CN214222205U - Modular fixed knot constructs for indoor blowdown pipeline installation - Google Patents

Modular fixed knot constructs for indoor blowdown pipeline installation Download PDF

Info

Publication number
CN214222205U
CN214222205U CN202022613289.8U CN202022613289U CN214222205U CN 214222205 U CN214222205 U CN 214222205U CN 202022613289 U CN202022613289 U CN 202022613289U CN 214222205 U CN214222205 U CN 214222205U
Authority
CN
China
Prior art keywords
fixed
block
piece
box
sewage pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022613289.8U
Other languages
Chinese (zh)
Inventor
王举光
陈鑫
王永国
高叶俊
李高峰
龚顺
熊奋
杨凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Original Assignee
Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gold Mantis Fine Decoration Technology Suzhou Co Ltd filed Critical Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Priority to CN202022613289.8U priority Critical patent/CN214222205U/en
Application granted granted Critical
Publication of CN214222205U publication Critical patent/CN214222205U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the technical field of the piping erection, and a modular fixed knot constructs for indoor blowdown piping erection is disclosed, the on-line screen storage device comprises a base, the top fixed mounting of base has the under casing, the left side fixed mounting at under casing top has the kicking block, the right side of kicking block articulates there is the fly leaf, the bottom of fly leaf and the top swing joint of under casing, the bottom fixed mounting on under casing right side has the side case, the bottom of side case and the top fixed connection of base, the left inside fixed mounting of under casing has the bearing. The utility model discloses a set up fly leaf, lead screw, motion piece and down tube, when the lead screw rotated, will make the motion piece take place to move, the down tube will promote the fly leaf through the fixed block and overturn this moment to the inclination of chassis and roof-rack has been changed, so that the staff can carry out the inclined support to sewage pipes fixedly, consequently increased this fixed knot structure's practicality.

Description

Modular fixed knot constructs for indoor blowdown pipeline installation
Technical Field
The utility model belongs to the technical field of the piping erection, specifically be a modular fixed knot constructs for indoor blowdown piping erection.
Background
The interior decoration comprises room design, decoration, furniture arrangement and various small decoration points, is heavier than decoration construction in buildings, and comprises long-term continuous decoration after entering.
At present, the staff is in to its indoor fitment the time, often need install sewage pipes, and sewage pipes generally realizes installation and fixed through corresponding structure, and current sewage pipes installation fixed knot constructs at the in-process of in-service use, has following defect:
first, current sewage pipes fixed knot constructs generally all adopts fixed design, can only carry out the plane to sewage pipes and support fixedly, if when sewage pipes need carry out the slope support, current fixed knot structure can't satisfy the installation demand to the operation of giving the staff has brought the inconvenience.
The second point, current sewage pipes fixed knot constructs when using, does not have the function of direction regulation, can only carry out unilateral support to sewage pipes and fix, if need carry out the support of other directions to sewage pipes when fixed, can only change this fixed knot structure holistic direction this moment and reach the installation purpose, have complex operation's drawback.
Third, current sewage pipes fixed knot constructs when using, only has simple fixed action, lacks corresponding buffering protection architecture, when sewage pipes is carrying a large amount of foul solution or is receiving external collision, will produce the vibration to can't play good protection effect to sewage pipes.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an indoor blowdown is modular fixed knot structure for piping erection to solve the problem that provides among the above-mentioned background art.
In order to achieve the above object, the present invention provides the following technical solutions: the utility model provides a modular fixed knot constructs for installation of indoor blowdown pipeline, includes the base, the top fixed mounting of base has the under casing, the left side fixed mounting at under casing top has the kicking block, the right side of kicking block articulates there is the fly leaf, the bottom of fly leaf and the top swing joint of under casing, the bottom fixed mounting on under casing right side has the side case, the bottom of side case and the top fixed connection of base, the left inside fixed mounting of under casing has the bearing, the inside fixed cup joints of bearing has the lead screw, the right-hand member fixed connection of lead screw has the connecting rod, the right-hand member of connecting rod runs through the under casing and extends to the inside of side case and cup joints with the inner wall activity of side case, the external surface of connecting rod cup joints the driven gear that is located the inside of side case, the inside movable mounting of side case has the movable rod that is located the driven gear top, the external surface fixed cup joints of movable rod has the driving gear, the surface of driving gear is connected with driven gear's external surface engagement, the right-hand member of movable rod runs through the side case and extends to in the inner wall of side case and fixed mounting has the disc that is located the side case outside, the top fixed mounting on disc right side has the handle, the surface screw thread of lead screw has cup jointed the motion piece, the top fixed mounting of motion piece has the installation piece, the inside of installation piece articulates there is the down tube, the other end of down tube articulates there is the fixed block, the top of fixed block and the bottom fixed connection of fly leaf.
Preferably, the middle part of base top has seted up spacing mouthful, spacing axle has been cup jointed in the inside activity of spacing mouthful, the top of spacing axle passes spacing mouthful and extends to the top of base and with the bottom fixed connection of motion piece, because the cooperation between spacing mouthful and the spacing axle, will play good limiting displacement to the motion piece, when the lead screw is at the pivoted in-process, will make the motion piece take place the motion.
Preferably, the top fixed mounting of fly leaf has the roof box, the top swing joint of roof box has the chassis, the top swing joint of chassis has the roof-rack, the inside activity of roof box has cup jointed the round bar, the top of round bar and the bottom fixed connection of chassis because the round bar can rotate in the inside of roof box to the direction to chassis and roof-rack is adjusted.
Preferably, the fixed surface of circle pole has cup jointed the circle piece that is located top incasement portion, the surface of circle piece and the inner wall swing joint of top case, the fixed orifices has been seted up to the surface of circle piece, the fixed orifices evenly encircles the outside at the circle pole to the staff carries out the fixed of different positions to chassis and roof-rack.
Preferably, the threaded rod has been cup jointed to the internal thread of top case, the one end of threaded rod runs through top case and extends to the outside and the fixed mounting of top case and has the round button, the other end of threaded rod is located the inside of fixed orifices, the inside of fixed orifices is equipped with the screw thread, and the screw thread of fixed orifices inside and the screw thread looks adaptation of threaded rod surface, through the cooperation between fixed orifices and the threaded rod, will have played good fixed action to round bar and circle piece.
Preferably, the both sides at chassis top and the both sides of roof-rack bottom all fixed mounting have the side piece, the internal thread of side piece has cup jointed the bolt, the top of bolt is located the top of side piece, because the cooperation between side piece and the bolt, will play good fixed action to chassis and roof-rack, also realize the fixed action to sewage pipes simultaneously.
Preferably, the equal fixed mounting in chassis and two contained angle departments of roof-rack inside has built-in piece, the inside activity of built-in piece has cup jointed movable arc piece, the outer fixed surface of activity arc piece is connected with the stiff spring, the other end of stiff spring and the inner wall fixed connection of built-in piece because the cooperation between activity arc piece and the stiff spring, will effectually cushion external vibration to the effect of protection has been played the blow off pipe.
Preferably, the outer fixed surface of activity arc piece installs the quarter butt, the other end of quarter butt runs through built-in piece and extends to the outside and the fixed mounting of built-in piece and connects the arc piece, the opposite side fixed mounting who connects the arc piece has fixed arc piece, the quantity of connecting arc piece and fixed arc piece is four, four connect arc piece and fixed arc piece and will play good spacing supporting role to sewage pipes, fixed arc piece adopts elastic rubber to make simultaneously to the surface of sewage pipes has played the guard action.
Preferably, the middle part of the top end of the top frame is fixedly provided with a pulling block, and due to the design of the pulling block, the top frame is convenient for operators to take.
The utility model has the advantages as follows:
1. the utility model discloses a set up fly leaf, lead screw, motion piece and down tube, when the lead screw rotated, will make the motion piece take place to move, the down tube will promote the fly leaf through the fixed block and overturn this moment to the inclination of chassis and roof-rack has been changed, so that the staff can carry out the inclined support to sewage pipes fixedly, consequently increased this fixed knot structure's practicality.
2. The utility model discloses a set up round bar, circle piece and threaded rod, the staff can rotate chassis or roof-rack to change the angle of chassis and roof-rack, the round bar will drive the circle piece and rotate in the inside of roof-box simultaneously, later the staff can with threaded rod screw in to corresponding fixed orifices, thereby fix its position, the staff of being convenient for supports fixedly to the blow off pipe of other directions, has consequently improved this fixed knot and has constructed's practicality.
3. The utility model discloses a set up activity arc piece, rigid spring, connection arc piece and fixed arc piece, because four cooperation between connection arc piece and the fixed arc piece will play good limiting displacement to sewage pipes, make it can not drop, and because the cooperation between activity arc piece and the rigid spring, the vibration that will effectual buffering blow off pipe received, and then played good guard action to the blow off pipe, consequently further increased this fixed knot structure's practicality.
Drawings
Fig. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic sectional view of the present invention;
FIG. 3 is a schematic view of the internal structure of the side box of the present invention;
FIG. 4 is a schematic view of the connection structure between the round bar and the bottom frame of the present invention;
fig. 5 is a schematic top view of the top box of the present invention.
In the figure: 1. a base; 2. a bottom box; 3. a top block; 4. a movable plate; 5. a side box; 6. a bearing; 7. a lead screw; 8. a connecting rod; 9. a driven gear; 10. a movable rod; 11. a disc; 12. a handle; 13. a driving gear; 14. mounting blocks; 15. a motion block; 16. a diagonal bar; 17. a fixed block; 18. a limiting port; 19. a limiting shaft; 20. a top box; 21. a round bar; 22. a round block; 23. a fixing hole; 24. a threaded rod; 25. a round button; 26. a chassis; 27. a top frame; 28. a side block; 29. a bolt; 30. pulling the block; 31. a built-in block; 32. a movable arc block; 33. a rigid spring; 34. a short bar; 35. connecting the arc blocks; 36. and fixing the arc block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in FIGS. 1 to 5, in the embodiment of the present invention, a modular fixing structure for installing an indoor sewage pipe comprises a base 1, a bottom case 2 is fixedly installed on the top of the base 1, a top block 3 is fixedly installed on the left side of the top of the bottom case 2, a movable plate 4 is hinged on the right side of the top block 3, the bottom of the movable plate 4 is movably connected with the top of the bottom case 2, a side case 5 is fixedly installed on the bottom of the right side of the bottom case 2, the bottom of the side case 5 is fixedly connected with the top of the base 1, a bearing 6 is fixedly installed inside the left side of the bottom case 2, a lead screw 7 is fixedly sleeved inside the bearing 6, a connecting rod 8 is fixedly connected with the right end of the lead screw 7, the right end of the connecting rod 8 penetrates through the bottom case 2 and extends into the inside of the side case 5 and is movably sleeved with the inner wall of the side case 5, a driven gear 9 positioned inside the side case 5 is fixedly sleeved with the outer surface of the connecting rod 10, a movable rod positioned above the driven gear 9 is movably installed inside the side case 5, the fixed driving gear 13 that has cup jointed of surface of movable rod 10, the surface of driving gear 13 is connected with driven gear 9's surface meshing, the right-hand member of movable rod 10 runs through side case 5 and extends to in the inner wall of side case 5 and fixed mounting has the disc 11 that is located the outside of side case 5, the top fixed mounting on disc 11 right side has handle 12, the surface screw thread of lead screw 7 has cup jointed motion piece 15, the top fixed mounting of motion piece 15 has installation piece 14, the inside of installation piece 14 articulates there is down tube 16, the other end of down tube 16 articulates there is fixed block 17, the top of fixed block 17 and the bottom fixed connection of fly leaf 4.
Wherein, spacing mouth 18 has been seted up at the middle part on base 1 top, and spacing axle 19 has been cup jointed in the inside activity of spacing mouth 18, and spacing mouth 18 is passed and extends to base 1's top and with the bottom fixed connection of motion piece 15 on the top of spacing axle 19, because the cooperation between spacing mouth 18 and the spacing axle 19, will play good limiting displacement to motion piece 15, when lead screw 7 at the pivoted in-process, will make motion piece 15 take place the motion.
Wherein, the top fixed mounting of fly leaf 4 has top case 20, and the top swing joint of top case 20 has chassis 26, and the top swing joint of chassis 26 has roof-rack 27, and the inside activity of top case 20 has cup jointed round bar 21, and the top of round bar 21 and the bottom fixed connection of chassis 26 can rotate in the inside of top case 20 because round bar 21 to the direction to chassis 26 and roof-rack 27 is adjusted.
Wherein, the fixed cover of surface of pole 21 has connect the disk 22 that is located top box 20 inside, and the surface of disk 22 and the inner wall swing joint of top box 20, fixed orifices 23 have been seted up to the surface of disk 22, and fixed orifices 23 evenly encircles in the outside of pole 21 to the staff carries out the fixed of different positions to chassis 26 and roof-rack 27.
Wherein, the threaded rod 24 has been cup jointed to the internal thread of top case 20, the one end of threaded rod 24 runs through top case 20 and extends to the outside and fixed mounting of top case 20 and has round button 25, the other end of threaded rod 24 is located the inside of fixed orifices 23, the inside of fixed orifices 23 is equipped with the screw thread, and the screw thread of the inside of fixed orifices 23 and the screw thread looks adaptation of threaded rod 24 surface, through the cooperation between fixed orifices 23 and the threaded rod 24, will play good fixed action to round bar 21 and circle piece 22.
Wherein, the both sides at chassis 26 top and the equal fixed mounting in both sides of roof-rack 27 bottom have side piece 28, and the inside screw thread of side piece 28 has cup jointed bolt 29, and the top of bolt 29 is located the top of side piece 28, because the cooperation between side piece 28 and the bolt 29, will play good fixed action to chassis 26 and roof-rack 27, also realize the fixed action to sewage pipes simultaneously.
Wherein, chassis 26 and the inside equal fixed mounting of two contained angle departments of roof-rack 27 have built-in piece 31, the inside activity of built-in piece 31 has cup jointed movable arc piece 32, the outer fixed surface of activity arc piece 32 is connected with rigid spring 33, the other end of rigid spring 33 and the inner wall fixed connection of built-in piece 31, because the cooperation between activity arc piece 32 and the rigid spring 33, will effectual buffering external vibration to the effect of protection has been played the blow off pipe.
Wherein, the outer fixed surface of activity arc piece 32 installs quarter butt 34, the other end of quarter butt 34 runs through built-in piece 31 and extends to the outside and fixed mounting of built-in piece 31 and connects arc piece 35, the opposite side fixed mounting who connects arc piece 35 has fixed arc piece 36, the quantity of connecting arc piece 35 and fixed arc piece 36 is four, four are connected arc piece 35 and fixed arc piece 36 and will have played good spacing supporting role to sewage pipes, fixed arc piece 36 adopts elastic rubber to make simultaneously, thereby the surface to sewage pipes has played the guard action.
Wherein, the middle part fixed mounting on roof-rack 27 top has and draws piece 30, owing to draw the design of piece 30 to be convenient for operating personnel to take roof-rack 27.
The working principle and the using process are as follows: when the worker needs to support and fix the sewage draining pipe in an inclined manner, the handle 12 can be rotated at the moment, so that the disc 11 drives the driving gear 13 to rotate through the movable rod 10, the driving gear 13 drives the connecting rod 8 and the lead screw 7 to rotate through the driven gear 9, the movement block 15 moves rightwards, the inclined rod 16 pushes the movable plate 4 to wholly deflect through the fixing block 17, the inclined angles of the bottom frame 26 and the top frame 27 are further changed, so that the sewage draining pipe is supported in an inclined manner, when the worker needs to support and fix the sewage draining pipe in other directions, the round button 25 can be rotated at the moment, so that the threaded rod 24 is separated from the inside of the fixing hole 23, then the bottom frame 26 or the top frame 27 is rotated, so that the position of the bottom frame 26 and the top frame 27 is changed, when the positions of the bottom frame 26 and the top frame 27 meet the requirement of the worker, the round button 25 can be rotated at the, when the sewage pipeline is arranged among the four fixed arc blocks 36, the movable arc blocks 32 and the rigid springs 33 are matched, so that the vibration of the sewage pipeline can be effectively buffered, and the sewage pipeline is well protected.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides an indoor blowdown is modular fixed knot structure for piping erection, includes base (1), its characterized in that: the top of the base (1) is fixedly provided with a bottom box (2), the left side of the top of the bottom box (2) is fixedly provided with a top block (3), the right side of the top block (3) is hinged with a movable plate (4), the bottom of the movable plate (4) is movably connected with the top of the bottom box (2), the bottom of the right side of the bottom box (2) is fixedly provided with a side box (5), the bottom of the side box (5) is fixedly connected with the top of the base (1), the left inside of the bottom box (2) is fixedly provided with a bearing (6), the inside of the bearing (6) is fixedly sleeved with a lead screw (7), the right end of the lead screw (7) is fixedly connected with a connecting rod (8), the right end of the connecting rod (8) penetrates through the bottom box (2), extends to the inside of the side box (5) and is movably sleeved with the inner wall of the side box (5), the outer surface of the connecting rod (8) is fixedly sleeved with a driven gear (9) positioned inside the side box (5), a movable rod (10) positioned above the driven gear (9) is movably arranged in the side box (5), the outer surface of the movable rod (10) is fixedly sleeved with a driving gear (13), the outer surface of the driving gear (13) is meshed and connected with the outer surface of the driven gear (9), the right end of the movable rod (10) penetrates through the side box (5) and extends into the inner wall of the side box (5) and is fixedly provided with a disc (11) positioned outside the side box (5), a handle (12) is fixedly arranged at the top of the right side of the disc (11), a moving block (15) is sleeved on the outer surface of the lead screw (7) in a threaded manner, the top of the motion block (15) is fixedly provided with an installation block (14), the interior of the installation block (14) is hinged with an inclined rod (16), the other end of the diagonal rod (16) is hinged with a fixed block (17), and the top of the fixed block (17) is fixedly connected with the bottom of the movable plate (4).
2. The modular fixing structure for indoor sewage pipes installation according to claim 1, wherein: the middle part of the top end of the base (1) is provided with a limiting port (18), a limiting shaft (19) is movably sleeved inside the limiting port (18), and the top end of the limiting shaft (19) penetrates through the limiting port (18) and extends to the upper part of the base (1) and is fixedly connected with the bottom of the motion block (15).
3. The modular fixing structure for indoor sewage pipes installation according to claim 1, wherein: the top fixed mounting of fly leaf (4) has top case (20), the top swing joint of top case (20) has chassis (26), the top swing joint of chassis (26) has roof-rack (27), round bar (21) have been cup jointed in the inside activity of top case (20), the top of round bar (21) and the bottom fixed connection of chassis (26).
4. The modular fixing structure for indoor sewage pipes installation according to claim 3, wherein: the outer fixed surface of circle pole (21) has cup jointed the circle piece (22) that are located top case (20) inside, the outer surface of circle piece (22) and the inner wall swing joint of top case (20), fixed orifices (23) have been seted up to the surface of circle piece (22).
5. The modular fixing structure for indoor sewage pipes installation according to claim 3, wherein: the internal thread of top case (20) has cup jointed threaded rod (24), the one end of threaded rod (24) runs through top case (20) and extends to the outside and the fixed mounting of top case (20) have round button (25), the other end of threaded rod (24) is located the inside of fixed orifices (23).
6. The modular fixing structure for indoor sewage pipes installation according to claim 3, wherein: the side blocks (28) are fixedly mounted on two sides of the top of the underframe (26) and two sides of the bottom of the top frame (27), bolts (29) are sleeved on the inner threads of the side blocks (28), and the top ends of the bolts (29) are located above the side blocks (28).
7. The modular fixing structure for indoor sewage pipes installation according to claim 3, wherein: the inner wall fixed connection of chassis (26) and roof-rack (27) inside two contained angle departments all have built-in piece (31), the inside activity of built-in piece (31) has cup jointed movable arc piece (32), the surface fixed connection of activity arc piece (32) has rigid spring (33), the other end of rigid spring (33) and the inner wall fixed connection of built-in piece (31).
8. The modular fixing structure for indoor sewage pipes installation according to claim 7, wherein: the outer surface of the movable arc block (32) is fixedly provided with a short rod (34), the other end of the short rod (34) penetrates through the built-in block (31) and extends to the outside of the built-in block (31) and is fixedly provided with a connecting arc block (35), and the other side of the connecting arc block (35) is fixedly provided with a fixed arc block (36).
9. The modular fixing structure for indoor sewage pipes installation according to claim 3, wherein: the middle part of the top end of the top frame (27) is fixedly provided with a pull block (30).
CN202022613289.8U 2020-11-12 2020-11-12 Modular fixed knot constructs for indoor blowdown pipeline installation Active CN214222205U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022613289.8U CN214222205U (en) 2020-11-12 2020-11-12 Modular fixed knot constructs for indoor blowdown pipeline installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022613289.8U CN214222205U (en) 2020-11-12 2020-11-12 Modular fixed knot constructs for indoor blowdown pipeline installation

