CN214228267U - Network communication monitoring device - Google Patents

Network communication monitoring device Download PDF

Info

Publication number
CN214228267U
CN214228267U CN202120567329.1U CN202120567329U CN214228267U CN 214228267 U CN214228267 U CN 214228267U CN 202120567329 U CN202120567329 U CN 202120567329U CN 214228267 U CN214228267 U CN 214228267U
Authority
CN
China
Prior art keywords
box
communication
monitoring device
fixedly connected
network communication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120567329.1U
Other languages
Chinese (zh)
Inventor
王向亮
郭国军
杨会珍
崔龙浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120567329.1U priority Critical patent/CN214228267U/en
Application granted granted Critical
Publication of CN214228267U publication Critical patent/CN214228267U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

The utility model discloses a network communication monitoring device, which comprises a communication box, wherein the bottom of the inner cavity of the communication box is fixedly connected with an installation box, the top of the communication box is fixedly connected with a water storage box, the top of the installation box is fixedly connected with a three-way pump, and the bottom of the water storage box is communicated with a water outlet pipe, the utility model discloses a network communication monitoring device is jointly constructed by the arrangement of the communication box, the installation box, the water storage box, the three-way pump, the water outlet pipe, a connecting pipe, a supporting pipe, an atomizing spray head, an exhaust box, a ventilation fan, a clapboard and a network communication monitoring body, wherein the surface of the installation box can be cooled by spraying water through the arrangement of the water storage box, the three-way pump, the water outlet pipe, the connecting pipe, the supporting pipe and the atomizing spray head, so that the temperature in the installation box can be rapidly reduced, and the circulation of air in the installation box can be accelerated through the arrangement of the exhaust box and the ventilation fan, further strengthen monitoring device's heat dissipation function, improve the radiating efficiency.

