CN214195611U CN202121652159.3U CN202121652159U CN214195611U CN 214195611 U CN214195611 U CN 214195611U CN 202121652159 U CN202121652159 U CN 202121652159U CN 214195611 U CN214195611 U CN 214195611U
Authority
CN
China
Prior art keywords
rod
sliding seat
wall
net
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121652159.3U
Other languages
Chinese (zh)
Inventor
孟令轩
何洪强
李新
贾莹
边明远
庄斌
彭丙翔
宋福成
辛景浩
孙旭东
詹浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Bureau Group Decoration Engineering Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Bureau Group Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Bureau Group Decoration Engineering Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202121652159.3U priority Critical patent/CN214195611U/en
Application granted granted Critical
Publication of CN214195611U publication Critical patent/CN214195611U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model belongs to the technical field of concrete placement, a be used for concrete wall body to pour couple formula operation platform is disclosed, step on the net including the operation, still include: the connecting frameworks are arranged on two sides of the operation pedal net, at least two groups of connecting frameworks are arranged, and the two groups of connecting frameworks are matched with the operation pedal net to support the operation pedal net; the first fixing assembly is arranged at the top of the connecting framework and used for fixing the connecting framework; the second fixing component is arranged on the side wall of the connecting framework, and the second fixing component is matched with the first fixing component to increase the stability of the connecting framework; the utility model discloses can be fixed in this device on the outer scaffold steel pipe of pouring the template, connect stably, the workman operates the space big on it, also safer, the handling tool of being convenient for can effectively improve the quality of pouring.

Description

Be used for concrete wall body to pour couple formula operation platform
Technical Field
The utility model relates to a concrete placement's technical field especially relates to a be used for concrete wall to pour couple formula operation platform.
Background
Concrete is a general term for engineering composite materials in which aggregate is cemented into a whole by a cementing material. The term concrete generally refers to cement as the cementing material and sand and stone as the aggregate; the cement concrete, also called ordinary concrete, is widely used in civil engineering. When the concrete pouring operation of the wall body with higher building height is performed, a crane is generally needed to lift and pour cement filling into the manufactured template to complete the pouring of the wall body, and the outer side of the template is fixed by the aid of the matching of scaffold steel pipes and the pull bolts.
In the existing process of pouring a wall body, a vibrating rod is needed to vibrate poured concrete, so that the concrete is more fully filled into a template, the concrete is required to be supplemented after the liquid level of the concrete descends, and the concrete is finally leveled, but when the processes are operated on site, workers can only stand on a simple platform built by scaffold steel pipes, the process is dangerous and inconvenient due to small space during operation, and the processes cannot be completely operated, so that the pouring quality of the wall body is influenced, and the process cannot be adjusted according to the situation on site, and therefore a device is urgently needed to improve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art workman's the less inconvenient use tool cooperation work of operation space when cooperation concrete wall pours to the security is lower, also has probably too can't complete operation to finish the process, leads to influencing the wall body and pours the quality, also can't adjust according to the site conditions, and the one kind that proposes is used for concrete wall to pour couple formula operation platform.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a be used for concrete wall body to pour couple formula operation platform, includes that the operation steps on the net, still includes:
the connecting frameworks are arranged on two sides of the operation pedal net, at least two groups of connecting frameworks are arranged, and the two groups of connecting frameworks are matched with the operation pedal net to support the operation pedal net;
the first fixing assembly is arranged at the top of the connecting framework and used for fixing the connecting framework;
the second fixing component is arranged on the side wall of the connecting framework, and the second fixing component is matched with the first fixing component to increase the stability of the connecting framework.
As preferred scheme, first fixed subassembly includes connecting rod and kelly, connecting rod fixed connection is in connection skeleton top, the kelly is connected in the connecting rod lateral wall, the kelly lateral wall rotates and is connected with first lead screw, first lead screw passes the connecting rod and outwards extends, the connecting rod is provided with the screw thread and cooperatees with first lead screw, the kelly both sides all are provided with the limiting plate, and are two sets of the equal sliding connection of limiting plate is in the connecting rod lateral wall.
As preferred scheme, the fixed subassembly of second includes second lead screw and sliding seat, it sets up flutedly to connect the skeleton lateral wall, the second lead screw rotates to be connected in the recess roof, second lead screw bottom is passed and is connected the skeleton and outwards extend, the sliding seat is connected in second lead screw outer wall, the sliding seat is provided with the screw thread and cooperatees with the second lead screw, sliding seat sliding connection is in the recess lateral wall, sliding seat inner wall sliding connection has tight piece of clamp, the sliding seat top is provided with screws up the bolt, it passes the sliding seat and presss from both sides tight piece and cooperate to screw up the bolt, it all is provided with the chucking groove with scaffold steel pipe matched with to press from both sides tight piece and sliding seat.
As a preferred scheme, one side of the connection framework, which is far away from the second fixing component, is connected with a mounting seat, mounting holes are formed in the side wall of the mounting seat, the mounting seat is detachably connected with a protection frame through the mounting holes, and the inner wall of the protection frame is connected with two groups of protection nets and a warning board.
As the preferred scheme, the operation is stepped on net both sides and is all provided with the trip, and two sets of trips are the crisscross setting each other, the trip joint is on connecting the skeleton ejector pin.
Compared with the prior art, the utility model provides a be used for concrete wall body to pour couple formula operation platform possesses following beneficial effect:
1. according to the hook type operation platform for concrete wall pouring, the device can be hung in an opening of a pouring template through the arrangement of the first fixing assembly, the connection is convenient, the distance between the clamping rod and the connecting rod can be changed to adapt to different conditions of on-site mold making, the hanging is more stable, the device can be fixed on a scaffold steel pipe outside the pouring template through the arrangement of the second fixing assembly, the device is more stable through the arrangement of the first fixing assembly, and workers can operate more safely on the scaffold steel pipe;
2. according to the hook type operation platform for pouring the concrete wall, the protection frame is arranged, and the protection net and the warning board are arranged in the protection frame, so that workers operating on the protection frame can be protected, the high-altitude falling is avoided, and meanwhile, the operation platform is convenient to disassemble and transport; by tightly splicing multiple groups of the operation stepping nets, overlarge gaps can be avoided, and workers are prevented from stepping empty or tools are prevented from falling off;
3. the part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses can be fixed in this device and pour the outer scaffold steel pipe of template on, connect stably, the workman is operating space big on it, also safer, the handling tool of being convenient for can effectively improve and pour the quality.
Drawings
Fig. 1 is a schematic diagram of a multi-group splicing of a concrete wall casting hook type operation platform according to the present invention;
fig. 2 is a schematic diagram showing a single-unit splicing of a concrete wall casting hook type operation platform according to the present invention;
fig. 3 is a schematic diagram of a single-unit splicing of a concrete wall casting hook type operation platform according to the present invention;
fig. 4 is the utility model provides a be used for concrete wall body to pour couple formula operation platform and connect skeleton texture sketch map.
In the figure: 1. connecting the framework; 101. a mounting seat; 102. a connecting rod; 103. a first lead screw; 104. a limiting plate; 105. a clamping rod; 106. a second lead screw; 107. a sliding seat; 108. a clamping block; 109. screwing down the bolt; 2. operating the pedal net; 201. a hook is clamped; 202. a protective frame; 203. a protective net; 204. a warning board.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example (b):
referring to fig. 1-4, a hanger type operation platform for concrete wall pouring comprises an operation pedal net 2 and further comprises: the connecting frameworks 1 are arranged on two sides of the operation stepping net 2, at least two groups of the connecting frameworks 1 are arranged, and the two groups of the connecting frameworks 1 are matched with the operation stepping net 2 to support the operation stepping net 2; the first fixing assembly is arranged at the top of the connecting framework 1 and used for fixing the connecting framework 1; the second fixing component is arranged on the side wall of the connecting framework 1 and is matched with the first fixing component to increase the stability of the connecting framework 1; make the fixed in that connects skeleton 1 more stable through first fixed subassembly and the fixed subassembly of second pour the template on the back, step on net 2 through being connected with the operation between two sets of connection skeletons 1, the activity space is bigger when can making the operation workman stand steadily, is favorable to operating the stick that shakes to promote and pour the quality.
