CN212175490U - Cap beam core bar penetrating rack fine-tuning falling position form removing structure - Google Patents
Cap beam core bar penetrating rack fine-tuning falling position form removing structure Download PDFInfo
- Publication number
- CN212175490U CN212175490U CN201922235416.2U CN201922235416U CN212175490U CN 212175490 U CN212175490 U CN 212175490U CN 201922235416 U CN201922235416 U CN 201922235416U CN 212175490 U CN212175490 U CN 212175490U
- Authority
- CN
- China
- Prior art keywords
- mould
- bent cap
- steel
- utility
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922235416.2U CN212175490U (en) | 2019-12-13 | 2019-12-13 | Cap beam core bar penetrating rack fine-tuning falling position form removing structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922235416.2U CN212175490U (en) | 2019-12-13 | 2019-12-13 | Cap beam core bar penetrating rack fine-tuning falling position form removing structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212175490U true CN212175490U (en) | 2020-12-18 |
Family
ID=73764092
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922235416.2U Active CN212175490U (en) | 2019-12-13 | 2019-12-13 | Cap beam core bar penetrating rack fine-tuning falling position form removing structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212175490U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113073558A (en) * | 2021-03-23 | 2021-07-06 | 中交第三航务工程局有限公司 | Construction process combining suspended support and overhanging reverse hoisting construction |
-
2019
- 2019-12-13 CN CN201922235416.2U patent/CN212175490U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113073558A (en) * | 2021-03-23 | 2021-07-06 | 中交第三航务工程局有限公司 | Construction process combining suspended support and overhanging reverse hoisting construction |
CN113073558B (en) * | 2021-03-23 | 2023-08-22 | 中交第三航务工程局有限公司 | Construction technology combining suspended bracket and overhanging anti-suspension construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107217839A (en) | Cast-in-situ concrete beam plate form bracing system and its construction method | |
CN201406639Y (en) | Support of construction formworks of side flange plate of concrete-steel beam | |
CN106337555A (en) | Method for constructing triangular steel support for cantilever structure of outer wall of building | |
CN202627506U (en) | Formwork for cast-in-place concrete connecting beams | |
CN205741932U (en) | A kind of bridge prefabrication box beam steel form | |
CN206942131U (en) | Cast-in-situ concrete beam plate form bracing system | |
CN106042173B (en) | Bridge production system | |
CN211369536U (en) | Cast-in-place box girder template system | |
CN212175490U (en) | Cap beam core bar penetrating rack fine-tuning falling position form removing structure | |
CN212176540U (en) | Hydraulic climbing formwork system formwork | |
CN201406844Y (en) | Support of middle flange plate construction formwork of concrete-steel beam | |
CN208088822U (en) | A kind of caisson of toilet formwork structure | |
CN111778863B (en) | Cantilever beam steel formwork system with adjustable cross slope | |
CN217680907U (en) | Interior pulling type exempts from to tear open composite forms and concrete section of thick bamboo wall | |
CN206655477U (en) | wall hole template | |
CN108930406A (en) | Construction method for large-formwork narrow-space wall based on integral assembly | |
CN212714939U (en) | Bored concrete pile convenient to demolish pile head | |
CN210975566U (en) | Temporary supporting structure for suspended basket pier top of cast-in-place bridge | |
CN109025262B (en) | Construction method for one-time pouring forming of concrete flanging | |
CN219972937U (en) | Construction assembly type bracket for bottom die of solid section at top of hollow pier | |
CN112140296A (en) | Concrete pouring device for precast concrete square culvert manufacturing | |
CN109797967A (en) | High and big die plate symmetrically hangs the construction method of climbing type English truss support system | |
CN211596454U (en) | Temporary consolidation device for continuous beam hanging basket cantilever construction | |
CN214993081U (en) | Recyclable steel concrete structure gap bridge | |
CN110788968B (en) | Template system for prefabricating U-shaped beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Zhanbing Inventor after: Xia Junhua Inventor after: Zhan Chunbo Inventor after: Hao Caiping Inventor before: Xia Junhua Inventor before: Liu Zhanbing Inventor before: Zhan Chunbo Inventor before: Hao Caiping |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Slightly adjusting the positioning and demolding structure of the hanging bracket for the core piercing rod of the cover beam Effective date of registration: 20230927 Granted publication date: 20201218 Pledgee: Industrial Bank Limited by Share Ltd. Wuhan branch Pledgor: HUBEI PROVINCIAL ROAD & BRIDGE Co.,Ltd. Registration number: Y2023980059401 |