CN214091326U CN202023061647.5U CN202023061647U CN214091326U CN 214091326 U CN214091326 U CN 214091326U CN 202023061647 U CN202023061647 U CN 202023061647U CN 214091326 U CN214091326 U CN 214091326U
Authority
CN
China
Prior art keywords
connecting seat
block
fixedly connected
fence
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023061647.5U
Other languages
Chinese (zh)
Inventor
姚莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202023061647.5U priority Critical patent/CN214091326U/en
Application granted granted Critical
Publication of CN214091326U publication Critical patent/CN214091326U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a forestry investigation planning is with site operation rail, including first rail frame and second rail frame, the first connecting seat of one side fixedly connected with of first rail frame, the fixed surface of first connecting seat is connected with first stopper, the one end threaded connection of first stopper has first fastening bolt, the inner wall swing joint of first connecting seat has the connecting block, the one end swing joint that first connecting seat was kept away from to the connecting block has the second connecting seat, the fixed surface of second connecting seat is connected with the second stopper, the surface threaded connection of second stopper has second fastening bolt, the one end of second connecting seat and one side fixed connection of second rail frame. Can rotate the connecting block at the inner wall of first connecting seat and second connecting seat and fold first rail frame and second rail frame to reach the portable purpose in folding rear, twist and move first fastening bolt and second fastening bolt and carry out spacing fixed through first stopper and second stopper to the connecting block.

Description

Forestry investigation planning is with site operation rail
Technical Field
The utility model relates to a site operation rail technical field specifically is a forestry investigation planning is with site operation rail.
Background
The investigation of forest land, forest and plants growing in the forest area and environmental conditions thereof is called as forestry investigation, and the forestry investigation is generally planned after the forestry investigation is finished so as to facilitate field construction, and a temporary construction fence is generally arranged at the periphery of a construction site.
Traditional rail frame comprises frame, stand, crossbeam and bottom support, constitutes the construction rail through bolt or hinge connection between the rail frame, the transport of not being convenient for, and is more at job site emergency, probably leads to the rail not convenient for put the flexibility less than to lack between rail and the rail and be connected and all singly put.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a forestry investigation planning is with site operation rail has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the site construction fence for forestry investigation planning comprises a first fence frame and a second fence frame, wherein a first connecting seat is fixedly connected to one side of the first fence frame, a first limiting block is fixedly connected to the surface of the first connecting seat, a first fastening bolt is connected to one end of the first limiting block in a threaded manner, a connecting block is movably connected to the inner wall of the first connecting seat, one end, away from the first connecting seat, of the connecting block is movably connected with a second connecting seat, a second limiting block is fixedly connected to the surface of the second connecting seat, a second fastening bolt is connected to the surface of the second limiting block in a threaded manner, one end of the second connecting seat is fixedly connected to one side of the second fence frame, fixed blocks are fixedly connected to the bottom of the first fence frame and the bottom of the second fence frame, and a base is movably connected to the surface of the fixed blocks, the surface threaded connection of base has fixed knob, one side fixedly connected with sleeve of first fence frame, the spout has been seted up to one side of second fence frame, the inner wall swing joint of spout has the slider.
Optionally, the surface of the first fence frame and the surface of the second fence frame are both fixedly connected with a transverse supporting rod.
Optionally, the surface of the transverse supporting rod is fixedly connected with a planning drawing display board.
Optionally, the surface of the sleeve is in threaded connection with a fixing bolt.
Optionally, one end of the first fastening bolt penetrates through the inner wall of the first limiting block and is in threaded connection with the inner wall of the connecting block, and one end of the second fastening bolt penetrates through the inner wall of the second limiting block and is in threaded connection with the inner wall of the second connecting block.
Optionally, one end of the fixing knob penetrates through the inner wall of the base and is movably connected with the surface of the fixing block.
(III) advantageous effects
The utility model provides a forestry investigation planning is with site operation rail possesses following beneficial effect:
1. this forestry investigation planning is with site operation rail, through first connecting seat, first stopper, connecting block, the cooperation setting between second connecting seat and the second stopper, can rotate the connecting block at the inner wall of first connecting seat and second connecting seat and fold first rail frame and second rail frame to reach the portable purpose in folding rear, twist and move first fastening bolt and second fastening bolt and carry out spacing fixed through first stopper and second stopper to the connecting block.
2. This forestry investigation planning is with site operation rail, through the fixed block, the cooperation setting between base and the fixed knob, can rotate the base on the surface of fixed block, twist the frictional force who moves fixed knob increase and fixed block surface after rotating required position, fix the base to increase the flexibility when the rail is placed, and can carry out a plurality of rail concatenations through sleeve and slider and use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of a first enclosure frame of the present invention;
FIG. 3 is a schematic cross-sectional view of the base of the present invention;
FIG. 4 is an enlarged schematic view of the structure at A of FIG. 1 according to the present invention;
fig. 5 is an enlarged schematic view of the structure at B in fig. 2 according to the present invention.
In the figure: 1. a first enclosure frame; 2. a second enclosure frame; 3. a first connecting seat; 4. a first stopper; 5. a first fastening bolt; 6. connecting blocks; 7. a second connecting seat; 8. a second limiting block; 9. a second fastening bolt; 10. a fixed block; 11. a base; 12. fixing the knob; 13. a sleeve; 14. a chute; 15. a slider; 16. a transverse support bar; 17. a plan view display board; 18. and (5) fixing the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 5, the present invention provides a technical solution: a field construction fence for forestry investigation planning comprises a first fence frame 1 and a second fence frame 2, wherein the surfaces of the first fence frame 1 and the second fence frame 2 are both fixedly connected with a transverse supporting rod 16, and the surface of the transverse supporting rod 16 is fixedly connected with a planning map display plate 17;
one side of the first fence frame 1 is fixedly connected with a first connecting seat 3, the surface of the first connecting seat 3 is fixedly connected with a first limiting block 4, one end of the first limiting block 4 is connected with a first fastening bolt 5 in a threaded manner, the inner wall of the first connecting seat 3 is movably connected with a connecting block 6, one end of the connecting block 6, which is far away from the first connecting seat 3, is movably connected with a second connecting seat 7, the surface of the second connecting seat 7 is fixedly connected with a second limiting block 8, the surface of the second limiting block 8 is connected with a second fastening bolt 9 in a threaded manner, one end of the first fastening bolt 5 penetrates through the inner wall of the first limiting block 4 to be connected with the inner wall of the connecting block 6 in a threaded manner, one end of the second fastening bolt 9 penetrates through the inner wall of the second limiting block 8 to be connected with the inner wall of the second connecting seat 7 in a threaded manner, and the first connecting seat 3, the first limiting block 4, the connecting block 6, the second connecting seat 7 and the second limiting block 8 are arranged in a matched manner, the connecting block 6 can be rotated on the inner walls of the first connecting seat 3 and the second connecting seat 7 to fold the first fence frame 1 and the second fence frame 2, so that the purpose of convenient carrying after folding is achieved, and the first fastening bolt 5 and the second fastening bolt 9 are screwed to limit and fix the connecting block 6 through the first limiting block 4 and the second limiting block 8;
one end of the second connecting seat 7 is fixedly connected with one side of the second fence frame 2, the bottom of the first fence frame 1 and the bottom of the second fence frame 2 are both fixedly connected with a fixing block 10, the surface of the fixing block 10 is movably connected with a base 11, the surface of the base 11 is in threaded connection with a fixing knob 12, and one end of the fixing knob 12 penetrates through the inner wall of the base 11 and is movably connected with the surface of the fixing block 10;
one side fixedly connected with sleeve 13 of first fence frame 1, sleeve 13's surperficial threaded connection has fixing bolt 18, spout 14 has been seted up to one side of second fence frame 2, the inner wall swing joint of spout 14 has slider 15, through fixed block 10, cooperation setting between base 11 and the fixed knob 12, can rotate base 11 on the surface of fixed block 10, twist the frictional force who moves fixed knob 12 increase and fixed block 10 surface after rotating required position, fix base 11, thereby increase the flexibility when the rail is placed, and can carry out a plurality of rail concatenations through sleeve 13 and slider 15 and use.
In summary, the field construction fence for forestry investigation planning has the following use steps:
1. when a plurality of fences are connected, the sleeves 13 can be used for being connected with the sliding blocks 15, the sliding blocks 15 slide up and down in the sliding grooves 14, the surfaces of the sliding blocks 15 can be movably connected with the inner walls of the sleeves 13, and the sliding blocks are fixed by screwing the fixing bolts 18;
2. the forestry plan can be pasted on the surface of the plan display board 17 through the plan display board 17, so that the forestry plan can be conveniently observed during construction;
3. the connecting block 6 can rotate on the inner walls of the first connecting seat 3 and the second connecting seat 7 to fold the first fence frame 1 and the second fence frame 2, and the first fastening bolt 5 and the second fastening bolt 9 are screwed to limit and fix the connecting block 6 through the first limiting block 4 and the second limiting block 8;
4. the base 11 can be rotated on the surface of the fixing block 10, and the fixing knob 12 is screwed after the base 11 is rotated to a required position to increase the friction force with the surface of the fixing block 10, so that the base 11 is fixed.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a forestry investigation planning is with site operation rail, includes first fence frame (1) and second fence frame (2), its characterized in that: a first connecting seat (3) is fixedly connected to one side of the first fence frame (1), a first limiting block (4) is fixedly connected to the surface of the first connecting seat (3), a first fastening bolt (5) is connected to one end of the first limiting block (4) through a thread, a connecting block (6) is movably connected to the inner wall of the first connecting seat (3), a second connecting seat (7) is movably connected to one end, far away from the first connecting seat (3), of the connecting block (6), a second limiting block (8) is fixedly connected to the surface of the second connecting seat (7), a second fastening bolt (9) is connected to the surface of the second limiting block (8) through a thread, one end of the second connecting seat (7) is fixedly connected to one side of the second fence frame (2), and a fixing block (10) is fixedly connected to the bottom of the first fence frame (1) and the bottom of the second fence frame (2), the surface swing joint of fixed block (10) has base (11), the surface threaded connection of base (11) has fixed knob (12), one side fixedly connected with sleeve (13) of first fence frame (1), spout (14) have been seted up to one side of second fence frame (2), the inner wall swing joint of spout (14) has slider (15).
2. The site construction fence for forestry investigation planning of claim 1, wherein: the surface of the first fence frame (1) and the surface of the second fence frame (2) are fixedly connected with transverse supporting rods (16).
3. The site construction fence for forestry investigation planning of claim 2, wherein: and a planning drawing display board (17) is fixedly connected to the surface of the transverse supporting rod (16).
4. The site construction fence for forestry investigation planning of claim 1, wherein: the surface of the sleeve (13) is in threaded connection with a fixing bolt (18).
5. The site construction fence for forestry investigation planning of claim 1, wherein: one end of the first fastening bolt (5) penetrates through the inner wall of the first limiting block (4) and is in threaded connection with the inner wall of the connecting block (6), and one end of the second fastening bolt (9) penetrates through the inner wall of the second limiting block (8) and is in threaded connection with the inner wall of the second connecting seat (7).
6. The site construction fence for forestry investigation planning of claim 1, wherein: one end of the fixed knob (12) penetrates through the inner wall of the base (11) and is movably connected with the surface of the fixed block (10).
CN202023061647.5U 2020-12-18 2020-12-18 Forestry investigation planning is with site operation rail Expired - Fee Related CN214091326U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023061647.5U CN214091326U (en) 2020-12-18 2020-12-18 Forestry investigation planning is with site operation rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023061647.5U CN214091326U (en) 2020-12-18 2020-12-18 Forestry investigation planning is with site operation rail

Publications (1)

Publication Number Publication Date
CN214091326U true CN214091326U (en) 2021-08-31

Family

ID=77429091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023061647.5U Expired - Fee Related CN214091326U (en) 2020-12-18 2020-12-18 Forestry investigation planning is with site operation rail

Country Status (1)

Country Link
CN (1) CN214091326U (en)

Similar Documents

Publication Publication Date Title
CN106644324A (en) Test device for light steel frame beam column node bearing test
CN110700538A (en) Building scaffold convenient to dismouting
CN214091326U (en) Forestry investigation planning is with site operation rail
CN202441052U (en) Column mould system
CN103821136B (en) Hang single-row of scaffold and construction method thereof
CN203514808U (en) Wall formwork supporting composite structure
CN210567095U (en) Civil surveying instrument support
CN203473395U (en) Special placing rack for construction site pipeline
CN104372923A (en) Scaffold
CN206829610U (en) A kind of removable variable cross-section steel framework wooden model
CN203241594U (en) Pneumatic lifting device for buried type optical cable cross-connecting box
CN206878403U (en) A kind of cable testing bridge connectivity structure
CN202227714U (en) Height-adjustable temporary support frame for construction
CN206225848U (en) Bridge-type high-voltage board installs suspension and support
CN205148143U (en) Modularization crew cut tower crane jib loading boom shaping frock
CN204435443U (en) Detachable pile tube beam test device
CN203878563U (en) Suspended single-row scaffold
CN203403681U (en) Temporary supporting frame of string beam
CN205531402U (en) Steel construction temporary remove lattice column butting positioning device
CN201981772U (en) Folding horse stool
CN206448551U (en) A kind of support meanss of building template
CN205149915U (en) Building site is with drawing brick car
CN214532285U (en) Fence for civil engineering
CN209777206U (en) Assembly type structure triangular truss placing frame
CN204736182U (en) Dynamometer instrument case installation appurtenance