The first fixing assembly comprises a connecting rod 102 and a clamping rod 105, the connecting rod 102 is fixedly connected to the top of the connecting framework 1, the clamping rod 105 is connected to the side wall of the connecting rod 102, the side wall of the clamping rod 105 is rotatably connected with a first screw rod 103, the first screw rod 103 penetrates through the connecting rod 102 and extends outwards, the connecting rod 102 is provided with threads to be matched with the first screw rod 103, two sides of the clamping rod 105 are provided with limiting plates 104, and the two groups of limiting plates 104 are connected to the side wall of the connecting rod 102 in a sliding mode; can make this device hang into through first fixed subassembly and pour template opening part, it is convenient to connect, and can change the distance between kelly 105 and the connecting rod 102 and come the different situation that the cooperation adapted on-the-spot mould making, makes to hang and leans on more stably.
The second fixing assembly comprises a second lead screw 106 and a sliding seat 107, a groove is formed in the side wall of the connecting framework 1, the second lead screw 106 is rotatably connected to the top wall of the groove, the bottom of the second lead screw 106 penetrates through the connecting framework 1 and extends outwards, the sliding seat 107 is connected to the outer wall of the second lead screw 106, threads are arranged on the sliding seat 107 and matched with the second lead screw 106, the sliding seat 107 is slidably connected to the side wall of the groove, a clamping block 108 is slidably connected to the inner wall of the sliding seat 107, a tightening bolt 109 is arranged at the top of the sliding seat 107, the tightening bolt 109 penetrates through the sliding seat 107 and is matched with the clamping block 108, and the clamping block 108 and the sliding seat 107 are both provided with clamping grooves matched with the scaffold steel pipe; can be fixed in this device on pouring the outer scaffold steel pipe of template through the fixed subassembly of second, cooperate first fixed subassembly to make the device more stable, the workman also operates on it safer.
One side of the connecting framework 1, which is far away from the second fixing component, is connected with an installation seat 101, the side wall of the installation seat 101 is provided with an installation hole, the installation seat 101 is detachably connected with a protection frame 202 through the installation hole, and the inner wall of the protection frame 202 is connected with two groups of protection nets 203 and a warning board 204; can protect the workman of operation on it, avoid the emergence that the high altitude falls, convenient to detach simultaneously makes things convenient for the transportation.
The two sides of the operation pedal net 2 are both provided with clamping hooks 201, the two groups of clamping hooks 201 are mutually staggered, and the clamping hooks 201 are clamped on the ejector rods of the connecting framework 1; the operation pedal net 2 can be closely spliced in multiple groups, so that overlarge gaps are avoided, and workers are prevented from stepping on the hollow or falling off tools.
The utility model discloses when using, it is not hard up to rotate first lead screw 103 messenger kelly 105, insert the kelly 105 and pour the template opening part, and connecting rod 102 can support the scaffold steel pipe, rotate second lead screw 106, second lead screw 106 drives sliding seat 107 and removes, go into the chucking inslot with another group scaffold steel pipe card, screw up bolt 109 in rotating, screw up bolt 109 and drive and press from both sides tight piece 108 and sliding seat 107 and cooperate and press from both sides the steel pipe tightly, rotate first lead screw 103, it is tight with the steel pipe with pour the template clamp to make kelly 105 and connecting rod 102 cooperate, build on two sets of connection frameworks 1 through trip 201 on the ejector pin of connecting framework 1, rethread mount pad 101 screws in protection frame 202 through the bolt, can carry out the multiunit concatenation according to the length of the construction wall body and use, the practicality is stronger.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a be used for concrete wall body to pour couple formula operation platform, includes that the operation steps on net (2), its characterized in that still includes:
the connecting frameworks (1) are arranged on two sides of the operation stepping net (2), at least two groups of connecting frameworks (1) are arranged, and the two groups of connecting frameworks (1) are matched with the operation stepping net (2) to support the operation stepping net (2);
the first fixing assembly is arranged at the top of the connecting framework (1) and used for fixing the connecting framework (1);
the second fixing component is arranged on the side wall of the connecting framework (1), and the second fixing component is matched with the first fixing component to increase the stability of the connecting framework (1).
2. The concrete wall pouring hook type operating platform is characterized in that the first fixing assembly comprises a connecting rod (102) and a clamping rod (105), the connecting rod (102) is fixedly connected to the top of the connecting frame (1), the clamping rod (105) is connected to the side wall of the connecting rod (102), the side wall of the clamping rod (105) is rotatably connected with a first screw rod (103), the first screw rod (103) penetrates through the connecting rod (102) and extends outwards, the connecting rod (102) is provided with threads to match with the first screw rod (103), two limiting plates (104) are arranged on two sides of the clamping rod (105), and the two limiting plates (104) are slidably connected to the side wall of the connecting rod (102).
3. The operating platform for casting the hook on the concrete wall according to claim 1, wherein the second fixing component comprises a second lead screw (106) and a sliding seat (107), the side wall of the connecting framework (1) is provided with a groove, the second lead screw (106) is rotatably connected to the top wall of the groove, the bottom of the second lead screw (106) penetrates through the connecting framework (1) and extends outwards, the sliding seat (107) is connected to the outer wall of the second lead screw (106), the sliding seat (107) is provided with threads to match with the second lead screw (106), the sliding seat (107) is slidably connected to the side wall of the groove, the inner wall of the sliding seat (107) is slidably connected with a clamping block (108), the top of the sliding seat (107) is provided with a tightening bolt (109), and the tightening bolt (109) penetrates through the sliding seat (107) to match with the clamping block (108), the clamping block (108) and the sliding seat (107) are provided with clamping grooves matched with scaffold steel pipes.
4. The concrete wall pouring hook type operation platform is characterized in that one side, far away from the second fixing component, of the connecting framework (1) is connected with a mounting seat (101), mounting holes are formed in the side wall of the mounting seat (101), the mounting seat (101) is detachably connected with a protection frame (202) through the mounting holes, and two groups of protective nets (203) and warning boards (204) are connected to the inner wall of the protection frame (202).
5. The operating platform for concrete wall casting hook type operation according to claim 1, wherein the operating pedal net (2) is provided with hooks (201) on both sides, the two groups of hooks (201) are arranged in a staggered manner, and the hooks (201) are connected to the ejector rod of the connecting framework (1) in a clamping manner.
CN202121652159.3U 2021-07-20 2021-07-20 Be used for concrete wall body to pour couple formula operation platform Active CN214195611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121652159.3U CN214195611U (en) 2021-07-20 2021-07-20 Be used for concrete wall body to pour couple formula operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121652159.3U CN214195611U (en) 2021-07-20 2021-07-20 Be used for concrete wall body to pour couple formula operation platform

Publications (1)

Publication Number Publication Date
CN214195611U true CN214195611U (en) 2021-09-14

Family

ID=77641109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121652159.3U Active CN214195611U (en) 2021-07-20 2021-07-20 Be used for concrete wall body to pour couple formula operation platform

Country Status (1)

Country Link
CN (1) CN214195611U (en)

Similar Documents

Publication Publication Date Title
CN107605177A (en) The construction method of efficient precast floor slab and its independent support frame
CN105464216B (en) Construction method based on integral lifting formwork-strengthening system superelevation super-section batter post
CN110145124A (en) A kind of control shear wall level connects the reinforcement tools and its construction method of batch quality
CN106150087A (en) A kind of combined frame column template and construction method thereof
CN108914780A (en) A kind of bridge tall pier and thin wall hydraulic sliding mould construction method
CN106042173A (en) Bridge production system
CN214195611U (en) Be used for concrete wall body to pour couple formula operation platform
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN205275016U (en) 2 centering hoist device of glomeration mode brickwork wall piece
CN109732773B (en) Mounting node and mounting method of support hinged concrete prefabricated part
CN105438965B (en) The hanging method of glomeration pattern masonry wall 2 centering hanging apparatus of piece
CN105952002B (en) A kind of terrace heavy steel plate pre-embedded device and construction method
CN213359365U (en) Steel structure concrete building template capable of facilitating demolding
CN115056323A (en) High-precision track beam machining device and method
CN207363110U (en) Novel concrete supporting beam
CN209521041U (en) A kind of dismountable external wall pours mold
CN212175490U (en) Cap beam core bar penetrating rack fine-tuning falling position form removing structure
CN207538506U (en) The independent supporting rack of efficient construction of precast floorslab
CN210067423U (en) Aluminum alloy template hangs mould system
CN111636697A (en) Concrete column base positioning fixer
CN217630515U (en) Building wall is with pre-buried connecting piece and safe cat ladder device
CN216305410U (en) Tool for controlling thickness of cast-in-place concrete floor
CN205876346U (en) Integral template of pouring of tunnel invert and short side wall
CN218323870U (en) Die carrier system of section of pouring does not have pull rod
CN218091927U (en) Foldable cantilever platform