CN214195406U - Discharge structure of building rubbish pipeline - Google Patents

Discharge structure of building rubbish pipeline Download PDF

Info

Publication number
CN214195406U
CN214195406U CN202022984592.9U CN202022984592U CN214195406U CN 214195406 U CN214195406 U CN 214195406U CN 202022984592 U CN202022984592 U CN 202022984592U CN 214195406 U CN214195406 U CN 214195406U
Authority
CN
China
Prior art keywords
pipeline
crushing
motor
rotation axis
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022984592.9U
Other languages
Chinese (zh)
Inventor
张晓涛
洪英泽
林俊卿
朱隆昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huayu Science And Industry Group Co ltd
Original Assignee
Shenzhen Huahe Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Huahe Construction Group Co ltd filed Critical Shenzhen Huahe Construction Group Co ltd
Priority to CN202022984592.9U priority Critical patent/CN214195406U/en
Application granted granted Critical
Publication of CN214195406U publication Critical patent/CN214195406U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Crushing And Pulverization Processes (AREA)

Abstract

The utility model discloses a discharge structure of building rubbish pipeline, including discharge gate and crushing pipeline, the bottom of discharge gate is equipped with crushing pipeline, and crushing pipeline and discharge gate pass through the buckle and connect, and one side of crushing pipeline is equipped with first mounting panel, and first mounting panel passes through the screw fixation with crushing pipeline, and the top of first mounting panel is equipped with the motor, and it is fixed that motor and first mounting panel pass through the motor cabinet, and the one end of motor is equipped with first rotation axis, and first rotation axis and motor rotate to be connected. The utility model discloses a sword is smashed to first crushing sword and the second that is equipped with, has realized the smashing of rubbish to reduce the possibility that rubbish blockked up in the pipeline, improved work efficiency, through the water tank and the water pump that are equipped with, realized washing of pipeline, improved the convenience, through the direction pipeline that is equipped with, realized the change of direction, thereby reduce the impact force when rubbish falls to the ground, improved the security.

Description

Discharge structure of building rubbish pipeline
Technical Field
The utility model relates to a construction waste pipeline specifically is a construction waste pipeline's ejection of compact structure.
Background
Along with social development, high-rise buildings are more and more, in the construction process of the high-rise buildings, construction waste needs to be transported from upstairs to the bottom of a building, the construction waste is generally transported by adopting a construction waste pipeline, workers do not need to go upstairs and downstairs to transport the waste, a large amount of manpower is saved, and the construction efficiency is improved.
At present, the ejection of compact structure of current building rubbish pipeline is mostly a straight tube, and this kind of ejection of compact structure makes the landing point of the ejection of compact limited with the mode of falling to the ground for during rubbish falls into the clearance pond perpendicularly, raise the dust easily, and this kind of ejection of compact mode also leads to the discharge gate to block up easily, has reduced the efficiency of construction. Therefore, the improvement is made, and the discharge structure of the construction waste pipeline is provided.
SUMMERY OF THE UTILITY MODEL
For solving the defect that prior art exists, the utility model provides a building rubbish pipeline's ejection of compact structure.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a discharge structure of a construction waste pipeline, which comprises a discharge port and a crushing pipeline, wherein the bottom of the discharge port is provided with the crushing pipeline, the crushing pipeline is connected with the discharge port through a buckle, one side of the crushing pipeline is provided with a first mounting plate, the first mounting plate and the crushing pipeline are fixed through screws, a motor is arranged at the top of the first mounting plate, the motor and the first mounting plate are fixed through a motor base, one end of the motor is provided with a first rotating shaft, the first rotating shaft is rotationally connected with the motor, one end of the first rotating shaft is provided with a first gear, the first gear and the first rotating shaft are fixed by penetration, the surface of the first rotating shaft is provided with a first crushing knife, and a second rotating shaft is arranged on one side of the first rotating shaft, a second gear is arranged at one end of the second rotating shaft, and the second gear is in meshed connection with the first gear.
As a preferred technical scheme of the utility model, the surface of second rotation axis is equipped with the crushing sword of second, the crushing sword of second and second rotation axis are fixed through alternating.
As an optimal technical scheme of the utility model, one side of smashing the pipeline is equipped with the through-hole, the through-hole inlays to be established on the lateral wall surface of smashing the pipeline.
As an optimal technical scheme of the utility model, bottom one side of smashing the pipeline is equipped with the second mounting panel, the second mounting panel passes through the screw fixation with smashing the pipeline.
As an optimal technical scheme of the utility model, the surface of second mounting panel is equipped with the water tank, the top of water tank is equipped with the water inlet.
As a preferred technical scheme of the utility model, one side of water tank is equipped with the water pipe, water pipe and water tank are fixed through alternating.
As an optimal technical scheme of the utility model, the middle part of water pipe is equipped with the water pump, water pump and second mounting panel pass through the screw fixation.
As an optimal technical scheme of the utility model, the bottom of smashing the pipeline is equipped with the direction pipeline, the direction pipeline passes through welded fastening with smashing the pipeline.
The utility model has the advantages that: the discharging structure of the building garbage pipeline realizes the crushing of garbage through the first crushing cutter and the second crushing cutter, thereby reducing the possibility of the garbage blocking in the pipeline, improving the working efficiency, realizing the flushing of the pipeline through the water tank and the water pump which are arranged, improving the convenience, realizing the change of direction through the guide pipeline which is arranged, thereby reducing the impact force when the garbage falls to the ground, improving the safety, solving the problems that the discharging structure of the existing building garbage pipeline is mostly a straight pipe, the discharging structure limits the landing point and the landing mode of discharging, enabling the garbage to fall into a cleaning pool vertically, easily lifting up dust, and the discharging mode also easily causes the blockage of a discharging port, reducing the construction efficiency, one side of the bottom of the crushing pipeline is provided with the second mounting plate, and the second mounting plate and the crushing pipeline are fixed through screws, one side of the bottom of the crushing pipeline is provided with a second mounting plate, so that the water tank is fixed, and the stability is improved.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of a discharge structure of a construction waste pipeline of the present invention;
fig. 2 is a schematic plan view of a discharge structure of a construction waste pipeline according to the present invention;
fig. 3 is an enlarged schematic structural diagram of the discharge structure a of the construction waste pipeline of the present invention.
In the figure: 1. a discharge port; 2. crushing the pipeline; 3. a first mounting plate; 4. a motor; 5. a first rotating shaft; 6. a first gear; 7. a first crushing cutter; 8. a second rotation shaft; 9. a second gear; 10. a second crushing cutter; 11. a through hole; 12. a second mounting plate; 13. a water tank; 14. a water inlet; 15. a water pipe; 16. a water pump; 17. and (5) guiding the pipeline.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Example (b): as shown in fig. 1, fig. 2 and fig. 3, the utility model relates to a discharge structure of construction waste pipeline, which comprises a discharge port 1 and a crushing pipeline 2, the bottom of the discharge port 1 is provided with the crushing pipeline 2, the crushing pipeline 2 is connected with the discharge port 1 by a buckle, one side of the crushing pipeline 2 is provided with a first mounting plate 3, the first mounting plate 3 is fixed with the crushing pipeline 2 by a screw, the top of the first mounting plate 3 is provided with a motor 4, the motor 4 and the first mounting plate 3 are fixed by a motor base, one end of the motor 4 is provided with a first rotating shaft 5, the first rotating shaft 5 is connected with the motor 4 in a rotating way, one end of the first rotating shaft 5 is provided with a first gear 6, the first gear 6 and the first rotating shaft 5 are fixed by penetration, the surface of the first rotating shaft 5 is provided with a first crushing cutter 7, one side of the first rotating shaft 5 is provided with a second rotating shaft 8, one end of the second rotating shaft 8 is provided with a second gear 9, the second gear 9 and the first gear 6 are in meshed connection.
Wherein, the surface of second rotation axis 8 is equipped with second crushing sword 10, and second crushing sword 10 and second rotation axis 8 are fixed through alternate, are equipped with second crushing sword 10 through the surface of second rotation axis 8, have realized the crushing of rubbish, have improved the function of this equipment.
Wherein, one side of smashing pipeline 2 is equipped with through-hole 11, and through-hole 11 inlays and establishes at the lateral wall surface of smashing pipeline 2, is equipped with through-hole 11 through one side of smashing pipeline 2, has realized the introduction of water to the realization is to the washing of pipeline, has improved the convenience.
Wherein, the bottom one side of smashing pipeline 2 is equipped with second mounting panel 12, and second mounting panel 12 passes through the screw fixation with smashing pipeline 2, is equipped with second mounting panel 12 through the bottom one side of smashing pipeline 2, has realized the fixed of water tank 13, has improved stability.
Wherein, the surface of second mounting panel 12 is equipped with water tank 13, and the top of water tank 13 is equipped with water inlet 14, is equipped with water tank 13 through the surface of second mounting panel 12, has realized the supply of water when wasing, has improved the convenience.
Wherein, one side of water tank 13 is equipped with water pipe 15, and water pipe 15 and water tank 13 are fixed through the interlude, are equipped with water pipe 15 through one side of water tank 13, have realized the drainage effect of water, have improved the convenience.
Wherein, the middle part of water pipe 15 is equipped with water pump 16, and water pump 16 and second mounting panel 12 pass through the screw fixation, and the middle part that leads to water pipe 15 is equipped with water pump 16, has realized the flow of water, has improved the dynamics of washing.
Wherein, the bottom of smashing pipeline 2 is equipped with guide pipeline 17, and guide pipeline 17 and crushing pipeline 2 pass through welded fastening, are equipped with guide pipeline 17 through the bottom of smashing pipeline 2, have realized the change of rubbish direction of leaving the way to reduce the impact force, improved the security.
When the garbage crusher works, when construction garbage falls into the crushing pipeline 2 from the discharge port 1, the motor 4 is started to drive the first rotating shaft 5 to rotate so as to drive the first crushing cutter 7 to rotate, when the first rotating shaft 5 rotates, the first gear 6 is driven to rotate so as to drive the second gear 9 to rotate, and further the second crushing cutter 10 is driven to rotate, so that the construction garbage is crushed, the water pump 16 is started to pump water in the water tank 13 into the crushing pipeline 2 to clean the inside of the crushing pipeline 2, the guide pipeline 17 is arranged at the bottom of the crushing pipeline 2, the guide pipeline 17 and the crushing pipeline 2 are fixed by welding, the guide pipeline 17 is arranged at the bottom of the crushing pipeline 2, so that the garbage descending direction is changed, so that the impact force is reduced, the second mounting plate 12 is arranged on one side of the bottom of the crushing pipeline 2, and the second mounting plate 12 and the crushing pipeline 2 are fixed by screws, the fixing of the water tank 13 is realized by arranging the second mounting plate 12 on one side of the bottom of the crushing pipe 2.
Finally, it should be noted that: in the description of the present invention, it should be noted that the terms "vertical", "upper", "lower", "horizontal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a discharge structure of building rubbish pipeline, includes discharge gate (1) and crushing pipeline (2), its characterized in that, the bottom of discharge gate (1) is equipped with crushing pipeline (2), crushing pipeline (2) and discharge gate (1) are connected through the buckle, one side of crushing pipeline (2) is equipped with first mounting panel (3), first mounting panel (3) and crushing pipeline (2) pass through the screw fixation, the top of first mounting panel (3) is equipped with motor (4), motor (4) and first mounting panel (3) are fixed through the motor cabinet, the one end of motor (4) is equipped with first rotation axis (5), first rotation axis (5) and motor (4) rotate to be connected, the one end of first rotation axis (5) is equipped with first gear (6), first gear (6) and first rotation axis (5) are fixed through interlude, the surface of first rotation axis (5) is equipped with first crushing sword (7), one side of first rotation axis (5) is equipped with second rotation axis (8), the one end of second rotation axis (8) is equipped with second gear (9), second gear (9) and first gear (6) are connected with meshing mutually.
2. The discharging structure of the construction waste pipeline according to claim 1, wherein the surface of the second rotating shaft (8) is provided with a second crushing knife (10), and the second crushing knife (10) and the second rotating shaft (8) are fixed by insertion.
3. The discharging structure of the construction waste pipeline according to claim 1, wherein a through hole (11) is formed at one side of the crushing pipeline (2), and the through hole (11) is embedded in the surface of the side wall of the crushing pipeline (2).
4. The discharging structure of the construction waste pipeline according to claim 1, wherein a second mounting plate (12) is arranged on one side of the bottom of the crushing pipeline (2), and the second mounting plate (12) and the crushing pipeline (2) are fixed through screws.
5. The discharging structure of construction waste pipe according to claim 4, characterized in that the surface of the second mounting plate (12) is provided with a water tank (13), and the top of the water tank (13) is provided with a water inlet (14).
6. The discharging structure of the construction waste pipeline according to claim 5, wherein a water pipe (15) is provided at one side of the water tank (13), and the water pipe (15) and the water tank (13) are fixed by inserting.
7. The discharging structure of the construction waste pipeline according to claim 6, wherein a water pump (16) is arranged in the middle of the water pipe (15), and the water pump (16) and the second mounting plate (12) are fixed through screws.
8. The discharge structure of the construction waste pipeline according to claim 1, characterized in that the bottom of the crushing pipeline (2) is provided with a guide pipeline (17), and the guide pipeline (17) and the crushing pipeline (2) are fixed by welding.
CN202022984592.9U 2020-12-10 2020-12-10 Discharge structure of building rubbish pipeline Expired - Fee Related CN214195406U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022984592.9U CN214195406U (en) 2020-12-10 2020-12-10 Discharge structure of building rubbish pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022984592.9U CN214195406U (en) 2020-12-10 2020-12-10 Discharge structure of building rubbish pipeline

Publications (1)

Publication Number Publication Date
CN214195406U true CN214195406U (en) 2021-09-14

Family

ID=77653232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022984592.9U Expired - Fee Related CN214195406U (en) 2020-12-10 2020-12-10 Discharge structure of building rubbish pipeline

Country Status (1)

Country Link
CN (1) CN214195406U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114084572A (en) * 2021-11-17 2022-02-25 西安居业建筑工程有限公司 Vertical transport channel for construction waste and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114084572A (en) * 2021-11-17 2022-02-25 西安居业建筑工程有限公司 Vertical transport channel for construction waste and use method thereof

Similar Documents

Publication Publication Date Title
CN210187390U (en) A breaker for building rubbish letter sorting
CN214195406U (en) Discharge structure of building rubbish pipeline
CN108745483A (en) A kind of multi-stage crushing device for building
CN213358860U (en) Hydraulic pipeline for hydraulic engineering
CN212926229U (en) Water conservancy sediment removal device
CN109653317A (en) A kind of crushing material case for sewage water lifter
CN209323675U (en) One kind having the integrated prefabricated pumping plant of automatically cleaning
CN215429422U (en) Dive is smashed nature grid
CN111037746A (en) Cement stirring device for power engineering
CN209317815U (en) A kind of settlement of sewage area grinding device
CN212077779U (en) Prevent stifled cistern among hydraulic engineering
CN214116582U (en) A reinforcing apparatus for collapsible loess foundation
CN112081546B (en) Resource recycling device for impact drilling and construction method thereof
CN213727835U (en) Construction is with simple and easy gravel screening plant of moulding
CN212866282U (en) Novel optimize prefabricated pump station
CN215802096U (en) Water conservancy water and electricity construction drainage device
CN218813439U (en) Air suction dredge for bridge construction
CN215367280U (en) Novel cast-in-place pile slag removal device
CN116220137A (en) Hydraulic engineering dredging device and use method thereof
CN215137728U (en) Clean sewage recovery unit that uses of building site vehicle
CN214363255U (en) Waterproof drainage device of hydraulic engineering construction
CN214210668U (en) Four-roller crusher with protective structure
CN216172570U (en) Can be to kibbling from mediation type recovery unit for job site of building rubbish
CN215857542U (en) Glass fiber reinforced plastic adjusting weir gate
CN213897404U (en) Sewage discharge structure that water conservancy construction used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518000 2908, building 4, phase II, Tianan Yungu Industrial Park, Gangtou community, Bantian street, Longgang District, Shenzhen, Guangdong

Patentee after: Shenzhen Huayu science and Industry Group Co.,Ltd.

Address before: 518000 2908, building 4, phase II, Tianan Yungu Industrial Park, Gangtou community, Bantian street, Longgang District, Shenzhen, Guangdong

Patentee before: Shenzhen Huahe Construction Group Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210914

CF01 Termination of patent right due to non-payment of annual fee