Publications (1)

Publication Number Publication Date
CN214222205U true CN214222205U (en) 2021-09-17

Family

ID=77697210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022613289.8U Active CN214222205U (en) 2020-11-12 2020-11-12 Modular fixed knot constructs for indoor blowdown pipeline installation

Country Status (1)

Country Link
CN (1) CN214222205U (en)

Similar Documents

Publication Publication Date Title
CN111215404A (en) Be applicable to bellows pipeline inner wall cleaning device
CN210316383U (en) Device is cleared to rubbish in high-rise building construction floor
CN112900762A (en) Balcony sun shield for green building
CN211661442U (en) Steel construction steel pipe arc welding set
CN214222205U (en) Modular fixed knot constructs for indoor blowdown pipeline installation
CN208769704U (en) Basket-hanging facade cleaning device
CN112268574B (en) Outdoor environment monitoring device
CN112361086A (en) Modular fixed knot constructs for indoor blowdown pipeline installation
CN209599143U (en) A kind of dust-proof impact drill of dust
CN217621100U (en) Feeding device for woodworking processing
CN207801197U (en) Outdoor electrical control cabinet based on Internet of Things
CN208407776U (en) A kind of cleaning equipment for solar energy photovoltaic panel
CN101461683A (en) Novel device for wiping glass
CN207119609U (en) A kind of fresh air pipeline cleaning plant
CN114659009A (en) Safety monitoring device based on bridge construction
CN211679164U (en) Cement bin cleaning device
CN210574170U (en) Fire alarm device with adjustable
CN210804511U (en) Automatic management equipment for building engineering materials
CN208725677U (en) A kind of home furnishings intelligent cup cleaner
CN218405874U (en) Dustproof mechanism of making an uproar that falls
CN110547729A (en) Intelligent floor sweeping robot
CN221134147U (en) Environment-friendly drilling device for constructional engineering
CN212359555U (en) Energy-saving easy-to-clean shutter structure
CN219973598U (en) Novel building curtain wall structure
CN214928515U (en) Chinese teaching aid with interactive function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant