CN213569352U - Fragment of brick handling equipment for civil engineering construction - Google Patents
Fragment of brick handling equipment for civil engineering construction Download PDFInfo
- Publication number
- CN213569352U CN213569352U CN202021911051.7U CN202021911051U CN213569352U CN 213569352 U CN213569352 U CN 213569352U CN 202021911051 U CN202021911051 U CN 202021911051U CN 213569352 U CN213569352 U CN 213569352U
- Authority
- CN
- China
- Prior art keywords
- wall
- civil engineering
- handling equipment
- brick
- engineering construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a fragment of brick handling equipment for civil engineering construction belongs to civil engineering technical field, this fragment of brick handling equipment for civil engineering construction, including mount, link and spout, the spout has been seted up to the outer wall of link, the inner wall sliding connection of spout has the mount, the inside of mount is provided with the drive shaft, the both ends of drive shaft and the inner wall sliding connection of spout, the outer wall fixed mounting of drive shaft has the base, the top fixedly connected with fixed plate of base, the outer wall fixed mounting of fixed plate has flexible post, the one end outer wall joint that the fixed plate was kept away from to flexible post has the sliding plate, the inner wall of joint ring and the outer wall fixed connection of flexible post. More bricks can be loaded through the fixing frame, a large number of bricks are prevented from being clamped by the brick clamping plates at a time, the bricks are broken due to the fact that the stress of the bricks is uneven, the bricks are convenient to lift off through the piston rod, and construction efficiency is improved.
Description
Technical Field
The utility model belongs to the technical field of civil engineering, concretely relates to fragment of brick handling equipment for civil engineering construction.
Background
Civil engineering is a general term for scientific technology for building various land engineering facilities. It refers to both the materials, equipment used and the technical activities carried out such as surveying, designing, construction, maintenance, repair, etc., as well as the objects of engineering construction. I.e. various engineering facilities such as houses, roads, railways, pipelines, tunnels, bridges, canals, dams, ports, power stations, airports, ocean platforms, water supply and drainage and protection projects, which are built on or under the ground, on land and directly or indirectly serve human life, production, military affairs and scientific research. The civil engineering refers to engineering entities for surveying, planning, designing, constructing, installing and maintaining various technical works and the like of newly-built, reconstructed or expanded buildings, structures, related supporting facilities and the like of various projects except house buildings.
A large amount of fragment of brick of the unable disposable transportation of common fragment of brick handling equipment to when a large amount of fragment of brick of centre gripping, make the fragment of brick atress inhomogeneous easily, lead to the fragment of brick to drop, broken, influence the efficiency of construction, for this reason, we provide a fragment of brick handling equipment for civil engineering construction and solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a fragment of brick handling equipment is used in civil engineering construction to provide a current fragment of brick handling equipment is used in civil engineering construction in solving above-mentioned background art in the use, because a large amount of fragments of brick can't once only be transported, and when a large amount of fragments of brick of centre gripping, make the fragment of brick atress inhomogeneous easily, thereby lead to the fragment of brick to drop, broken, influence the problem of efficiency of construction.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a fragment of brick handling equipment for civil engineering construction, includes mount, connection frame and spout, the spout has been seted up to the outer wall of connection frame, the inner wall sliding connection of spout has the mount, the inside of mount is provided with the drive shaft, the both ends of drive shaft and the inner wall sliding connection of spout, the outer wall fixed mounting of drive shaft has the base, the top fixedly connected with fixed plate of base, the outer wall fixed mounting of fixed plate has flexible post, the one end outer wall joint that the fixed plate was kept away from to flexible post has the sliding plate.
Preferably, the right end of the sliding plate is provided with a clamping ring, the inner wall of the clamping ring is fixedly connected with the outer wall of the telescopic column, the bottom of the sliding plate is slidably connected with the outer wall of the base, the left end of the sliding plate is provided with a non-slip mat, and the right end of the non-slip mat is fixedly connected with the left end of the sliding plate.
Preferably, the bottom fixedly connected with piston rod of connecting frame, the bottom of piston rod is provided with the cover post, the inner wall of cover post and the outer wall swing joint of piston rod, the bottom fixed mounting of cover post has the back shaft.
Preferably, the two ends of the supporting shaft are movably connected with driving wheels, an advancing crawler belt is arranged outside the driving wheels, and the outer wall of the advancing crawler belt is in transmission connection with the outer wall of the driving wheels.
Preferably, the bottom fixedly connected with hinge shell of connecting frame, the inside fixed mounting of hinge shell has the rotation axis, the outer wall swing joint of rotation axis has the swinging boom, the outer wall fixed mounting of swinging boom has the connecting rod.
Preferably, the inner wall sliding connection of connecting rod has the slide bar, the one end that the connecting rod was kept away from to the slide bar is provided with the joint axle, the one end of joint axle and the outer wall fixed connection of slide bar, the other end swing joint of joint axle has splint, the bottom fixed mounting of splint has the protection bottom plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. can accomodate the fragment of brick of splint centre gripping through the mount and fix, the inside a plurality of mounts that are provided with of connection frame can accomodate a large amount of fragments of brick to the fragment of brick can all be accomodate to the top and the bottom of mount, improves the transportation volume of this device, avoids a large amount of fragments of brick of splint disposable clamping, and the fragment of brick atress is inhomogeneous, makes the fragment of brick damage that drops.
2. The fixing frame is driven to ascend and descend through the piston rod in a lifting mode, the fixing frame is convenient to detach the bricks, the piston rod descends when the bricks are placed in the fixing frame through the clamping plates, the sliding rod is convenient to move, lift and clamp the bricks, the brick transportation efficiency is improved, the connecting frame can descend when the bricks are detached, the bricks are in contact with the ground, and the bricks are directly detached.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic side view of the fixing frame of the present invention;
fig. 3 is a schematic view of the slide bar of the present invention.
In the figure: 1. a fixed mount; 101. a drive shaft; 102. a base; 103. a fixing plate; 104. a telescopic column; 105. a sliding plate; 106. a snap ring; 107. a non-slip mat; 2. a connecting frame; 3. a chute; 4. a piston rod; 5. sleeving a column; 6. a hinged shell; 7. a rotating arm; 8. a connecting rod; 9. a slide bar; 10. clamping the shaft; 11. a splint; 12. a protective base plate; 13. a support shaft; 14. a traveling crawler; 15. a driving wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a fragment of brick handling equipment for civil engineering construction, including mount 1, carriage 2 and spout 3, spout 3 has been seted up to carriage 2's outer wall, the inner wall sliding connection of spout 3 has mount 1, the inside of mount 1 is provided with drive shaft 101, the both ends of drive shaft 101 and the inner wall sliding connection of spout 3, the outer wall fixed mounting of drive shaft 101 has base 102, the top fixedly connected with fixed plate 103 of base 102, the outer wall fixed mounting of fixed plate 103 has flexible post 104, the one end outer wall joint that fixed plate 103 was kept away from to flexible post 104 has sliding plate 105.
In this embodiment, can accomodate the fragment of brick of splint 11 centre gripping fixedly through mount 1, the inside a plurality of mounts 1 that is provided with of connection frame 2 can accomodate a large amount of fragments of brick to the fragment of brick can all be accomodate to the top and the bottom of mount 1, improves the transportation volume of this device, avoids a large amount of fragments of brick of splint 11 disposable clamping, and the fragment of brick atress is inhomogeneous drops the damage.
Specifically, the right end of the sliding plate 105 is provided with a clamping ring 106, the inner wall of the clamping ring 106 is fixedly connected with the outer wall of the telescopic column 104, the bottom of the sliding plate 105 is slidably connected with the outer wall of the base 102, the left end of the sliding plate 105 is provided with a non-slip mat 107, and the right end of the non-slip mat 107 is fixedly connected with the left end of the sliding plate 105.
In this embodiment, the telescopic column 104 drives the sliding plate 105 through the snap ring 106, and the sliding plate 105 slides on the base 102 to clamp the brick.
Specifically, the bottom fixedly connected with piston rod 4 of connecting frame 2, the bottom of piston rod 4 is provided with cover post 5, the inner wall of cover post 5 and the outer wall swing joint of piston rod 4, and the bottom fixed mounting of cover post 5 has back shaft 13.
In this embodiment, piston rod 4 can reciprocate in sleeve post 5, and the clamping fragment of brick of being convenient for improves the efficiency of construction.
Specifically, two ends of the supporting shaft 13 are movably connected with driving wheels 15, a traveling crawler 14 is arranged outside the driving wheels 15, and the outer wall of the traveling crawler 14 is in transmission connection with the outer wall of the driving wheels 15.
In this embodiment, the driving wheels 15 drive the traveling crawler 14 to move the apparatus to a predetermined place.
Specifically, the bottom fixedly connected with of connecting frame 2 articulates shell 6, and the inside fixed mounting of articulated shell 6 has the rotation axis, and the outer wall swing joint of rotation axis has swinging boom 7, and the outer wall fixed mounting of swinging boom 7 has connecting rod 8.
In this embodiment, the rotating arm 7 rotates in the hinge housing 6 to drive the sliding rod 9 to ascend, so that the clamping plate 11 moves to the fixing frame 1.
Specifically, the inner wall of the connecting rod 8 is slidably connected with a sliding rod 9, one end, away from the connecting rod 8, of the sliding rod 9 is provided with a clamping shaft 10, one end of the clamping shaft 10 is fixedly connected with the outer wall of the sliding rod 9, the other end of the clamping shaft 10 is movably connected with a clamping plate 11, and the bottom of the clamping plate 11 is fixedly provided with a protection bottom plate 12.
In this embodiment, the slide bar 9 moves inside the connecting rod 8 to drive the clamping plate 11 to clamp the brick.
The utility model discloses a theory of operation and use flow: the piston rod 4 descends to drive the fixed frame 1 in the connecting frame 2 to descend, the slide rod 9 moves in the connecting rod 8 to drive the clamping plate 11 to clamp bricks, the protective bottom plate 12 protects and fixes the bricks directly contacting with the clamping plate 11, the rotating arm 7 rotates in the hinged shell 6 to drive the slide rod 9 to ascend, so that the clamping plate 11 moves to the fixed frame 1, one end of the brick contacts with the base 102, the telescopic column 104 drives the sliding plate 105 through the clamping ring 106, the sliding plate 105 slides on the base 102 to clamp the brick, after clamping is completed, the drive shaft 101 rotates the base 102 to rotate one end of the unclamped brick to the bottom to clamp the brick, after the fixed frame 1 is clamped, the drive shaft 101 drives the fixed frame 1 to move in the connecting frame 2, after clamping is completed, the piston rod 4 ascends, the drive wheel 15 drives the traveling crawler 14 to move the device to a designated place, when the brick reaches a designated place, the piston rod 4 descends, and the fixing frame 1 enables the brick to contact the ground, so that the brick is directly detached.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a fragment of brick handling equipment for civil engineering construction, includes mount (1), connecting frame (2) and spout (3), its characterized in that: spout (3) have been seted up to the outer wall of linking frame (2), the inner wall sliding connection of spout (3) has mount (1), the inside of mount (1) is provided with drive shaft (101), the both ends of drive shaft (101) and the inner wall sliding connection of spout (3), the outer wall fixed mounting of drive shaft (101) has base (102), the top fixedly connected with fixed plate (103) of base (102), the outer wall fixed mounting of fixed plate (103) has flexible post (104), the one end outer wall joint that fixed plate (103) were kept away from in flexible post (104) has sliding plate (105).
2. The brick handling equipment for civil engineering construction according to claim 1, wherein: the right end of the sliding plate (105) is provided with a clamping ring (106), the inner wall of the clamping ring (106) is fixedly connected with the outer wall of the telescopic column (104), the bottom of the sliding plate (105) is slidably connected with the outer wall of the base (102), the left end of the sliding plate (105) is provided with an anti-skid pad (107), and the right end of the anti-skid pad (107) is fixedly connected with the left end of the sliding plate (105).
3. The brick handling equipment for civil engineering construction according to claim 1, wherein: the bottom fixedly connected with piston rod (4) of connecting frame (2), the bottom of piston rod (4) is provided with cover post (5), the inner wall of cover post (5) and the outer wall swing joint of piston rod (4), the bottom fixed mounting of cover post (5) has back shaft (13).
4. The brick handling equipment for civil engineering construction according to claim 3, characterized in that: two ends of the supporting shaft (13) are movably connected with driving wheels (15), a traveling crawler (14) is arranged outside the driving wheels (15), and the outer wall of the traveling crawler (14) is in transmission connection with the outer wall of the driving wheels (15).
5. The brick handling equipment for civil engineering construction according to claim 1, wherein: the bottom fixedly connected with hinge shell (6) of connecting frame (2), the inside fixed mounting of hinge shell (6) has the rotation axis, the outer wall swing joint of rotation axis has swinging boom (7), the outer wall fixed mounting of swinging boom (7) has connecting rod (8).
6. The brick handling equipment for civil engineering construction according to claim 5, wherein: the inner wall sliding connection of connecting rod (8) has slide bar (9), the one end that connecting rod (8) were kept away from in slide bar (9) is provided with joint axle (10), the one end of joint axle (10) and the outer wall fixed connection of slide bar (9), the other end swing joint of joint axle (10) has splint (11), the bottom fixed mounting of splint (11) has protection bottom plate (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021911051.7U CN213569352U (en) | 2020-09-03 | 2020-09-03 | Fragment of brick handling equipment for civil engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021911051.7U CN213569352U (en) | 2020-09-03 | 2020-09-03 | Fragment of brick handling equipment for civil engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213569352U true CN213569352U (en) | 2021-06-29 |
Family
ID=76569542
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021911051.7U Expired - Fee Related CN213569352U (en) | 2020-09-03 | 2020-09-03 | Fragment of brick handling equipment for civil engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213569352U (en) |
-
2020
- 2020-09-03 CN CN202021911051.7U patent/CN213569352U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209007676U (en) | A kind of cutting equipment of logical spool | |
CN210462333U (en) | Tunnel construction monitoring devices | |
CN213569352U (en) | Fragment of brick handling equipment for civil engineering construction | |
CN209469446U (en) | Tunnel gantry type automates trolley | |
CN108397217A (en) | The tunnel steel arch frame transport fitting machine and method that achievable monitoring element is laid in advance | |
CN211036638U (en) | Road paving device for municipal works | |
CN209799459U (en) | Civil engineering strutting arrangement | |
CN216196428U (en) | Novel ingate operation construction platform | |
CN214222228U (en) | Pipeline clamping structure for water conservancy construction | |
CN212931432U (en) | Building engineering measures pay-off | |
CN211362231U (en) | Pipe fitting placer for civil engineering | |
CN211466142U (en) | Municipal works pipeline quick connect device | |
CN215168103U (en) | Building templates connects steelframe for civil engineering | |
CN211627082U (en) | Sewage sample collection device | |
CN215326433U (en) | Temporary protection device for pipeline construction | |
CN210659381U (en) | Strutting arrangement for civil engineering | |
CN211850719U (en) | Civil construction crane | |
CN214113315U (en) | Civil engineering pipeline placer | |
CN214246523U (en) | Civil engineering safety scaffold | |
CN217375442U (en) | Pipe fitting rack for civil engineering | |
CN105438668B (en) | Climb clear library device | |
CN213543557U (en) | Civil engineering uses portable measuring apparatu | |
CN213568819U (en) | Civil engineering building unwrapping wire equipment | |
CN218914340U (en) | Wall plastering device | |
CN216143270U (en) | High-efficient pipeline laying equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210629 Termination date: 20210903 |