CN210804511U - Automatic management equipment for building engineering materials - Google Patents

Automatic management equipment for building engineering materials Download PDF

Info

Publication number
CN210804511U
CN210804511U CN201921920256.9U CN201921920256U CN210804511U CN 210804511 U CN210804511 U CN 210804511U CN 201921920256 U CN201921920256 U CN 201921920256U CN 210804511 U CN210804511 U CN 210804511U
Authority
CN
China
Prior art keywords
bottom plate
equipment
management equipment
stand
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921920256.9U
Other languages
Chinese (zh)
Inventor
周明权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hongtai Engineering Project Management Co ltd
Original Assignee
Zhejiang Hongtai Engineering Project Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hongtai Engineering Project Management Co ltd filed Critical Zhejiang Hongtai Engineering Project Management Co ltd
Priority to CN201921920256.9U priority Critical patent/CN210804511U/en
Application granted granted Critical
Publication of CN210804511U publication Critical patent/CN210804511U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an automatic management equipment of building engineering material, including bottom plate and stand, the lower fixed surface of bottom plate installs the support frame, and is provided with the wheel on the support frame, be provided with on the bottom plate and adjust the structure, the upper and lower both ends of stand all are equipped with coupling mechanism, and the stand passes through coupling mechanism and the bottom plate fixed connection of lower extreme, be provided with control panel on the coupling mechanism of stand upper end position department. A building engineering material automated management equipment, through the wheel that sets up, the cooperation is adjusting the structure and is using, both can conveniently remove whole equipment, can also guarantee the stability of equipment after removing, adopts the vibrating arm simultaneously, the stationarity of equipment when guaranteeing to adjust is convenient for dismantle equipment through the coupling mechanism who sets up, makes things convenient for the staff to transport equipment and carries, practices thrift the space, reduces the difficult degree of transportation.

Description

Automatic management equipment for building engineering materials
Technical Field
The utility model relates to a management equipment field, in particular to building engineering material automated management equipment.
Background
Building materials engineering materials are a general term for materials used in civil engineering and construction. It can be divided into structural material, decorative material and some special materials. The structural materials comprise wood, bamboo, stone, cement, concrete, metal, tiles, ceramics, glass, engineering plastics, composite materials and the like. The decorative material comprises various coatings, paints, plating layers, veneers, ceramic tiles with various colors, glass with special effects and the like; the special material is used for water proofing, moisture proofing, corrosion prevention, fire prevention, flame retardance, sound insulation, heat preservation, sealing and the like. When the engineering materials are used, management and recording are needed, manual management is generally adopted, and management equipment is adopted for efficient and accurate management of the engineering materials; among the current management equipment, equipment or can remove poor stability at that time, or stability height removes the difficulty, can not use in a flexible way during the use, has certain limitation to current management equipment is an overall structure, can not dismantle, need occupy great space during the transport, and the transport is comparatively troublesome.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a building engineering material automated management equipment can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an automatic management equipment of building engineering material, includes bottom plate and stand, the lower fixed surface of bottom plate installs the support frame, and is provided with the wheel on the support frame, be provided with on the bottom plate and adjust the structure, the upper and lower both ends of stand all are equipped with coupling mechanism, and the stand passes through coupling mechanism and the bottom plate fixed connection of lower extreme, be provided with control panel on the coupling mechanism of stand upper end position department, and fixed mounting has the touch-sensitive screen on the control panel, the last position department that is close to the touch-sensitive screen of control panel is provided with raises the sound mouth, and is provided with the switch on the control panel.
Preferably, adjust the structure and include screw rod, vibrating arm, abrasion pad and swiveling wheel, the screw rod runs through to set up on the bottom plate, and screw rod and bottom plate threaded connection, the lower extreme fixed mounting of screw rod has the vibrating arm, and the lower extreme of vibrating arm is provided with the abrasion pad, the upper end fixed mounting of screw rod has the swiveling wheel that is used for the regulation.
Preferably, the vibrating arm includes buffer frame, fixed post, cushion, spring, mount and connecting block, be provided with fixed post in the buffer frame, and the lower extreme fixed mounting of fixed post has the cushion, the inside of buffer frame is located the outer fixed mounting of fixed post and has the spring, the last fixed surface of mount installs the connecting block, and the connecting block is located within the buffer frame, the upper surface of connecting block and the lower extreme fixed connection of spring.
Preferably, the connecting mechanism comprises a first connecting seat, a square small block, a threaded hole, a second connecting seat, a square groove, a through hole and a fastening screw, the square small block is fixedly mounted on the lower surface of the first connecting seat, the threaded hole is formed in the square small block, the square groove is formed in the second connecting seat, the through hole is formed in the second connecting seat, one end of the fastening screw penetrates through the through hole to be in threaded connection with the threaded hole, and the square small block and the fastening screw are fixed in the square groove.
Preferably, the connection mode between support frame and the bottom plate is the welding, and is equipped with the pivot on the support frame, the wheel passes through pivot and support frame swing joint.
Compared with the prior art, the utility model discloses following beneficial effect has: this building engineering material automated management equipment, through the wheel that sets up, the cooperation is adjusting the structure and is using, both can conveniently remove whole equipment, can also guarantee the stability of equipment after removing, adopts the vibrating arm simultaneously, and the stationarity of equipment when guaranteeing to adjust is convenient for dismantle equipment through the coupling mechanism who sets up, makes things convenient for the staff to transport equipment and carries, practices thrift the space, reduces the transportation difficulty degree.
Drawings
Fig. 1 is a schematic view of the overall structure of an automatic management device for construction engineering materials of the present invention;
FIG. 2 is a schematic structural diagram of the bottom plate of the automatic management equipment for construction engineering materials of the present invention;
FIG. 3 is a schematic structural view of a vibrating rod of an automated construction material management apparatus according to the present invention;
fig. 4 is the utility model relates to a building engineering material automated management equipment coupling mechanism's schematic structure diagram.
In the figure: 1. a base plate; 2. a support frame; 3. a wheel; 4. an adjustment structure; 401. a screw; 402. a vibrating rod; 4021. a buffer frame; 4022. fixing the small column; 4023. an elastic pad; 4024. a spring; 4025. a fixed mount; 4026. connecting blocks; 403. a wear pad; 404. a rotating wheel; 5. a column; 6. a connecting mechanism; 601. a first connecting seat; 602. a square small block; 603. a threaded hole; 604. a second connecting seat; 605. a square groove; 606. a through hole; 607. fastening screws; 7. a control panel; 8. a touch screen; 9. a sound raising port; 10. and (4) switching.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-4, an automatic management device for building engineering materials comprises a bottom plate 1 and an upright post 5, wherein a support frame 2 is fixedly installed on the lower surface of the bottom plate 1, wheels 3 are arranged on the support frame 2, an adjusting structure 4 is arranged on the bottom plate 1, connecting mechanisms 6 are respectively arranged at the upper end and the lower end of the upright post 5, the upright post 5 is fixedly connected with the bottom plate 1 through the connecting mechanism 6 at the lower end, a control panel 7 is arranged on the connecting mechanism 6 at the upper end of the upright post 5, a touch screen 8 is fixedly installed on the control panel 7, a sound raising port 9 is arranged at a position, close to the touch screen 8, on the control panel 7, and a switch 10 is arranged on the control;
the adjusting structure 4 comprises a screw 401, a vibrating rod 402, a wear-resistant pad 403 and a rotating wheel 404, the screw 401 is arranged on the bottom plate 1 in a penetrating mode, the screw 401 is in threaded connection with the bottom plate 1, the vibrating rod 402 is fixedly arranged at the lower end of the screw 401, the wear-resistant pad 403 is arranged at the lower end of the vibrating rod 402, and the rotating wheel 404 for adjusting is fixedly arranged at the upper end of the screw 401; the vibrating rod 402 comprises a buffer 4021, a fixed post 4022, an elastic pad 4023, a spring 4024, a fixed frame 4025 and a connecting block 4026, the fixed post 4022 is arranged in the buffer 4021, the elastic pad 4023 is fixedly arranged at the lower end of the fixed post 4022, the spring 4024 is fixedly arranged inside the buffer 4021 and outside the fixed post 4022, the connecting block 4026 is fixedly arranged on the upper surface of the fixed frame 4025, the connecting block 4026 is arranged inside the buffer 4021, and the upper surface of the connecting block 4026 is fixedly connected with the lower end of the spring 4024; the connecting mechanism 6 comprises a first connecting seat 601, a square small block 602, a threaded hole 603, a second connecting seat 604, a square groove 605, a through hole 606 and a fastening screw 607, the square small block 602 is fixedly installed on the lower surface of the first connecting seat 601, the threaded hole 603 is formed in the square small block 602, the square groove 605 is formed in the second connecting seat 604, the through hole 606 is formed in the second connecting seat 604, one end of the fastening screw 607 penetrates through the through hole 606 to be in threaded connection with the threaded hole 603, and the square small block 602 and the fastening screw 607 are fixed in the square groove 605; the connection mode between support frame 2 and bottom plate 1 is the welding, and is equipped with the pivot on the support frame 2, and wheel 3 is through pivot and support frame 2 swing joint.
It should be noted that the utility model relates to an automatic management equipment for building engineering materials, when using, the staff promotes whole equipment, under the drive of wheel 3 on support frame 2, the equipment begins to move, until moving to suitable position, stop the promotion to the equipment, the staff rotates swiveling wheel 404 in the regulation structure 4 on bottom plate 1, swiveling wheel 404 takes screw 401 to rotate, make screw 401 descend relative to bottom plate 1, until wearing pad 403 of the lower end of vibration rod 402 contacts the ground, continue to rotate regulation structure 4, until wheel 3 is lifted off the ground, at this moment the equipment supports on the ground through regulation structure 4, and place on the ground steadily, in the process of adjusting, vibration rod 402 can effectively damp, after wearing pad contacts the ground, the mount 4025 takes connecting block 4026 to compress spring 4 in the buffer 4021 together, the formed buffer ensures the stability during adjustment, improves the stability during adjustment, when the equipment is placed, a worker connects the equipment to a power supply, the power supply is switched on, then the equipment is used, when the equipment is used, the worker turns on the switch 10 on the control panel 7, the touch screen 8 is lightened, relevant personnel record the material entering and exiting through the touch screen 8 and record the material storage position, thereby completing the management work of engineering materials, when the worker searches the material position, the position information is displayed on the touch screen 8, meanwhile, the sound-emitting port 9 plays a voice message to help the worker to acquire information, if the equipment needs to be carried, the power supply can be switched off, the fastening screw 607 in the through hole 606 and the threaded hole 603 is selected, the square small block 602 on the first connecting seat 601 is taken out of the square groove 605 on the second connecting seat 604, thereby dismantle whole equipment, transport each part of equipment afterwards, after transporting to the destination, assemble the device through coupling mechanism 6, connect the power afterwards and can use.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. An automatic management equipment of building engineering material which characterized in that: including bottom plate (1) and stand (5), the lower fixed surface of bottom plate (1) installs support frame (2), and is provided with wheel (3) on support frame (2), be provided with on bottom plate (1) and adjust structure (4), the upper and lower both ends of stand (5) all are equipped with coupling mechanism (6), and stand (5) through coupling mechanism (6) and bottom plate (1) fixed connection of lower extreme, be provided with control panel (7) on coupling mechanism (6) of stand (5) upper end position department, and fixed mounting has touch-sensitive screen (8) on control panel (7), the position department that is close to touch-sensitive screen (8) on control panel (7) is provided with raises sound mouth (9), and is provided with switch (10) on control panel (7).
2. The automatic construction engineering material management equipment according to claim 1, wherein: adjust structure (4) including screw rod (401), vibrating arm (402), abrasion pad (403) and swiveling wheel (404), screw rod (401) run through to set up on bottom plate (1), and screw rod (401) and bottom plate (1) threaded connection, the lower extreme fixed mounting of screw rod (401) has vibrating arm (402), and the lower extreme of vibrating arm (402) is provided with abrasion pad (403), the upper end fixed mounting of screw rod (401) has swiveling wheel (404) that is used for the regulation.
3. The automatic construction engineering material management equipment according to claim 2, wherein: the vibrating rod (402) comprises a buffer frame (4021), fixed small columns (4022), elastic pads (4023), springs (4024), a fixing frame (4025) and connecting blocks (4026), wherein the fixed small columns (4022) are arranged in the buffer frame (4021), the elastic pads (4023) are fixedly arranged at the lower ends of the fixed small columns (4022), the springs (4024) are fixedly arranged outside the fixed small columns (4022) in the buffer frame (4021), the connecting blocks (4026) are fixedly arranged on the upper surface of the fixing frame (4025), the connecting blocks (4026) are located in the buffer frame (4021), and the upper surface of the connecting blocks (4026) is fixedly connected with the lower ends of the springs (4024).
4. The automatic construction engineering material management equipment according to claim 1, wherein: the connecting mechanism (6) comprises a first connecting seat (601), a square small block (602), a threaded hole (603), a second connecting seat (604), a square groove (605), a through hole (606) and a fastening screw (607), the square small block (602) is fixedly installed on the lower surface of the first connecting seat (601), the threaded hole (603) is formed in the square small block (602), the square groove (605) is formed in the second connecting seat (604), the through hole (606) is formed in the second connecting seat (604), one end of the fastening screw (607) penetrates through the through hole (606) to be in threaded connection with the threaded hole (603), and the square small block (602) and the fastening screw (607) are fixed in the square groove (605).
5. The automatic construction engineering material management equipment according to claim 1, wherein: the connection mode between support frame (2) and bottom plate (1) is the welding, and is equipped with the pivot on support frame (2), wheel (3) are through pivot and support frame (2) swing joint.
CN201921920256.9U 2019-11-08 2019-11-08 Automatic management equipment for building engineering materials Active CN210804511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921920256.9U CN210804511U (en) 2019-11-08 2019-11-08 Automatic management equipment for building engineering materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921920256.9U CN210804511U (en) 2019-11-08 2019-11-08 Automatic management equipment for building engineering materials

Publications (1)

Publication Number Publication Date
CN210804511U true CN210804511U (en) 2020-06-19

Family

ID=71233129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921920256.9U Active CN210804511U (en) 2019-11-08 2019-11-08 Automatic management equipment for building engineering materials

Country Status (1)

Country Link
CN (1) CN210804511U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111768532A (en) * 2020-06-24 2020-10-13 杭州职业技术学院 Information acquisition device for student management

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111768532A (en) * 2020-06-24 2020-10-13 杭州职业技术学院 Information acquisition device for student management

Similar Documents

Publication Publication Date Title
CN203808464U (en) Automatic microcomputer wall plastering machine
CN210804511U (en) Automatic management equipment for building engineering materials
CN213115525U (en) Building templates demolishs device
CN210500339U (en) Fine adjustment lifting mechanism of pulp filling robot for hanging net
CN207959875U (en) A kind of construction scaffold
CN211891503U (en) Drilling support for building engineering
CN208473262U (en) A kind of decorative engineering ceramic tile installation supplementary structure
CN213683344U (en) Supporting device for building engineering detection
CN212718377U (en) Anti-seismic support and hanger structure
CN211080716U (en) Keelless ceramic stone dry hanging piece
CN210482684U (en) Environment-friendly building curtain
CN209784155U (en) Architectural decoration detects structure
CN207248716U (en) A kind of face brick adhesive strength device that subject detection is built for room
CN207177315U (en) A kind of build concrete hollow brick masonry device
CN219576504U (en) Integrated SMC composite cable bridge
CN114808607B (en) Rapid construction flattening device based on municipal road engineering
CN110821016B (en) Green building curtain
CN217951848U (en) Measuring tool is used in building engineering cost design
CN209653341U (en) A kind of construction scaffold
CN220319183U (en) Safety protection equipment for building engineering
CN114738615A (en) Building materials consumption control management device for engineering management
CN214223016U (en) Mobile monitoring and lighting equipment for building construction
CN219012076U (en) Structure is built in quick detachable interim room
CN219031572U (en) Simple movable lifting device for toughened glass
CN216809670U (en) Water conservancy construction protector for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant