effects of the utility model reside in that: by adopting the technical scheme of the utility model, when a user carries out construction operation in a construction site by using large-scale mechanical equipment, the water in the reservoir is pumped by the water supply pump and the flaky spray is sprayed out by the nozzle, thereby the dust fall purpose is carried out on the construction site, the dust is avoided, the construction site environment is improved, the spray pipe is fixedly connected with the wind-break wall by the supporting device, the water supply pipe can rotate in the supporting device, thereby the orientation of the nozzle is adjusted, the nozzle is aligned to the corresponding working device on the large-scale mechanical equipment used by the user, the better dust fall effect is achieved, in addition, the flow of the spray can be adjusted by the flow adjusting valve, the wind-break wall blocks natural wind in the construction site environment on one hand, the dust is prevented from being blown up, on the other hand, the wind-break wall plays a supporting role on the water supply pipe, the height of common large-scale mechanical equipment is more than 1m, the mounted position of the corresponding equipment on the mechanical equipment is also more than 1m, therefore, under the condition that the wind-break wall plays supporting role to the delivery pipe, make lamellar water splash spray on large-scale mechanical equipment's tooling device more accurately, reach better dust fall effect, in addition, still be provided with the catch basin in the construction site, be used for collecting the sewage that scatters on subaerial, flow back to in the cistern through the catch basin, can reuse after the sediment, make the water resource high-efficient utilization, water in the catch basin still passes through filter screen prefiltration and purifies, be favorable to effectively utilizing the water resource.
Drawings
Fig. 1 is a top view of the present invention;
FIG. 2 is a schematic view showing a connection structure of the water supply pipe, the supporting device and the wind-break wall according to the present invention;
FIG. 3 is a schematic view of the connection structure of the water supply pipe, the spray pipe and the nozzle of the present invention;
fig. 4 is a schematic structural view of the spray nozzle of the present invention.
In the figure: 1-water supply pipe, 2-spray pipe, 3-wind shield wall, 4-supporting device, 5-water supply pump, 6-water storage tank, 7-nozzle, 8-flow regulating valve, 9-water collecting channel, 10-filter screen, 11-construction site, 41-supporting hoop, 42-holding hoop, 43-hinge pin, 44-hinge screw rod, 45-locking nut, 46-pin rod and 71-spray nozzle.
Detailed Description
The technical solution of the present invention is further described below, but the scope of the claimed invention is not limited to the described.
As shown in fig. 1, fig. 2, fig. 3 and the drawing, the utility model provides a construction site dust fall dust pelletizing system is built in room, including delivery pipe 1, wind-break wall 3 and many spray pipes 2, wind-break wall 3 is through excavating in the construction site 11 the earth and stone side pile up and form in construction site 11 border department, delivery pipe 1 is installed on wind-break wall 3 and through delivery pump 5 and cistern 6 intercommunication through supporting device 4, cistern 6 is through excavating behind the 11 interior earth and stone sides of construction site, the one end and the delivery pipe 1 of spray pipe 2 are connected and are linked together, the other end fixedly connected with nozzle 7 of spray pipe 2, be provided with a plurality of nozzle 71 on the nozzle 7, a plurality of nozzle 71 mutual independence and nozzle 71 are flat shape.
Further, the spray opening 71 has a rectangular, oval or quadrangular front view projection surrounded by two arc line segments parallel to each other and two straight line segments parallel to each other. Preferably, the aspect ratio of spray opening 71 is greater than 5. The number of the spray outlets 71 is 3 to 5.
In addition, the height of the wind-break wall 3 is 1 m-2.2 m. The spray pipe 2 is also connected with a flow regulating valve 8 for regulating the flow of water passing through the spray pipe 2.
In addition, the supporting device 4 includes a supporting hoop 41, a holding hoop 42, a hinge pin 43, a hinge screw 44 and a lock nut 45, a pin rod 46 which can be inserted into the wind-break wall 3 is fixedly connected to the supporting hoop 41, both ends of the supporting hoop 41 and the holding hoop 42 are provided with an open slot, both ends of the hinge pin 43 are respectively hinged to the open slot at one end of the supporting hoop 41 and the open slot at one end of the holding hoop 42, the open slot at the other end of the supporting hoop 41 is hinged to the hinge screw 44, the lock nut 45 is screwed onto the hinge screw 44, and when the hinge screw 44 is sleeved in the open slot at the other end of the holding hoop 42 and the open slots corresponding to the supporting hoop 41 and the holding hoop 42 are tightly connected through the lock nut 45, the supporting hoop 41 and the holding hoop 42 encircle the periphery of the water supply pipe 1. Preferably, the pin 46 is greater than 20cm in length. Adopt the technical scheme of the utility model, wind-break wall 3 is formed through the mounding of the earth and stone side in excavating job site 11, and the mode fixed bolster device 4 that inserts wind-break wall 3 through pin rod 46 makes delivery pipe 1 dismouting of being convenient for, and it is neat to keep the job site utensil after delivery pipe 1 has been installed, and after this takes the construction operation to end, still can conveniently dismantle, shifts delivery pipe 1 to other mining areas and uses.
The pin rod 46 has a reverse tapered shape with a large upper end and a small lower end. The supporting hoop 41, the holding hoop 42, the hinge pin 43, the hinge screw 44 and the lock nut 45 are all made of stainless steel. A water collecting ditch 9 is also dug in the construction site 11, and the water collecting ditch 9 is arranged between the edge of the construction site 11 and the inner wall of the wind-break wall 3 and is communicated with the water storage tank 6. The front projection of the wind-break wall 3 is non-closed ring. A filter screen 10 is arranged at the joint of the water collecting ditch 9 and the water storage tank 6.
By adopting the technical scheme of the utility model, when a user carries out construction operation in a construction site by using large-scale mechanical equipment, the water in the reservoir is pumped by the water supply pump and the flaky spray is sprayed out by the nozzle, thereby the dust fall purpose is carried out on the construction site, the dust is avoided, the construction site environment is improved, the spray pipe is fixedly connected with the wind-break wall by the supporting device, the water supply pipe can rotate in the supporting device, thereby the orientation of the nozzle is adjusted, the nozzle is aligned to the corresponding working device on the large-scale mechanical equipment used by the user, the better dust fall effect is achieved, in addition, the flow of the spray can be adjusted by the flow adjusting valve, the wind-break wall blocks natural wind in the construction site environment on one hand, the dust is prevented from being blown up, on the other hand, the wind-break wall plays a supporting role on the water supply pipe, the height of common large-scale mechanical equipment is more than 1m, the mounted position of the corresponding equipment on the mechanical equipment is also more than 1m, therefore, under the condition that the wind-break wall plays supporting role to the delivery pipe, make lamellar water splash spray on large-scale mechanical equipment's tooling device more accurately, reach better dust fall effect, in addition, still be provided with the catch basin in the construction site, be used for collecting the sewage that scatters on subaerial, flow back to in the cistern through the catch basin, can reuse after the sediment, make the water resource high-efficient utilization, water in the catch basin still passes through filter screen prefiltration and purifies, be favorable to effectively utilizing the water resource.
Claims (10)
1. The utility model provides a job site dust fall dust pelletizing system is built in room which characterized in that: including delivery pipe (1), wind-break wall (3) and many spray pipes (2), wind-break wall (3) are through excavating construction site (11) interior earth and stone side and pile up and form in construction site (11) border department, delivery pipe (1) install through strutting arrangement (4) in on wind-break wall (3) and through delivery pump (5) and cistern (6) intercommunication, cistern (6) form through excavating construction site (11) interior earth and stone side back, the one end of spray pipe (2) with delivery pipe (1) is connected and is communicate, the other end fixedly connected with nozzle (7) of spray pipe (2), be provided with a plurality of nozzle (71) on nozzle (7), a plurality of nozzle (71) mutual independence and nozzle (71) are flat shape.
2. The dust settling and removing system for the house construction site as claimed in claim 1, which is characterized in that: the main view projection of the spray opening (71) is rectangular, waist-circular or a quadrangle formed by two arc line segments which are parallel to each other and two straight line segments which are parallel to each other.
3. The house building construction site dust fall and removal system of claim 2, characterized in that: the aspect ratio of the spray opening (71) is more than 5.
4. The dust settling and removing system for the house construction site as claimed in claim 1, which is characterized in that: the number of the spray outlets (71) is 3-5.
5. The dust settling and removing system for the house construction site as claimed in claim 1, which is characterized in that: the height of the wind-shield wall (3) is 1 m-2.2 m.
6. The dust settling and removing system for the house construction site as claimed in claim 1, which is characterized in that: and the spraying pipe (2) is also connected with a flow regulating valve (8) for regulating the flow of water flow passing through the spraying pipe (2).
7. The dust settling and removing system for the house construction site as claimed in claim 1, which is characterized in that: the supporting device (4) comprises a supporting hoop (41), a holding hoop (42), a hinge pin (43), a hinge screw (44) and a lock nut (45), a pin rod (46) which can be inserted into the wind-break wall (3) is fixedly connected to the supporting hoop (41), open slots are arranged at both ends of the supporting hoop (41) and the holding hoop (42), both ends of the hinge pin (43) are respectively hinged with the open slot at one end of the supporting hoop (41) and the open slot at one end of the holding hoop (42), the open slot at the other end of the supporting hoop (41) is hinged with the hinge screw (44), the lock nut (45) is screwed on the hinge screw (44), when the hinged screw rod (44) is sleeved in the opening groove at the other end of the holding clamp (42) and the corresponding opening grooves of the supporting clamp (41) and the holding clamp (42) are tightly combined through the locking nut (45), the supporting hoop (41) and the holding hoop (42) encircle the periphery of the water supply pipe (1).
8. The dust settling and removing system for the house construction site as claimed in claim 7, which is characterized in that: the pin (46) has a length greater than 20 cm.
9. The dust settling and removing system for the house construction site as claimed in claim 7, which is characterized in that: the pin rod (46) is in an inverted cone shape with a large upper end and a small lower end.
10. The dust settling and removing system for the house construction site as claimed in claim 1, which is characterized in that: and a water collecting ditch (9) is also dug in the construction site (11), and the water collecting ditch (9) is arranged between the edge of the construction site (11) and the inner wall of the wind-break wall (3) and is communicated with the reservoir (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022707667.9U CN214233296U (en) | 2020-11-20 | 2020-11-20 | Dust fall dust pelletizing system of job site is built in room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022707667.9U CN214233296U (en) | 2020-11-20 | 2020-11-20 | Dust fall dust pelletizing system of job site is built in room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214233296U true CN214233296U (en) | 2021-09-21 |
Family
ID=77733540
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022707667.9U Active CN214233296U (en) | 2020-11-20 | 2020-11-20 | Dust fall dust pelletizing system of job site is built in room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214233296U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117482674A (en) * | 2024-01-02 | 2024-02-02 | 国昌德工(陕西)建筑工程有限公司 | Construction dust fall equipment |
-
2020
- 2020-11-20 CN CN202022707667.9U patent/CN214233296U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117482674A (en) * | 2024-01-02 | 2024-02-02 | 国昌德工(陕西)建筑工程有限公司 | Construction dust fall equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209900940U (en) | Building construction building site dust removal atomizer | |
CN211143163U (en) | Hydraulic engineering desilting equipment | |
CN211215690U (en) | Adjustable irrigation equipment for water conservancy | |
CN214233296U (en) | Dust fall dust pelletizing system of job site is built in room | |
CN206993955U (en) | A kind of gardens intelligent environment protection water injector | |
CN210145722U (en) | Equipment pipe network structure is sprayed in atmosphere pollution control | |
CN212866151U (en) | Formula of sinking retaining greenery patches | |
CN112370904A (en) | Dust fall dust pelletizing system of job site is built in room | |
CN210728862U (en) | Rural irrigation canals and ditches water filter equipment for pollution treatment | |
CN112551615A (en) | River channel treatment intake pool and integrated sewage treatment system | |
CN218757348U (en) | Irrigation and drainage channel convenient for irrigation and water conservancy irrigation | |
CN215542208U (en) | Novel artificial waterfall of landscape architecture | |
CN211340968U (en) | Rainwater collection device is used in gardens | |
CN213836589U (en) | Water conservancy drainage device that uses is planted to carrot | |
CN213280958U (en) | A irrigation equipment is collected to rainwater for landscape architecture | |
CN212069801U (en) | Cleaning device for chemical sewage treatment device | |
CN209173551U (en) | A kind of filter device for water facilities | |
CN208500701U (en) | A kind of microorganism carrier apparatus administered for water course in situ | |
CN202785792U (en) | Bio-contact oxidation pond | |
CN214169203U (en) | Hydraulic engineering desilting device | |
CN216586653U (en) | Box ecological landscape barricade | |
CN213326946U (en) | Rural water body prosthetic devices | |
CN216452370U (en) | Turf irrigation device for slope protection | |
CN215872955U (en) | Water storage device with automatic irrigation function for landscaping | |
CN214613904U (en) | Ecological slope protection structure of water conservancy construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |