CN214023266U - Movable reinforcement cage mould for high-speed railway prefabricated box girder - Google Patents

Movable reinforcement cage mould for high-speed railway prefabricated box girder Download PDF

Info

Publication number
CN214023266U
CN214023266U CN202022914771.5U CN202022914771U CN214023266U CN 214023266 U CN214023266 U CN 214023266U CN 202022914771 U CN202022914771 U CN 202022914771U CN 214023266 U CN214023266 U CN 214023266U
Authority
CN
China
Prior art keywords
reinforcement cage
movable
box girder
steel reinforcement
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022914771.5U
Other languages
Chinese (zh)
Inventor
李守玺
魏奎斐
王照利
刘耀刚
张良
邓泽瑾
杜庆轩
胡磊
张亮
张金瑞
齐亚北
马鹏飞
马玉成
节志刚
赵振山
李世超
王磊
赵建兵
张金振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN202022914771.5U priority Critical patent/CN214023266U/en
Application granted granted Critical
Publication of CN214023266U publication Critical patent/CN214023266U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a prefabricated case roof beam activity steel reinforcement cage mould of high-speed railway, include: the fixed support is provided with a binding surface matched with the box girder reinforcement cage, and a fixed reinforcement clamping piece is arranged on the bottom surface of the binding surface; the movable support is arranged on the fixed support, and a movable steel bar clamping piece positioned on the side surface of the binding surface is arranged on the movable support; when in binding, the box girder steel reinforcement cage and the movable steel reinforcement clamping piece are attached; during hoisting, the box girder steel reinforcement cage and the movable steel reinforcement clamping piece are arranged at intervals. The utility model discloses simple structure, durable firm, convenient to use can satisfy single line steel reinforcement cage's ligature and hoist and mount requirement simultaneously, improves steel reinforcement cage's ligature accuracy and hoist and mount efficiency, satisfies the construction needs.

Description

Movable reinforcement cage mould for high-speed railway prefabricated box girder
Technical Field
The utility model belongs to the technical field of steel reinforcement cage ligature technique for the bridge construction and specifically relates to a prefabricated case roof beam activity steel reinforcement cage mould of high-speed railway is related to.
Background
In the construction of railway passenger lines, a large number of reinforcement cages are bound to prefabricate the special passenger box girder. According to the difference of special case roof beam of visitor, the steel reinforcement cage divide into single line and double-line two kinds. No matter single line steel reinforcement cage or double-line steel reinforcement cage, in order to guarantee the durability of concrete, need during the ligature according to 4 density per square meter at its outside ligature concrete cushion. Because the steel reinforcement cage is attached to the mould, and the thickness of concrete cushion is about 30 millimeters, therefore the concrete cushion is located the mould outside. For the single-wire steel reinforcement cage with the web plate, the top plate and the bottom plate being vertical to each other, the concrete cushion block located at the web plate can lift the steel reinforcement cage upwards from the mould to form a barrier. In order to smoothly lift the reinforcement cage, great manpower and material resources are needed, and the reinforcement cage binding and lifting efficiency is low.
Disclosure of Invention
In order to solve the problem, the utility model provides a prefabricated case roof beam activity steel reinforcement cage mould of high-speed railway that can ligature and hoist and mount fast specifically can take following technical scheme:
prefabricated case roof beam activity steel reinforcement cage mould of high-speed railway, include
The fixed support is provided with a binding surface matched with the box girder reinforcement cage, and a fixed reinforcement clamping piece is arranged on the bottom surface of the binding surface; and
the movable bracket is arranged on the fixed bracket, and a movable steel bar clamping piece positioned on the side surface of the binding surface is arranged on the movable bracket; and is
During binding, the box girder reinforcement cage and the movable reinforcement clamping piece are attached; during hoisting, the box girder steel reinforcement cage and the movable steel reinforcement clamping piece are arranged at intervals.
The fixed support is fixedly connected with the ground embedded steel plate.
The fixed bolster includes left socle, right branch frame and sets up lower intermediate strut between the two, the top surface, the medial surface of left socle and right branch frame and the top surface of intermediate strut constitute the ligature face.
Piece is put for arranging into latticed bracing piece for setting up respectively on left socle, right branch frame and middle support top surface to fixed reinforcing bar card, movable reinforcing bar card is put the horizontal pole that the piece is parallel with left socle/right branch frame medial surface, just all offer the recess that is used for placing the reinforcing bar on the top surface of bracing piece and horizontal pole.
The movable steel bar clamping piece is provided with at least one row, and each row of movable steel bar clamping piece is at least one section.
The left bracket and the right bracket are both provided with translation supporting units used for connecting the movable steel bar clamping pieces, and each section of the translation supporting unit corresponding to the movable steel bar clamping pieces is at least provided with one.
The translation supporting unit comprises a horizontal rail arranged on the left support/the right support, a pulley moving along the cross section of the fixed support is arranged on the horizontal rail, one end, close to the binding face, of the pulley is connected with the movable steel bar clamping piece, and a locking assembly matched with the left support/the right support is arranged at the other end of the pulley.
The locking assembly comprises a bearing jack arranged on the left support/the right support, a first hole and a second hole arranged on the pulley supporting plate, and a pin shaft matched with the bearing jack, the first hole and the second hole.
The distance between the first hole and the second hole is 15-25 cm.
The utility model provides a prefabricated case roof beam activity steel reinforcement cage mould of high-speed railway, simple structure, it is durable firm, convenient to use can satisfy the ligature and the hoist and mount requirement of single line steel reinforcement cage simultaneously, improves the ligature accuracy and the hoist and mount efficiency of steel reinforcement cage, satisfies the construction needs.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view showing an extended state of the horizontal bar of fig. 1.
Fig. 3 is a schematic view of the retracted state of the horizontal stick of fig. 1.
Detailed Description
The embodiments of the present invention will be described in detail with reference to the accompanying drawings, and the embodiments are implemented on the premise of the technical solution of the present invention, and detailed embodiments and specific operation procedures are given, but the scope of the present invention is not limited to the following embodiments.
As shown in figures 1-3, precast box girder activity steel reinforcement cage mould of high-speed railway, including fixed bolster and movable support, wherein, the fixed bolster is by left socle 1.1, the right branch frame 1.2 that the channel-section steel welding formed and lie in lower intermediate support 1.3 between the two and constitute, its bottom links to each other with the pre-buried steel sheet 2 welding in ground. The top surface of above-mentioned left socle 1.1 and right branch frame 1.2, the top surface of medial surface and intermediate strut 1.3 constitute with the ligature face of single line case roof beam steel reinforcement cage lateral surface looks adaptation, to the intermediate strut 1.3 top surface that does not hinder the steel reinforcement cage hoist and mount, the welding has fixed reinforcing bar card to put the piece on it, this fixed reinforcing bar card is put the piece and is seted up notched bracing piece 3 for the top surface, in order to form firm support to the reinforcing bar, above-mentioned bracing piece 3 constitutes latticedly along horizontal and vertical staggered arrangement. And the inner side surfaces of the left support 1.1 and the right support 1.2 are provided with movable steel bar clamping pieces through the translation supporting units, and the movable steel bar clamping pieces are horizontal rods 4 with grooves formed in the top surfaces. The supporting rod 3 and the horizontal rod 4 are both made of angle steel convenient to weld and groove, and the distance between the grooves on the supporting rod and the horizontal rod is determined according to the binding requirement of a reinforcement cage. The horizontal rods 4 are arranged in parallel to the inner side surfaces of the left support 1.1/the right support 1.2, the horizontal rods 4 on each side are at least one row (two rows in the figure), each row of the horizontal rods 4 is at least one section, and each section of the horizontal rods 4 is at least connected with one translation supporting unit. The translation supporting unit structure is the same, all including the horizontal track 5.1 of making by the channel-section steel of welding on 1.1 of left socle/right branch frame 1.2, install coaster 5.2 that pulley and layer board constitute on horizontal track 5.1, coaster 5.2 can move along the fixed bolster cross section on horizontal track 5.1, coaster 5.2 layer board is close to ligature face one end and links to each other with movable reinforcing bar card putting piece (horizontal pole 4), first hole 5.3 and second hole 5.4 have been seted up to the other end, it constitutes the locking Assembly with set up bearing hole and supporting round pin axle 5.5 on 1.1 of left socle and right branch frame 1.2. The distance between the first hole 5.3 and the second hole 5.4 is larger than the thickness of the concrete cushion block outside the steel reinforcement cage of the box girder, and is usually 15-25 cm. When the first hole 5.3 corresponds to the socket hole and is locked by the pin shaft 5.5, the horizontal rod 4 extends out (see figure 2), the reinforcing steel bars are placed in the grooves of the supporting rod 3 and the horizontal rod 4 for binding a reinforcing steel bar cage, and then the concrete cushion block is bound; when the second hole 5.4 corresponds to the socket hole and is locked by the pin shaft 5.5, the horizontal rod 4 retracts (see figure 3), the whole single-line box girder steel reinforcement cage and the concrete cushion block at the outer side of the steel reinforcement cage do not interfere with the fixed support, and therefore the bound steel reinforcement cage can be directly lifted out of the fixed support.
It should be noted that in the description of the present invention, terms of orientation or positional relationship such as "front", "rear", "left", "right", "vertical", "horizontal", "inner", "outer", etc., are based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.

Claims (9)

1. The utility model provides a prefabricated case roof beam activity steel reinforcement cage mould of high-speed railway which characterized in that: comprises that
The fixed support is provided with a binding surface matched with the box girder reinforcement cage, and a fixed reinforcement clamping piece is arranged on the bottom surface of the binding surface; and
the movable bracket is arranged on the fixed bracket, and a movable steel bar clamping piece positioned on the side surface of the binding surface is arranged on the movable bracket; and is
During binding, the box girder reinforcement cage and the movable reinforcement clamping piece are attached; during hoisting, the box girder steel reinforcement cage and the movable steel reinforcement clamping piece are arranged at intervals.
2. The prefabricated box girder movable reinforcement cage mould of high-speed railway of claim 1, characterized in that: the fixed support is fixedly connected with the ground embedded steel plate.
3. The prefabricated box girder movable reinforcement cage mould of high-speed railway of claim 1, characterized in that: the fixed bolster includes left socle, right branch frame and sets up lower intermediate strut between the two, the top surface, the medial surface of left socle and right branch frame and the top surface of intermediate strut constitute the ligature face.
4. The precast box girder steel reinforcement cage clamping fixture for high-speed railways according to claim 3, is characterized in that: piece is put for arranging into latticed bracing piece for setting up respectively on left socle, right branch frame and middle support top surface to fixed reinforcing bar card, movable reinforcing bar card is put the horizontal pole that the piece is parallel with left socle/right branch frame medial surface, just all offer the recess that is used for placing the reinforcing bar on the top surface of bracing piece and horizontal pole.
5. The precast box girder steel reinforcement cage clamping fixture for high-speed railways according to claim 3, is characterized in that: the movable steel bar clamping piece is provided with at least one row, and each row of movable steel bar clamping piece is at least one section.
6. The precast box girder steel reinforcement cage clamping fixture for high-speed railways according to claim 5, is characterized in that: the left bracket and the right bracket are both provided with translation supporting units used for connecting the movable steel bar clamping pieces, and each section of the translation supporting unit corresponding to the movable steel bar clamping pieces is at least provided with one.
7. The precast box girder steel reinforcement cage clamping fixture for high-speed railways according to claim 6, is characterized in that: the translation supporting unit comprises a horizontal rail arranged on the left support/the right support, a pulley moving along the cross section of the fixed support is arranged on the horizontal rail, one end, close to the binding face, of the pulley is connected with the movable steel bar clamping piece, and a locking assembly matched with the left support/the right support is arranged at the other end of the pulley.
8. The precast box girder steel reinforcement cage clamping fixture for high-speed railways according to claim 7, is characterized in that: the locking assembly comprises a bearing jack arranged on the left support/the right support, a first hole and a second hole arranged on the pulley supporting plate, and a pin shaft matched with the bearing jack, the first hole and the second hole.
9. The precast box girder steel reinforcement cage clamping fixture for high-speed railways according to claim 8, is characterized in that: the distance between the first hole and the second hole is 15-25 cm.
CN202022914771.5U 2020-12-08 2020-12-08 Movable reinforcement cage mould for high-speed railway prefabricated box girder Active CN214023266U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022914771.5U CN214023266U (en) 2020-12-08 2020-12-08 Movable reinforcement cage mould for high-speed railway prefabricated box girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022914771.5U CN214023266U (en) 2020-12-08 2020-12-08 Movable reinforcement cage mould for high-speed railway prefabricated box girder

Publications (1)

Publication Number Publication Date
CN214023266U true CN214023266U (en) 2021-08-24

Family

ID=77333833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022914771.5U Active CN214023266U (en) 2020-12-08 2020-12-08 Movable reinforcement cage mould for high-speed railway prefabricated box girder

Country Status (1)

Country Link
CN (1) CN214023266U (en)

Similar Documents

Publication Publication Date Title
CN110528405B (en) Bridge high-altitude lifting and shifting device based on vehicle set and construction method thereof
KR101212729B1 (en) Apparatus for manufacturing curvilineal track beam for monorail in mold room
CN111172887A (en) Construction method of hollow thin-wall pier continuous rigid frame bridge main beam and No. 0 block bracket thereof
CN101200874A (en) Box-beam steel bar centralized tying and integral hoisting construction method
CN104831632A (en) Upper transverse beam and lower transverse beam construction method for bridge cable bent tower
CN214023266U (en) Movable reinforcement cage mould for high-speed railway prefabricated box girder
CN201080597Y (en) Multifunctional cast-in-situ cantilever plate construction bracket
CN103507157B (en) Precast T-Beam floor steel bar positioning frame
CN109629350B (en) Prestressed seamless connection concrete track beam for empty iron and construction method thereof
CN201405772Y (en) 100-meter long rial transportation device
CN106738308A (en) Precast T-Beam reinforcing bar molding bed rack system
CN114922132B (en) Construction method for upper structure of high pile wharf based on combined inclined piles
CN105648908A (en) Decorating trolley used for crossing existing lines or crossing bridges and construction method
CN213684228U (en) Novel assembled evacuation platform structure
CN212001640U (en) Plate-type prefabricated part
CN215104790U (en) Reinforced structure for existing railway underpass frame bridge construction
CN211897881U (en) No. 0 block bracket
CN213951776U (en) Forward free prefabricated integral ballast bed
CN211762458U (en) Device of encorbelmenting, moving mechanism and system of encorbelmenting
CN211765803U (en) Double-block type sleeper steel bar truss's floor truck
CN210530084U (en) Open type steel reinforced concrete composite truss floor
CN112482241A (en) Walking type hanging bracket for post-pouring section of box girder flange plate and construction method thereof
CN202862351U (en) T-shaped web horseshoe reinforcement framework precast tire mold
CN219602066U (en) Novel steel reinforcement framework transportation support frame
CN111516137A (en) Hydraulic integral movable prefabricated box girder web plate reinforcing steel bar jig frame and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant