CN110821016B - Green building curtain - Google Patents
Green building curtain Download PDFInfo
- Publication number
- CN110821016B CN110821016B CN201910990680.9A CN201910990680A CN110821016B CN 110821016 B CN110821016 B CN 110821016B CN 201910990680 A CN201910990680 A CN 201910990680A CN 110821016 B CN110821016 B CN 110821016B
- Authority
- CN
- China
- Prior art keywords
- sleeve
- cushion
- spring
- vertical plate
- riser
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Building Environments (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The invention discloses a green environment-friendly building curtain wall which comprises a keel and thick rods, wherein the right end of the keel is fixedly connected with a plurality of thick rods, the left side of a rotating assembly is provided with a limiting assembly, the left side of the outer wall of the rotating assembly is sleeved with an anti-skidding sleeve, the outer side of the rotating assembly is provided with an installation assembly, and the installation assembly is tightly attached to a stone plate. This green building curtain, through first sleeve, the slabstone, the second riser, the first riser, the cushion, first spring, the screw, cooperation between slider and the apron, it still needs the problem that will take out in each curtain gap department to remove fixed when changing specific curtain to have solved prior art, through the fixture block, the second sleeve, the draw-in groove, the diaphragm, the second spring, the down tube, cooperation between second riser and the slabstone, the rotation restriction of having solved prior art curtain realization installation leads to the too big problem that leads to the easy appearance fracture of partial curtain surface tension.
Description
Technical Field
The invention relates to the technical field of buildings, in particular to a green environment-friendly building curtain wall.
Background
The building curtain wall refers to an outer wall enclosure without bearing the weight of a building, and generally comprises panel glass, metal plates, stone plates, ceramic plates and the like, a rear supporting structure aluminum beam upright post, a steel structure, a glass rib and the like, the building curtain wall consists of a supporting structure system and a panel, can have certain displacement capacity relative to a main structure, and does not share the outer building protective structure or decorative structure acted on the main structure.
Disclosure of Invention
The invention aims to provide a green environment-friendly building curtain wall, which solves the problems that in the background technology, when a specific curtain wall is replaced, the fixation is released, and the curtain wall still needs to be taken out from the gap of each curtain wall, and meanwhile, the problem that the curtain wall is easy to crack due to overlarge surface tension of a part of the curtain wall caused by rotation limitation of the installation position of the curtain wall still exists.
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides a green building curtain, includes fossil fragments and thick pole, the right-hand member rigid coupling of fossil fragments has a plurality of thick poles, rotating assembly is all installed to the outer wall right side of thick pole, spacing subassembly is installed in rotating assembly's left side, anti-skidding cover has been cup jointed in rotating assembly's outer wall left side, the installation component is installed in rotating assembly's the outside, the installation component closely laminates with the slabstone.
Preferably, the rotating assembly comprises a second rubber mat, a rotary table, inclined rods, a bearing, a second vertical plate and a second sleeve, the inside of the rotary table is connected with the thick rods through the bearing in a rotating mode, the outer side of the rotary table is fixedly connected with the second vertical plate through the four inclined rods, the right end of the second vertical plate is fixedly connected with the second rubber mat, the second rubber mat is tightly attached to the stone plate, and the left end of the rotary table is fixedly connected with the second sleeve.
Preferably, the four inclined rods are respectively distributed in an included angle.
Preferably, the mounting assembly comprises a first vertical plate, a first sleeve, a cover plate, a first rubber mat, a first spring, a connecting rod, a cushion block, screws, a sliding block and sliding grooves, the upper end and the lower end of each sliding block are connected with the inner wall of a second vertical plate through the connecting rod, the outer side of each sliding block is provided with the first sleeve, the sliding grooves are machined in the first sleeve, the first vertical plate is arranged on the left side of each first sleeve, the first spring is arranged on the right side of each first vertical plate, the left side and the right side of each first spring are respectively fixedly connected with the first vertical plate and the second vertical plate, the cushion block is arranged on the left side of the inner portion of each first spring and is fixed at the right end of the first vertical plate, the cover plate is fixedly connected at the right end of each first sleeve, the first sleeve is in clearance fit with the first vertical plate, the first rubber mat, the stone slab and the second rubber mat, the first rubber mat is fixedly connected at the left end of, the screw is connected with the cover plate, the first sleeve and the sliding block in a threaded mode, and the first rubber pad is tightly attached to the stone plate.
Preferably, a sliding structure is formed between the sliding groove and the sliding block.
Preferably, the mounting position of the screw is on the bevel angle of the stone plate.
Preferably, spacing subassembly includes third riser, draw-in groove, fixture block, diaphragm, second spring, montant and roof, the third riser rigid coupling is at the left side outer wall of thick pole, the third riser rotates with first sleeve and links to each other, and is a plurality of the draw-in groove is all processed in the outer wall left side of thick pole, top the inside of draw-in groove is equipped with the fixture block, the upper end rigid coupling of fixture block has the diaphragm to be fixed continuous with the montant, the upper end rigid coupling of montant has the roof, and montant and third riser clearance fit, the outer wall of montant is equipped with the second spring, the upper and lower both sides of second spring are fixed continuous with third riser and diaphragm respectively.
Preferably, a clamping structure is formed between the clamping block and the upper clamping groove.
Compared with the prior art, the invention has the beneficial effects that: this green building curtain, through the first sleeve, the slabstone, the second riser, the first riser, the cushion, first spring, a screw, cooperation between slider and the apron, make and inject first sleeve to extreme position and screw up the screw after corresponding slabstone and second riser position, only need to unscrew the screw and can open the realization slabstone and pop out when needs are changed to the slabstone, the problem of prior art remove fixed still need will take out in each curtain gap department when changing specific curtain has been solved, through the fixture block, the second sleeve, the draw-in groove, the diaphragm, the second spring, the down tube, cooperation between second riser and the slabstone, the restriction is rotated to the second riser that makes the installation of realization slabstone four corners through the restriction between fixture block and the draw-in groove, the rotation restriction of having solved prior art curtain realization installation leads to partial curtain surface tension too big problem that leads to the fracture to appear easily.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic cross-sectional structural view of the inventive structure;
FIG. 3 is a left side cross-sectional view of the first sleeve, slide and link of FIG. 2;
FIG. 4 is a schematic view of the structure of FIG. 2 at the second spring, slate and keel;
FIG. 5 is a schematic view from the right of the keel, slab and screw of FIG. 1;
figure 6 is a left side view of the keel, slate and diagonal of figure 1.
In the figure: 1. keel, 2, mounting component, 201, first riser, 202, first sleeve, 203, cover plate, 204, first cushion, 205, first spring, 206, connecting rod, 207, cushion block, 208, screw, 209, slider, 210, spout, 3, rotating assembly, 301, second cushion, 302, carousel, 303, down tube, 304, bearing, 305, second riser, 306, second sleeve, 4, spacing subassembly, 401, third riser, 402, draw-in groove, 403, fixture block, 404, diaphragm, 405, second spring, 406, montant, 407, roof, 5, thick pole, 6, slabstone, 7, antiskid cover.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution: the utility model provides a green building curtain, including fossil fragments 1 and thick pole 5, fossil fragments 1's right-hand member rigid coupling has a plurality of thick poles 5, fossil fragments 1 can support a plurality of thick poles 5, rotating assembly 3 is all installed on thick pole 5's outer wall right side, spacing subassembly 4 is installed in rotating assembly 3's left side, anti-skidding cover 7 has been cup jointed on rotating assembly 3's outer wall left side, it slides to appear when rotating assembly 3's left side is rotated in anti-skidding cover 7, installation component 2 is installed in rotating assembly 3's the outside, installation component 2 closely laminates with slabstone 6.
The rotating component 3 comprises a second rubber cushion 301, a rotating disc 302, inclined rods 303, bearings 304, a second vertical plate 305 and a second sleeve 306, the inside of the rotating disc 302 is rotatably connected with the thick rods 5 through the bearings 304, the thick rods 5 can rotatably support the rotating disc 302 through the bearings 304, the outer side of the rotating disc 302 is fixedly connected with the second vertical plate 305 through four inclined rods 303, the rotating disc 302 can drive the second vertical plate 305 to rotate through a plurality of inclined rods 303, the right end of the second vertical plate 305 is fixedly connected with the second rubber cushion 301, the second vertical plate 305 can support the second rubber cushion 301, the second rubber cushion 301 is tightly attached to the stone plate 6, the friction force between the stone plate 6 and the second rubber cushion 301 is increased, the left end of the rotating disc 302 is fixedly connected with the second sleeve 306, the second sleeve 306 can drive the rotating disc 302 to rotate, the outer wall of the second sleeve 306 is sleeved with the non-slip sleeve 7, the first rubber cushion 204 and the second rubber cushion 301 are made of rubber material, the four diagonal rods 303 are respectively distributed at 90-degree included angles, so that the diagonal rods 303 are used for supporting the four-corner stone plates 6.
The mounting component 2 comprises a first vertical plate 201, a first sleeve 202, a cover plate 203, a first rubber cushion 204, a first spring 205, a connecting rod 206, a cushion block 207, a screw 208, a sliding block 209 and a sliding groove 210, wherein the upper end and the lower end of each of four sliding blocks 209 pass through the inner walls of the connecting rod 206 and the second vertical plate 305, the second vertical plate 305 can support the sliding block 209 through the connecting rod 206, the first sleeve 202 is arranged outside the sliding block 209 and limits the relative position of the sliding block 209 and the first sleeve 202, the first sleeve 202 is in clearance fit with the sliding block 209, the sliding groove 210 is processed inside the first sleeve 202, the first vertical plate 201 is arranged on the left side of the first sleeve 202 and limits the relative position of the first sleeve 202 and the first vertical plate 201, the first spring 205 is arranged on the right side of the first vertical plate 201, the elastic coefficient K of the first spring 205 is 500N/m, the left side and the right side of the first spring 205 are fixedly connected with the first vertical plate, the first vertical plate 201 can stretch the first spring 205 by moving leftwards, the cushion block 207 is arranged on the left side inside the first spring 205, the first sleeve 202 is in contact with the cushion block 207, the cushion block 207 is fixed at the right end of the first vertical plate 201, the cushion block 207 supports the first vertical plate 201, the right end of the first sleeve 202 is fixedly connected with the cover plate 203, the cover plate 203 can drive the first sleeve 202 to move, the first sleeve 202 is in clearance fit with the first vertical plate 201, the first rubber pad 204, the stone plate 6 and the second rubber pad 301, the first sleeve 202 can move inside the first vertical plate 201, the first rubber pad 204, the stone plate 6 and the second rubber pad 301, the first rubber pad 204 is fixedly connected with the left end of the cover plate 203, the cover plate 203 is internally provided with a screw 208, the screw 208 is in threaded connection with the cover plate 203, the first sleeve 202 and the sliding block 209, and the position fixing among the cover plate 203, the first sleeve 202 and the sliding block 209 can be realized by screwing the screw, first cushion 204 and slabstone 6 closely laminate, make the frictional force of the slabstone 6 left and right sides all enough fixed, constitute sliding structure between spout 210 and the slider 209, spout 210 can restrict the both ends extreme position of slider 209, and the mounted position of screw 208 makes the fixed position that can realize slabstone 6 in the four corners rigidity of slabstone 6 on the 45 degrees oblique angles of slabstone 6.
The limiting component 4 comprises a third vertical plate 401, a clamping groove 402, a clamping block 403, a transverse plate 404, a second spring 405, a vertical rod 406 and a top plate 407, the third vertical plate 401 is fixedly connected to the outer wall of the left side of the thick rod 5, the thick rod 5 can support the third vertical plate 401, the third vertical plate 401 is in clearance fit with the first sleeve 202, the first sleeve 202 can rotate inside the third vertical plate 401, a plurality of clamping grooves 402 are all processed on the left side of the outer wall of the thick rod 5, the clamping block 403 is arranged inside the upper clamping groove 402 to limit the relative positions of the clamping groove 402 and the clamping block 403, the transverse plate 404 is fixedly connected to the upper end of the clamping block 403, the vertical rod 406 can drive the clamping block 404 to move, the top plate 406 is fixedly connected to the upper end of the vertical rod 406, the top plate 407 can drive the vertical rod 406 to move, the vertical rod 406 is in clearance fit with the third vertical plate 401, the vertical rod 406 can move inside the third vertical plate 401, the elastic coefficient K of the second spring 405 is 400N/m, the upper side and the lower side of the second spring 405 are fixedly connected with the third vertical plate 401 and the transverse plate 404 respectively, the transverse plate 404 moves upwards to extrude the second spring 405, a clamping structure is formed between the clamping block 403 and the clamping groove 402 above, and the clamping groove 402 can limit the position of the clamping block 403.
When the green environment-friendly building curtain wall is required to be installed and used, firstly, the thick rod 5 with the rotating component 3 can be fixed on a plurality of corresponding positions on the right side of the keel 1, due to installation errors, a user can pull the top plate 407 upwards to enable the transverse plate 404 to drive the clamping blocks 403 to move upwards to extrude the second springs 405, meanwhile, the second sleeve 306 is rotated to drive the four second vertical plates 305 to rotate, the positions of the second vertical plates 305, which are distributed at 45 degrees with the vertical horizontal direction, are rotated, then the clamping blocks 403 are inserted into the corresponding clamping grooves 402 by loosening the top plate 407, the specific positions of the four second vertical plates 305 are fixed, then, the corresponding through holes of the stone slab 6 are preset to correspond to the internal through holes of the second vertical plates 305, the first sleeve 202 is pushed leftwards at the corresponding through holes, the first sleeve 202 is enabled to move on the outer wall of the sliding block 209, and meanwhile, the first sleeve 202 can drive the first vertical plates 201, the first spring 205 is stretched, the screws 208 can be screwed at the center of the cover plate 203 at the extreme position pushed leftward, the position installation of the stone slab 6 can be completed after the screws 208 are screwed at the four corners of the stone slab 6, the rotation of the four second vertical plates 305 at the position for fixing the stone slab 6 is limited in the use process, the problem that the surface tension of part of the stone slab 6 is overlarge due to the fact that the rotation positions of the four second vertical plates 305 are fixed by the stone slab 6 is solved, if one of the stone slabs 6 needs to be replaced after being used for a period of time, a user can screw down the screws 208 corresponding to the four corners of the stone slab 6, the stone slab 6 can be pushed out rightward by the elasticity of the first spring 205, and the stone slab 6 can be conveniently taken down.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.
In the present invention, unless otherwise expressly specified or limited, the terms "mounted," "disposed," "connected," "secured," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; the terms may be directly connected or indirectly connected through an intermediate, and may be communication between two elements or interaction relationship between two elements, unless otherwise specifically limited, and the specific meaning of the terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (1)
1. The utility model provides a green building curtain, includes fossil fragments (1) and thick pole (5), the right-hand member rigid coupling of fossil fragments (1) has a plurality of thick poles (5), its characterized in that: the outer wall right side of thick pole (5) all installs rotating assembly (3), spacing subassembly (4) are installed in the left side of rotating assembly (3), antiskid cover (7) have been cup jointed on the outer wall left side of rotating assembly (3), installation component (2) are installed to the outside of rotating assembly (3), installation component (2) closely laminate with slabstone (6), rotating assembly (3) include second cushion (301), carousel (302), down tube (303), bearing (304), second riser (305) and second sleeve (306), the inside of carousel (302) all rotates with thick pole (5) through bearing (304) and links to each other, the outside of carousel (302) all links to each other with second riser (305) through four down tube (303) are fixed, the right-hand member rigid coupling of second riser (305) has second cushion (301), second cushion (301) closely laminate with slabstone (6), the left end of the turntable (302) is fixedly connected with a second sleeve (306), four inclined rods (303) are distributed at 90-degree included angles respectively, the mounting assembly (2) comprises a first vertical plate (201), the first sleeve (202), a cover plate (203), a first rubber cushion (204), a first spring (205), a connecting rod (206), a cushion block (207), a screw (208), a sliding block (209) and a sliding groove (210), the upper end and the lower end of the sliding block (209) pass through the inner walls of the connecting rod (206) and the second vertical plate (305), the first sleeve (202) is arranged on the outer side of the sliding block (209), the sliding groove (210) is machined in the first sleeve (202), the first vertical plate (201) is arranged on the left side of the first sleeve (202), the first spring (205) is arranged on the right side of the first vertical plate (201), and the left side and right side of the first spring (205) are fixedly connected with the first vertical plate (201) and the second vertical plate (305) respectively, the utility model discloses a set up the spring, including first spring (205), cushion (207) and first sleeve (202), first sleeve (202) and first riser (201), first cushion (204), slabstone (6) and second cushion (301) are fixed to the right-hand member rigid coupling of first spring (205) is equipped with cushion (207) on the left side in inside, and first sleeve (202) and first riser (201), first cushion (203) and the equal clearance fit of second cushion (301), the left end rigid coupling of apron (203) has first cushion (204), the inside of apron (203) is equipped with screw (208), screw (208) and apron (203), first sleeve (202) and the equal threaded connection of slider (209), first cushion (204) and slabstone (6) closely laminate, constitute sliding construction between spout (210) and slider (209), the mounted position of screw (208) is on the 45 degrees oblique angles of slabstone (6), spacing subassembly (4) include third riser (401), A clamping groove (402), a clamping block (403), a transverse plate (404), a second spring (405), a vertical rod (406) and a top plate (407), the third vertical plate (401) is fixedly connected to the outer wall of the left side of the thick rod (5), the third vertical plate (401) is in clearance fit with the first sleeve (202), the clamping grooves (402) are all machined on the left side of the outer wall of the thick rod (5), a clamping block (403) is arranged in the clamping groove (402) above the clamping grooves, the upper end of the clamping block (403) is fixedly connected with a transverse plate (404) and a vertical rod (406), the upper end of the vertical rod (406) is fixedly connected with a top plate (407), the vertical rod (406) is in clearance fit with the third vertical plate (401), the outer wall of the vertical rod (406) is provided with a second spring (405), the upper side and the lower side of the second spring (405) are respectively fixedly connected with a third vertical plate (401) and a transverse plate (404), and a clamping structure is formed between the clamping block (403) and the upper clamping groove (402).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910990680.9A CN110821016B (en) | 2019-10-18 | 2019-10-18 | Green building curtain |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910990680.9A CN110821016B (en) | 2019-10-18 | 2019-10-18 | Green building curtain |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110821016A CN110821016A (en) | 2020-02-21 |
CN110821016B true CN110821016B (en) | 2021-01-29 |
Family
ID=69549509
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910990680.9A Active CN110821016B (en) | 2019-10-18 | 2019-10-18 | Green building curtain |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110821016B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622401A (en) * | 2020-06-23 | 2020-09-04 | 上海市机械施工集团有限公司 | Node connecting device between curtain wall structure and building main body |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109457938A (en) * | 2018-12-11 | 2019-03-12 | 上海市建筑装饰工程集团有限公司 | It is a kind of for installing the scaffold of stone curtain wall |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10300662B4 (en) * | 2003-01-10 | 2009-04-09 | Fkn Fassaden Gmbh & Co.Kg | building facade |
CN202899367U (en) * | 2012-10-30 | 2013-04-24 | 湖南省金为型材有限公司 | Connection component used for installation of curtain wall boards |
WO2015051545A1 (en) * | 2013-10-12 | 2015-04-16 | 杨东佐 | Architectural curtain wall |
CN105507537B (en) * | 2015-07-03 | 2019-04-05 | 陆星但 | It freely assembles and disassembles, the building decoration panel dried hanging hang structure of size independent assortment |
CN205012520U (en) * | 2015-07-24 | 2016-02-03 | 杭州斯泰新材料技术有限公司 | Spacing type screw in formula back of body is tied |
CN206408799U (en) * | 2016-12-12 | 2017-08-15 | 深圳市海腾建设工程有限公司 | A kind of convenient curtain wall installed |
CN207700472U (en) * | 2017-12-11 | 2018-08-07 | 江苏龙升节能科技股份有限公司 | Spring connection installation curtain wall construction |
CN208430680U (en) * | 2018-05-22 | 2019-01-25 | 武汉博宏建设有限公司 | A kind of section construction curtain wall |
CN108951976B (en) * | 2018-09-18 | 2020-06-19 | 温州瓯林电子科技有限公司 | Efficient glass curtain wall and disassembling and assembling method thereof |
CN109707165A (en) * | 2018-12-11 | 2019-05-03 | 上海市建筑装饰工程集团有限公司 | A kind of construction method of stone curtain wall |
-
2019
- 2019-10-18 CN CN201910990680.9A patent/CN110821016B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109457938A (en) * | 2018-12-11 | 2019-03-12 | 上海市建筑装饰工程集团有限公司 | It is a kind of for installing the scaffold of stone curtain wall |
Also Published As
Publication number | Publication date |
---|---|
CN110821016A (en) | 2020-02-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215563647U (en) | Mounting structure of building curtain wall | |
CN110821016B (en) | Green building curtain | |
CN112360164A (en) | Assembled auxiliary supporting device for installation of building wallboard | |
CN111677155B (en) | Building curtain wall mechanism | |
CN219394764U (en) | Angle-adjustable solar photovoltaic power generation panel bracket | |
CN218643648U (en) | Prefabricated assembly type reinforcing bar building carrier plate | |
CN215636088U (en) | Height-adjustable television hanger convenient to move and fix | |
CN214905579U (en) | Exhibition stand structure matched with screen | |
CN212898062U (en) | Large-scale glass door is with adjusting mechanism that levels | |
CN209994314U (en) | Distributed photovoltaic module ground mounting structure | |
CN213333442U (en) | Information acquisition device based on green building construction technology | |
CN211175980U (en) | Adjustable fixed stay frame of supervisory equipment | |
CN211223491U (en) | Glass curtain wall protective structure | |
CN215532962U (en) | Landscape design is display device for drawing with overall protective structure | |
CN218626344U (en) | Building perimeter long cylinder type monitoring camera | |
CN214145214U (en) | Upper suspension type barrier-free push-pull assembly convenient to install | |
CN219710854U (en) | Installation component convenient to use | |
CN214613621U (en) | Bridge V type mound concrete support frame | |
CN217003404U (en) | Wear-resisting type antidetonation support of convenient height-adjusting | |
CN213682925U (en) | Modular connecting structure for laminated glass handrail | |
CN215604576U (en) | Movable display device for environmental art design | |
CN218441438U (en) | Fixing device of spliced screen | |
CN220261379U (en) | Glazing equipment for ceramic bowl production | |
CN214884788U (en) | Light steel keel with strong bearing capacity | |
CN215330759U (en) | Architectural decoration glass curtain wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210112 Address after: 518000 901, block a, chuanglingtong technology building, Shihua Road, Fubao community, Fubao street, Futian District, Shenzhen City, Guangdong Province Applicant after: Shenzhen the Great Wall Decoration Group Co.,Ltd. Address before: 411100 No. 52, Xiacheng rural United Village, Yuetang District, Xiangtan City, Hunan Province Applicant before: Zuo Jian |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |