CN212931432U CN202021942319.3U CN202021942319U CN212931432U CN 212931432 U CN212931432 U CN 212931432U CN 202021942319 U CN202021942319 U CN 202021942319U CN 212931432 U CN212931432 U CN 212931432U
Authority
CN
China
Prior art keywords
fixedly connected
installing frame
swing joint
fixing bolt
construction work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021942319.3U
Other languages
Chinese (zh)
Inventor
张昌勇
房俊静
隋向阳
宫艳琴
杨国妮
李秀敏
宗培刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021942319.3U priority Critical patent/CN212931432U/en
Application granted granted Critical
Publication of CN212931432U publication Critical patent/CN212931432U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a building engineering measures pay-off, including the installing frame, the both sides of installing frame are all set up threaded hole, the inside threaded connection of screw hole has fixing bolt, the top fixedly connected with mount of installing frame, the positive reverse motor of inside fixedly connected with of mount, the output swing joint of positive reverse motor has the transmission shaft, the one end swing joint of transmission shaft has the dwang. This building engineering measures pay-off, through the installing frame, screw hole and fixing bolt's setting, the staff places the installing frame on fixed wallboard, fixes the installing frame on the wallboard through the screw hole with fixing bolt for the device consolidates stably, and can not take place the side and move, thereby makes staff easy operation, and conveniently carries, has reached convenient to use, consolidates firm effect, through the setting of damping pivot, bull stick and overhead line board, has reached the convenient effect of rotation.

Description

Building engineering measures pay-off
Technical Field
The utility model relates to an engineering survey technical field specifically is a building engineering measures pay-off.
Background
According to the engineering types served by engineering survey, the method can also be divided into building engineering survey, line survey, bridge and tunnel survey, mine survey, urban survey, hydraulic engineering survey and the like. In addition, high-precision positioning and deformation observation for large equipment are also called high-precision engineering measurement; the application of photogrammetry techniques to engineering construction is called engineering photogrammetry; the measuring system with electronic total station or ground camera as sensor and supported by computer is called three-dimensional industrial measurement, the engineering measurement is directly served for engineering construction, and its service and application range includes various engineering construction departments of urban construction, geology, railway, traffic, real estate management, water conservancy and power, energy, spaceflight and national defense.
The current device mobility is not good, and the mobility is poor, consequently the utility model provides a building engineering measures pay-off.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building engineering measures pay-off has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a building engineering measures pay-off, includes the installing frame, the both sides of installing frame all set up threaded hole, the inside threaded connection of screw hole has fixing bolt, the top fixedly connected with mount of installing frame, the positive motor that reverses of inside fixedly connected with of mount, the output swing joint of the positive motor that reverses has the transmission shaft, the one end swing joint of transmission shaft has the dwang.
Optionally, one end of the rotating rod is movably connected with a wire winding rod, and a bearing seat is arranged at one end of the wire winding rod.
Optionally, one side fixedly connected with solidus ware of bearing frame, the bottom fixedly connected with bracing piece of solidus ware, there is the base bottom of bracing piece through fixing bolt threaded connection.
Optionally, the surface of the mounting frame is fixedly connected with a damping rotating shaft, and a rotating rod is arranged inside the damping rotating shaft.
Optionally, the fixed surface of the rotating rod is connected with a fixing ring, one side of the fixing ring is fixedly connected with a wiring board, and both sides of the wiring board are provided with through wire holes.
Optionally, the inside of the through hole is movably connected with a movable rope, and one end of the movable rope is movably connected with a gravity hammer.
(III) advantageous effects
The utility model provides a building engineering measures pay-off possesses following beneficial effect:
1. this building engineering measures pay-off, through installing frame, screw hole and fixing bolt's setting, the staff places the installing frame on fixed wallboard, fixes the installing frame on the wallboard through the screw hole with fixing bolt for the device consolidates stably, and can not take place the side and move, thereby makes staff easy operation, and conveniently carries, has reached convenient to use, consolidates firm effect.
2. This building engineering measures pay-off, through positive and negative motor, the setting of wire winding pole and bearing frame, the staff is with positive and negative motor switch on, it rotates to drive the transmission shaft through positive and negative motor, the transmission shaft drives the dwang and rotates, make the dwang rotate the wire winding pole, during corotation, the device carries out the unwrapping wire operation, during the reversal, the line operation is received to the device, reached and placed the circuit and received the simple and convenient effect of line, through the damping pivot, the setting of bull stick and wiring board, the staff can rotate the position of wiring board at will through damping pivot and bull stick, and the pivoted position stops can not remove easily, convenient effect has been rotated to the rotation.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a schematic plan view of the present invention;
fig. 3 is an enlarged schematic structural view of a portion a in fig. 1 according to the present invention.
In the figure: 1. installing a frame; 2. a threaded hole; 3. fixing the bolt; 4. a fixed mount; 5. a positive and negative rotation motor; 6. a drive shaft; 7. rotating the rod; 8. a wire winding rod; 9. a bearing seat; 10. a wire fixing device; 11. a support bar; 12. a base; 13. a damping rotating shaft; 14. a rotating rod; 15. a fixing ring; 16. a wiring board; 17. a through hole; 18. a movable rope; 19. a gravity hammer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a construction engineering measurement pay-off device comprises a mounting frame 1, wherein threaded holes 2 are formed in two sides of the mounting frame 1, and fixing bolts 3 are connected with the inner threads of the threaded holes 2;
through the arrangement of the mounting frame 1, the threaded hole 2 and the fixing bolt 3, a worker places the mounting frame 1 on a fixed wallboard, and fixes the mounting frame 1 on the wallboard through the threaded hole 2 and the fixing bolt 3, so that the device is stably reinforced, and lateral movement cannot occur, and therefore the worker is easy to operate and convenient to carry, and the effects of convenience in use and firmness in reinforcement are achieved;
the top of the mounting frame 1 is fixedly connected with a fixed frame 4, the interior of the fixed frame 4 is fixedly connected with a forward and reverse rotating motor 5, the output end of the forward and reverse rotating motor 5 is movably connected with a transmission shaft 6, one end of the transmission shaft 6 is movably connected with a rotating rod 7, one end of the rotating rod 7 is movably connected with a winding rod 8, and one end of the winding rod 8 is provided with a bearing seat 9;
through the arrangement of the forward and reverse rotation motor 5, the winding rod 8 and the bearing seat 9, a worker switches on the forward and reverse rotation motor 5, the forward and reverse rotation motor 5 drives the transmission shaft 6 to rotate, the transmission shaft 6 drives the rotating rod 7 to rotate, so that the rotating rod 7 rotates the winding rod 8, the device performs a wire releasing operation during forward rotation, and performs a wire winding operation during reverse rotation, so that the effects of circuit placement and wire winding simplicity are achieved;
a wire fixing device 10 is fixedly connected to one side of the bearing seat 9, a supporting rod 11 is fixedly connected to the bottom of the wire fixing device 10, the bottom of the supporting rod 11 is in threaded connection with a base 12 through a fixing bolt, a damping rotating shaft 13 is fixedly connected to the surface of the mounting frame 1, a rotating rod 14 is arranged inside the damping rotating shaft 13, a fixing ring 15 is fixedly connected to the surface of the rotating rod 14, and a wiring board 16 is fixedly connected to one side of the fixing ring 15;
through the arrangement of the damping rotating shaft 13, the rotating rod 14 and the wiring board 16, a worker can rotate the position of the wiring board 16 at will through the damping rotating shaft 13 and the rotating rod 14, and the rotating position stops and cannot move easily, so that the effect of convenient rotation is achieved;
wire through holes 17 are formed in the two sides of the wiring board 16, movable ropes 18 are movably connected inside the wire through holes 17, and one ends of the movable ropes 18 are movably connected with gravity hammers 19.
The utility model discloses in, the device's working procedure as follows:
1. through the arrangement of the mounting frame 1, the threaded hole 2 and the fixing bolt 3, a worker places the mounting frame 1 on a fixed wallboard, and fixes the mounting frame 1 on the wallboard through the threaded hole 2 and the fixing bolt 3, so that the device is stably reinforced, and lateral movement cannot occur, and therefore the worker is easy to operate and convenient to carry, and the effects of convenience in use and firmness in reinforcement are achieved;
2. through motor 5 just reversing, the setting of wire winding rod 8 and bearing frame 9, the staff will just reverse 5 switch on power supplies of motor, it rotates to drive transmission shaft 6 through motor 5 just reversing, transmission shaft 6 drives dwang 7 and rotates, make dwang 7 rotate wire winding rod 8, during corotation, the device carries out the unwrapping wire operation, during the reversal, the line operation is received to the device, reached and placed the circuit and received the simple and convenient effect of line, through damping pivot 13, the setting of bull stick 14 and wiring board 16, the staff can rotate the position of wiring board 16 at will through damping pivot 13 and bull stick 14, and the pivoted position stops can not remove easily, convenient effect has been rotated to reached.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a building engineering measures pay-off, includes installing frame (1), its characterized in that: threaded hole (2) are all seted up to the both sides of installing frame (1), the inside threaded connection of screw hole (2) has fixing bolt (3), the top fixedly connected with mount (4) of installing frame (1), the positive reverse motor (5) of the inside fixedly connected with of mount (4), the output swing joint of positive reverse motor (5) has transmission shaft (6), the one end swing joint of transmission shaft (6) has dwang (7).
2. The construction work surveying line laying apparatus as claimed in claim 1, wherein: one end swing joint of dwang (7) has wire winding pole (8), the one end of wire winding pole (8) is provided with bearing frame (9).
3. A construction work surveying line laying apparatus according to claim 2, characterised in that: one side fixedly connected with solidus ware (10) of bearing frame (9), the bottom fixedly connected with bracing piece (11) of solidus ware (10), there is base (12) bottom of bracing piece (11) through fixing bolt threaded connection.
4. The construction work surveying line laying apparatus as claimed in claim 1, wherein: the surface of the mounting frame (1) is fixedly connected with a damping rotating shaft (13), and a rotating rod (14) is arranged inside the damping rotating shaft (13).
5. The construction work surveying line laying apparatus as claimed in claim 4, wherein: the surface fixing of bull stick (14) is connected with solid fixed ring (15), one side fixedly connected with wiring board (16) of solid fixed ring (15), lead to line hole (17) have all been seted up to the both sides of wiring board (16).
6. The construction work surveying line laying apparatus as claimed in claim 5, wherein: the inside swing joint in through-hole (17) has activity rope (18), the one end swing joint of activity rope (18) has gravity hammer (19).
CN202021942319.3U 2020-09-08 2020-09-08 Building engineering measures pay-off Active CN212931432U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021942319.3U CN212931432U (en) 2020-09-08 2020-09-08 Building engineering measures pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021942319.3U CN212931432U (en) 2020-09-08 2020-09-08 Building engineering measures pay-off

Publications (1)

Publication Number Publication Date
CN212931432U true CN212931432U (en) 2021-04-09

Family

ID=75305025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021942319.3U Active CN212931432U (en) 2020-09-08 2020-09-08 Building engineering measures pay-off

Country Status (1)

Country Link
CN (1) CN212931432U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113532405A (en) * 2021-07-19 2021-10-22 王烁程 Stable drop wire capable of avoiding long-time swinging for constructional engineering and operation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113532405A (en) * 2021-07-19 2021-10-22 王烁程 Stable drop wire capable of avoiding long-time swinging for constructional engineering and operation method thereof
CN113532405B (en) * 2021-07-19 2023-09-01 新疆汉块建设工程有限公司 Stable falling line capable of avoiding long-time swing for constructional engineering and operation method thereof

Similar Documents

Publication Publication Date Title
CN212931432U (en) Building engineering measures pay-off
CN211735086U (en) Prefabricated case roof beam hoist and mount positioner
CN105350560A (en) Marine wind-finding radar foundation structure and installation method thereof
CN213062066U (en) Sinking auxiliary device for open caisson construction
CN212984676U (en) Vertical prefabricated component is from perpendicular strutting arrangement that inclines
CN219037856U (en) On-site measurement device for municipal water supply and drainage engineering design
CN213651651U (en) Road and bridge construction tool rapid lifting equipment based on civil engineering
CN204615274U (en) A kind of actinobacillus device of transmission line
CN211166131U (en) Angle-automatically-adjustable surveying and mapping platform
CN114809142A (en) Perpendicular digging device of deep basal pit
CN210264517U (en) Intelligent tunnel drilling equipment
CN210834256U (en) Civil engineering detects uses concrete sampling device
CN207483165U (en) A kind of self-positioning lifting cross beam
CN219426796U (en) Intelligent mechanical arm system for assisting in adjusting verticality of vertical prefabricated part
CN212803259U (en) Hydraulic butt-joint supporting system device for pressure tunnel steel pipe lining
RU73323U1 (en) EMERGENCY REPAIR MEANS FOR WORK ON WEAKLY SOILS
CN212893691U (en) Lifting equipment for civil engineering
CN212689030U (en) Single-pile bearing capacity experimental device for civil engineering
CN220686147U (en) Underground flood-proof and corrosion-proof structure for civil engineering
CN215326433U (en) Temporary protection device for pipeline construction
CN216445739U (en) Cement troweling device for municipal road construction
CN218437151U (en) Open caisson excavation positioner
CN220727641U (en) Range finder for civil engineering
CN215760562U (en) Constructional column steel bar positioning device
CN213569352U (en) Fragment of brick handling equipment for civil engineering construction