CN213980053U - Building construction strutting arrangement - Google Patents

Building construction strutting arrangement Download PDF

Info

Publication number
CN213980053U
CN213980053U CN202022938771.9U CN202022938771U CN213980053U CN 213980053 U CN213980053 U CN 213980053U CN 202022938771 U CN202022938771 U CN 202022938771U CN 213980053 U CN213980053 U CN 213980053U
Authority
CN
China
Prior art keywords
supporting
fixedly mounted
rod
bottom box
columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022938771.9U
Other languages
Chinese (zh)
Inventor
申红芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liu Qi
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022938771.9U priority Critical patent/CN213980053U/en
Application granted granted Critical
Publication of CN213980053U publication Critical patent/CN213980053U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of building construction, in particular to a building construction supporting device, aiming at the problems that most of the existing wall supporting devices use supporting rods to support a wood plate to support a wall body, the supporting device is inconvenient for adjusting the supporting angle and the supporting height, the application range is limited, and the using effect is not ideal, the utility model provides a bottom box, two fixing columns are fixedly arranged at the top of the bottom box, a rotating rod is rotatably arranged between the two fixing columns, two supporting columns are fixedly arranged at the bottom of the bottom box, universal wheels are fixedly arranged at the bottom ends of the two supporting columns, a telescopic rod is fixedly arranged at the top of the bottom box, a fixing block is fixedly arranged on the telescopic rod, the utility model has simple structure, can be adjusted according to the height of a wall surface, and can realize the adjustment of the supporting height, meet different supporting requirements and have wide application range.

Description

Building construction strutting arrangement
Technical Field
The utility model relates to a construction technical field especially relates to a construction strutting arrangement.
Background
In the building work progress, need construct interim wall body under the condition a bit to play interim each section and the effect that blocks, because interim wall construction is lower to the requirement of ground, the crack appears in the later stage of using easily and collapses even, consequently need carry out the outside to the wall and strut.
Most of the existing wall supporting devices use supporting rods to support the wood boards to support the wall, so that the supporting device is inconvenient to adjust the supporting angle and the supporting height, the application range is limited, and the using effect is not ideal.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving present wall body strutting arrangement most and all supporting the plank with the bracing piece and supporting the wall body, such strutting arrangement is not convenient for carry out support angle and the regulation of support height, and application scope is limited, the unsatisfactory shortcoming of result of use, and the building construction strutting arrangement who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a supporting device for building construction comprises a bottom box, wherein two fixing columns are fixedly mounted at the top of the bottom box, a rotating rod is rotatably mounted between the two fixing columns, two supporting columns are fixedly mounted at the bottom of the bottom box, universal wheels are fixedly mounted at the bottoms of the two supporting columns, a telescopic rod is fixedly mounted at the top of the bottom box, a fixing block is fixedly mounted on the telescopic rod, a connecting block is in threaded connection with the rotating rod, a fixing block is fixedly mounted at the top of the connecting block, a supporting rod is rotatably mounted on the fixing block, a motor is fixedly mounted at the top of the bottom box, a fixing rod is fixedly mounted on the inner wall of the bottom box, a rotating shaft is rotatably mounted on the fixing rod, a cross rod is slidably mounted between the two supporting columns, two connecting columns are fixedly mounted on the cross rod, and drill bits are fixedly mounted at the bottoms of the two connecting columns, the supporting rod is rotatably provided with a supporting plate.
Preferably, fixed mounting has first belt pulley on the dwang, fixed mounting has the second belt pulley in the axis of rotation, transmission connection has same belt on first belt pulley and the second belt pulley.
Preferably, the top ends of the two connecting columns are provided with thread grooves, and the thread grooves are internally connected with screws.
Preferably, a sliding groove is formed in the fixing block, the supporting rod is slidably mounted in the sliding groove, and threads are formed in the outer side of the rotating rod.
Preferably, the rotating shaft is fixedly provided with two first bevel gears, the top ends of the two screws are fixedly provided with second bevel gears, and the first bevel gears are meshed with the second bevel gears.
Compared with the prior art, the utility model has the advantages of:
this scheme is owing to set up the motor, the dwang, the fixed block, the bracing piece, support board and telescopic link, the motor drives the dwang and rotates, will drive the fixed block when the dwang rotates and remove, makes the contained angle between bracing piece and the fixed block change, through the angle between regulation bracing piece and the fixed block, makes and supports board and wall body surface in close contact with, realizes the support to the wall body, and the device can realize supporting angle and the regulation of support height, can satisfy different support demands.
Owing to set up the dwang, first belt pulley, the belt, the second belt pulley, effect conical gear, second conical gear, the screw rod, spliced pole and drill bit, when the dwang rotated, the dwang rotated and drives first belt pulley and rotate, first belt pulley passes through the belt and is connected with the second belt pulley, drive the second belt, the axis of rotation, first conical gear rotates, the meshing through first conical gear and second conical gear drives the screw rod and rotates, drive the spliced pole downstream, and then drive the drill bit downstream, finally the drill bit will insert the underground, reach and fix the effect to whole strutting arrangement.
The utility model discloses simple structure can highly adjust according to the wall, can realize the regulation of support height, satisfies different support demands, and application scope is wide.
Drawings
Fig. 1 is a schematic front view of a supporting device for building construction according to the present invention;
fig. 2 is a schematic side view of the first belt pulley and the second belt pulley of the support device for building construction according to the present invention;
fig. 3 is the utility model provides a part a schematic structure of construction strutting arrangement.
In the figure: 1. a bottom case; 2. fixing a column; 3. rotating the rod; 4. a support pillar; 5. a telescopic rod; 6. a rectangular block; 7. a support bar; 8. connecting blocks; 9. a fixed block; 10. a sliding groove; 11. an electric motor; 12. fixing the rod; 13. a rotating shaft; 14. a first pulley; 15. a second pulley; 16. a belt; 17. a universal wheel; 18. a cross bar; 19. a screw; 20. connecting columns; 21. a thread groove; 22. a drill bit; 23. a first bevel gear; 24. a second bevel gear; 25. and a support plate.
Detailed Description
The technical solutions in the embodiments will be described clearly and completely with reference to the drawings in the embodiments, and it is obvious that the described embodiments are only a part of the embodiments, but not all embodiments.
Referring to fig. 1-3, a supporting device for building construction comprises a bottom box 1, two fixed columns 2 are fixedly installed at the top of the bottom box 1, a rotating rod 3 is rotatably installed between the two fixed columns 2, two supporting columns 4 are fixedly installed at the bottom of the bottom box 1, universal wheels 17 are fixedly installed at the bottoms of the two supporting columns 4, a telescopic rod 5 is fixedly installed at the top of the bottom box 1, a rectangular block 6 is fixedly installed on the telescopic rod 5, a connecting block 8 is connected onto the rotating rod 3 in a threaded manner, a fixed block 9 is fixedly installed at the top of the connecting block 8, a supporting rod 7 is rotatably installed on the fixed block 9, a motor 11 is fixedly installed at the top of the bottom box 1, a fixed rod 12 is fixedly installed on the inner wall of the bottom box 1, a rotating shaft 13 is rotatably installed on the fixed rod 12, a cross rod 18 is slidably installed between the two supporting columns 4, and two connecting columns 20 are fixedly installed on the cross rod 18, the bottom ends of the two connecting columns 20 are fixedly provided with drill bits 22, and the support rod 7 is rotatably provided with a resisting plate 25.
In this embodiment, fixed mounting has first belt pulley 14 on dwang 3, and fixed mounting has second belt pulley 15 on the axis of rotation 13, the transmission is connected with same belt 16 on first belt pulley 14 and the second belt pulley 15.
In this embodiment, the top ends of the two connecting columns 20 are both provided with a thread groove 21, and the thread groove 21 is internally threaded with a screw 19.
In this embodiment, the rectangular block 6 is provided with a sliding groove 10, the support rod 7 is slidably mounted in the sliding groove 10, and the outer side of the rotating rod 3 is provided with a thread.
In this embodiment, two first bevel gears 23 are fixedly mounted on the rotating shaft 13, two second bevel gears 24 are fixedly mounted at the top ends of the two screws 19, and the first bevel gears 23 are meshed with the second bevel gears 24.
In this embodiment, when the wall needs to be supported, the motor 11 is started, the motor 11 drives the rotating rod 3 to rotate, when the rotating rod 3 rotates, because the fixed block 9 is in threaded connection with the rotating rod 3, when the rotating rod 3 rotates, the fixed block 9 is driven to move, so that the included angle between the supporting rod 7 and the fixed block 9 is changed, when the angle is increased, the supporting rod 7 drives the telescopic rod 5 to move upwards, the supporting plate 25 is driven to move upwards, by adjusting the angle between the supporting rod 7 and the fixed block 9, the supporting plate 25 is in close contact with the surface of the wall, the wall is supported, the device can realize the adjustment of the supporting angle and the supporting height, and can meet different supporting requirements, when the rotating rod 3 rotates, the rotating rod 3 rotates to drive the first belt pulley 14 fixedly installed on the rotating rod 3 to rotate, the first belt pulley 14 is connected with the second belt pulley 15 through the belt 16, drive second belt pulley 15 and rotate, drive axis of rotation 13 and rotate, thereby drive two first bevel gear 23 of fixed mounting on axis of rotation 13 and rotate, drive screw rod 19 through the meshing of first bevel gear 23 and second bevel gear 24 and rotate, because of screw rod 19 and spliced pole 20 threaded connection, screw rod 19 drives spliced pole 20 downstream simultaneously in the pivoted, and then drive drill bit 22 and move down, final drill bit 22 will insert the underground, fix the effect to whole strutting arrangement, when the wall body need not support, reverse motor 11, bracing piece 7 will drive and support board 25 and move down, make and support board 25 break away from the strong face, screw rod 19 drives spliced pole 20 and moves up simultaneously, make spliced pole 20 and drill bit 22 and ground contactless, whole device just can move.
The above descriptions are only preferred embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the scope of the present invention, and the technical solutions and the utility model concepts of the present invention are equivalent to, replaced or changed.

Claims (5)

1. The building construction supporting device comprises a bottom box (1) and is characterized in that two fixing columns (2) are fixedly mounted at the top of the bottom box (1), a rotating rod (3) is mounted between the two fixing columns (2) in a rotating manner, two supporting columns (4) are fixedly mounted at the bottom of the bottom box (1), universal wheels (17) are fixedly mounted at the bottom ends of the two supporting columns (4), a telescopic rod (5) is fixedly mounted at the top of the bottom box (1), a rectangular block (6) is fixedly mounted on the telescopic rod (5), a connecting block (8) is in threaded connection with the rotating rod (3), a fixing block (9) is fixedly mounted at the top of the connecting block (8), a supporting rod (7) is rotatably mounted on the fixing block (9), a motor (11) is fixedly mounted at the top of the bottom box (1), and a fixing rod (12) is fixedly mounted on the inner wall of the bottom box (1), rotation axis (13) are installed in the last rotation of dead lever (12), two slidable mounting has horizontal pole (18) between support column (4), fixed mounting has two spliced poles (20) on horizontal pole (18), two the equal fixed mounting in bottom of spliced pole (20) has drill bit (22), rotate on bracing piece (7) and install to board (25).
2. The construction supporting device according to claim 1, wherein a first belt pulley (14) is fixedly installed on the rotating rod (3), a second belt pulley (15) is fixedly installed on the rotating shaft (13), and the same belt (16) is in transmission connection with the first belt pulley (14) and the second belt pulley (15).
3. The construction supporting device according to claim 1, wherein the top ends of the two connecting columns (20) are provided with thread grooves (21), and the thread grooves (21) are internally connected with screw rods (19).
4. The construction supporting device according to claim 1, wherein the rectangular block (6) is provided with a sliding groove (10), the supporting rod (7) is slidably mounted in the sliding groove (10), and the rotating rod (3) is provided with a thread on the outer side.
5. The construction supporting device according to claim 3, wherein two first bevel gears (23) are fixedly mounted on the rotating shaft (13), two second bevel gears (24) are fixedly mounted at the top ends of the two screw rods (19), and the first bevel gears (23) are meshed with the second bevel gears (24).
CN202022938771.9U 2020-12-10 2020-12-10 Building construction strutting arrangement Active CN213980053U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022938771.9U CN213980053U (en) 2020-12-10 2020-12-10 Building construction strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022938771.9U CN213980053U (en) 2020-12-10 2020-12-10 Building construction strutting arrangement

Publications (1)

Publication Number Publication Date
CN213980053U true CN213980053U (en) 2021-08-17

Family

ID=77241511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022938771.9U Active CN213980053U (en) 2020-12-10 2020-12-10 Building construction strutting arrangement

Country Status (1)

Country Link
CN (1) CN213980053U (en)

Similar Documents

Publication Publication Date Title
CN210396193U (en) Temporary supporting device for prefabricated wall
CN215803326U (en) Assembled wall body installation auxiliary assembly
CN208620004U (en) A kind of industrial robot mounting seat
CN213980053U (en) Building construction strutting arrangement
CN218911155U (en) Road and bridge construction supporting platform
CN111975882B (en) Wood cutting equipment convenient to equipment is changed
CN115680256A (en) Construction platform for housing construction engineering
CN212317871U (en) Inclination angle adjusting device for drilling tower
CN210767955U (en) A consolidate bearing structure for building engineering
CN212010294U (en) Building engineering cost statistics show board
CN208333513U (en) A kind of geology monitoring device for complicated landform area
CN208686410U (en) A kind of mining more steel strand wires combination supporting devices
CN214329808U (en) Building construction operation platform
CN220013728U (en) Reinforcing structure of side slope
CN220247267U (en) Light wallboard non-vertical component combined type fixing frame
CN211598495U (en) Novel ladder is used in decoration
CN213569168U (en) Steel groove buckle plate component
CN219012539U (en) Auxiliary positioner for drilling well
CN218375545U (en) Building engineering strutting arrangement
CN213333435U (en) Block terminal support that building site used
CN218375050U (en) Safety protection supporting platform
CN219508356U (en) Detachable and adjustable gap bridge
CN219489289U (en) Car top wheel device capable of adjusting installation angle
CN211774576U (en) A reinforcing apparatus for membrane structure support
CN219045313U (en) Combined support template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220302

Address after: 264001 No. 4, No. 52, Taohua street, Zhifu District, Yantai City, Shandong Province

Patentee after: Liu Qi

Address before: 264001 No. 101, Zhichu Road, Zhifu District, Yantai City, Shandong Province

Patentee before: Shen Hongfang