CN214003887U - Tower crane large arm walking safety rope tying and hanging protection device - Google Patents

Tower crane large arm walking safety rope tying and hanging protection device Download PDF

Info

Publication number
CN214003887U
CN214003887U CN202023164753.6U CN202023164753U CN214003887U CN 214003887 U CN214003887 U CN 214003887U CN 202023164753 U CN202023164753 U CN 202023164753U CN 214003887 U CN214003887 U CN 214003887U
Authority
CN
China
Prior art keywords
safety rope
tower crane
hook
large arm
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023164753.6U
Other languages
Chinese (zh)
Inventor
张文超
赵豹
黄用兵
周奎
丁锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Shuishui Shun'an Hoisting Equipment Installation Co ltd
Anhui Water Resources Development Co Ltd
Original Assignee
Anhui Shuishui Shun'an Hoisting Equipment Installation Co ltd
Anhui Water Resources Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Shuishui Shun'an Hoisting Equipment Installation Co ltd, Anhui Water Resources Development Co Ltd filed Critical Anhui Shuishui Shun'an Hoisting Equipment Installation Co ltd
Priority to CN202023164753.6U priority Critical patent/CN214003887U/en
Application granted granted Critical
Publication of CN214003887U publication Critical patent/CN214003887U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model provides a safety rope tying and hanging protection device for the traveling of a tower crane boom; comprises a safety rope, a fixing component and a hook component; the fixing component at least comprises two fixing rings, the two fixing rings are respectively and fixedly connected with the two sides of the large arm of the tower crane, and the two ends of the safety rope are respectively and fixedly connected with the two fixing rings of the fixing component; the hook component comprises a plurality of hook seats, the hook seats are fixedly connected to the tower crane large arm and located between two fixing rings of the fixing component, the hook seats are distributed at intervals in sequence, the distribution trend of the hook seats is consistent with the length direction of the safety rope, the hook seats are provided with hooking grooves, the hooking grooves penetrate through two sides of the hook seats, and the hooking grooves of the hook seats are matched with the safety rope. The beneficial technical effect of this protection device does: the safety coefficient of the personnel of maintaining of ann's tearing open during the big arm walking of equipment fixing and inspection dimension guarantor process is greatly improved, alleviate the fear in walking process high altitude simultaneously. The construction efficiency is improved while the personal safety is further ensured.

Description

Tower crane large arm walking safety rope tying and hanging protection device
Technical Field
The utility model relates to a big arm walking safety rope of tower crane is tied and is hung protection device.
Background
In the process of installing, dismantling and maintaining the large arm of the tower crane, personnel must walk back and forth on the large arm according to the working requirement. However, the large arm of the tower crane is made of a steel structure, the main chord members are connected in a multi-position steel structure, the safety belt needs to be continuously tied and hung when an operator walks on the large arm of the tower crane due to the fact that the distance between the diagonal bracing connecting rods is too short (the maximum distance is not more than 50cm), the safety belt needs to be tied and hung again every two or three steps basically, work is not facilitated, and the safety belt is not used at all because some operators wear the safety belt due to trouble in the walking process of the large arm of the tower crane, and great safety risk exists; meanwhile, the accident caused by unbalance due to the fact that the safety belt is pulled because the safety belt is sometimes forgotten to be loosened during the work is also considered.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a protection device is tied to big arm walking safety rope of tower crane rational in infrastructure, convenient to use is provided.
In order to solve the technical problem, the utility model provides a safety rope tying and hanging protection device for the traveling of a large arm of a tower crane;
comprises a safety rope, a fixing component and a hook component;
the fixing component at least comprises two fixing rings, the two fixing rings are respectively and fixedly connected with the two sides of the large arm of the tower crane, and the two ends of the safety rope are respectively and fixedly connected with the two fixing rings of the fixing component;
the hook component comprises a plurality of hook seats, the hook seats are fixedly connected to the tower crane large arm and located between two fixing rings of the fixing component, the hook seats are distributed at intervals in sequence, the distribution trend of the hook seats is consistent with the length direction of the safety rope, the hook seats are provided with hooking grooves, the hooking grooves penetrate through two sides of the hook seats, and the hooking grooves of the hook seats are matched with the safety rope.
In order to understand the technical content of the utility model more clearly, the protection device is tied and hung to this big arm walking safety rope of tower crane for short below.
Preferably, the hook base is provided with a guide channel, the guide channel also penetrates through two sides of the hook bases on two sides, the safety rope enters and exits the hook holding groove through the guide channel, and an opening of the guide channel is positioned on the end face of the hook base, which is close to one side of the tower crane boom; with this arrangement, the guide passage can define a path for the safety line to enter and exit the hooking groove.
As the optimization of this protection device, guide channel top opening is on the terminal surface that the couple seat is close to tower crane large arm one side, guide channel middle part is equipped with downwards and bends, guide channel end and hook hold the groove intercommunication.
Preferably, the guide channel is provided with at least one blocking protrusion on one side wall in the middle.
Preferably, the safety rope is a steel wire rope.
As the optimization of this protection device, fixed subassembly still includes a plurality of wire rope buckles, and a plurality of wire rope buckles divide into two sets ofly, two sets of wire rope buckles and two retainer plates one-to-one, and safety rope tip runs through behind the corresponding retainer plate and fixes through a set of wire rope buckle.
After adopting such structure, installation and maintenance personnel hang the safety belt on the safety rope in the walking process on the tower crane jib, and the inspection of walking back and forth is convenient to ensure the safety of operating personnel.
In addition, because the large arm of the tower crane is long, if the end position of the safety rope is limited only by the fixing component, when the installation and maintenance personnel walk to the middle part of the large arm of the tower crane, the safety rope is stressed and can be stretched and deformed, and stable support cannot be provided for the installation and maintenance personnel;
if a plurality of segment fixing points are arranged between two fixing rings of the fixing component, although the purpose of stabilizing the safety rope can be achieved, installation and maintenance personnel have to remove the connecting lock catches between the segment fixing points and the safety rope each time when the installation and maintenance personnel pass through the segment fixing points, and then quickly cross the segment fixing points and then reconnect the segment fixing points.
A plurality of segmentation fixed points between two retainer plates are replaced to a plurality of couple seats through the couple subassembly in this application, installation and dimension guarantor personnel when certain couple seat, break away from the cooperation with the couple seat earlier safety rope, need not stride across the couple seat under the prerequisite of connecting lock catch and safety rope separation, stride across behind the couple seat again with safety rope and couple seat cooperation, installation and dimension guarantor personnel's connecting lock catch is fixed all the time on safety rope, the safety risk that significantly reduces.
The beneficial technical effect of this protection device does: the safety coefficient of the personnel of maintaining of ann's tearing open during the big arm walking of equipment fixing and inspection dimension guarantor process is greatly improved, alleviate the fear in walking process high altitude simultaneously. The construction efficiency is improved while the personal safety is further ensured.
Drawings
Fig. 1 is a usage state diagram of the embodiment of the protection device.
Fig. 2 is an enlarged view of a portion a of fig. 1.
Fig. 3 is a sectional view taken along line B-B of fig. 1.
Fig. 4 is an enlarged view of a portion C of fig. 3.
Detailed Description
As shown in fig. 1 to 4 (the safety rope is omitted in fig. 3 and 4)
This protection device includes safety rope 2, fixed subassembly and couple subassembly.
Fixed subassembly includes two retainer plates 11 and six wire rope buckles 12, retainer plate 11 adopts M30's nut, two retainer plates 11 welded fastening are in the main chord 41 both sides of the big arm of tower crane respectively, six wire rope buckles 12 divide into two sets ofly, two sets of wire rope buckles 12 and two 11 one-to-ones of retainer plates, safety rope 2 is wire rope, 2 tip of safety rope run through correspond behind the retainer plate 11 fixed through a set of wire rope buckle 12, make 2 both ends of safety rope respectively with two 11 fixed connection of retainer plates of fixed subassembly, 2 tensionings of safety rope are between two retainer plates 11.
The hook component comprises a plurality of hook seats 31, the hook seats 31 are welded and fixed on a main chord 41 of a tower crane large arm (if a pull rod support is welded on the pull rod support most preferably), the hook seats 31 are located between two fixing rings 11 of the fixing component, the hook seats 31 are distributed at intervals in sequence, adjacent hook seats 31 are evenly spaced by 10 meters, and the distribution trend of the hook seats 31 is consistent with the length direction of the safety rope 2.
The hook seat 31 is provided with a hooking groove 32 and a guide channel 33, the width of the guide channel 33 only allows the safety rope 2 to pass through, the guide channel 33 penetrates through the two sides of the hook seats 31 on the two sides, the opening at the starting end of the guide channel 33 is positioned on the end face of one side, close to the tower crane boom, of the hook seat 31, a bend is arranged downwards in the middle of the guide channel 33, the tail end of the guide channel 33 is communicated with the hooking groove 32, and two blocking protrusions 33a are arranged on one side wall of the middle of the guide channel 33.
The safety rope 2 passes in and out of the hooking grooves 32 through the guide passage 33, the hooking grooves 32 also penetrate both sides of the hook bases 31 on both sides, and the hooking grooves 32 of the hook bases 31 are engaged with the safety rope 2.
The large arm of the tower crane in the implementation adopts a QTZ (80)5610 type tower crane of Anhui construction machinery factory, and the whole field of the large arm of the tower crane is 56 meters.
When the safety belt is used, the installation and maintenance personnel hang the safety belt on the steel wire rope in the walking process on the big arm, so that the walking inspection is convenient, and the safety of the operation personnel is ensured.
The above description is only one embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and improvements can be made without departing from the principle of the present invention, and these should also be considered as belonging to the protection scope of the present invention.

Claims (6)

1. The utility model provides a big arm of tower crane safety rope system hangs protection device which characterized in that:
comprises a safety rope, a fixing component and a hook component;
the fixing component at least comprises two fixing rings, the two fixing rings are respectively and fixedly connected with the two sides of the large arm of the tower crane, and the two ends of the safety rope are respectively and fixedly connected with the two fixing rings of the fixing component;
the hook component comprises a plurality of hook seats, the hook seats are fixedly connected to the tower crane large arm and located between two fixing rings of the fixing component, the hook seats are distributed at intervals in sequence, the distribution trend of the hook seats is consistent with the length direction of the safety rope, the hook seats are provided with hooking grooves, the hooking grooves penetrate through two sides of the hook seats, and the hooking grooves of the hook seats are matched with the safety rope.
2. The tower crane large arm walking safety rope tying and hanging protection device as claimed in claim 1, wherein:
the hook seat is also provided with a guide channel, the guide channel also penetrates through the two sides of the hook seats on the two sides, the safety rope passes through the guide channel to enter and exit the hooking groove, and the opening of the guide channel is positioned on the end face of the hook seat close to one side of the large arm of the tower crane.
3. The tower crane large arm walking safety rope tying and hanging protection device as claimed in claim 2, wherein:
the guide passage starting end opening is located on the end face, close to one side of the tower crane large arm, of the hook seat, a bend is arranged downwards in the middle of the guide passage, and the tail end of the guide passage is communicated with the hooking groove.
4. The tower crane large arm walking safety rope tying and hanging protection device as claimed in claim 3, wherein:
at least one blocking bulge is arranged on one side wall in the middle of the guide channel.
5. The tower crane large arm walking safety rope tying and hanging protection device as claimed in claim 1, wherein:
the safety rope is a steel wire rope.
6. The tower crane large arm walking safety rope tying and hanging protection device as claimed in claim 5, wherein:
the fixing assembly further comprises a plurality of steel wire rope buckles, the steel wire rope buckles are divided into two groups, the two groups of steel wire rope buckles are in one-to-one correspondence with the two fixing rings, and the end portions of the safety ropes are fixed through the steel wire rope buckles after penetrating through the corresponding fixing rings.
CN202023164753.6U 2020-12-23 2020-12-23 Tower crane large arm walking safety rope tying and hanging protection device Active CN214003887U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023164753.6U CN214003887U (en) 2020-12-23 2020-12-23 Tower crane large arm walking safety rope tying and hanging protection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023164753.6U CN214003887U (en) 2020-12-23 2020-12-23 Tower crane large arm walking safety rope tying and hanging protection device

Publications (1)

Publication Number Publication Date
CN214003887U true CN214003887U (en) 2021-08-20

Family

ID=77290282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023164753.6U Active CN214003887U (en) 2020-12-23 2020-12-23 Tower crane large arm walking safety rope tying and hanging protection device

Country Status (1)

Country Link
CN (1) CN214003887U (en)

Similar Documents

Publication Publication Date Title
CN203583910U (en) Fixing bracket system for safety rope for high-altitude operations with steel structure
CN109973130B (en) Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand
CN104499723A (en) Movable safety net and installation method thereof
CN214003887U (en) Tower crane large arm walking safety rope tying and hanging protection device
CN210134661U (en) Device for fixing life rope of steel pipe scaffold
KR20140065124A (en) Lifting gantry for girder erection works of suspension bridges
CN112573404A (en) Tower crane large arm walking safety rope tying and hanging protection device
CN108675170A (en) Roofing monorail crane and its construction method
CN203626222U (en) Safety device of movable scaffold
CN215249030U (en) Multi-head lifting hook
CN212773371U (en) Limited space steel construction daylighting top cable work platform
CN106703418B (en) The installation of large span latticed shell structure roofing hangs method with moving type security net
CN211736295U (en) Detachable multifunctional high-strength bolt construction platform device
CN218538946U (en) Hoist and mount auxiliary device suitable for large-scale cable drum
CN212897146U (en) Assembled buckling and hanging metal grid suspended ceiling structure
CN218420711U (en) Safety belt fastening and hanging device for operation at bottom of bridge
CN107858927B (en) Hanging system for integrally removing up-going movable formwork template
CN219771614U (en) Safety device on tower crane big arm
CN220745084U (en) Single-row steel bar combined lifting appliance for lifting main steel bars of steel bar framework of bridge tower
CN216072701U (en) Balanced hoisting accessory
CN213865042U (en) Assembled two cabin piping lane hoists
CN218114849U (en) Curtain wall material hoisting device
CN218563118U (en) Large-span tensioning cable type slidable safety flat net
CN214989935U (en) Corrugated plate hoisting system for reinforcing tunnel lining
CN218420710U (en) Safety rope hangs fixed arrangement structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant