CN214005691U - Steerable steel brace connecting piece between manual hole digging retaining piles - Google Patents

Steerable steel brace connecting piece between manual hole digging retaining piles Download PDF

Info

Publication number
CN214005691U
CN214005691U CN202022889368.1U CN202022889368U CN214005691U CN 214005691 U CN214005691 U CN 214005691U CN 202022889368 U CN202022889368 U CN 202022889368U CN 214005691 U CN214005691 U CN 214005691U
Authority
CN
China
Prior art keywords
pile foundation
support
steering
steel pipe
steerable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022889368.1U
Other languages
Chinese (zh)
Inventor
马悦
曲健豪
许露露
乔为国
杨海平
韩军
谢圣纲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Design Institute Co Ltd
Original Assignee
Chongqing Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Design Institute Co Ltd filed Critical Chongqing Design Institute Co Ltd
Priority to CN202022889368.1U priority Critical patent/CN214005691U/en
Application granted granted Critical
Publication of CN214005691U publication Critical patent/CN214005691U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a steerable steel shotcrete connecting piece between artifical hole digging retaining pile, including first pile foundation and second pile foundation, its characterized in that: the first pile foundation and the second pile foundation are both provided with connecting platforms, a steering support is fixed on the connecting platform through a steering base, a steering head is embedded in the steering support, a supporting steel pipe is welded on the steering head, and the supporting steel pipe on the first pile foundation can be in direct connection with the supporting steel pipe on the second pile foundation after being in rotary alignment. The remarkable effects are as follows: all can use under the condition such as pile foundation not counterpoint, connect more stably, industrialization degree is high, and parts such as ball pivot support can recycle moreover, compares in other modes and is very little to the influence of cost.

Description

Steerable steel brace connecting piece between manual hole digging retaining piles
Technical Field
The utility model relates to steel shotcrete sets up technical field between the fender pile, concretely relates to steel shotcrete connecting piece that can turn to between artifical hole digging fender pile.
Background
In the Chongqing areas, water flow is abundant, and in projects such as river regulation process, construction of drainage box culvert, replacement and filling of soil body, support is often needed in excavation of foundation pit, and the pile plate retaining wall is an effective support measure. Taking the construction of a drainage box culvert with deeper burial depth as an example, when the width of a river channel is wide, the pressure of soil is large, and soil retaining piles need to be arranged. After excavating certain degree of depth, can set up the steel shotcrete between the stake between two offside piles, can effectual reduction retaining pile's cross sectional dimension like this. However, sometimes two retaining piles are influenced by the terrain or meet the turning of a river channel, the retaining piles cannot be completely aligned according to the ideal situation, the steel support is difficult to set at the time, and the safety is influenced by not setting the steel support.
Disclosure of Invention
The utility model aims at providing a not enough to prior art, the utility model aims at providing a steerable steel shotcrete connecting piece between artifical hole digging retaining pile can be applicable to when the topography receives serious restriction or the pile foundation can not counterpoint, sets up the steel shotcrete between the stake.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a steerable steel shotcrete connecting piece between artifical hole digging retaining pile, its key lies in: including first pile foundation and second pile foundation all be formed with connection platform on first pile foundation and the second pile foundation be fixed with through turning to on the base on the connection platform and turn to the support, should turn to and be equipped with in the embedded head that turns to of support, should turn to overhead the welding and have the support steel pipe, can just be connected with the support steel pipe that is located the second pile foundation after the rotatory counterpoint of support steel pipe on the first pile foundation.
Furthermore, the connection platform and the first pile foundation or the second pile foundation are integrally cast.
Furthermore, the steering base is provided with a limiting clamping groove through a limiting ring, and the steering support is provided with a limiting step matched with the limiting clamping groove.
Furthermore, the steering base is hermetically connected with the steering support.
Furthermore, an oil storage chamber is arranged in the steering head, oil is filled in the oil storage chamber, the oil storage chamber is communicated with an inner cavity of the steering support, and a sealing rubber ring is annularly arranged between the steering head and the steering support.
Furthermore, turn to overhead being connected with the support and push up the platform, the terminal surface and this support top platform fixed connection of support steel pipe.
Furthermore, the peripheral sides of the support steel pipes are connected with the support top platform through a plurality of stiffening rib plates.
Furthermore, the support steel pipe on the first pile foundation is connected with the support steel pipe on the second pile foundation through a flange and a bolt.
The utility model discloses a show the effect and be:
1. through the supporting structure between the piles of the design, when the retaining pile is influenced by the terrain, the supporting structure between the piles can be arranged, and the stability of a foundation pit is ensured when the river course is renovated.
2. The support connection between the piles is stable, the industrialization degree is high, and parts such as the spherical hinge support can be recycled, so that the influence on the engineering cost is small compared with other modes.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is an enlarged partial schematic view of A of FIG. 1;
fig. 3 is a top view of the present invention;
fig. 4 is a schematic cross-sectional view of the present invention.
Detailed Description
The following provides a more detailed description of the embodiments and the operation of the present invention with reference to the accompanying drawings.
As shown in fig. 1-4, the steerable steel support connecting piece between the manual hole digging retaining piles comprises a first pile foundation 1 and a second pile foundation 2, wherein a connecting platform 3 is formed on the first pile foundation 1 and the second pile foundation 2, a steering support 5 is fixed on the connecting platform 3 through a steering base 4, a steering head 6 is embedded in the steering support 5, a support steel pipe 7 is welded on the steering head 6, and the support steel pipe 7 on the first pile foundation 1 can be in direct connection with the support steel pipe 7 on the second pile foundation 2 after being in rotary alignment.
In this embodiment, in order to reduce the construction process and improve the structural strength, the connecting platform 3 is integrally cast with the first pile foundation 1 or the second pile foundation 2, and specifically, the connecting platform 3 is formed by embedding anchor bars 8 in the pile foundations and then casting concrete.
As shown in fig. 1 and 2, the steering base 4 is formed with a limiting clamping groove 10 through a limiting ring 9, the steering support 5 is formed with a limiting step 11 adapted to the limiting clamping groove 10, and the steering support 5 and the steering base 4 are clamped through the matching of the limiting clamping groove 10 and the limiting step 11.
Furthermore, the steering base 4 is hermetically connected with the steering support 5, an oil storage chamber 12 is arranged in the steering head 6, and oil is filled in the oil storage chamber 12 to play roles of lubrication and damping; the oil storage chamber 12 is communicated with the inner cavity of the steering support 5, and a sealing rubber ring 13 is annularly arranged between the steering head 6 and the steering support 5 to prevent oil from leaking.
Preferably, the steering head 6 is connected with a support top platform 14 which is a plane steel plate, the support top platform 14 is welded with the support steel pipe 7, that is, the end surface of the support steel pipe 7 is fixedly connected with the support top platform 14, and the periphery of the support steel pipe 7 is also connected with the support top platform 14 through a plurality of stiffening rib plates 15.
Further, the supporting steel pipe 7 on the first pile foundation 1 is connected with the supporting steel pipe 7 on the second pile foundation 2 through a flange 16 and a bolt 17.
During specific implementation, firstly, the embedded anchor bars 8 are arranged on the pile foundation, then the concrete platform is poured to form the connecting platform 3, the first pile foundation 1 of the retaining pile, the second pile foundation 2, the connecting platform 3 and the steering base 4 are connected into a whole through the embedded parts, then the steering support 5 is installed on the steering base 4, then the support steel pipe 7 is connected on the support top platform 14 connected on the steering head 6 through bolts, and then the support steel pipe 7 and the stiffening rib plate 15 are welded in a surrounding mode. After the first pile foundation 1 and the second pile foundation 2 on two sides are prepared, the supporting steel pipe 7 is cut, then is rotated and aligned, and finally is connected with the bolt 17 through the flange 16. The support steel pipe 7 in this embodiment can rotate in a certain angle through turning to the support 5, and the slippage on the base 4 is followed to turning to because of the space angle problem when avoiding directly supporting with a whole steel pipe, makes things convenient for the setting that the pile foundation supported.
The advantage of this example lies in receiving the influence of topography very little, all can use under the circumstances such as pile foundation not counterpoint, connects more stably, and industrialization degree is high, and parts such as ball pivot support can all recycle moreover, compares in the influence of other modes to the cost very little.
The technical scheme provided by the utility model is introduced in detail above. The principles and embodiments of the present invention have been explained herein using specific examples, and the above descriptions of the embodiments are only used to help understand the method and its core ideas of the present invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.

Claims (8)

1. The utility model provides a steerable steel shotcrete connecting piece between artifical hole digging retaining pile, includes first pile foundation and second pile foundation, its characterized in that: the first pile foundation and the second pile foundation are both provided with connecting platforms, a steering support is fixed on the connecting platform through a steering base, a steering head is embedded in the steering support, a supporting steel pipe is welded on the steering head, and the supporting steel pipe on the first pile foundation can be in direct connection with the supporting steel pipe on the second pile foundation after being in rotary alignment.
2. The steerable steel shotcrete connection between artificial excavation retaining piles according to claim 1, characterized in that: and the connecting platform and the first pile foundation or the second pile foundation are integrally cast.
3. The steerable steel shotcrete connection between artificial excavation retaining piles according to claim 1, characterized in that: the steering base is provided with a limiting clamping groove through a limiting ring, and the steering support is provided with a limiting step matched with the limiting clamping groove.
4. The steerable steel shotcrete connection between artificial excavation retaining piles according to claim 1, characterized in that: the steering base is connected with the steering support in a sealing mode.
5. The steerable steel shotcrete connection between artificial excavation retaining piles according to claim 1, characterized in that: an oil storage chamber is arranged in the steering head, oil is filled in the oil storage chamber, the oil storage chamber is communicated with an inner cavity of the steering support, and a sealing rubber ring is annularly arranged between the steering head and the steering support.
6. A steerable steel shotcrete connection between artificial excavation retaining piles according to any one of claims 1 to 5, characterized in that: the steering head is connected with a support jacking platform, and the end face of the supporting steel pipe is fixedly connected with the support jacking platform.
7. A steerable steel support connection between manual hole-excavating soil-retaining piles according to claim 6, characterized in that: the peripheral sides of the supporting steel pipes are also connected with the support top platform through a plurality of stiffening rib plates.
8. A steerable steel shotcrete connection between artificial excavation retaining piles according to any one of claims 1 to 5, characterized in that: and the support steel pipe on the first pile foundation is connected with the support steel pipe on the second pile foundation through a flange and a bolt.
CN202022889368.1U 2020-12-04 2020-12-04 Steerable steel brace connecting piece between manual hole digging retaining piles Active CN214005691U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022889368.1U CN214005691U (en) 2020-12-04 2020-12-04 Steerable steel brace connecting piece between manual hole digging retaining piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022889368.1U CN214005691U (en) 2020-12-04 2020-12-04 Steerable steel brace connecting piece between manual hole digging retaining piles

Publications (1)

Publication Number Publication Date
CN214005691U true CN214005691U (en) 2021-08-20

Family

ID=77309350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022889368.1U Active CN214005691U (en) 2020-12-04 2020-12-04 Steerable steel brace connecting piece between manual hole digging retaining piles

Country Status (1)

Country Link
CN (1) CN214005691U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319139A (en) * 2022-02-18 2022-04-12 厦门合诚工程技术有限公司 External prestressed steel structure steering device of continuous box girder bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319139A (en) * 2022-02-18 2022-04-12 厦门合诚工程技术有限公司 External prestressed steel structure steering device of continuous box girder bridge

Similar Documents

Publication Publication Date Title
CN214005691U (en) Steerable steel brace connecting piece between manual hole digging retaining piles
CN111733853A (en) Tongue-and-groove type prefabricated underground continuous wall structure
CN113373962B (en) Combined leakage stoppage construction method for deep foundation pit
CN108868786B (en) Novel steel sleeve for shield airtight starting and receiving
CN201241329Y (en) Positioner of steel pipe column
CN113431065A (en) Rapid construction method and structure of occlusive pile and steel sleeve combined cofferdam
CN216474980U (en) Cast-in-place pile filling mould free of digging soil between piles
CN216839456U (en) Post grouting device for pile end of steel pipe pile
CN215715333U (en) Pre-buried device of flow plasticity geology bottom plate construction
CN212452659U (en) A diagonal bracing screw thread pile supporting construction for foundation ditch enclosure
CN204825936U (en) Lock catch type steel -pipe pile is used in cofferdam
CN114411745A (en) Post-grouting device for pile end of steel pipe pile and construction method thereof
CN210013222U (en) Section steel inner support system node
CN108457200B (en) Temporary supporting structure for underpinning of curved bridge section pile foundation and construction method
JP6792239B2 (en) Scuttling prevention device for steel pipe piles and scuttling prevention method
CN215406059U (en) A guider that is used for constructing leading formula batter pile of excavation supporting system
CN209874007U (en) Construction structure for receiving well
CN211446570U (en) Abutment structure
CN219261048U (en) Working well
CN219196019U (en) Underground open caisson of municipal works
CN216475060U (en) Occlusive pile structure with reinforcing function
CN110952453B (en) Construction method of abutment structure
CN216108596U (en) Upper expanded-head cast-in-place pile foundation for steel pipe pole of power transmission line
CN214245752U (en) Prestressed reinforced cemented soil expanding head inclined throwing support
CN218148482U (en) Simple foundation pile structure, system thereof and trestle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant