CN214149938U - Underground water taking device for engineering investigation drilling - Google Patents
Underground water taking device for engineering investigation drilling Download PDFInfo
- Publication number
- CN214149938U CN214149938U CN202023142059.4U CN202023142059U CN214149938U CN 214149938 U CN214149938 U CN 214149938U CN 202023142059 U CN202023142059 U CN 202023142059U CN 214149938 U CN214149938 U CN 214149938U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- water tank
- water
- base
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model relates to an engineering reconnaissance technical field just discloses an engineering reconnaissance drilling water intake device in pit, the on-line screen storage device comprises a base, the bottom fixedly connected with fixed block of base, the bottom fixedly connected with pulley of fixed block, one side fixedly connected with of base props up the piece, prop up the top fixedly connected with push rod of piece, the outer wall fixedly connected with antiskid cover of push rod, the fixed slot has been seted up in the front of base, the inner wall swing joint of fixed slot has the water tank. This water intaking device in pit of engineering reconnaissance drilling has reached this water intaking device in pit of engineering reconnaissance drilling and has collected convenient purpose to solved the inconvenient problem of water intaking device in pit of general engineering reconnaissance drilling and collected, the water of getting will carry out detached collection, just so can not obscure, cause the error of later stage detection, the water tank that the interlayer is clear has satisfied the demand of daily water intaking, the good engineering reconnaissance of can be better.
Description
Technical Field
The utility model relates to an engineering investigation technical field specifically is an engineering investigation drilling water intake device in pit.
Background
The engineering investigation is to research and find out the geological and geographic environmental characteristics of the engineering construction site and the comprehensive application science related to the engineering construction, for the planning, design, construction and operation and comprehensive treatment of the engineering of urban construction, industrial and civil construction, railways, roads, offshore ports, power transmission and pipeline engineering, water conservancy and hydraulic construction, mining and underground and the like, provides the basic data required by feasibility evaluation and construction through mapping, exploration, testing and comprehensive evaluation of the elements such as terrain, geology and hydrology, is the first link of basic construction, makes good engineering investigation, especially the first-stage investigation, can make detailed argumentation on the construction site, ensures the reasonable proceeding of the engineering, promotes the engineering to obtain the best economic, social and environmental benefits, and the drilling is the operation of processing a hole on a solid material by using a drill bit, and teaches the drilling work in the exploration work, and auxiliary tools needed by drilling and partial emergency measure methods, wherein some drill holes can be combined with exploration to exploit underground water, geothermy, oil gas and the like, so that an underground water taking device for the engineering exploration drill holes is needed.
However, the general engineering investigation drilling water intaking device in the market mostly has the inconvenient problem of collection at present, and the hand sample of water intaking needs to carry out detached collection, just so can carry out scientific sampling and detect, and it is inconvenient to collect, and unable detached water sample, and direct can influence the testing result and the judgement in later stage, causes serious consequence.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides an engineering reconnaissance drilling water intake device in pit possesses advantages such as collect convenience, has solved general engineering reconnaissance drilling water intake device in pit and has collected inconvenient problem.
(II) technical scheme
For realizing above-mentioned this engineering reconnaissance drilling water intake device in pit collects convenient purpose, the utility model provides a following technical scheme: the utility model provides an engineering investigation drilling underground water intake device, includes the base, the bottom fixedly connected with fixed block of base, the bottom fixedly connected with pulley of fixed block, one side fixedly connected with of base props up the piece, prop up the top fixedly connected with push rod of piece, the outer wall fixedly connected with antiskid cover of push rod, the fixed slot has been seted up in the front of base, the inner wall swing joint of fixed slot has the water tank, one side fixedly connected with supporting shoe of water tank, the inner wall swing joint of supporting shoe has the bolt.
The utility model discloses a water tank, including base, inside wall fixedly connected with waterproof baffle of water tank, one side fixedly connected with inlet tube of water tank, one side fixedly connected with waste pipe of water tank, one side fixedly connected with outlet pipe of water tank, the inner wall swing joint of outlet pipe has the valve, the top swing joint of valve has the movable rod, the draw-in groove has been seted up in the front of base, the inner wall swing joint of draw-in groove has the waste water tank, the delivery port has been seted up in the front of waste water tank, the inner wall swing joint of waste pipe has the small valve, the top fixedly connected with dead lever of small valve, the positive fixedly connected with of water tank observes glass.
Preferably, the front surface of the water tank is provided with an observation groove, and the shape and size of the observation groove are matched with those of the observation glass.
Preferably, the shape and size of the fixed groove are matched with those of the water tank, and the base is movably connected with the water tank through the fixed groove.
Preferably, the front surface of the water outlet pipe is provided with a valve opening, and the shape and the size of the valve opening are matched with those of the valve.
Preferably, the front surface of the waste water pipe is provided with a small valve port, and the shape and the size of the small valve port are matched with those of the small valve.
Preferably, the shape and size of the anti-skid sleeve are matched with those of the push rod, and the anti-skid sleeve is a rubber anti-skid sleeve.
Preferably, the number of pulleys is four, and every two pulleys are a set of, and two sets of pulleys use the perpendicular bisector of base to set up as symmetry axis symmetry.
(III) advantageous effects
Compared with the prior art, the utility model provides an engineering reconnaissance drilling is water intake device in pit possesses following beneficial effect:
1. this water intaking device in pit of engineering reconnaissance drilling, by the base, the fixed slot, the water tank, the supporting shoe, the bolt, water proof baffle, the inlet tube, the waste pipe, the outlet pipe, the valve, the movable rod, mutually supporting of little valve and dead lever is used, reached this water intaking device in pit of engineering reconnaissance drilling and collected convenient purpose, thereby solved the inconvenient problem of water intaking device in pit of general engineering reconnaissance drilling and collected, the water of getting will carry out detached collection, just so can not obscure, cause the error of later stage detection, the water tank that the interlayer is clear, the demand of daily water intaking has been satisfied, good engineering reconnaissance that can be better.
2. This water intaking device in pit of engineering reconnaissance drilling, through the use of mutually supporting of base, outlet pipe, valve, movable rod, draw-in groove, waste water tank and delivery port, reached this water intaking device in pit of engineering reconnaissance drilling waste water and collected convenient purpose, the water of getting all need handle after a small amount of uses, the convenient collection that carries on waste water lets daily sample work become simpler operation more.
3. This water intaking device in pit of engineering reconnaissance drilling uses through mutually supporting of base, fixed block and pulley, has reached this water intaking device in pit of engineering reconnaissance drilling and has removed convenient purpose, and the device needs remove according to the position removal of engineering reconnaissance, and the pulley can make things convenient for thrust unit to any place, satisfies the demand.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a front view of the present invention;
fig. 3 is a rear view of the present invention;
fig. 4 is an enlarged view of a structure a in fig. 1 according to the present invention.
In the figure: 1. a base; 2. a fixed block; 3. a pulley; 4. supporting a block; 5. a push rod; 6. an anti-slip sleeve; 7. fixing grooves; 8. a water tank; 9. a support block; 10. a bolt; 11. a waterproof partition plate; 12. a water inlet pipe; 13. a waste pipe; 14. a water outlet pipe; 15. a valve; 16. a movable rod; 17. a card slot; 18. a wastewater tank; 19. a water outlet; 20. a small valve; 21. fixing the rod; 22. the glass was observed.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, an underground water intake device for engineering investigation borehole comprises a base 1, a fixed block 2 is fixedly connected to the bottom of the base 1, pulleys 3 are fixedly connected to the bottom of the fixed block 2, the number of the pulleys 3 is four, every two pulleys 3 are in one group, two groups of pulleys 3 are symmetrically arranged by taking the perpendicular bisector of the base 1 as a symmetry axis, a supporting block 4 is fixedly connected to one side of the base 1, and the pulley 3, the fixed block 2 and the pulley 1 are used in a mutually matched manner, so that the purpose of convenient movement of the underground water intake device for engineering investigation is achieved, the device needs to move according to the position movement of the engineering investigation, the pulley 3 can conveniently push the device to any place to meet the requirement, a push rod 5 is fixedly connected to the top of the supporting block 4, a sleeve 6 is fixedly connected to the outer wall of the anti-skid push rod 5, and the shape and size of the anti-skid sleeve 6 are matched with the shape and size of the push rod 5, the anti-slip sleeve 6 is made of rubber, the rubber is an elastic polymer and can be obtained from sap of some plants or artificial, the rubber can be divided into synthetic rubber and natural rubber according to different manufacturing modes, the front face of the base 1 is provided with a fixing groove 7, the inner wall of the fixing groove 7 is movably connected with a water tank 8, one side of the water tank 8 is fixedly connected with a supporting block 9, and the inner wall of the supporting block 9 is movably connected with a bolt 10.
A waterproof clapboard 11 is fixedly connected on the inner side wall of the water tank 8, a water inlet pipe 12 is fixedly connected on one side of the water tank 8, the shape and size of the fixed groove 7 are matched with those of the water tank 8, the base 1 is movably connected with the water tank 8 through the fixed groove 7, a waste water pipe 13 is fixedly connected on one side of the water tank 8, a small valve port is arranged on the front surface of the waste water pipe 13, the shape and size of the small valve port are matched with those of the small valve 20, a water outlet pipe 14 is fixedly connected on one side of the water tank 8, a valve 15 is movably connected on the inner wall of the water outlet pipe 14, a valve port is arranged on the front surface of the water outlet pipe 14, the shape and size of the valve port are matched with those of the valve 15, a movable rod 16 is movably connected on the top of the valve 15, a clamping groove 17 is arranged on the front surface of the base 1, a waste water tank 18 is movably connected with the inner wall of the clamping groove 17, and a water outlet 19 is arranged on the front surface of the waste water tank 18, the purpose of conveniently collecting the waste water of the underground water taking device for the engineering exploration drilling is achieved through the mutual matching use of the base 1, the water outlet pipe 14, the valve 15, the movable rod 16, the clamping groove 17, the waste water box 18 and the water outlet 19, the purpose of conveniently collecting the waste water of the underground water taking device for the engineering exploration drilling is achieved, the collected water needs to be treated after a small amount of water is used, the collection of the waste water is conveniently carried out, the daily sampling work becomes simpler operation, the inner wall of the waste water pipe 13 is movably connected with the small valve 20, the top of the small valve 20 is fixedly connected with the fixed rod 21, and then the base 1, the fixed groove 7, the water box 8, the supporting block 9, the bolt 10, the waterproof partition plate 11, the water inlet pipe 12, the waste water pipe 13, the water outlet pipe 14, the valve 15, the movable rod 16, the small valve 20 and the fixed rod 21 are mutually matched for use, the purpose of conveniently collecting the underground water taking device for the engineering exploration drilling is achieved, so that the problem of inconvenient collection of the underground water taking device for the engineering exploration drilling is solved, the water of getting will carry out detached collection, just so can not obscure, causes the error of later stage detection, and the water tank 8 that the interlayer is clear has satisfied the demand of daily water intaking, and good cooperation engineering investigation that can be better, the positive fixedly connected with observation glass 22 of water tank 8, and the observation groove has been seted up in the front of water tank 8, and the shape size of observation groove all matches each other with the shape size of observation glass 22.
When the water tank waste water collecting device is used, the water tank 8 is placed into the fixing groove 7, the water tank 8 is reinforced from two sides through the supporting blocks 9 and is fixed through the bolts 10, collected water is respectively injected into different layers through the water inlet pipe 12 to be collected, waste water which is not needed is extracted through the valve 15 by pulling the movable rod 16 and is injected into the waste water tank 18 through the water outlet pipe 14, the waste water tank 18 is moved out of the clamping groove 17 and is poured out through the water outlet 19, and operation is completed.
To sum up, this water intaking device in pit of engineering reconnaissance drilling has reached this water intaking device in pit of engineering reconnaissance drilling and has collected convenient purpose, and the water of getting will carry out detached collection, when detecting once more, just can distinguish, can not obscure, causes the error of later stage detection, and the clear water tank 8 of interlayer has satisfied the demand of daily water intaking, good engineering reconnaissance of cooperation that can be better.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides an engineering investigation drilling is water intake device in pit, includes base (1), its characterized in that: the bottom of the base (1) is fixedly connected with a fixed block (2), the bottom of the fixed block (2) is fixedly connected with a pulley (3), one side of the base (1) is fixedly connected with a supporting block (4), the top of the supporting block (4) is fixedly connected with a push rod (5), the outer wall of the push rod (5) is fixedly connected with an anti-skidding sleeve (6), the front side of the base (1) is provided with a fixed groove (7), the inner wall of the fixed groove (7) is movably connected with a water tank (8), one side of the water tank (8) is fixedly connected with a supporting block (9), and the inner wall of the supporting block (9) is movably connected with a bolt (10);
the inner side wall of the water tank (8) is fixedly connected with a waterproof partition board (11), one side of the water tank (8) is fixedly connected with a water inlet pipe (12), one side of the water tank (8) is fixedly connected with a waste water pipe (13), one side of the water tank (8) is fixedly connected with a water outlet pipe (14), the inner wall of the water outlet pipe (14) is movably connected with a valve (15), the top of the valve (15) is movably connected with a movable rod (16), the front surface of the base (1) is provided with a clamping groove (17), the inner wall of the clamping groove (17) is movably connected with a waste water tank (18), a water outlet (19) is arranged on the front surface of the waste water tank (18), the inner wall of the waste water pipe (13) is movably connected with a small valve (20), the top of the small valve (20) is fixedly connected with a fixed rod (21), and the front of the water tank (8) is fixedly connected with observation glass (22).
2. The apparatus of claim 1, wherein: an observation groove is formed in the front face of the water tank (8), and the shape and size of the observation groove are matched with those of the observation glass (22).
3. The apparatus of claim 1, wherein: the shape and size of the fixing groove (7) and the shape and size of the water tank (8) are matched with each other, and the base (1) is movably connected with the water tank (8) through the fixing groove (7).
4. An apparatus for taking water from a borehole in an engineering survey as claimed in claim 1, wherein: the front surface of the water outlet pipe (14) is provided with a valve opening, and the shape and the size of the valve opening are matched with those of the valve (15).
5. The apparatus of claim 1, wherein: the front surface of the waste water pipe (13) is provided with a small valve port, and the shape and the size of the small valve port are matched with those of the small valve (20).
6. The apparatus of claim 1, wherein: the shape and size of the anti-skid sleeve (6) are matched with those of the push rod (5), and the anti-skid sleeve (6) is a rubber anti-skid sleeve.
7. The apparatus of claim 1, wherein: the quantity of pulley (3) is four, and per two pulley (3) are a set of, and two sets of pulley (3) use the perpendicular bisector of base (1) to set up as symmetry axis symmetry.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023142059.4U CN214149938U (en) | 2020-12-23 | 2020-12-23 | Underground water taking device for engineering investigation drilling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023142059.4U CN214149938U (en) | 2020-12-23 | 2020-12-23 | Underground water taking device for engineering investigation drilling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214149938U true CN214149938U (en) | 2021-09-07 |
Family
ID=77530163
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023142059.4U Active CN214149938U (en) | 2020-12-23 | 2020-12-23 | Underground water taking device for engineering investigation drilling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214149938U (en) |
-
2020
- 2020-12-23 CN CN202023142059.4U patent/CN214149938U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110082164B (en) | Underground water multilayer undisturbed monitoring system | |
CN104697914B (en) | The Forecasting Methodology in the dissimilar organic hole of a kind of mud shale | |
AU2020100817A4 (en) | A Placement Wetland Soil Water Collecting And Monitoring Device And An Application Method Thereof | |
CN210427082U (en) | Geological exploration sampling device | |
CN105092450A (en) | Low-permeability saturated clay permeation testing instrument and method | |
CN108930261B (en) | Civil engineering is with device of fetching earth fast | |
CN110542585B (en) | Placed wetland soil water collection and monitoring device and application method | |
Dorsey et al. | A comparison of four field methods for measuring saturated hydraulic conductivity | |
CN113740508A (en) | Test method for simulating landslide to convert landslide into debris flow | |
CN209086009U (en) | A kind of practical river water sampler | |
CN214149938U (en) | Underground water taking device for engineering investigation drilling | |
CN103726841A (en) | Portable geological prospecting sampling drill | |
CN103594020A (en) | Device and method for detecting runoff producing positions on karst slope surface | |
CN211401722U (en) | Soil sampling device is used in geology reconnaissance | |
Link et al. | Effects of coppice dune topography and vegetation on soil water dynamics in a cold-desert ecosystem | |
CN212083426U (en) | Adjustable karst underground water and soil leakage simulator | |
CN203455195U (en) | Visible bottom mud collector | |
CN112330485B (en) | Method and system for storing water resources by using underground flood-flushing fan | |
CN212693353U (en) | Sampling equipment convenient to groundwater pollution detection | |
Price et al. | The influence of unlined boreholes on groundwater chemistry: A comparative study using pore‐water extraction and packer sampling | |
CN205067484U (en) | Domatic interflow velocity of flow and flow measurement system | |
CN204758452U (en) | Hypotonicity saturated clay infiltration apparatus | |
Moreira et al. | Electrical resisitivity to detect zones of biogas accumulation in a landfill | |
CN111443185A (en) | Adjustable karst underground water and soil leakage simulator | |
CN208502697U (en) | A kind of mud pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |