CN214091161U - Strutting arrangement is used in building engineering construction - Google Patents

Strutting arrangement is used in building engineering construction Download PDF

Info

Publication number
CN214091161U
CN214091161U CN202023070964.3U CN202023070964U CN214091161U CN 214091161 U CN214091161 U CN 214091161U CN 202023070964 U CN202023070964 U CN 202023070964U CN 214091161 U CN214091161 U CN 214091161U
Authority
CN
China
Prior art keywords
group
connecting rod
engineering construction
fixed
building engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023070964.3U
Other languages
Chinese (zh)
Inventor
杜艳丽
朱志峰
祁传昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202023070964.3U priority Critical patent/CN214091161U/en
Application granted granted Critical
Publication of CN214091161U publication Critical patent/CN214091161U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a strutting arrangement is used in building engineering construction belongs to strutting arrangement technical field for the construction. A supporting device for building engineering construction comprises a first fixing plate, a second fixing plate, a first group of lifting components and a second group of lifting components, wherein the first group of lifting components and the second group of lifting components are symmetrically connected to the first fixing plate and the second fixing plate; the utility model discloses a rotatory tooth of first connecting rod, second connecting rod cooperation rotates, reaches the lift, and then reaches height-adjusting's purpose.

Description

Strutting arrangement is used in building engineering construction
Technical Field
The utility model relates to a strutting arrangement technical field for the construction especially relates to a strutting arrangement for building engineering construction.
Background
The building support composite structure generally adopts wood poles, steel pipes, battens, fasteners, U supports, step tightening and the like in building construction to be connected as a main support system in the concrete forming process, and is an operation method which is experienced, pieced together and fussy in installation, extremely serious in material waste and has great potential safety hazards.
In the work progress, when carrying out the furred ceiling decoration to the floor roof, take out the figurative profile of furred ceiling with the plank earlier for a lot, water the required material of furred ceiling again, because the plank is comparatively fragile, break off easily when pouring, cause personnel's damage, at this moment need use strutting arrangement, support in the bottom, traditional strutting arrangement majority is to support the plank with the steel pipe, unable height-adjusting can cause the use loaded down with trivial details, work efficiency reduces.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the traditional strutting arrangement majority supports the plank with the steel pipe, and unable height-adjusting can cause the use to get up loaded down with trivial details, work efficiency reduces.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a supporting device for building engineering construction comprises a first fixing plate, a second fixing plate, a first group of lifting components and a second group of lifting components, wherein the first group of lifting components and the second group of lifting components are symmetrically connected on the first fixing plate and the second fixing plate, the first group of lifting components and the second group of lifting components both comprise a first connecting rod and a second connecting rod, two groups of first fixed blocks are fixedly connected to the first fixed plate, the first fixed block is rotatably connected with a rotating gear, the first connecting rod is fixedly connected with the rotating gear, one end of the first connecting rod, which is far away from the rotating teeth, is rotationally connected with a second connecting rod, a second fixed block is rotationally connected on the second connecting rod, the second fixed block is fixedly connected on the second fixed plate, the first fixed plate is connected with a rack in a sliding way, the rack is positioned at the lower end of the rotating teeth on the second group of lifting components and at the upper end of the rotating teeth on the first group of lifting components.
Preferably, be equipped with the promotion subassembly on the first fixed plate, the promotion subassembly includes third fixed block, threaded rod, third fixed block fixed connection is on first fixed plate, threaded rod threaded connection is on the third fixed block, the threaded rod screws the one end fixed connection of preceding moving direction on the third fixed block.
Preferably, two sets of rotate on the first fixed block and be connected with first telescopic link and second telescopic link, first telescopic link and second telescopic link are the fork form, the one end rotation connection on the second fixed block that first fixed block was kept away from to first telescopic link and second telescopic link is connected.
Preferably, the bottom of the first fixing plate is fixedly connected with a telescopic moving wheel.
Preferably, the bottom of the first fixing plate is fixedly connected with a telescopic supporting column.
Compared with the prior art, the utility model provides a strutting arrangement is used in building engineering construction possesses following beneficial effect:
1. this kind of strutting arrangement for building engineering construction, during the user uses, passes through earlier: the pushing component pushes the rack to move forwards, the rack is meshed with the first group of lifting components and the rotating teeth of the second lifting components to rotate, the rotating teeth on the first group of lifting components drive the first connecting rods on the first group of lifting components to rotate in the advancing direction of the rack, the rotating teeth on the second lifting components drive the first connecting rods on the second group of lifting components to rotate in the advancing direction of the rack, the first connecting rods on the first group of lifting components and the second group of lifting components drive the second connecting rods to be closer to 90 degrees with the included angle of the first fixing plate more and more, the closer to 90 degrees, the higher the supporting device is lifted.
2. This kind of strutting arrangement for building engineering construction, first telescopic link and second telescopic link all carry out the altitude mixture control back at the device through screw fixation, can fix first telescopic link and second telescopic link through the locking screw, make strutting arrangement more firm.
3. This kind of strutting arrangement for building engineering construction, after the device removes required position through removing the wheel, puts the flexible support column on ground, then fixes, will remove the wheel again and retrieve for whole strutting arrangement can be more firm play the supporting role.
The part that does not relate to among the device all is the same with prior art or can adopt prior art to realize, the utility model discloses a first connecting rod, the rotatory tooth of second connecting rod cooperation rotate, reach the lift, and then reach height-adjusting's purpose.
Drawings
Fig. 1 is one of the schematic structural diagrams of a supporting device for construction of building engineering provided by the present invention;
fig. 2 is a second schematic structural view of a supporting device for construction of building engineering according to the present invention;
fig. 3 is a schematic structural view of a supporting device for construction in fig. 1 according to the present invention;
fig. 4 is a schematic structural view of a supporting device for construction of building engineering shown in fig. 1B;
fig. 5 is the utility model provides a constructional schematic of the partial cross-sectional view of strutting arrangement rack and first fixed plate for the building engineering construction.
In the figure: 1. a first fixing plate; 101. a first fixed block; 102. rotating the teeth; 104. a first link; 105. a second link; 106. a second fixed block; 2. a second fixing plate; 3. a first telescopic rod; 4. a second telescopic rod; 5. a rack; 501. a third fixed block; 502. a threaded rod; 7. a telescopic moving wheel; 8. a telescopic supporting column.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example 1:
referring to fig. 1-5, a supporting device for construction of building engineering comprises a first fixing plate 1, a second fixing plate 2, and a first fixing plate 1 symmetrically connected to the first fixing plate, first group's lifting unit and second group's lifting unit on the second fixed plate 2, first group's lifting unit and second group's lifting unit all include first connecting rod 104 and second connecting rod 105, two sets of first fixed block 101 of fixedly connected with on the first fixed plate 1, rotate on the first fixed block 101 and be connected with rotatory tooth 102, first connecting rod 104 fixed connection is on rotatory tooth 102, the one end that rotatory tooth 102 was kept away from to first connecting rod 104 rotates with second connecting rod 105 and links to each other, rotate on the second connecting rod 105 and be connected with second fixed block 106, second fixed block 106 fixed connection is on second fixed plate 2, sliding connection has rack 5 on first fixed plate 1, rack 5 is located the upper end of the lower extreme of rotatory tooth 102 on the second group's lifting unit and the rotatory tooth 102 on the first group's lifting unit.
When the user uses the utility model, firstly pass through: the pushing component pushes the rack 5 forwards, the rack 5 is meshed with the rotating teeth 102 on the first group of lifting components and the second lifting components to rotate, the rotating teeth 102 on the first group of lifting components drive the first connecting rods 104 on the first group of lifting components to rotate in the advancing direction of the rack 5, the rotating teeth 102 on the second lifting components drive the first connecting rods 104 on the second group of lifting components to rotate in the advancing direction of the rack 5, the first connecting rods 104 on the first group of lifting components and the second group of lifting components drive the included angle between the second connecting rods 105 and the first fixing plate 1 to be closer to 90 degrees, and the closer to 90 degrees, the higher the supporting device is lifted.
Example 2:
referring to fig. 1 to 5, a supporting device for construction of a construction project, which is substantially the same as the embodiment 1, further comprising: be equipped with the pushing assembly on first fixed plate 1, the pushing assembly includes third fixed block 501, threaded rod 502, and third fixed block 501 fixed connection is on first fixed plate 1, and threaded rod 502 threaded connection is on third fixed block 501, and threaded rod 502 screws the one end fixed connection of preceding moving direction on third fixed block 501, through the pushing assembly, can make rack 5 advance and retreat.
Example 3:
referring to fig. 1 to 5, a supporting device for construction of a construction project, which is substantially the same as the embodiment 1, further comprising: rotate on two sets of first fixed blocks 101 and be connected with first telescopic link 3 and second telescopic link 4, first telescopic link 3 and second telescopic link 4 are the fork form, the one end that first fixed block 101 was kept away from to first telescopic link 3 and second telescopic link 4 is rotated and is connected on second fixed block 106, first telescopic link 3 and second telescopic link 4 are all through the screw fixation, after the device carries out altitude mixture control, can fix first telescopic link 3 and second telescopic link 4 through the locking screw, make strutting arrangement more firm.
Example 4:
referring to fig. 1 to 5, a supporting device for construction of a construction project, which is substantially the same as the embodiment 1, further comprising: 1 bottom fixedly connected with of first fixed plate is flexible to remove wheel 7, and flexible removal wheel 7 includes sleeve and fixed screw, and flexible removal wheel 7 slides in the sleeve, removes the removal that wheel 7 can make things convenient for strutting arrangement through flexible.
Example 5:
referring to fig. 1 to 5, a supporting device for construction of a construction project, which is substantially the same as the embodiment 1, further comprising: 1 bottom fixedly connected with telescopic support column 8 of first fixed plate, telescopic support column 8 includes the sleeve, the support column, the fixed screw, and the support column slides in the sleeve, fixes through the fixed screw, removes wheel 7 when the device is flexible and removes behind the required position, puts telescopic support column 8 on ground, then fixes, removes wheel 7 with flexible again and withdraws for whole strutting arrangement can be more firm play the supporting role.
The utility model discloses a first connecting rod 104, second connecting rod 105 cooperation rotatory tooth 102 rotate, reach the lift, and then reach height-adjusting's purpose.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a strutting arrangement for building engineering construction, its characterized in that includes first fixed plate (1), second fixed plate (2), still includes first group's lifting unit and the second group's lifting unit of symmetric connection on first fixed plate (1), second fixed plate (2), first group's lifting unit and the second group's lifting unit all include first connecting rod (104) and second connecting rod (105), fixedly connected with two sets of first fixed block (101) on first fixed plate (1), rotate on first fixed block (101) and be connected with rotatory tooth (102), first connecting rod (104) fixed connection is on rotatory tooth (102), the one end that rotatory tooth (102) were kept away from in first connecting rod (104) rotates with second connecting rod (105) and links to each other, rotate on second connecting rod (105) and be connected with second fixed block (106), second fixed block (106) fixed connection is on second fixed plate (2), the first fixing plate (1) is connected with a rack (5) in a sliding mode, and the rack (5) is located at the lower end of the rotating teeth (102) on the second group of lifting assemblies and the upper end of the rotating teeth (102) on the first group of lifting assemblies.
2. The supporting device for the building engineering construction as claimed in claim 1, wherein a pushing assembly is arranged on the first fixing plate (1), the pushing assembly comprises a third fixing block (501) and a threaded rod (502), the third fixing block (501) is fixedly connected to the first fixing plate (1), the threaded rod (502) is in threaded connection with the third fixing block (501), and one end of the threaded rod (502) in a screwing forward direction is fixedly connected to the third fixing block (501).
3. The supporting device for building engineering construction according to claim 1, wherein a first telescopic rod (3) and a second telescopic rod (4) are rotatably connected to the two sets of first fixing blocks (101), the first telescopic rod (3) and the second telescopic rod (4) are in a cross shape, and one ends of the first telescopic rod (3) and the second telescopic rod (4) far away from the first fixing blocks (101) are rotatably connected to the second fixing blocks (106).
4. The supporting device for constructional engineering construction as claimed in claim 2, wherein a telescopic moving wheel (7) is fixedly connected to the bottom of the first fixing plate (1).
5. The supporting device for building engineering construction according to claim 2, wherein a telescopic supporting column (8) is fixedly connected to the bottom of the first fixing plate (1).
CN202023070964.3U 2020-12-18 2020-12-18 Strutting arrangement is used in building engineering construction Expired - Fee Related CN214091161U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023070964.3U CN214091161U (en) 2020-12-18 2020-12-18 Strutting arrangement is used in building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023070964.3U CN214091161U (en) 2020-12-18 2020-12-18 Strutting arrangement is used in building engineering construction

Publications (1)

Publication Number Publication Date
CN214091161U true CN214091161U (en) 2021-08-31

Family

ID=77430752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023070964.3U Expired - Fee Related CN214091161U (en) 2020-12-18 2020-12-18 Strutting arrangement is used in building engineering construction

Country Status (1)

Country Link
CN (1) CN214091161U (en)

Similar Documents

Publication Publication Date Title
CN110284703A (en) A kind of light-duty climbing form system of screw rod promotion
CN214091161U (en) Strutting arrangement is used in building engineering construction
CN108914776B (en) A basket is hung in construction for municipal works and room are built
CN2799740Y (en) Assembling bis-adjustable multifunctional early-demolishment device
CN214302988U (en) Building structure design roof beam reinforced structure
CN204252506U (en) A kind of liftable scaffold
CN211524184U (en) Supporting device for building construction
CN217861988U (en) Inserted device is arranged to borer roof beam
CN216045790U (en) Auxiliary device for pipeline installation and connection
CN215926629U (en) Scaffold frame that building engineering used
CN213112441U (en) Heavy object lifting and retracting device
CN211736448U (en) Fixing device for mounting prefabricated external wall panel
CN211058842U (en) Auxiliary mounting device for support front beam jack
CN210201319U (en) Auxiliary device for installing GIL pipe bus
CN111042521B (en) Building templates link for civil engineering
CN201738592U (en) Self-propelled glass mounting vehicle for special-shaped framework glass curtain wall
CN213573167U (en) Construction engineering is with diversified ground support that consolidates
CN212105254U (en) Temporary support frame for emergency repair and reinforcement of earthen site
CN219936537U (en) Solar signal lamp convenient to assemble for traffic control
CN211879980U (en) Strutting arrangement for construction
CN218409038U (en) Heat supply pipeline patching device for heat supply engineering
CN214944368U (en) Mine hole internal support reinforcing apparatus with safeguard function
CN211663269U (en) Civil engineering reforms transform and transports transfer device with cement pipe way
CN216276885U (en) Simple movable walking table type template
CN213143520U (en) Freezing-resistant stone curtain wall structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210831