Description

Network communication monitoring device
Technical Field
The utility model relates to a network communication technical field specifically is a network communication monitoring device.
Background
The network protocol is a bridge for communication and communication among networks, only computers with the same network protocol can communicate and communicate information, the same as various languages used for communication among people, and can communicate normally and conveniently along the network communication network only by using the same language, and the network protocol is defined from a professional perspective, is an agreement which the computers must obey when realizing communication in the network, namely the communication protocol, and mainly makes provisions and sets standards for the rate, transmission codes, code structures, transmission control steps, error control and the like of information transmission.
The existing network communication monitoring device is poor in heat dissipation effect, cannot dissipate internal heat in time, and influences the service life of the existing network communication monitoring device.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a network communication monitoring device possesses the good advantage of radiating effect, and it is not good to have solved current network communication monitoring device radiating effect, can not in time spill the heat of inside, influences its life's problem.
In order to achieve the above object, the utility model provides a following technical scheme: a network communication monitoring device comprises a communication box, wherein the bottom of the inner cavity of the communication box is fixedly connected with an installation box, the top of the communication box is fixedly connected with a water storage box, the top of the installation box is fixedly connected with a three-way pump, the bottom of the water storage box is communicated with a water outlet pipe, the bottom of the water outlet pipe penetrates through the communication box and extends to the inner cavity of the communication box and is communicated with the three-way pump, two sides of the three-way pump are communicated with connecting pipes, one end, away from the three-way pump, of each connecting pipe is communicated with a supporting pipe, one side, opposite to the two supporting pipes, of each supporting pipe is communicated with an atomizing spray head, an air exhaust box is embedded at the bottom of the inner cavity of the installation box, two sides of the inner cavity of the air exhaust box are fixedly connected with ventilation fans through supports, the bottom of the air exhaust box sequentially penetrates through the installation box and the communication box and extends to the outside of the communication box, and the bottoms of two sides of the inner cavity of the installation box are fixedly connected with a partition plate, and a network communication monitoring body is arranged at the top of the partition plate.
Preferably, the right side of the water storage tank is communicated with a water inlet pipe, and the surface of the partition plate is designed in a hollow manner.
Preferably, the bottom of the inner cavity of the communication box and the two sides of the installation box are both provided with water outlets, and the inner cavity of each water outlet is provided with a dust screen.
Preferably, the bottom of the inner cavity of the exhaust box is provided with a ventilation port, and the inner cavity of the ventilation port is provided with a filter screen.
Preferably, both sides of the surface of the communication box are movably connected with box doors through hinges, and the surfaces of the box doors are fixedly connected with handles.
Preferably, the top and the bottom of both sides of the communication box are fixedly connected with mounting plates.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a communication box, the install bin, the water storage box, the tee bend pump, the outlet pipe, the connecting pipe, the stay tube, the atomizer, the exhaust box, the scavenger fan, the setting of baffle and network communication control body, a network communication monitoring device has been found jointly, wherein through the water storage box, the tee bend pump, the outlet pipe, the connecting pipe, the setting of stay tube and atomizer, can carry out the water spray cooling to the surface of install bin, thereby make the temperature in the install bin descend fast, the setting of rethread exhaust box and scavenger fan, the circulation of the interior air of install bin can accelerate, further strengthen monitoring device's heat dissipation function, and the heat dissipation efficiency is improved.
2. The utility model can discharge the water sprayed by the atomizing nozzle by arranging the water outlet;
by arranging the ventilation port and the filter screen, when the ventilation fan accelerates the air circulation in the installation box, dust is prevented from invading the installation box to pollute the network communication monitoring body;
by arranging the box door, a user can conveniently overhaul the network communication monitoring body;
through setting up the mounting panel, can conveniently carry out fixed mounting to monitoring device.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a perspective view of the communication box of the present invention;
FIG. 3 is a cross-sectional view of an exhaust box in the structure of the present invention;
fig. 4 is a partial enlarged view of a in the structure of the present invention.
In the figure: 1. a communication box; 2. installing a box; 3. a water storage tank; 4. a three-way pump; 5. a water outlet pipe; 6. a connecting pipe; 7. supporting a tube; 8. an atomizing spray head; 9. an exhaust box; 10. a partition plate; 11. a network communication monitoring body; 12. a ventilator; 13. a water outlet; 14. a ventilation port; 15. a filter screen; 16. a box door; 17. and (7) mounting the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a network communication monitoring device comprises a communication box 1, a mounting box 2 is fixedly connected to the bottom of the inner cavity of the communication box 1, a water storage box 3 is fixedly connected to the top of the communication box 1, a three-way pump 4 is fixedly connected to the top of the mounting box 2, a water outlet pipe 5 is communicated with the bottom of the water storage box 3, the bottom of the water outlet pipe 5 penetrates through the communication box 1 and extends to the inner cavity of the communication box 1 and is communicated with the three-way pump 4, connecting pipes 6 are respectively communicated with two sides of the three-way pump 4, one ends of the connecting pipes 6 far away from the three-way pump 4 are communicated with supporting pipes 7, atomizing nozzles 8 are respectively communicated with one sides opposite to the two supporting pipes 7, an air exhaust box 9 is embedded in the bottom of the inner cavity of the mounting box 2, two sides of the inner cavity of the air exhaust box 9 are respectively fixedly connected with a ventilating fan 12 through a support, the bottom of the air exhaust box 9 sequentially penetrates through the mounting box 2 and the communication box 1 and extends to the outside of the communication box 1, the equal fixedly connected with baffle 10 in bottom of 2 inner chamber both sides of install bin, network communication control body 11 has been placed at the top of baffle 10, through communication box 1, install bin 2, water storage box 3, three way pump 4, outlet pipe 5, connecting pipe 6, stay tube 7, atomizer 8, exhaust box 9, scavenger fan 12, the setting of baffle 10 and network communication control body 11, a network communication monitoring device has been found jointly, wherein through water storage box 3, three way pump 4, outlet pipe 5, connecting pipe 6, stay tube 7 and atomizer 8's setting, can spray water cooling to the surface of install bin 2, thereby make the temperature in install bin 2 descend fast, the setting of rethread exhaust box 9 and scavenger fan 12, can accelerate the circulation of the interior air of install bin 2, further strengthen monitoring device's heat dissipation function, and improve the radiating efficiency.
Referring to fig. 1, the right side of the water storage tank 3 is communicated with a water inlet pipe, and the surface of the partition plate 10 is designed to be hollow.
Referring to fig. 1 and 4, the bottom of the inner cavity of the communication box 1 and both sides of the installation box 2 are provided with water outlets 13, the inner cavity of the water outlet 13 is provided with a dust screen, and the water sprayed by the atomizer 8 can be discharged through the arrangement of the water outlet 13.
Referring to fig. 3, a ventilation port 14 is formed at the bottom of an inner cavity of the exhaust box 9, a filter screen 15 is disposed in the inner cavity of the ventilation port 14, and by arranging the ventilation port 14 and the filter screen 15, when the ventilation fan 12 accelerates the air circulation in the installation box 2, dust is prevented from invading the installation box 2 and polluting the network communication monitoring body 11.
Referring to fig. 2, both sides of the surface of the communication box 1 are movably connected with a box door 16 through hinges, the surface of the box door 16 is fixedly connected with a handle, and the arrangement of the box door 16 can facilitate a user to overhaul the network communication monitoring body 11.
Referring to fig. 1, the top and the bottom of the two sides of the communication box 1 are both fixedly connected with mounting plates 17, and the monitoring device can be conveniently and fixedly mounted by arranging the mounting plates 17.
When the device is used, the monitoring device is firstly installed at a required position through the installation plate 17, then the network communication monitoring body 11 is started to operate, at the moment, certain heat is generated during the operation of the network communication monitoring body 11, then the three-way pump 4 is started to pump cooling water in the water storage tank 3 into the connecting pipe 6 and the supporting pipe 7 through the water outlet pipe 5, then the surface of the installation box 2 is sprayed with water and cooled through the atomizing spray head 8, so that the temperature in the installation box 2 can be quickly reduced, the sprayed cooling water can be discharged through the water outlet 13, meanwhile, the ventilation fan 12 is started to operate, the circulation of air in the installation box 2 can be accelerated, and through the ventilation port 14 and the filter screen 15, when the ventilation fan 12 accelerates the circulation of air in the installation box 2, dust is prevented from invading into the installation box 2, and pollution is caused to the network communication monitoring body 11, the cooperation of the two is used, the heat dissipation function of the monitoring device is further enhanced, and the heat dissipation efficiency is improved.
The control mode of the present application is automatically controlled by a controller, the control circuit of the controller can be realized by simple programming by those skilled in the art, and the present application is common knowledge in the field, and the present application mainly protects the mechanical device, so the control mode and the circuit connection are not explained in detail in the present application.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A network communication monitoring device, comprising a communication box (1), characterized in that: the bottom of the inner cavity of the communication box (1) is fixedly connected with an installation box (2), the top of the communication box (1) is fixedly connected with a water storage box (3), the top of the installation box (2) is fixedly connected with a three-way pump (4), the bottom of the water storage box (3) is communicated with a water outlet pipe (5), the bottom of the water outlet pipe (5) penetrates through the communication box (1), extends to the inner cavity of the communication box (1) and is communicated with the three-way pump (4), two sides of the three-way pump (4) are both communicated with connecting pipes (6), one end, far away from the three-way pump (4), of each connecting pipe (6) is communicated with a support pipe (7), one side, opposite to the two support pipes (7), of each support pipe (8) is communicated with an atomizing nozzle (8), an air exhaust box (9) is embedded at the bottom of the inner cavity of the installation box (2), and two sides of the inner cavity of the air exhaust box (9) are both fixedly connected with a ventilation fan (12) through a support, the bottom of row's bellows (9) runs through install bin (2) and communication box (1) in proper order and extends to the outside of communication box (1), equal fixedly connected with baffle (10) in the bottom of install bin (2) inner chamber both sides, network communication control body (11) have been placed at the top of baffle (10).
2. A network communication monitoring device according to claim 1, wherein: the right side of the water storage tank (3) is communicated with a water inlet pipe, and the surface of the partition plate (10) is designed in a hollow manner.
3. A network communication monitoring device according to claim 1, wherein: the bottom of the inner cavity of the communication box (1) and the two sides of the mounting box (2) are both provided with water outlets (13), and the inner cavity of each water outlet (13) is provided with a dust screen.
4. A network communication monitoring device according to claim 1, wherein: the bottom of the inner cavity of the air exhaust box (9) is provided with a ventilation port (14), and the inner cavity of the ventilation port (14) is provided with a filter screen (15).
5. A network communication monitoring device according to claim 1, wherein: both sides of the surface of the communication box (1) are movably connected with box doors (16) through hinges, and the surface of each box door (16) is fixedly connected with a handle.
6. A network communication monitoring device according to claim 1, wherein: the top and the bottom of the two sides of the communication box (1) are fixedly connected with mounting plates (17).
CN202120567329.1U 2021-03-19 2021-03-19 Network communication monitoring device Expired - Fee Related CN214228267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120567329.1U CN214228267U (en) 2021-03-19 2021-03-19 Network communication monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120567329.1U CN214228267U (en) 2021-03-19 2021-03-19 Network communication monitoring device

Publications (1)

Publication Number Publication Date
CN214228267U true CN214228267U (en) 2021-09-17

Family

ID=77694064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120567329.1U Expired - Fee Related CN214228267U (en) 2021-03-19 2021-03-19 Network communication monitoring device

Country Status (1)

Country Link
CN (1) CN214228267U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115085063A (en) * 2022-07-18 2022-09-20 安徽君锐电力设备有限公司 Heat dissipation type box and box-type substation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115085063A (en) * 2022-07-18 2022-09-20 安徽君锐电力设备有限公司 Heat dissipation type box and box-type substation
CN115085063B (en) * 2022-07-18 2024-01-02 安徽君锐电力设备有限公司 Heat dissipation type box and box-type substation

Similar Documents

Publication Publication Date Title
CN214228267U (en) Network communication monitoring device
CN113972580B (en) Intelligent cooling device and cooling method for power distribution room
CN211650626U (en) Efficient intelligent heat dissipation device for building machine room
CN216530127U (en) Dustproof power communication equipment that radiating effect is good
CN212615474U (en) Cooling device of electric fan
CN208317245U (en) A kind of high temperature resistant industrial ethernet switch
CN208170603U (en) A kind of air-cooled board house of water mist blown within doors
CN214312883U (en) Energy-saving power transformer heat sink
CN216322889U (en) Water paint constant-temperature spraying room
CN212935224U (en) Electric simulation screen cabinet that radiating effect is good
CN216988255U (en) Surface paint spraying device for wood furniture production
CN214507727U (en) Frequency converter cabinet with ventilation cooling structure
CN210951486U (en) Bath heater with independent air duct
CN218569571U (en) Anticorrosive thermal-insulated type forceful electric power installation cabinet
CN215846242U (en) Welding gun capable of cooling rapidly for welding external wall panel of assembly type building
CN218039424U (en) Start-stop battery that heat dispersion that heavy current car was used is good
CN220853213U (en) Noise reduction type cooling tower additionally provided with air inlet and outlet muffler
CN216242190U (en) Ventilation structure for automobile gearbox
CN216794841U (en) Switching power supply with high temperature resistant structure
CN217720463U (en) Heat dissipation device for 10KV box-type substation
CN205014487U (en) Split type floor type air conditioner
CN211084312U (en) Simple indoor cooling device
CN220274132U (en) Heat dissipation formula frequency conversion cabinet
CN219454772U (en) Box heat exchanger unit
CN216845744U (en) Variable flow cooling tower group

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210917