CN214195492U - Hoisting type platform - Google Patents

Hoisting type platform Download PDF

Info

Publication number
CN214195492U
CN214195492U CN202022251961.3U CN202022251961U CN214195492U CN 214195492 U CN214195492 U CN 214195492U CN 202022251961 U CN202022251961 U CN 202022251961U CN 214195492 U CN214195492 U CN 214195492U
Authority
CN
China
Prior art keywords
main body
stair
body part
plates
walkway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022251961.3U
Other languages
Chinese (zh)
Inventor
马保发
魏德强
黄鑫
陈威
杨乔
段凤主
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Longyue Construction Engineering Co ltd
Original Assignee
Guangdong Longyue Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Longyue Construction Engineering Co ltd filed Critical Guangdong Longyue Construction Engineering Co ltd
Priority to CN202022251961.3U priority Critical patent/CN214195492U/en
Application granted granted Critical
Publication of CN214195492U publication Critical patent/CN214195492U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a hoisting type platform, which relates to the field of building construction equipment, wherein the hoisting type platform comprises a main body part, a railing and a protective steel bar; the main body part is provided with a stepping stair and a walkway plate, one side of the main body part is provided with an extension part, and the distances from the four side surfaces of the main body part to the wall of the staircase of the building are first intervals; the stepping stair is obliquely connected with the bottom of the extension part and the top of the main body part, and a plurality of stepping plates are arranged on the stepping stair; the plurality of walkway plates are respectively arranged at two sides of the stair step; the handrail is arranged on the top of the main body part; the protection steel bar is arranged on the side surface of the main body part. The lifting type platform improves the construction efficiency, and the safety of constructors is guaranteed.

Description

Hoisting type platform
Technical Field
The utility model relates to a construction equipment field, in particular to hoist and mount formula platform.
Background
There is a commonality problem during construction, the one deck can all be lagged behind in the stair installation of hoist and mount formula marking time at every turn, this position will produce very big hole, there is 6 meters deepest, the short department has 3 meters, constructor takes place the accident of falling easily, the public steel stair of correlation technique, the personnel of being convenient for go up and down, but the security of constructor around the hole can not be guaranteed to the stair area is little, and the stair stress point leans on the formwork support body of last one deck, the personnel all climb up from the formwork rod piece from top to bottom and climb down, be not convenient for construction and safe unable guarantee. Still disclose and set up steel pipe scaffold frame in the stair position, nevertheless need demolish the scaffold frame again when the prefabricated stair of installation each time, the circulation is taken and is torn open like this, intensity of labour increases, and cost increase takes open the process time long, and constructor safety around this in-process cavity hardly obtains the guarantee.
SUMMERY OF THE UTILITY MODEL
The utility model discloses aim at solving one of the technical problem that exists among the prior art at least. Therefore, the utility model provides a hoist and mount formula platform can install conveniently, is convenient for be under construction, and constructor's safety can obtain the guarantee.
According to the utility model discloses a hoist and mount formula platform, include: the guardrail comprises a main body part, a guardrail and a protective steel bar; the main body part is provided with a stepping stair and a walkway plate, one side of the main body part is provided with an extension part, and the distances from the four side surfaces of the main body part to the wall of the staircase of the building are first intervals; the stepping stair is obliquely connected with the bottom of the extension part and the top of the main body part, and a plurality of stepping plates are arranged on the stepping stair; the plurality of walkway plates are respectively arranged at two sides of the stair step; the handrail is arranged on the top of the main body part; the protection steel bar is arranged on the side surface of the main body part.
According to the utility model discloses hoist and mount formula platform has following beneficial effect at least: after the hoisting type platform is installed, the heights of the platform and a construction layer are consistent, so that the operation of constructors is facilitated; the lifting type platform is provided with a stair step for workers to go up and down, and the two sides of the stair step are provided with the walkway plates, so that an operation platform can be provided for the workers, construction materials can be placed, and the number of times of up-and-down carrying is reduced; the distance between the lifting type platform and the wall of the staircase of the building is a first distance, so that the lifting type platform is convenient to install and use. By using the hoisting type platform, the construction efficiency can be improved, and the safety of constructors is guaranteed.
According to some embodiments of the invention, the main body portion comprises a framework formed by welding a plurality of square steels.
According to some embodiments of the invention, there are 13 of the tread plates.
According to some embodiments of the invention, the edge of the step plate is bent downwards.
According to some embodiments of the invention, the tread plate is a patterned steel plate.
According to some embodiments of the invention, the guidance tape has three, the length of guidance tape with main part length equals.
According to some embodiments of the utility model, the first side of stair of marking time is installed two walk the guidance tape, the second side of stair of marking time is installed one walk the guidance tape.
According to some embodiments of the invention, the first distance is 25 cm.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
fig. 1 is a schematic view of a hoisting platform according to an embodiment of the present invention;
fig. 2 is a front view of a suspended platform according to an embodiment of the present invention;
fig. 3 is a side view of a suspended platform according to an embodiment of the present invention;
fig. 4 is a top view of the hoisting platform of the embodiment of the present invention.
Reference numerals:
the main body 110, the extension part 120, the railing 130, the stair 140, the tread plate 141, the walkway plate 150, and the protective steel bar 160.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present invention, and should not be construed as limiting the present invention.
In the description of the present invention, it should be understood that the orientation or positional relationship indicated with respect to the orientation description, such as up, down, front, rear, left, right, etc., is based on the orientation or positional relationship shown in the drawings, and is only for convenience of description and simplification of description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
In the description of the present invention, a plurality of means are one or more, a plurality of means are two or more, and the terms greater than, less than, exceeding, etc. are understood as not including the present number, and the terms greater than, less than, within, etc. are understood as including the present number. If the first and second are described for the purpose of distinguishing technical features, they are not to be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated or implicitly indicating the precedence of the technical features indicated.
In the description of the present invention, unless there is an explicit limitation, the words such as setting, installation, connection, etc. should be understood in a broad sense, and those skilled in the art can reasonably determine the specific meanings of the above words in combination with the specific contents of the technical solution.
Referring to fig. 1, 2, 3 and 4, in this embodiment, a hoisting platform is disclosed, which includes: the body 110, the rail 130, and the protective steel bar 160; the main body 110 is provided with a stepping stair 140 and a walkway plate 150, one side of the main body 110 is provided with an extension 120, and the four side surfaces of the main body 110 are spaced from the wall of the staircase of the building by a first distance; the stair 140 is obliquely connected with the bottom of the extension part 120 and the top of the main body part 110, and a plurality of tread plates 140 are arranged on the stair 140; a plurality of walkway plates 150 are installed at both sides of the stair step 140; the rail 130 is installed on the top of the main body 110; the protective steel bar 160 is disposed at a side of the body 110.
The suspended platform is suitable for a staircase of a building under construction, the extension part 120 serves to maintain the main body part 110 in a horizontal state even in the staircase, the extension part 120 is placed on the platform of the staircase, and the main body part 110 is placed on the plane of an upper floor.
The four sides of the body portion 110 are spaced a first distance from the wall of the stairwell of the building, it being understood that the entire body portion 110 does not touch the wall of the stairwell and is spaced a first distance from the wall. It should be noted that the specific value of the first distance may be set according to the situation of the construction site, and in this embodiment, the first distance is 25 cm.
The bottom of the stair 140 is connected to the bottom of the extension 120, the top of the stair 140 is connected to the top of the main body 110, and a plurality of tread plates 141 are disposed on the stair 140, that is, the constructors can walk from the platform of the stairwell to the top of the main body 110 or reach the upper floor through the stair 140. The walkway plates 150 are provided at both sides of the stairway 140 to provide an operation platform for the constructors. The rail 130 is disposed on the top of the main body 110, the rail 130 is fixed on the top of the main body 110 by welding, and the rail 130 is made of square steel by welding. The side surface of the main body 110 is also provided with a protective steel bar 160 to prevent a constructor from falling off from the lifting platform in the operation process. It should be noted that the protection steel bar 160 can be obliquely, transversely or vertically installed on the side surface of the main body 110, so as to perform a protection function.
After the prefabricated staircase is installed, the hoisting type platform is hoisted to a staircase of a building, the distance between the side surface of the main body part 110 and the wall of the staircase is a first distance, so that the main body part 110 is prevented from scratching the wall of the staircase and the wall is prevented from being damaged in the process of placing the hoisting type platform. The stair 140 provides a passageway for constructors to go up and down, and facilitates construction. The stair 140 has walkway plates 150 at both sides, and the walkway plates 150 can be used for placing materials and providing a platform for constructors to work. The lifting type platform can be conveniently and rapidly placed in a staircase, safety of constructors is guaranteed through the arrangement of the handrails 130 and the protection steel bars 160, and the phenomenon of empty stepping is avoided.
In some embodiments of the present invention, the main body 110 includes a frame formed by welding a plurality of square bars, and it is understood that the plurality of square bars are combined by welding to form an outer frame, providing a mounting position for the stair step 140 and the walkway plate 150. The square steel can improve the integral hardness of the hoisting type platform, and the hoisting type platform is prevented from being damaged due to collision; the construction efficiency can be improved by welding the square steel to form the framework, and frequent disassembly and assembly are not needed; meanwhile, the framework formed by welding the square steel can also improve the overall stability of the hoisting type platform, the hoisting type platform is prevented from shaking in the construction operation process of constructors, and the safety of the constructors is guaranteed.
In some embodiments of the present invention, there are 13 tread plates 141, 13 tread plates 141 are disposed on the stair 140, and the equal distance between the tread plates 141 is disposed on the stair 140, it can be understood that, in the vertical direction, the equal distance between the tread plates 141 is disposed on the stair 140. The edge of the step plate 141 is bent downward, that is, the edge of the step plate 141 facing the side is bent downward, and the bent degree is small. The step plate 141 is formed by cutting, and the edge of the step plate 141 becomes sharp, so that the person can be prevented from colliding with the step plate 141 and being injured by bending the edge of the step plate 141 in the process of walking up and down the stair 140.
In some embodiments of the present invention, the tread plate 141 is made of a patterned steel plate. The decorative pattern plays the effect of increase friction, and constructor is at the in-process of walking on the stair 140 of marking time, and the decorative pattern on the footboard 141 can increase constructor's frictional force under the foot, avoids constructor to slide at the in-process of stair 140 of marking time from top to bottom, has improved the security of hoist and mount formula platform, has ensured constructor's safety.
In some embodiments of the present invention, the number of the walkway plates 150 is three, and the length of the walkway plates 150 is equal to the length of the main body 110. it can be understood that the walkway plates 150 are placed on both sides of the stairway 140, and are identical to the length of the main body 110, and can be moved from one side of the main body 110 to the other side through the walkway plates 150. Two walkway boards 150 are installed at the first side of stair 140, one walkway board 150 is installed at the second side of stair 140, and two walkway boards 150 are respectively in different layers, i.e. at the first side of stair 140, two walkway boards 150 are installed in layers, there is a floor height between two walkway boards 150, the height of the floor height can accommodate constructors to operate, for example, the floor height is set to 1.7 m. The distinction between the first side and the second side is determined according to the installation location of the fabricated stairway, for example, the fabricated stairway is installed on the left side of the building stairway, the first side of the stair-stepping 140 is on the right side of the building stairway, and the second side of the stair-stepping 140 is on the left side of the building stairway.
The length of the walkway plate 150 is equal to that of the main body 110, and an operation platform can be provided for constructors, thereby facilitating construction work. The second side of the stair 140 is provided with a walkway plate 150, which can provide a walking channel for the constructors to go up and down through the prefabricated stairs, thus being beneficial to the constructors to go up and down floors or carry materials and improving the construction efficiency.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art.

Claims (8)

1. A suspended platform disposed in a stairwell of a building, comprising:
the stair-stepping stair-climbing building comprises a main body part, a stair-stepping stair and a walkway plate are installed on the main body part, an extension part is arranged on one side of the main body part, and the distance between the four side surfaces of the main body part and the wall of a building staircase is a first interval; the stepping stair is obliquely connected with the bottom of the extension part and the top of the main body part, and a plurality of stepping plates are arranged on the stepping stair; the plurality of walkway plates are respectively arranged at two sides of the stair step;
a rail mounted on the top of the main body;
the protection billet, the protection billet sets up the side of main part.
2. The hoistable platform of claim 1, wherein the main body portion comprises a framework of a plurality of square steel welds.
3. The suspended platform of claim 1, wherein there are 13 said tread plates.
4. A suspended platform according to claim 1 or 3, wherein the edges of the tread plate are bent downwards.
5. The suspended platform of claim 4, wherein the tread plate is a patterned steel plate.
6. The suspended platform of claim 1, wherein there are three walkway plates, and the walkway plates have a length equal to the length of the main body.
7. The hoistable platform of claim 1 or 6, wherein two of the walkway plates are installed on a first side of the stairway step and one of the walkway plates is installed on a second side of the stairway step.
8. The hoistable platform of claim 1, wherein the first spacing is 25 centimeters.
CN202022251961.3U 2020-10-10 2020-10-10 Hoisting type platform Active CN214195492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022251961.3U CN214195492U (en) 2020-10-10 2020-10-10 Hoisting type platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022251961.3U CN214195492U (en) 2020-10-10 2020-10-10 Hoisting type platform

Publications (1)

Publication Number Publication Date
CN214195492U true CN214195492U (en) 2021-09-14

Family

ID=77641794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022251961.3U Active CN214195492U (en) 2020-10-10 2020-10-10 Hoisting type platform

Country Status (1)

Country Link
CN (1) CN214195492U (en)

Similar Documents

Publication Publication Date Title
US8511039B2 (en) Safety barrier for multi-storey buildings
JP2009036014A (en) Pedestrian bridge
US20100293875A1 (en) Stairway for Use on Building Sites
CN104929353A (en) Detachable stepwise automatic climbing operating platform for elevator shafts
JP5614812B2 (en) Staircase
CN214195492U (en) Hoisting type platform
KR20090025737A (en) A prefabricated foothold
KR102454852B1 (en) Stair railing in which the staircase width becomes narrow
CN210316280U (en) Assembled construction safety protection stair
CN215670884U (en) Assembly type building staircase operation platform
CN214364846U (en) Platform device suitable for scaffold-free installation of machine-room-free elevator
CN211949288U (en) Firm steel construction stair
KR101111234B1 (en) Elevator infrastructure establishment construction workbench
CN210316278U (en) Multifunctional safety protection stair
CN210002827U (en) Climbing frame gap bridge of connection tower cranes
CN216142461U (en) Prefabricated staircase passageway integral lifting protection support body
CN209556317U (en) A kind of building elevator shaft mouth security protection platform
CN218843689U (en) Engineering construction is used as business layer stair and is faced frontier defense operation platform
CN207079889U (en) A kind of working assembling type mobile construction platform of ceiling
CN212983624U (en) Movable hanging basket
CN220747593U (en) Liftable temporary manned stair in assembled structure
JP4011722B2 (en) Hanging stairs
CN221169392U (en) Staircase for interior decoration
CN206128636U (en) Detachable stair formwork of flier
CN218758991U (en) Temporary staircase

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant