CN214144582U - Mortar strickle - Google Patents

Mortar strickle Download PDF

Info

Publication number
CN214144582U
CN214144582U CN202023062653.2U CN202023062653U CN214144582U CN 214144582 U CN214144582 U CN 214144582U CN 202023062653 U CN202023062653 U CN 202023062653U CN 214144582 U CN214144582 U CN 214144582U
Authority
CN
China
Prior art keywords
tube
shaft pump
lifting
supporting tube
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023062653.2U
Other languages
Chinese (zh)
Inventor
徐晓洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202023062653.2U priority Critical patent/CN214144582U/en
Application granted granted Critical
Publication of CN214144582U publication Critical patent/CN214144582U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses a mortar strickles off ware, including the same first stay tube of specification and second stay tube, first lifter and second lifter that the suit specification is the same in first stay tube and the second stay tube respectively, first lifter and second lifter are outer the same first fall way of suit specification and second fall way of difference. The mortar strickle is strong in ductility, time-saving and labor-saving, and improves the working efficiency of workers.

Description

Mortar strickle
Technical Field
The utility model relates to an auxiliary assembly that mortar wall strickleed off specifically is a mortar strickles off ware.
Background
In the building decoration and finishing engineering, the slicker is mostly used for leveling the wall surface, and the wall surface is slicked by the slicker, so that the wall surface has good finish and smoothness, and the overall attractiveness of the wall surface is enhanced.
The wall surface scraping work amount is large, the technical requirement is high, and the labor intensity of workers is high. At present, the strickle of wall is still mainly with manual operation, the workman is held the strickle and is strickleed off the wall by hand, the structure of present strickle off the ware is mostly fairly simple, strickle off the ware including strickle off the board and set up the handle on strickleing off the board, strickle off board and handle fixed connection, during the use, the workman is held the handle by hand, smooth repeatedly on the wall, strickle off the wall, sometimes the wall broad or when higher, the workman will use very big power just can strickle off whole wall, work efficiency is very low, high labor strength.
The existing strickle uses the electric automatic strickle to strickle off a bit, has saved workman's intensity of labour, but the ductility of the electric strickle off is poor, need many times work to accomplish the work of strickleing off of the whole wall when the wall is broad or higher, between the adjacent wall of strickleing off, still can produce the phenomenon of unevenness.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a mortar strickle to the not enough of existence among the prior art. The mortar strickle is strong in ductility, time-saving and labor-saving, and improves the working efficiency of workers.
Realize the utility model discloses the technical scheme of purpose is:
a mortar strickle comprises a first supporting tube and a second supporting tube which have the same specification, wherein a first through hole and a second through hole which have the same position and have the same central point on the same horizontal line are respectively arranged on the first supporting tube and the second supporting tube, a first lifting rod and a second lifting rod which have the same specification are respectively sleeved in the first supporting tube and the second supporting tube, a first lifting tube and a second lifting tube which have the same specification are respectively sleeved outside the first lifting rod and the second lifting rod, the tops of the first lifting tube and the second lifting tube are sealed, a first sleeve and a second sleeve which have the same position are respectively arranged in the first lifting tube and the second lifting tube, detachable springs are respectively arranged in the first sleeve and the second sleeve, the first lifting tube and the second lifting tube are respectively sleeved in the first supporting tube and the second supporting tube, a first shaft pump and a second shaft pump which have the same specification and are provided with a group of rolling shafts are respectively sleeved outside the first supporting tube and the second supporting tube, the first shaft pump and the second shaft pump can respectively move on the first supporting tube and the second supporting tube, a pull rope which can be contracted on the first shaft pump or the second shaft pump is arranged between the first shaft pump and the second shaft pump,
first lifter includes first fixed pipe, first riser, first rack and the first bracing piece of sequence connection, is equipped with the first scroll bar and the first turbine of meshing in the first riser, first turbine and the meshing of first rack, and in the first fixed pipe of the rotatory first scroll bar of first rack accessible withdrawal, when first lifter emboliaed first bracing piece after, the rotatory mouth of first scroll bar is just to first through-hole.
The first and second sleeves are the same length as the first and second elevator tubes.
And a first pull rod and a second pull rod which can pull the first shaft pump and the second shaft pump to move on the first supporting pipe and the second supporting pipe are respectively arranged on the first shaft pump and the second shaft pump.
The first lifting pipe drives the first turbine, the first rack and the first supporting rod to lift simultaneously by rotating the first worm.
The number of the rollers on the first shaft pump is 4, wherein two rollers are opposite to the other two rollers.
The first supporting tube, the second supporting tube, the first lifting tube and the second lifting tube are square tubes.
First elevator pipe is through rotatory first scroll bar drive first turbine, first rack and first bracing piece when rising to the highest, highly can reach 4 meters, can adjust first bracing piece, first fixed pipe, first rack, first bracing piece and first elevator pipe length simultaneously according to the wall height to reach and accord with the wall height requirement.
First scroll bar and second scroll bar adopt electronic drive synchronous revolution when rotatory, are convenient for first fall way and second fall way and arrive the wall height that needs strickle fast simultaneously.
The assembling process comprises the following steps: the first scroll bar is rotated, so that the first scroll bar drives the first turbine and the first rack to contract until the first rack completely contracts into the first fixing pipe, the first lifting rod is sleeved into the first supporting pipe, the spring is arranged in the first supporting pipe, the first supporting rod is aligned to the first sleeve, then the first lifting pipe is sleeved into the first supporting pipe, the first shaft pump is sleeved outside the first supporting pipe, the assembling process of the second supporting pipe is the same as that of the first supporting pipe, after the first supporting pipe and the second supporting pipe are sleeved, the pull rope on the first shaft pump or the second shaft pump is stretched to the second shaft pump or the first shaft pump to be fixed.
The working process is as follows: after the wall mortar has been smeared, place the both sides limit at the wall with the first stay tube and the second stay tube that the equipment was accomplished, the first scroll bar of electric control and second scroll bar, make first fall way and second fall way rise to the topmost of wall, then supplementary use infrared spirit level to beat a horizontal straight line on the wall, according to the horizontal straight line of infrared spirit level, adjust first axle pump and second axle pump, make the stay cord and the horizontal straight line parallel and level of infrared spirit level, through spur first pull rod and second pull rod on first axle pump and the second axle pump simultaneously, make first axle pump and second axle pump move about from top to bottom at first stay tube and first fall way and second stay tube and second fall way respectively, thereby drive the stay cord and strike off the mortar of unevenness on the wall.
If the pull rod is not used, the controller can be arranged on the first shaft pump and the second shaft pump, and the first shaft pump and the second shaft pump can move up and down on the first supporting pipe, the first lifting pipe, the second supporting pipe and the second lifting pipe respectively in a remote control mode.
The mortar strickle is strong in ductility, time-saving and labor-saving, and improves the working efficiency of workers.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment;
FIG. 2 is a schematic view of a first lift pin according to an embodiment;
FIG. 3 is a schematic view of a first axial pump according to an embodiment.
In the figure, 1, a first supporting pipe 2, a second supporting pipe 3, a first lifting rod 4, a second lifting rod 5, a first lifting pipe 6, a second lifting pipe 7, a first sleeve 71, a second sleeve 8, a first shaft pump 9, a second shaft pump 10, a pull rope 11, a first fixed pipe 12, a first lifter 13, a first rack 14, a first supporting rod 15, a first scroll rod 151, a second scroll rod 16, a first turbine 17 and a roller 18 spring.
Detailed Description
The contents of the present invention will be further described with reference to the accompanying drawings and examples, but the present invention is not limited thereto.
Example (b):
referring to fig. 1, a mortar slicker comprises a first supporting tube 1 and a second supporting tube 2 with the same specification, wherein the first supporting tube 1 and the second supporting tube 2 are respectively provided with a first through hole and a second through hole which have the same position and the same central point on the same horizontal line, a first lifting rod 3 and a second lifting rod 4 with the same specification are respectively sleeved in the first supporting tube 1 and the second supporting tube 2, the first lifting rod 3 and the second lifting rod 4 are respectively sleeved with a first lifting tube 5 and a second lifting tube 6 with the same specification, the tops of the first lifting tube 5 and the second lifting tube 6 are sealed, the first lifting tube 5 and the second lifting tube 6 are respectively provided with a first sleeve 7 and a second sleeve 71 with the same position, the first sleeve 7 and the second sleeve 71 are respectively provided with a detachable spring 18, the first lifting tube 5 and the second lifting tube 6 are respectively sleeved in the first supporting tube 1 and the second supporting tube 2, a first shaft pump 8 and a second shaft pump 9 which have the same specification and are provided with a group of rollers 17 are respectively sleeved outside the first supporting pipe 1 and the second supporting pipe 2, the first shaft pump 8 and the second shaft pump 9 can respectively move on the first supporting pipe 1 and the second supporting pipe 2, a pull rope 10 which can be contracted on the first shaft pump 8 or the second shaft pump 9 is arranged between the first shaft pump 8 and the second shaft pump 9,
as shown in fig. 2, the first lifting rod 3 includes a first fixed pipe 11, a first lifter 12, a first rack 13 and a first support rod 14, which are connected in sequence, a first worm 15 and a first worm wheel 16 are arranged in the first lifter 12, the first worm wheel 16 is meshed with the first rack 13, the first rack 13 can be retracted into the first fixed pipe 11 by rotating the first worm 15, and when the first lifting rod 3 is sleeved in the first support pipe 1, a rotation port of the first worm wheel 15 faces the first through hole.
The first and second thimbles 7 and 71 are the same length as the first and second elevator tubes 5 and 6.
The first shaft pump 8 and the second shaft pump 9 are respectively provided with a first pull rod and a second pull rod which can pull the first shaft pump 8 and the second shaft pump 9 to move on the first supporting pipe 1 and the second supporting pipe 2.
The first lifting pipe 5 drives the first worm wheel 16, the first rack 13 and the first support rod 14 to lift and lower simultaneously by rotating the first worm 15.
As shown in fig. 3, the number of the rollers 17 on the first shaft pump 8 is 4, wherein two rollers 17 are opposite to the other two rollers 17.
The first support tube 1, the second support tube 2, the first elevator tube 5 and the second elevator tube 6 are square tubes.
First fall way 5 drives first turbine 16, first rack 13 and first bracing piece 14 through rotatory first scroll bar 15 and rises to when the highest, highly can reach 4 meters, can adjust first bracing piece 1, first fixed pipe 11, first rack 13, first bracing piece 14 and first fall way 5 length simultaneously according to the wall height to reach and accord with the wall height requirement.
The first scroll bar 15 and the second scroll bar 151 are electrically driven to rotate when rotating.
The pull cord 10 in this example is a steel cord.
The assembling process comprises the following steps: the first scroll bar 15 is rotated, so that the first scroll bar 15 drives the first turbine 16 and the first rack 13 to contract until the first rack 13 completely contracts into the first fixed pipe 11, the first lifting rod 3 is sleeved in the first supporting pipe 1, the spring 18 is arranged in the first sleeve 7, the first supporting rod 14 is aligned to the first sleeve 7, then the first lifting pipe 5 is sleeved in the first supporting pipe 1, the first shaft pump 8 is sleeved outside the first supporting pipe 1, the assembly process of the second supporting pipe 2 is the same as that of the first supporting pipe 1, and after the first supporting pipe 1 and the second supporting pipe 2 are sleeved, the pull rope 10 on the first shaft pump 8 or the second shaft pump 9 is stretched to the second shaft pump 9 or the first shaft pump 8 to be fixed.
The working process is as follows: after wall mortar has been smeared, place the both sides limit at the wall with first stay tube 1 and the second stay tube 2 that the equipment was accomplished, the first scroll bar 15 of electric control and second scroll bar 151, make first fall way 5 and second fall way 6 rise to the topmost of wall, then supplementary use infrared spirit level to beat a horizontal straight line on the wall, according to the horizontal straight line of infrared spirit level, adjust first axial pump 8 and second axial pump 9, make stay cord 10 and infrared spirit level's horizontal straight line parallel and level, through first pull rod and the second pull rod on spur first axial pump 8 and second axial pump 9 simultaneously, make first axial pump 8 and second axial pump 9 move about from top to bottom at first stay tube 1 and first fall way 5 and second stay tube 2 and second fall way 6 respectively, thereby drive stay cord 10 and scrape out the mortar of unevenness on the wall.
If the pull rod is not used, a controller can be arranged on the first shaft pump 8 and the second shaft pump 9, and the first shaft pump 8 and the second shaft pump 9 can move up and down on the first supporting pipe 1, the first lifting pipe 5, the second supporting pipe 2 and the second lifting pipe 6 respectively in a remote control mode.

Claims (4)

1. A mortar strickle is characterized by comprising a first supporting tube and a second supporting tube which have the same specification, wherein a first through hole and a second through hole which have the same position and have the same central point on the same horizontal line are respectively arranged on the first supporting tube and the second supporting tube, a first lifting rod and a second lifting rod which have the same specification are respectively sleeved in the first supporting tube and the second supporting tube, a first lifting tube and a second lifting tube which have the same specification are respectively sleeved outside the first lifting rod and the second lifting rod, the tops of the first lifting tube and the second lifting tube are sealed, a first sleeve and a second sleeve which have the same position are respectively arranged in the first lifting tube and the second lifting tube, detachable springs are respectively arranged in the first sleeve and the second sleeve, the first lifting tube and the second lifting tube can be respectively sleeved in the first supporting tube and the second supporting tube, a first shaft pump and a second shaft pump which have the same specification and are provided with a group of rolling shafts are respectively sleeved outside the first supporting tube and the second supporting tube, the first shaft pump and the second shaft pump can respectively move on the first supporting tube and the second supporting tube, a pull rope which can be contracted on the first shaft pump or the second shaft pump is arranged between the first shaft pump and the second shaft pump,
first lifter includes first fixed pipe, first riser, first rack and the first bracing piece of sequence connection, is equipped with the first scroll bar and the first turbine of meshing in the first riser, first turbine and the meshing of first rack, and in the first fixed pipe of the rotatory first scroll bar of first rack accessible withdrawal, when first lifter emboliaed first bracing piece after, the rotatory mouth of first scroll bar is just to first through-hole.
2. The mortar screed of claim 1, wherein the first and second thimbles are the same length as the first and second elevator tubes.
3. The mortar screed according to claim 1, wherein the first shaft pump and the second shaft pump are respectively provided with a first pull rod and a second pull rod which can pull the first shaft pump and the second shaft pump to move on the first support pipe and the second support pipe.
4. The mortar screed according to claim 1, wherein the first lifting pipe drives the first turbine, the first rack, and the first support rod to be lifted and lowered simultaneously by rotating the first scroll rod.
CN202023062653.2U 2020-12-18 2020-12-18 Mortar strickle Active CN214144582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023062653.2U CN214144582U (en) 2020-12-18 2020-12-18 Mortar strickle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023062653.2U CN214144582U (en) 2020-12-18 2020-12-18 Mortar strickle

Publications (1)

Publication Number Publication Date
CN214144582U true CN214144582U (en) 2021-09-07

Family

ID=77588186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023062653.2U Active CN214144582U (en) 2020-12-18 2020-12-18 Mortar strickle

Country Status (1)

Country Link
CN (1) CN214144582U (en)

Similar Documents

Publication Publication Date Title
CN214144582U (en) Mortar strickle
CN212105028U (en) Safe type scaffold frame for construction
CN210659336U (en) Automatic wall building machine
CN218561044U (en) A operation platform for installing template
CN206769351U (en) A kind of regularization hoistway operation platform hoisting frame
CN108979094A (en) One kind patch exterior wall brick device for building and application method
CN215926629U (en) Scaffold frame that building engineering used
CN213654128U (en) Spraying and plastering device for civil and industrial construction
CN109748194A (en) A kind of hoisting equipment for building
CN210239082U (en) Temporary hydropower integrated bracket for construction site
CN208792800U (en) A kind of elevating mechanism that exterior wall glass cleaning uses
CN214422208U (en) Worker is high altitude protection hanging flower basket for civil engineering
CN218665305U (en) Adjustable engineering hanging basket
CN217975296U (en) Constructional engineering steel construction support frame
CN210065023U (en) High-rise material lifting device
CN220451368U (en) Intelligence auxiliary stay frame convenient to adjust
CN219548294U (en) Impact assembly for firm tile
CN114014176B (en) Indoor and outdoor universal crane applicable to various building models and hoisting method
CN219118679U (en) Vertical automatic wall brick sticking machine
CN206901618U (en) A kind of architectural engineering lowering or hoisting gear
CN216889993U (en) Lifting device for building construction and supervision
CN213950475U (en) Lifting machine for constructional engineering
CN220791169U (en) Annular drill rod power tongs convenient to carry
CN219587167U (en) Scaffold for building engineering
CN212957485U (en) Large-area wall decoration plastering device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant