CN214168925U - Rubber roll built-in elastic ring hoop for sleeving positioning pile at wharf - Google Patents

Rubber roll built-in elastic ring hoop for sleeving positioning pile at wharf Download PDF

Info

Publication number
CN214168925U
CN214168925U CN202023124609.XU CN202023124609U CN214168925U CN 214168925 U CN214168925 U CN 214168925U CN 202023124609 U CN202023124609 U CN 202023124609U CN 214168925 U CN214168925 U CN 214168925U
Authority
CN
China
Prior art keywords
roller
positioning pile
hoop
steel
wharf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023124609.XU
Other languages
Chinese (zh)
Inventor
朱业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai China Communications Water Transportation Design & Research Co ltd
Original Assignee
Shanghai China Communications Water Transportation Design & Research Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai China Communications Water Transportation Design & Research Co ltd filed Critical Shanghai China Communications Water Transportation Design & Research Co ltd
Priority to CN202023124609.XU priority Critical patent/CN214168925U/en
Application granted granted Critical
Publication of CN214168925U publication Critical patent/CN214168925U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The rubber roll built-in elastic ring hoop for the wharf to sleeve the positioning pile comprises a steel hoop (1) and a PU roller (3); the steel anchor ear is characterized in that the steel anchor ear (1) is of a square annular structure, an anchor ring (2) is fixed on the inner wall of the steel anchor ear (1), and the anchor ring (2) is connected with two ends of the PU roller (3) through an anchor chain (4). The steel anchor ear (1) floats up and down relative to the positioning pile (5) to avoid direct rigid contact, so that the positioning of the pontoon (6) can be effectively realized, the PU wheel roller (3) can absorb the relative motion load of the pontoon (6) and the positioning pile (5), and the friction between the steel anchor ear (1) and the positioning pile (5) is obviously reduced, thereby effectively protecting the glass steel ladle coating of the positioning pile (5) and reducing the maintenance cost; the designed pile diameter of the positioning pile (5) is reduced, and the manufacturing cost is reduced; the pontoon (6) can float up and down along with the water level, and can keep stable in the wave, thereby ensuring the safety of the pontoon (6). The PU wheel roller (3) rotates and is also beneficial to reducing the friction between the steel anchor ear (1) and the positioning pile (5) when moving up and down, reducing the collision, protecting the pile body and reducing the frictional noise performance of mooring connection.

Description

Rubber roll built-in elastic ring hoop for sleeving positioning pile at wharf
Technical Field
The utility model relates to a port and pier's attached mooring protection equipment's institutional advancement technique is applied to floating wharf boat and is connected with the spud pile, and especially the pier is used for cup jointing the built-in rubber roll elastic ring staple bolt of spud pile.
Background
In the prior art, a pontoon is a rectangular flat-bottomed boat without a power device, is usually fixed on the shore, is only used as a pontoon initially, is used for loading and unloading goods or pedestrians, and is also used for business, entertainment, water office work and the like with the development of the times.
In the pontoon, which was basically positioned by a chain in the past, a spud-type pontoon now appears. The guide pile type structure of the steel pipe pile is generally selected for the positioning pile, and a single pontoon mode is adopted for a pontoon. The mooring mode can be used for performing wharf operation at any time, and the displacement of the wharf boat is small.
The pontoon is mostly used as a docking platform for loading and unloading ships, cargo transfer or transverse ferry, and the like. Because there is typically no power plant, a tug boat or other external force assistance is required to move. A wharf boat specially used for cargo transfer can be provided with a hoisting boom to hoist cargoes from a cargo ship which cannot lean against the bank and transfer the cargoes to the wharf.
At present, floating pontoon wharfs are mostly adopted for berthing the official working boats in river basin, and the floating pontoon wharf has the characteristics of good adaptability to water level change, low manufacturing cost, quick construction and flexible arrangement. The floating pontoon wharf is moored generally by means of anchor chains, anchors, strut systems or positioning piles. Under the limited circumstances of waters condition, more adoption guide pile combines the fixed mode of steel staple bolt to reduce waters usable floor area, the guide pile sets up in aquatic, sets up the steel staple bolt on the wharf boat, can effectively retrain the plane removal of wharf boat, simultaneously, allows the wharf boat freely to go up and down along with the water level change again. However, when the pontoon rises and falls along with the change of water level, the positioning pile and the steel anchor ear can generate severe collision friction due to rigid contact, so that the anticorrosive coating of the steel pile is damaged and peeled off, the pile body is corroded, and the service life of the steel pile is shortened. Increasing the cost of post-maintenance. The rust produced is not compatible with the surrounding ecological environment. And the friction generates larger noise, which affects the surrounding environment.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a pier is used for cup jointing the built-in rubber roll elastic ring staple bolt of spud, reduces the friction between steel staple bolt and the spud. The defect of the traditional steel anchor ear collision friction positioning pile body is overcome, the outer wall of the positioning pile is prevented from being corroded and falling, the corrosion of the positioning pile body is reduced, and the noise pollution is reduced.
The purpose of the utility model is realized by the following technical measures: a rubber roll built-in elastic ring hoop for a wharf to sleeve a positioning pile comprises a steel hoop and a PU roller, wherein the steel hoop and the PU roller are sleeved on the positioning pile; the steel anchor ear is of a square annular structure, an anchor ring is fixed on the inner wall of the steel anchor ear, and the anchor ring is connected with two ends of the PU roller through anchor chains.
In particular, the shaft part of the PU roller is provided with a through hole, the anchor chain is connected through the through hole, or the shaft rod is connected in the through hole in a penetrating way, and the anchor chain is connected at the outer end of the shaft rod.
Particularly, two ends of the middle shaft part of the PU roller are respectively provided with a hinge structure which is connected with the anchor chain through a bearing structure.
Particularly, each group of PU wheel rollers is fixedly connected by an upper group of anchor chains and a lower group of anchor chains, and two ends of the two groups of anchor chains are correspondingly tied on two pairs of anchor rings arranged on the upper part and the lower part of the inner wall of the steel anchor ear respectively.
Particularly, a group of PU wheel rollers are respectively arranged on four inner walls of the steel hoop.
Particularly, the outer diameter of the PU roller is 0.75-0.95 of the minimum clearance under the condition that the inner wall of the steel hoop and the outer wall of the positioning pile are coaxial.
In particular, the outer wall of the PU roller is provided with a convex edge or a straight groove.
In particular, the outer walls of the steel anchor ear and the PU roller are provided with polyurethane elastic protective layers.
In particular, at least two independent PU wheel rollers form a group and are connected with the same anchor chain together.
In particular, the outer wall of the positioning pile (5) is coated by glass fiber reinforced plastic.
The utility model discloses an advantage and effect: the PU wheel roller can absorb the relative motion load of the pontoon and the positioning pile, and the friction between the steel anchor ear and the positioning pile is obviously reduced, so that the glass fiber reinforced plastic coating of the positioning pile is effectively protected, and the maintenance cost is reduced; therefore, the designed pile diameter of the positioning pile can be properly reduced, and the manufacturing cost is reduced; the pontoon can float up and down along with the water level, and can keep stable in the wave, ensures the safety of the pontoon. Through PU wheel roller and spud cup joint the cooperation, when the steel staple bolt height changed along with the water level, floated about for the spud, can effectual realization pontoon location.
Drawings
Fig. 1 is a schematic view of a main view cross-section structure of embodiment 1 of the present invention.
Fig. 2 is a schematic top view of embodiment 1 of the present invention.
Fig. 3 is a schematic view of a planar installation structure for a berthing pontoon according to embodiment 1 of the present invention.
The reference numerals include:
1-anchor ear structure, 2-anchor ring, 3-PU roller, 4-anchor chain, 5-positioning pile, 6-pontoon, WL-water surface.
Detailed Description
The utility model discloses the principle lies in, not enough to above-mentioned prior art, combine novel material technique, set up elasticity isolating device in the side that steel staple bolt and spud are relative, 1 inboard of steel staple bolt sets up PU wheel roller 3, keep apart steel staple bolt 1 and spud 5, avoid direct rigid contact, PU wheel roller 3 rotates and still reduces and spud 5 between friction when doing benefit to steel staple bolt 1 and reciprocate in addition, alleviates the collision simultaneously, and the protection pile body reduces the mooring connection and connects the friction noise performance.
The utility model discloses be applied to and be connected fixedly between landing stage and the spud.
The present invention will be further explained with reference to the drawings and examples.
Example 1: as shown in attached figures 1 and 2, the rubber roll built-in elastic ring hoop for sleeving a positioning pile at a wharf comprises a steel hoop 1 and a PU roller 3; the steel anchor ear 1 is of a square annular structure, the inner wall of the steel anchor ear 1 is fixed with the anchor ring 2, and the anchor ring 2 is connected with the two ends of the PU roller 3 through the anchor chain 4.
In the above, the shaft of the PU roller 3 has a through hole through which the anchor chain 4 is connected, or a shaft rod is inserted into the through hole, and the anchor chain 4 is connected to the outer end of the shaft rod.
In the foregoing, two ends of the middle shaft part of the PU roller 3 are respectively provided with a hinge structure which is connected with the anchor chain 4 through a bearing structure.
In the foregoing, each group of PU roller 3 is connected and fixed by two groups of upper and lower anchor chains 4, and two ends of the two groups of anchor chains 4 are correspondingly tied to two pairs of anchor rings 2 installed on the upper and lower parts of the inner wall of the steel hoop 1.
In the foregoing, a set of PU roller 3 is respectively installed on four inner walls of the steel hoop 1.
In the above, the outer diameter of the PU roller 3 is 0.75-0.95 of the minimum clearance under the condition that the inner wall of the steel hoop 1 and the outer wall of the positioning pile 5 are coaxial.
In the foregoing, the outer wall of the PU roller 3 is provided with a convex edge or a straight groove.
In the above, at least two independent PU rollers 3 are grouped together and connected to the same anchor chain 4. So as to adapt to different postures of the steel hoop 1.
The embodiment of the utility model provides an in, PU takes turns 3 materials of roller to have the sound absorption effect, and material strength, abrasion resistance are high.
In the embodiment of the utility model, the outer cladding glass steel fiber material of 5 anticorrosive coatings of steel spud. The positioning pile 5 is externally coated with glass fiber reinforced plastics, so that the roller is prevented from being directly contacted with the coating, and the generation of rust can be further eliminated.
The embodiment of the utility model provides an in, as shown in figure 3, steel staple bolt 1 outer wall is connected in the 6 shipboards of wharf boat outside, steel staple bolt 1 cup joints on spud 5 simultaneously, 1 inboard PU wheel roller 3 of steel staple bolt keeps necessary sliding gap with 5 outer walls of spud, this clearance should not be too big, when wharf boat 6 goes up and down along with surface of water WL, take place the contact and rub the upset between PU wheel roller 3 and the 5 outer walls of spud, under the condition that does not take place direct collision as far as and do not produce great noise, accomplish the lift relative displacement.

Claims (10)

1. The rubber roll built-in elastic ring hoop for the wharf to be sleeved with the positioning pile comprises a steel hoop (1) and a PU roller (3), wherein the steel hoop (1) and the PU roller (3) are sleeved on the positioning pile (5); the steel anchor ear is characterized in that the steel anchor ear (1) is of a square annular structure, an anchor ring (2) is fixed on the inner wall of the steel anchor ear (1), and the anchor ring (2) is connected with two ends of the PU roller (3) through an anchor chain (4).
2. The rubber covered roller elastic ring hoop used for the wharf sleeved positioning pile in claim 1 is characterized in that a through hole is formed in the middle shaft part of the PU roller (3), and an anchor chain (4) penetrates through the through hole to be connected; a shaft rod is penetrated in the through hole, and an anchor chain (4) is connected at the outer end of the shaft rod.
3. The rubber covered roller elastic ring hoop for the wharf sleeved with the positioning pile as claimed in claim 1, wherein two ends of the middle shaft part of the PU roller (3) are respectively provided with a hinge structure to be connected with the anchor chain (4) through a bearing structure.
4. The rubber-covered elastic ring hoop for the wharf sleeved with a positioning pile as claimed in claim 1, wherein each group of PU roller (3) is fixedly connected by an upper group of anchor chains (4) and a lower group of anchor chains (4), and two ends of the two groups of anchor chains (4) are correspondingly tied on two pairs of anchor rings (2) arranged on the upper part and the lower part of the inner wall of the steel hoop (1) respectively.
5. The rubber-covered elastic ring hoop for the wharf sleeved with a positioning pile in claim 1 is characterized in that a group of PU rollers (3) are respectively arranged on four inner walls of the steel hoop (1).
6. The rubber covered roller elastic hoop for the wharf sleeved with the positioning pile as claimed in claim 1, wherein the outer diameter of the PU roller (3) is 0.75-0.95 of the minimum clearance under the condition that the inner wall of the steel hoop (1) and the outer wall of the positioning pile (5) are coaxial.
7. The rubber covered roller elastic ring hoop for the wharf sleeved with the positioning pile as claimed in claim 1, wherein the outer wall of the PU roller (3) is provided with a rib or a straight groove.
8. The rubber-covered elastic ring hoop for the wharf sleeved with a positioning pile as claimed in claim 1, wherein the outer walls of the steel hoop (1) and the PU roller (3) are provided with a polyurethane elastic protective layer.
9. The rubber covered roller elastic hoop for the wharf sleeved with the positioning pile as claimed in claim 1, wherein at least two independent PU roller (3) form a group and are connected with the same anchor chain (4) together.
10. The rubber covered elastic hoop for the wharf sleeved with the positioning pile as claimed in claim 1, wherein the outer wall of the positioning pile (5) is coated with glass fiber reinforced plastic.
CN202023124609.XU 2020-12-23 2020-12-23 Rubber roll built-in elastic ring hoop for sleeving positioning pile at wharf Active CN214168925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023124609.XU CN214168925U (en) 2020-12-23 2020-12-23 Rubber roll built-in elastic ring hoop for sleeving positioning pile at wharf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023124609.XU CN214168925U (en) 2020-12-23 2020-12-23 Rubber roll built-in elastic ring hoop for sleeving positioning pile at wharf

Publications (1)

Publication Number Publication Date
CN214168925U true CN214168925U (en) 2021-09-10

Family

ID=77607771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023124609.XU Active CN214168925U (en) 2020-12-23 2020-12-23 Rubber roll built-in elastic ring hoop for sleeving positioning pile at wharf

Country Status (1)

Country Link
CN (1) CN214168925U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114737517A (en) * 2022-04-12 2022-07-12 广东海润游艇码头设备科技有限公司 Pile holding mechanism for anchoring system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114737517A (en) * 2022-04-12 2022-07-12 广东海润游艇码头设备科技有限公司 Pile holding mechanism for anchoring system
CN114737517B (en) * 2022-04-12 2023-09-22 广东海润游艇码头设备科技有限公司 Pile holding mechanism for anchoring system

Similar Documents

Publication Publication Date Title
RU2673136C2 (en) Transfer structure, a transfer system and a method for transferring liquefied natural gas and / or transmitting electric power
CN100393576C (en) Berthing method and system
CN106114762B (en) Shallow water floating platform mooring gear and method
US3979785A (en) Combined catenary and single anchor leg mooring system
CN217198567U (en) Floating type offshore wind power platform rolling and loading transfer system
CN214168925U (en) Rubber roll built-in elastic ring hoop for sleeving positioning pile at wharf
EP1725447B1 (en) Floating structure
CN104619583A (en) Semi-submersible integrated port
CN103895819A (en) Buoy used for overwater aids to navigation and production method thereof
CN109159853B (en) Self-adaptive mooring device for offshore shallow water area
US5855178A (en) Taut leg mooring system
CN101481002B (en) Floating berth loading and unloading system
CN112455613A (en) Logistics support floating base for open sea oil and gas resource development
CN110949611A (en) Mooring device, ship and arrangement method of mooring device
CN203767029U (en) Water navigation aiding buoy
US10960958B2 (en) Device and method for securing a watercraft
CN110696963A (en) Ship wharf mooring method
KR20130127699A (en) Mooring device of floating plant and mooring method thereof
US3245438A (en) Ship mooring device
CN110205987B (en) Flexible docking railing
CN202642041U (en) Elastomer anticorrosion water drum body
CN219584405U (en) Single-point mooring oil conveying device
KR102270519B1 (en) Multi purpose sea work Barge with Vertical and Horizontal bouyancy Tanks
US4387660A (en) Single point mooring
CN203094382U (en) Floating production storage offloading (FPSO) dock mooring rope connection distributing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant