CN214197921U - Fixing device of geological disaster monitoring equipment - Google Patents
Fixing device of geological disaster monitoring equipment Download PDFInfo
- Publication number
- CN214197921U CN214197921U CN202120059344.5U CN202120059344U CN214197921U CN 214197921 U CN214197921 U CN 214197921U CN 202120059344 U CN202120059344 U CN 202120059344U CN 214197921 U CN214197921 U CN 214197921U
- Authority
- CN
- China
- Prior art keywords
- wall
- fixing
- monitoring equipment
- box
- geological disaster
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 52
- 230000001681 protective effect Effects 0.000 claims abstract description 18
- 238000001514 detection method Methods 0.000 claims abstract description 6
- 238000009434 installation Methods 0.000 claims description 18
- 238000005192 partition Methods 0.000 claims description 5
- 239000000428 dust Substances 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 abstract description 3
- 230000002159 abnormal effect Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012806 monitoring device Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Landscapes
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
The utility model discloses a fixing device of geological disaster monitoring equipment, which relates to the field of geological disaster monitoring and aims at the existing geological disaster monitoring and fixing problem, the following proposal is proposed, which comprises a horizontal plate, the outer wall of the top of the horizontal plate is fixedly connected with a protective fixing box, and the inner wall of the bottom of the protective fixing box is fixedly connected with a mounting fixing block, the outer wall of the top of both ends of the mounting fixing block is provided with a threaded hole, a sleeve seat is arranged above the threaded hole, the outer wall of both ends of the sleeve seat is provided with a fixing pad, and the outer wall of the top of the fixing pad and the sleeve seat are provided with a placing hole, the placing hole is matched with the threaded hole, the threaded hole and the inner wall of the placing hole are connected through bolts, the utility model discloses a level gauge which is arranged at one side by the horizontal plate, the fixing device is convenient to be placed at the horizontal position, the detection quality is improved, and passes through the protective fixing box arranged at the top of the horizontal plate, can prevent that the bolt of being connected between fixed block and the cover cylinder seat from being corroded, influencing later stage maintenance.
Description
Technical Field
The utility model relates to a geological disasters monitoring field especially relates to a geological disasters monitoring facilities's fixing device.
Background
The geological disaster monitoring equipment is generally used for monitoring natural geological disasters, and comprises the steps that under the action of power in the earth, external power or artificial geological power, the earth generates abnormal energy release, material movement, deformation displacement of rock and soil bodies, abnormal change of the environment and the like, and due to uncertainty of monitoring regions and timeliness of monitoring time, the monitoring equipment needs to be capable of being rapidly installed in different complex terrain areas such as plains, mountainous areas and the like and has the function of rapid temporary installation;
however, most of the existing fixing devices are installed on the concrete ground with a horizontal surface through bolts, the concrete foundation needs to be built, the horizontal position of the concrete foundation surface needs to be kept, the installation mode is not only low in efficiency, but also the installation device can not be installed temporarily, and inconvenience is brought to maintenance of the monitoring equipment which needs to be taken down in the later period.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a fixing device of geological disaster monitoring equipment.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a fixing device of geological disaster monitoring equipment comprises a horizontal plate, wherein a protective fixing box is fixedly connected to the outer wall of the top of the horizontal plate, an installation fixing block is fixedly connected to the inner wall of the bottom of the protective fixing box, threaded holes are formed in the outer walls of the tops of two ends of the installation fixing block, a sleeve seat is installed above the threaded holes, fixing pads are installed on the outer walls of two ends of the sleeve seat, placing holes are formed in the outer walls of the tops of the fixing pads and the sleeve seat, the placing holes are matched with the threaded holes, the threaded holes and the inner wall of the placing holes are connected through bolts, the outer wall of the top end of the sleeve seat penetrates through the protective fixing box, mounting holes are formed in the outer wall of the sleeve seat, the mounting holes are located in the outer wall of the sleeve seat and fixedly connected with a fixing mechanism, the fixing mechanism comprises a fixing box, a stretching rod, a sliding block and a clamping head, the fixing box is fixedly connected with the outer wall of the sleeve seat, and one side of the fixing box is provided with a fixing hole, fixed orifices inner wall and tensile pole sliding connection, and tensile pole outer wall has cup jointed extension spring, tensile pole, extension spring end all with sliding block fixed connection, and sliding block one side outer wall and joint fixed connection, joint and mounting hole sliding connection, the bracing piece has been cup jointed to cover sleeve seat top inner wall, and the bracing piece outer wall is connected with the joint, and the fixed slot that the equidistance distributed is seted up to the bracing piece outer wall.
Preferably, bracing piece top outer wall fixedly connected with monitoring facilities case, and monitoring facilities incasement wall fixedly connected with division board, check out test set has been placed to the division board, and the monitoring facilities bottom of the case portion is close to the bracing piece both ends outer wall and all installs the intake pipe, the filter mantle has all been cup jointed to the intake pipe end, and monitoring facilities incasement outer wall articulates there is the guard gate, and guard gate and monitoring facilities case handing-over department install the sealing washer, and the guard gate outer wall is opened there is the observation groove, and transparent observation window is installed to the observation groove inner wall.
Preferably, the outer wall of one side of the horizontal plate is provided with a mounting groove, and the inner wall of the mounting groove is provided with a level gauge.
Preferably, the top end of the stretching rod is fixedly connected with a stretching handle, and the outer wall of the stretching handle is provided with a rubber sleeve.
Preferably, the outer wall of the bottom of the horizontal plate is provided with a fixing rod, and the tail end of the fixing rod is of a conical structure.
Preferably, the outer wall of the top of the monitoring equipment box is provided with an air outlet, and the air outlet is positioned on the outer wall of the top of the monitoring equipment box and provided with a dust baffle.
The utility model has the advantages that:
1. in the utility model, the fixing device is conveniently placed at a horizontal position through the level gauge installed at one side of the horizontal plate, the detection quality is improved, and the bolt connected between the fixing block and the sleeve seat can be prevented from being rusted to influence the later maintenance through the protective fixing box installed at the top of the horizontal plate;
cup joint through cover barrel holder and bracing piece, can conveniently fix the monitoring facilities case to reach quick interim installation, at the fixed establishment through cover barrel holder installation, fixed box, sliding block, joint, extension spring and the tensile pole of fixed establishment installation mutually support, can adjust according to monitoring facilities case needs position.
2. The detection equipment can be placed inside through the monitoring equipment box arranged at the top end of the supporting rod, so that the detection equipment can be protected from being damaged by natural weather, and the service life of the monitoring equipment is prolonged;
the fixing rod installed at the bottom of the horizontal plate can be conveniently fixed on unstable ground such as a slope, and the fixing rod is convenient to install and improves the installation efficiency.
Drawings
Fig. 1 is the utility model provides a geological disaster monitoring facilities's fixing device's section structure sketch map.
Fig. 2 is the utility model provides a geological disaster monitoring equipment's fixing device's fixed establishment structure sketch map.
Fig. 3 is a schematic structural diagram of a in fig. 1 according to the present invention.
In the figure: the device comprises a horizontal plate 1, a protective fixing box 2, a fixing block 3, a sleeve seat 4, a fixing pad 5, a fixing mechanism 6, a fixing box 7, a stretching rod 8, a sliding block 9, a clamping joint 10, a stretching spring 11, a supporting rod 12, a monitoring equipment box 13, a partition plate 14, a level 15 and a fixing rod 16.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a fixing device of a geological disaster monitoring device comprises a horizontal plate 1, wherein an installation groove is formed in the outer wall of one side of the horizontal plate 1, a level gauge 15 is installed on the inner wall of the installation groove, a protective fixing box 2 is fixedly connected to the outer wall of the top of the horizontal plate 1, an installation fixing block 3 is fixedly connected to the inner wall of the bottom of the protective fixing box 2, threaded holes are formed in the outer walls of the tops of two ends of the installation fixing block 3, a sleeve seat 4 is installed above the threaded holes, fixing pads 5 are installed on the outer walls of two ends of the sleeve seat 4, and placing holes are formed in the fixing pads 5 and the outer wall of the top of the sleeve seat 4;
the placing hole is matched with the threaded hole, the threaded hole is connected with the inner wall of the placing hole through a bolt, the outer wall of the top end of the sleeve seat 4 penetrates through the protective fixing box 2, the outer wall of the sleeve seat 4 is provided with a mounting hole, the mounting hole is positioned on the outer wall of the sleeve seat 4 and is fixedly connected with a fixing mechanism 6, the fixing mechanism 6 comprises a fixing box 7, a stretching rod 8, a sliding block 9 and a clamping head 10, the fixing box 7 is fixedly connected with the outer wall of the sleeve seat 4, the outer wall of one side of the fixing box 7 is provided with a fixing hole, the inner wall of the fixing hole is connected with the stretching rod 8 in a sliding mode, the outer wall of the stretching rod 8 is sleeved with a stretching spring 11, the top end of the stretching rod 8 is fixedly connected with a stretching handle, and the outer wall of the stretching handle is provided with a rubber sleeve;
the tail ends of the stretching rod 8 and the stretching spring 11 are fixedly connected with the sliding block 9, the outer wall of one side of the sliding block 9 is fixedly connected with the clamping joint 10, the clamping joint 10 is connected with the mounting hole in a sliding mode, the inner wall of the top end of the sleeve seat 4 is sleeved with the supporting rod 12, the outer wall of the supporting rod 12 is connected with the clamping joint 10, fixing grooves distributed at equal intervals are formed in the outer wall of the supporting rod 12, the outer wall of the top of the supporting rod 12 is fixedly connected with the monitoring equipment box 13, the inner wall of the monitoring equipment box 13 is fixedly connected with the partition plate 14, and the partition plate 14 is provided with detection equipment;
13 top outer walls of monitoring facilities case are opened there is the venthole, and the venthole is located 13 top outer walls of monitoring facilities case and installs the dust board, and the intake pipe is all installed near bracing piece 12 both ends outer wall in 13 bottoms of monitoring facilities case, the filter mantle has all been cup jointed to the intake pipe end, and 13 outer walls of monitoring facilities case articulate has the guard gate, and guard gate and 13 handing-over departments of monitoring facilities case install the sealing washer, and the guard gate outer wall is opened there is the observation groove, and transparent observation window is installed to the observation groove inner wall, dead lever 16 is installed to 1 bottom outer wall of horizontal plate, and 16 ends of dead lever are the toper structure.
The working principle is as follows: the fixing device is conveniently placed in a horizontal position through the level gauge 15 arranged on one side of the horizontal plate 1, and the bolt connected between the fixing block 3 and the sleeve seat 4 can be prevented from being corroded through the protective fixing box 2 arranged on the top of the horizontal plate 1;
the sleeve seat 4 is sleeved with the support rod 12, so that the monitoring equipment box 13 can be conveniently fixed, and rapid temporary installation is achieved, and the fixing mechanism 6 installed through the sleeve seat 4 is matched with the fixing box 7, the sliding block 9, the clamping joint 10, the extension spring 11 and the extension rod 8 installed through the fixing mechanism 6, so that the position can be adjusted according to the position required by the monitoring equipment box 13;
through the monitoring facilities case 13 of 12 top installations of bracing piece, can place check out test set in inside, can protect check out test set can not receive natural weather's damage, at the dead lever 16 through the installation of horizontal plate 1 bottom, can conveniently fix on uneven ground such as slope.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. A fixing device of geological disaster monitoring equipment comprises a horizontal plate (1) and is characterized in that a protective fixing box (2) is fixedly connected to the outer wall of the top of the horizontal plate (1), a mounting fixing block (3) is fixedly connected to the inner wall of the bottom of the protective fixing box (2), threaded holes are formed in the outer walls of the tops of two ends of the mounting fixing block (3), a sleeve seat (4) is mounted above the threaded holes, fixing pads (5) are mounted on the outer walls of two ends of the sleeve seat (4), placing holes are formed in the outer walls of the tops of the fixing pads (5) and the sleeve seat (4), the placing holes are matched with threaded holes, the threaded holes and the inner wall of the placing holes are connected through bolts, the outer wall of the top of the sleeve seat (4) penetrates through the protective fixing box (2), mounting holes are formed in the outer wall of the sleeve seat (4), and a fixing mechanism (6) is fixedly connected to the outer wall of the sleeve seat (4), and fixed establishment (6) are including fixed box (7), tensile pole (8), sliding block (9) and joint (10), fixed box (7) and cover barrel seat (4) outer wall fixed connection, and fixed box (7) one side outer wall has seted up the fixed orifices, fixed orifices inner wall and tensile pole (8) sliding connection, and tensile pole (8) outer wall has cup jointed extension spring (11), tensile pole (8), extension spring (11) end all with sliding block (9) fixed connection, and sliding block (9) one side outer wall and joint (10) fixed connection, joint (10) and mounting hole sliding connection, cover barrel seat (4) top inner wall has cup jointed bracing piece (12), and bracing piece (12) outer wall and joint (10) are connected, and the fixed slot that the equidistance distributed is seted up to bracing piece (12) outer wall.
2. The fixing device for the geological disaster monitoring equipment as claimed in claim 1, wherein the outer wall of the top of the supporting rod (12) is fixedly connected with a monitoring equipment box (13), the inner wall of the monitoring equipment box (13) is fixedly connected with a partition plate (14), a detection device is placed on the partition plate (14), the bottom of the monitoring equipment box (13) is close to the outer walls of the two ends of the supporting rod (12) and is provided with an air inlet pipe, the tail end of the air inlet pipe is sleeved with a filter cover, the outer wall of the monitoring equipment box (13) is hinged with a protective door, a sealing ring is installed at the joint of the protective door and the monitoring equipment box (13), the outer wall of the protective door is provided with an observation slot, and a transparent observation window is installed on the inner wall of the observation slot.
3. A fixing device for a geological disaster monitoring equipment according to claim 1, characterized in that the horizontal plate (1) is provided with an installation groove on one side of the outer wall, and a level gauge (15) is installed on the inner wall of the installation groove.
4. A fixing device of a geological disaster monitoring equipment according to claim 1, characterized in that the top end of the stretching rod (8) is fixedly connected with a stretching handle, and the outer wall of the stretching handle is provided with a rubber sleeve.
5. A fixing device for a geological disaster monitoring equipment as defined in claim 1, characterized in that the fixing rod (16) is installed on the outer wall of the bottom of the horizontal plate (1), and the end of the fixing rod (16) is a cone structure.
6. A fixing device for a geological disaster monitoring equipment as claimed in claim 2, characterized in that the outer wall of the top of the monitoring equipment box (13) is provided with air outlet holes, and the air outlet holes are arranged on the outer wall of the top of the monitoring equipment box (13) and provided with dust baffles.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120059344.5U CN214197921U (en) | 2021-01-11 | 2021-01-11 | Fixing device of geological disaster monitoring equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120059344.5U CN214197921U (en) | 2021-01-11 | 2021-01-11 | Fixing device of geological disaster monitoring equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214197921U true CN214197921U (en) | 2021-09-14 |
Family
ID=77634641
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120059344.5U Expired - Fee Related CN214197921U (en) | 2021-01-11 | 2021-01-11 | Fixing device of geological disaster monitoring equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214197921U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114001782A (en) * | 2021-11-26 | 2022-02-01 | 中国电建集团成都勘测设计研究院有限公司 | Geological disaster monitoring device |
CN114673875A (en) * | 2022-03-16 | 2022-06-28 | 山东省地质矿产勘查开发局第五地质大队(山东省第五地质矿产勘查院) | Geological disaster early warning monitoring device |
-
2021
- 2021-01-11 CN CN202120059344.5U patent/CN214197921U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114001782A (en) * | 2021-11-26 | 2022-02-01 | 中国电建集团成都勘测设计研究院有限公司 | Geological disaster monitoring device |
CN114673875A (en) * | 2022-03-16 | 2022-06-28 | 山东省地质矿产勘查开发局第五地质大队(山东省第五地质矿产勘查院) | Geological disaster early warning monitoring device |
CN114673875B (en) * | 2022-03-16 | 2024-03-08 | 山东省地质矿产勘查开发局第五地质大队(山东省第五地质矿产勘查院) | Geological disaster early warning and monitoring device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214197921U (en) | Fixing device of geological disaster monitoring equipment | |
CN108828693B (en) | Intelligent rainfall detection equipment based on computer vision | |
CN210348747U (en) | Device for monitoring geological disasters | |
CN110304202B (en) | Water environment on-line monitoring buoy station with warning device | |
CN210513192U (en) | Bridge safety monitoring device based on big dipper high accuracy | |
CN114718167B (en) | Municipal drainage system | |
CN214471185U (en) | Town road ponding monitoring and early warning device | |
CN213417915U (en) | Comprehensive verification device for stress capacity of steel sheet pile | |
CN213846833U (en) | Monitoring equipment for geological disaster monitoring | |
CN212248634U (en) | Inspection shaft lid with screening function | |
CN210375189U (en) | Ground disaster monitoring equipment with protection device | |
CN215930893U (en) | Civil engineering measuring device | |
CN210141132U (en) | Tunnel supporting device | |
CN218759692U (en) | Electric power calandria seals and prevents flooding inspection shaft cat ladder installation device | |
CN220108102U (en) | Building engineering progress real-time monitoring device with safeguard function | |
CN211856274U (en) | Tunnel construction environment monitoring device | |
CN220135038U (en) | Pressure sensor fixing device | |
CN218373938U (en) | Ecological protection mechanism for strongly weathered rock slope | |
CN214146817U (en) | Pipeline strutting arrangement is used in municipal administration pipe network construction | |
CN209837103U (en) | Inspection well with anti-falling net | |
CN213809521U (en) | Integrated mounting bracket for field equipment | |
CN214116399U (en) | Town road guardrail | |
CN113155169A (en) | Geological disaster monitoring device | |
CN210831261U (en) | Be used for building engineering to measure support device | |
CN212537729U (en) | Holeless anti-theft flat plate light collector and lighting system with same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210914 |
|
CF01 | Termination of patent right due to non-payment of annual fee |