CN213951948U - Prepressing test structure of assembled bracket - Google Patents

Prepressing test structure of assembled bracket Download PDF

Info

Publication number
CN213951948U
CN213951948U CN202022009708.7U CN202022009708U CN213951948U CN 213951948 U CN213951948 U CN 213951948U CN 202022009708 U CN202022009708 U CN 202022009708U CN 213951948 U CN213951948 U CN 213951948U
Authority
CN
China
Prior art keywords
bracket
counter
force
side plate
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022009708.7U
Other languages
Chinese (zh)
Inventor
王安文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202022009708.7U priority Critical patent/CN213951948U/en
Application granted granted Critical
Publication of CN213951948U publication Critical patent/CN213951948U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a pre-compaction test structure of assembled bracket, including two experimental mounds of concrete, be equipped with the counter-force roof beam between two experimental mounds, pour respectively in experimental mound concrete at the both ends of counter-force roof beam, an assembled bracket is installed respectively at the opposite side of two experimental mounds to counter-force roof beam top, has been set up the spandrel girder between two brackets, and the both ends top surface of spandrel girder is vertical jack that sets up respectively, sets up a shoulder pole roof beam on every jack, and the both ends of shoulder pole roof beam are connected through the pull rod respectively with between the counter-force roof beam. The utility model discloses carry out bearing capacity pre-compaction test on experimental mound, provide pressure through the jack, provide the counter-force through the counter-force roof beam, can detect the bracket bearing capacity fast, the bracket direct mount that the bearing capacity satisfies the design requirement uses on cable tower, high mound, avoids loaded down with trivial details process and the safety risk of high altitude pre-compaction.

Description

Prepressing test structure of assembled bracket
Technical Field
The utility model belongs to the technical field of the bridge construction, a suspension bridge's cable tower crossbeam construction is related to, concretely relates to carries out the structure that the pre-compaction was experimental to the bearing capacity of the assembled bracket that the crossbeam construction adopted.
Background
A pylon of a suspension bridge usually comprises two pylons, between which a cross-beam is arranged. Because the crossbeam position is higher, usually adopt high altitude bracket method construction, install the bracket respectively in the opposite side of two high tower departments of tower, set up the spandrel girder as the main bearing structure of bracket between the bracket.
And pre-pressing the bracket after the bracket is installed to test the stress performance of the bracket. The conventional preloading method adopts a stacking method, needs to hoist a large amount of ballast to high altitude, and has long construction period and poor safety.
Disclosure of Invention
The utility model aims at not enough to surcharge the pre-compaction method and exist, provide a simple, swift, safe bracket pre-compaction test structure, avoid the safe risk and the loaded down with trivial details process that the high altitude pre-compaction exists to guarantee that the bracket bearing capacity after the installation accords with the designing requirement.
The technical scheme of the utility model as follows:
the utility model provides a pre-compaction test structure of assembled bracket which characterized in that: the device comprises two concrete test piers, wherein a counter-force beam is arranged between the two test piers, the two ends of the counter-force beam are respectively poured in the concrete of the test piers, an assembly bracket is respectively installed on the opposite sides of the two test piers above the counter-force beam, a bearing beam is arranged between the two brackets, the top surfaces of the two ends of the bearing beam are respectively and vertically provided with a jack, the upper end of each jack is provided with a carrying pole beam, and the two ends of the carrying pole beam are respectively connected with the counter-force beam through pull rods.
The utility model is suitable for a pre-compaction of assembled bracket is experimental. Utilize the installation of assembled bracket, dismantle convenient characteristics, install earlier the bracket and carry out bearing capacity pre-compaction test on lower experimental mound, provide pressure through the jack, provide the counter-force through the counter-force roof beam, moreover, the steam generator is simple in structure, the atress is clear and definite, can detect the bracket bearing capacity fast, and the testing result is accurate, high in safety, can lift off direct mount on the pylon from experimental mound after the bracket pre-compaction bearing capacity satisfies the designing requirement, use on the high mound, avoid the loaded down with trivial details process of high altitude pre-compaction and the safe risk that exists.
Drawings
Fig. 1 is a schematic side elevation structure of the present invention;
fig. 2 is a schematic diagram of the horizontal vertical structure of the present invention.
Detailed Description
As shown in fig. 1 and 2, the utility model discloses a two experimental mounds of concrete 1 are equipped with counter-force roof beam 2 between two experimental mounds 1, pour respectively in experimental mound concrete at the both ends of counter-force roof beam 2, and assembled bracket is installed respectively at the opposite side of two experimental mounds to counter-force roof beam top.
Assembled bracket includes roof 3 that the level set up, and roof one side vertical welding curb plate 4, the welding have with roof and curb plate equal vertically backup pad 5 between curb plate and the roof. And 4 pin rod jacks and 4 deformed steel bar jacks are arranged on the side plate. A side plate 4 of the bracket is tightly attached to the side wall of the test pier 1, finish-rolled deformed steel bars 6 and pin bars 7 corresponding to each pin bar jack and each deformed steel bar jack on the side plate of the bracket are inserted into the test pier, one end of each finish-rolled deformed steel bar 6 penetrates through the deformed steel bar jack on the side plate of the bracket, the other end of each finish-rolled deformed steel bar protrudes to the other side of the pier body, and nuts are respectively screwed at two ends of the finish-rolled deformed steel bars to fasten the bracket on the pier body; one end of each pin rod 7 penetrates through the side plate of the bracket, the other end of each pin rod protrudes to the other side of the pier body, and the pin rods provide supporting force for the bracket.
A bearing beam 8 is erected between the brackets on the two test piers, two ends of the bearing beam 8 are respectively supported on the top plates 3 of the two brackets, top surfaces of two ends of the bearing beam 8 are respectively and vertically provided with a jack 9, the upper end of each jack is provided with a carrying pole beam 10, and two ends of the carrying pole beam 10 are respectively connected with the counter-force beam 2 through a pull rod 11.
The jack 9 pushes the shoulder pole beam 10 upwards, and provides counter force through the counter force beam 2 to apply pressure to the bracket. The jack is pressurized step by 5 stages and 20% of each stage according to the design load of the bracket, the jack lasts for a period of time after the maximum design load is reached, the design requirement is met after the bracket is observed to be not deformed, the jack can be installed on a tower column and a high pier and directly used for construction of a cross beam and a cover beam after the bracket is detached from a test pier, high-altitude prepressing is not needed, and the construction safety can be ensured.

Claims (2)

1. The utility model provides a pre-compaction test structure of assembled bracket which characterized in that: the device comprises two concrete test piers, wherein a counter-force beam is arranged between the two test piers, the two ends of the counter-force beam are respectively poured in the concrete of the test piers, an assembly bracket is respectively installed on the opposite sides of the two test piers above the counter-force beam, a bearing beam is arranged between the two brackets, the top surfaces of the two ends of the bearing beam are respectively and vertically provided with a jack, the upper end of each jack is provided with a carrying pole beam, and the two ends of the carrying pole beam are respectively connected with the counter-force beam through pull rods.
2. The pre-compression test structure of the fabricated bracket according to claim 1, wherein: the assembly type bracket comprises a horizontally arranged top plate, one side of the top plate is vertically welded with a side plate, and a supporting plate which is perpendicular to the top plate and the side plate is welded between the side plate and the top plate; the side plate is provided with 4 pin rod insertion holes and 4 deformed steel bar insertion holes, the side plate is tightly attached to the side wall of the test pier, finish-rolled deformed steel bars and pin rods corresponding to the pin rod insertion holes and the deformed steel bar insertion holes in the bracket side plate are inserted into the test pier, one end of each finish-rolled deformed steel bar penetrates through the deformed steel bar insertion hole in the bracket side plate, the other end of each finish-rolled deformed steel bar protrudes out of the other side of the pier body, and two ends of each finish-rolled deformed steel bar are respectively connected with nuts in a threaded mode; one end of each pin rod penetrates through the bracket side plate, and the other end of each pin rod protrudes to the other side of the pier body.
CN202022009708.7U 2020-09-14 2020-09-14 Prepressing test structure of assembled bracket Active CN213951948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022009708.7U CN213951948U (en) 2020-09-14 2020-09-14 Prepressing test structure of assembled bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022009708.7U CN213951948U (en) 2020-09-14 2020-09-14 Prepressing test structure of assembled bracket

Publications (1)

Publication Number Publication Date
CN213951948U true CN213951948U (en) 2021-08-13

Family

ID=77201441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022009708.7U Active CN213951948U (en) 2020-09-14 2020-09-14 Prepressing test structure of assembled bracket

Country Status (1)

Country Link
CN (1) CN213951948U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117433822A (en) * 2023-12-20 2024-01-23 贵州省公路工程集团有限公司 Structural performance evaluation system and method using reinforced concrete bracket as support

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117433822A (en) * 2023-12-20 2024-01-23 贵州省公路工程集团有限公司 Structural performance evaluation system and method using reinforced concrete bracket as support
CN117433822B (en) * 2023-12-20 2024-02-13 贵州省公路工程集团有限公司 Structural performance evaluation system and method using reinforced concrete bracket as support

Similar Documents

Publication Publication Date Title
CN102108786B (en) Overall lifting construction method of ultra-large type building member and device thereof
CN204255832U (en) Crab-bolt pullout tests charger
CN104032678A (en) H-shaped tower column inner force adjustable temporary cross supporting structure and construction method thereof
CN109505317A (en) A kind of resistance to compression of high stake, resistance to plucking and horizontally loading test equipment
CN105201219B (en) A kind of structure synchronization discharge mechanism and its construction method
CN213951948U (en) Prepressing test structure of assembled bracket
CN202766971U (en) A ground counter-pull pre-pressing device for a continuous beam cantilever cast-in-place hanging basket
CN205223871U (en) Suspension bridge bridge tower overarm brace pre -compaction device
CN203173749U (en) Assembled integral type vertical self-jacking device of hydraulic double-type crane tower
CN201110804Y (en) Multifunctional experimental bench
CN104894981B (en) Reaction frame pre-pressing system for bracket of cantilever section
CN103185682A (en) Loading method for axial forces of pre-stressed pipe pile
CN214328534U (en) 0# block bracket pre-pressing device of continuous rigid frame bridge
CN212670670U (en) Loading device and test equipment for foundation pile compression-resistant static load test
CN101514556A (en) Prefabricated tower crane foundation and a dedicated hydraulic installation piling machine thereof
CN211368423U (en) Stay cable tower top lifting traction operation platform
CN204530506U (en) End bay closing device
CN107238494A (en) A kind of vertical load loading device and method suitable for unstability frame structure outside face
CN211317981U (en) Containing node test bed device suitable for containing type node truss
CN210712562U (en) Tower crane system for construction of cast-in-situ tower column of cable-stayed bridge
CN209367674U (en) A kind of dedicated anchoring rod device of large-tonnage bridge floor crane
CN203866710U (en) Temporary cross arm structure of H-shaped tower column with internal force adjustable
CN112195783A (en) Assembly type bracket mounting structure for cable tower beam construction and prepressing method
CN218059911U (en) Basket pre-compaction device is hung to assembled
CN212426778U (en) Bracket pre-pressing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant