CN214222228U - Pipeline clamping structure for water conservancy construction - Google Patents

Pipeline clamping structure for water conservancy construction Download PDF

Info

Publication number
CN214222228U
CN214222228U CN202023200830.9U CN202023200830U CN214222228U CN 214222228 U CN214222228 U CN 214222228U CN 202023200830 U CN202023200830 U CN 202023200830U CN 214222228 U CN214222228 U CN 214222228U
Authority
CN
China
Prior art keywords
clamping
support frame
pipeline
water conservancy
clamping sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023200830.9U
Other languages
Chinese (zh)
Inventor
张人超
徐维
罗树奇
邹诗雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Huatai Hongxiang Engineering Co ltd
Original Assignee
Hunan Huatai Hongxiang Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Huatai Hongxiang Engineering Co ltd filed Critical Hunan Huatai Hongxiang Engineering Co ltd
Priority to CN202023200830.9U priority Critical patent/CN214222228U/en
Application granted granted Critical
Publication of CN214222228U publication Critical patent/CN214222228U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the field of water conservancy construction, a pipeline clamping structure for water conservancy construction is related to, the loach carrying platform comprises a supporting fram, be provided with centre gripping subassembly and lifting unit on the support frame, lifting unit is used for adjusting the centre gripping subassembly is in height on the support frame, the centre gripping subassembly includes that first clamp cover and second press from both sides the cover, first clamp cover sets up on the support frame, the second press from both sides the cover articulate in the upper end that first clamp cover, be provided with on the support frame and be used for the drive the second presss from both sides the cover and is close to the driving piece that first clamp cover. This application has the effect of using manpower sparingly when the centre gripping pipeline.

Description

Pipeline clamping structure for water conservancy construction
Technical Field
The application relates to the field of water conservancy construction, especially, relate to a pipeline clamping structure for water conservancy construction.
Background
In the process of hydraulic construction, there are many common points to the construction of general civil engineering works such as roads, bridges, house buildings, etc., construction is performed in an environment near a water source, dams are constructed according to the conditions of water flow, and other hydraulic engineering works are performed.
Chinese patent No. CN212126431U discloses a pipe clamping structure for water conservancy construction, which comprises an anti-slip grip and a bottom machine body, wherein the anti-slip grip is installed and fixed at the middle position of the upper end of the bottom machine body, a rope belt fixer consisting of a fixed shaft column, a limit groove, a concave shell and a fixing screw effectively prevents a clamping material belt from falling off, and the concave shell of the rope belt fixer is welded on the bottom machine body, so that the rope belt is not easy to fall off when in use; when the pipeline clamping mechanism is used, a pipeline is placed between the clamping material belts, then the clamping material belts are locked, the pipeline is clamped by the anti-skidding grab handle, and then the pipeline is placed in a ditch.
In view of the above-mentioned related art, the inventor believes that when clamping a pipe, the pipe needs to be lifted by a hand-held grip, and the pipe is heavy and labor-consuming.
SUMMERY OF THE UTILITY MODEL
In order to use manpower sparingly at the in-process of centre gripping pipeline, this application provides a pipeline clamping structure for water conservancy construction.
The application provides a pair of pipeline clamping structure for water conservancy construction adopts following technical scheme:
the utility model provides a pipeline clamping structure for water conservancy construction, includes the support frame, be provided with centre gripping subassembly and lifting unit on the support frame, lifting unit is used for adjusting the height of centre gripping subassembly on the support frame, the centre gripping subassembly includes first clamp cover and second clamp cover, first clamp cover sets up on the support frame, the second clamp cover articulates in the upper end of first clamp cover, be provided with on the support frame and be used for driving the second clamp cover is close to the driving piece of first clamp cover.
Through adopting above-mentioned technical scheme, when the centre gripping pipeline, place the pipeline between first clamp cover and second clamp cover, utilize the driving piece, the drive second presss from both sides the cover and is close to first clamp cover, then with first clamp cover and the common centre gripping pipeline of second clamp cover, then utilize lifting unit, in the drive first clamp cover and the second clamp cover press from both sides the clamp and get the pipeline and get into the irrigation canals and ditches, have the in-process that can be at the centre gripping pipeline, the effect of using manpower sparingly.
Optionally, the driving part includes a first cylinder, an outer shell of the first cylinder is hinged to the support frame, one end, far away from the support frame, of a telescopic rod of the first cylinder is hinged to a side wall of the second jacket, and the telescopic rod of the first cylinder extends out to drive the second jacket to be close to the first jacket.
By adopting the technical scheme, the first cylinder is started, the telescopic rod of the first cylinder stretches out to drive the second jacket to be close to the first jacket, the first jacket and the second jacket clamp the pipeline, and when the pipeline is placed into a ditch, the telescopic rod of the cylinder contracts to drive the second jacket to be far away from the first jacket.
Optionally, the lifting assembly includes a vertically arranged screw rod, the screw rod is rotatably connected to the support frame, one end of the screw rod is coaxially and fixedly connected with a motor, a side wall of the first clamping sleeve abuts against the support frame, and the first clamping sleeve is sleeved on the screw rod and is in threaded fit with the screw rod.
Through adopting above-mentioned technical scheme, the starter motor, the output shaft of motor drives the lead screw and rotates, and the lead screw drives first cover that presss from both sides and slides along vertical direction to first cover and second press from both sides drive the pipeline and descend to the irrigation canals and ditches in, have the effect that is convenient for drive the pipeline and descend to the irrigation canals and ditches, and the motor can use manpower sparingly as the power supply.
Optionally, a storage battery is arranged on the support frame, and the motor is electrically connected with the storage battery.
Through adopting above-mentioned technical scheme, because water conservancy pipeline clamping structure removes more frequently in the open air, be not convenient for use external power supply, use the battery to provide the power supply, it is more convenient.
Optionally, a clamping table is fixedly connected to the first jacket, and an anti-slip layer is fixedly connected to one surface, close to the pipeline, of the clamping table.
Through adopting above-mentioned technical scheme, when the centre gripping pipeline, can place the pipeline on the centre gripping platform, the skid resistant course has the effect that prevents the first cover that presss from both sides of pipeline landing.
Optionally, the support frame lower extreme is provided with the base, the base is the level setting, the base lower extreme sets up the plug connector that is used for inserting earth.
Through adopting above-mentioned technical scheme, utilize plug connector and base, can fix the support frame on ground, press from both sides the in-process that cover drive the pipeline at first cover and second and go up and down, can increase the effect of the support stability of support frame.
Optionally, the plug connector comprises a ground nail, and the ground nail is in threaded connection with the base.
Through adopting above-mentioned technical scheme, when the base was placed in soil subaerial, inlay the ground nail in the ground, can make the base fix on the ground, when removing the support frame, twist the ground nail, can follow the base with the ground nail and take off, can prevent that the sharp-pointed part of ground nail from stabbing people.
Optionally, the support frame is connected to the base in a sliding manner along the width direction of the base, and a first cylinder is arranged on the base.
Through adopting above-mentioned technical scheme, the support frame is followed the width direction sliding connection of base is in on the base, be provided with the second cylinder on the base, the second cylinder is vertical setting, the telescopic link of second cylinder up and with the lower extreme fixed connection of support frame.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the clamping assembly and the lifting assembly are arranged, the driving piece is used for driving the second jacket to be close to the first jacket, then the first jacket and the second jacket clamp the pipeline together, and then the lifting assembly is used for driving the first jacket and the second jacket to clamp the pipeline into the ditch, so that the effect of saving labor in the process of clamping the pipeline is achieved;
2. set up plug connector and base, can fix the support frame on ground, press from both sides the in-process that cover drive the pipeline at first cover and second and go up and down, can increase the effect of the support stability of support frame.
Drawings
Fig. 1 is an overall structural schematic diagram of a pipe clamping structure for water conservancy construction according to an embodiment of the present application;
fig. 2 is an exploded view of the ground nail and base of fig. 1.
Description of reference numerals: 1. a base; 2. a support frame; 21. a transverse plate; 22. a vertical plate; 3. a clamping assembly; 31. a first jacket; 32. a second jacket; 4. a reinforcing plate; 5. a clamping table; 6. an anti-slip layer; 7. a ground nail; 8. a lifting assembly; 81. a screw rod; 82. a motor; 9. a support block; 10. a support plate; 11. a fixing plate; 12. a first cylinder; 13. a second cylinder; 14. and (4) a storage battery.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses pipeline clamping structure for water conservancy construction. Referring to fig. 1, the pipeline clamping structure comprises a base 1, a support frame 2 is connected to the base 1, a clamping assembly 3 and a lifting assembly 8 are arranged on the support frame 2, the clamping assembly 3 is used for clamping a pipeline, and the lifting assembly 8 is arranged at the lower end of the support frame 2 and used for adjusting the height of the clamping assembly 3.
Referring to fig. 1, the supporting frame 2 is composed of a transverse plate 21 and a vertical plate 22 which are vertically connected, a right-angled triangular reinforcing plate 4 is arranged between the transverse plate 21 and the vertical plate 22 of the supporting frame 2, and two right-angled sides of the reinforcing plate 4 are respectively and fixedly connected to the side walls of the transverse plate 21 and the vertical plate 22 of the supporting frame 2; the clamping assembly 3 comprises a first clamping sleeve 31 and a second clamping sleeve 32, the first clamping sleeve 31 and the second clamping sleeve 32 are both arc-shaped, the upper end of the first clamping sleeve 31 is fixedly connected to the lower surface of the transverse plate 21 of the support frame 2, and the upper end of the second clamping sleeve 32 is hinged to the upper end of the first clamping sleeve 31; the support frame 2 is provided with a driving part for driving the second jacket 32 to be close to the first jacket 31, and the driving part can realize that the second jacket 32 is close to the first jacket 31, so that the second jacket 32 and the first jacket 31 clamp the pipeline together.
Referring to fig. 1, the driving member includes a first cylinder 12, the outer shell of the first cylinder 12 is hinged to the side wall of the support frame 2 near the second jacket 32, the telescopic rod of the first cylinder 12 is hinged to the side wall of the second jacket 32, the first cylinder 12 is started, the telescopic rod of the first cylinder 12 extends out, and the second jacket 32 is close to the first jacket 31.
Referring to fig. 1, a clamping table 5 is arranged at the lower end of the inner side wall of the first clamping sleeve 31, the length of the clamping table 5 is greater than that of the first clamping sleeve 31, the clamping table 5 is horizontally arranged, and a rubber anti-slip layer 6 is bonded on the upper surface of the clamping table 5 and used for preventing a pipeline from slipping off from the clamping table 5.
Referring to fig. 1, a rectangular base 1 is arranged below a support frame 2, a support plate 10 is vertically arranged on the upper surface of the base 1, and two support blocks 9 are welded on the side wall of the support plate 10; the lifting assembly 8 comprises a vertically arranged screw rod 81, two ends of the screw rod 81 are respectively and rotatably connected to the two supporting blocks 9 through bearings, the upper end of the screw rod 81 penetrates out of the supporting blocks 9 and is coaxially welded with a motor 82, and the motor 82 belongs to a forward and reverse rotation motor 82; the side wall of the support plate 10 far away from the screw rod 81 is provided with a storage battery 14, and the motor 82 is connected with the storage battery 14; two rectangular fixing plates 11 are welded on the side wall of the vertical plate 22 far away from the reinforcing plate 4, and the two fixing plates 11 are both sleeved on the screw rod 81 and are in threaded fit with the screw rod 81; the motor 82 is started, the output shaft of the motor 82 drives the screw rod 81 to rotate, and the screw rod 81 drives the fixing plate 11 to vertically displace, so that the first jacket 31 and the second jacket 32 are driven to vertically lift, and the height of the clamping pipeline is adjusted.
Referring to fig. 1, the supporting plate 10 is slidably connected to the upper surface of the base 1 along the width direction of the base 1, the base 1 is provided with a second cylinder 13, the second cylinder 13 is arranged along the width direction of the base 1, the housing of the second cylinder 13 is bolted to the upper surface of the base 1, the telescopic rod of the second cylinder 13 is welded to the side wall of the supporting plate 10 far away from the first jacket 31, the second cylinder 13 is started, and the telescopic rod of the second cylinder 13 extends to drive the supporting plate 10 to move, so as to adjust the horizontal displacement of the pipeline.
Referring to fig. 1 and 2, base 1 lower surface is provided with the plug connector, and the plug connector includes ground nail 7, and the quantity of ground nail 7 sets up to four, and four equal threaded connection in base 1 lower surfaces of ground nail 7, when removing clamping structure, ground nail 7 can follow and dismantle from base 1 and avoid pricking the injury people.
The implementation principle of the pipeline clamping structure for water conservancy construction in the embodiment of the application is as follows: when the pipeline is clamped, the pipeline is placed between a first clamping sleeve 31 and a second clamping sleeve 32 and is placed on a clamping table 5, then a first air cylinder 12 is started, an expansion rod of the first air cylinder 12 extends out to drive the second clamping sleeve 32 to be close to the first clamping sleeve 31, and the pipeline is clamped; starting the second cylinder 13, wherein the telescopic rod of the second cylinder 13 extends out to drive the fixing plate 11 to move towards the ditch; the motor 82 is started, the output shaft of the motor 82 drives the screw rod 81 to rotate, the screw rod 81 drives the fixing plate 11 to move downwards to drive the support frame 2 to move downwards, the support frame 2 drives the first clamping sleeve 31 and the second clamping sleeve 32 to move downwards so as to drive the pipeline to descend into the ditch, and finally the telescopic rod of the first cylinder 12 is contracted so as to enable the second clamping sleeve 32 to be far away from the first clamping sleeve 31 and move the pipeline out of the clamping table 5.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a pipeline clamping structure for water conservancy construction which characterized in that: the clamping device comprises a support frame (2), wherein a clamping assembly (3) and a lifting assembly (8) are arranged on the support frame (2), the lifting assembly (8) is used for adjusting the height of the clamping assembly (3) on the support frame (2), the clamping assembly (3) comprises a first clamping sleeve (31) and a second clamping sleeve (32), the first clamping sleeve (31) is arranged on the support frame (2), the second clamping sleeve (32) is hinged to the upper end of the first clamping sleeve (31), and a driving piece used for driving the second clamping sleeve (32) to be close to the first clamping sleeve (31) is arranged on the support frame (2).
2. The pipeline clamping structure for water conservancy construction according to claim 1, characterized in that: the driving piece comprises a first air cylinder (12), the outer shell of the first air cylinder (12) is hinged to the supporting frame (2), one end, far away from the supporting frame (2), of an expansion rod of the first air cylinder (12) is hinged to the side wall of the second clamping sleeve (32), and the expansion rod of the first air cylinder (12) stretches out to drive the second clamping sleeve (32) to be close to the first clamping sleeve (31).
3. The pipeline clamping structure for water conservancy construction according to claim 2, characterized in that: the lifting assembly (8) comprises a vertically arranged screw rod (81), the screw rod (81) is rotatably connected onto the support frame (2), one end of the screw rod (81) is coaxially and fixedly connected with a motor (82), the side wall of the first clamping sleeve (31) is abutted to the support frame (2), and the first clamping sleeve (31) is sleeved on the screw rod (81) and is in threaded fit with the screw rod (81).
4. The pipeline clamping structure for water conservancy construction according to claim 3, characterized in that: the support frame (2) is provided with a storage battery (14), and the motor (82) is electrically connected with the storage battery (14).
5. The pipeline clamping structure for water conservancy construction according to claim 4, characterized in that: the clamping device is characterized in that a clamping table (5) is fixedly connected to the first clamping sleeve (31), and an anti-skid layer (6) is fixedly connected to one surface, close to the pipeline, of the clamping table (5).
6. The pipeline clamping structure for water conservancy construction according to claim 1, characterized in that: the support frame (2) lower extreme is provided with base (1), base (1) is the level setting, base (1) lower extreme sets up the plug connector that is used for inserting earth.
7. The pipeline clamping structure for water conservancy construction according to claim 6, characterized in that: the plug connector comprises a ground nail (7), and the ground nail (7) is in threaded connection with the base (1).
8. The pipeline clamping structure for water conservancy construction according to claim 6, characterized in that: the support frame (2) is followed the width direction sliding connection of base (1) is in on base (1), be provided with second cylinder (13) on base (1), second cylinder (13) are the level setting, the telescopic link of second cylinder (13) with the lower extreme fixed connection of support frame (2).
CN202023200830.9U 2020-12-25 2020-12-25 Pipeline clamping structure for water conservancy construction Active CN214222228U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023200830.9U CN214222228U (en) 2020-12-25 2020-12-25 Pipeline clamping structure for water conservancy construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023200830.9U CN214222228U (en) 2020-12-25 2020-12-25 Pipeline clamping structure for water conservancy construction

Publications (1)

Publication Number Publication Date
CN214222228U true CN214222228U (en) 2021-09-17

Family

ID=77705956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023200830.9U Active CN214222228U (en) 2020-12-25 2020-12-25 Pipeline clamping structure for water conservancy construction

Country Status (1)

Country Link
CN (1) CN214222228U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114147512A (en) * 2021-12-16 2022-03-08 南京九趾装备科技有限公司 Pipe machining feeding and clamping mechanism

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114147512A (en) * 2021-12-16 2022-03-08 南京九趾装备科技有限公司 Pipe machining feeding and clamping mechanism

Similar Documents

Publication Publication Date Title
CN214222228U (en) Pipeline clamping structure for water conservancy construction
CN208653839U (en) A kind of portable building detection concrete extraction element
CN205530257U (en) Novel full topography pile driver
CN211572879U (en) Protector for construction
CN112392054A (en) Continuous drainage device for foundation pit support
CN209799459U (en) Civil engineering strutting arrangement
CN214143885U (en) Stone crushing device for hydraulic engineering
CN218058271U (en) Material lifting device is used in hydraulic and hydroelectric engineering construction
CN214738194U (en) Sunk well screw anchor pressurization deviation correcting device
CN210369098U (en) Efficient water conservancy construction sediment removal device
CN212671226U (en) Wallboard mounting machine
CN212684350U (en) Wall drilling equipment is used in security protection engineering construction
CN212685614U (en) Handling device is used in hydraulic engineering pile foundation construction
CN211004334U (en) Curb installation auxiliary device
CN218436537U (en) Waterproof processing device is used in road bed construction
CN218098479U (en) Lake sampling device
CN220686078U (en) Building envelope of foundation ditch interlock pile foundation
CN218292068U (en) High-strength excavator sleeve arm
CN217352832U (en) Dredging treatment equipment for lake pipe network
CN221034324U (en) Hydraulic pipeline supporting device for hydraulic engineering
CN221030058U (en) Foundation detection device
CN213730262U (en) Supporting auxiliary device for welding large-diameter oil and gas pipelines
CN220847392U (en) Protection slope for water and soil loss treatment
CN213569352U (en) Fragment of brick handling equipment for civil engineering construction
CN220703171U (en) Municipal administration public piping shaft construction auxiliary device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant