CN213937288U - Cable bridge convenient to installation is dismantled - Google Patents

Cable bridge convenient to installation is dismantled Download PDF

Info

Publication number
CN213937288U
CN213937288U CN202022727834.6U CN202022727834U CN213937288U CN 213937288 U CN213937288 U CN 213937288U CN 202022727834 U CN202022727834 U CN 202022727834U CN 213937288 U CN213937288 U CN 213937288U
Authority
CN
China
Prior art keywords
wall
bridge
fixed
fixedly arranged
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022727834.6U
Other languages
Chinese (zh)
Inventor
顾纪阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jin Li Electric Co ltd
Original Assignee
Jiangsu Jin Li Electric Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jin Li Electric Co ltd filed Critical Jiangsu Jin Li Electric Co ltd
Priority to CN202022727834.6U priority Critical patent/CN213937288U/en
Application granted granted Critical
Publication of CN213937288U publication Critical patent/CN213937288U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a cable bridge convenient to installation and disassembly, including wall body and two fixed mounts of fixed setting on the wall body lower wall, two the fixed mount is erect the crane span structure jointly, the lower wall of crane span structure is the opening form setting, the opening part is fixed and is equipped with the pivot, fixed being equipped with the rotor plate in the pivot, fixed being equipped with the spacing groove in the crane span structure, the upper wall of rotor plate is also fixed and is equipped with a plurality of spacing grooves, the one end that the rotor plate kept away from the pivot is equipped with the joint pole, be equipped with assorted draw-in groove in the lower extreme lateral wall of crane span structure, be equipped with corresponding sliding chamber in the rotor plate, the joint pole is kept away from the one end joint of pivot and is set up in the draw-in groove, the other end of joint pole sets up in the sliding chamber, the fixed spring that is equipped with between bottom wall and the joint pole of sliding chamber; the utility model discloses a when cable laying, can install it from the diapire of crane span structure and dismantle, avoided tedious handling.

Description

Cable bridge convenient to installation is dismantled
Technical Field
The utility model relates to a crane span structure technical field especially relates to a cable testing bridge convenient to installation is dismantled.
Background
The cable bridge is a cable laying device which can make the laying of electric wires, cables and pipes reach standardization, serialization and universalization. Basic species: the groove type cable bridge is a totally enclosed cable bridge, which is most suitable for laying computer cables, communication cables, thermocouple cables and control cables of other high-sensitivity systems, and has better effects on shielding interference and protecting cables in heavy corrosion environments. The tray type cable bridge has the advantages of light weight, large load, attractive appearance, simple structure, convenience in installation and the like, and is suitable for installation of power cables and laying of control cables. The ladder type cable bridge is suitable for laying common straight and light large cables, and is particularly suitable for laying high and low power cables;
when the existing cable bridge frame is mounted and dismounted, the fixing frame and the bridge frame need to be dismounted together, so that the cable bridge frame is maintained and checked, when the cable bridge frame is mounted, the cable needs to be laid in the bridge frame firstly, then the fixing frame and the bridge frame are lifted together to be fixed, the process is complex, the fixing frame and the bridge frame need to be dismounted and carried repeatedly, a large amount of labor force is consumed, and the cable bridge frame convenient to mount and dismount is provided.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is, not enough to prior art, provide a cable testing bridge convenient to installation is dismantled, when the cable laying, can follow the diapire of crane span structure and install it and dismantle, avoided tedious handling.
The utility model discloses a solve the technical scheme that above-mentioned technical problem provided and be: a cable bridge convenient to mount and dismount comprises a wall body and two fixing frames fixedly arranged on the lower wall of the wall body, wherein a bridge is jointly erected on the two fixing frames, the lower wall of the bridge is in an opening shape, a rotating shaft is fixedly arranged at the opening, a rotating plate is fixedly arranged on the rotating shaft, a limiting groove is fixedly arranged in the bridge, a plurality of limiting grooves are fixedly arranged on the upper wall of the rotating plate, a clamping rod is arranged at one end, away from the rotating shaft, of the rotating plate, a matched clamping groove is arranged in the side wall of the lower end of the bridge, a corresponding sliding cavity is arranged in the rotating plate, one end, away from the rotating shaft, of the clamping rod is clamped in the clamping groove, the other end of the clamping rod is arranged in the sliding cavity, a spring is fixedly arranged between the bottom wall of the sliding cavity and the clamping rod, a fixing rod is fixedly arranged on the side wall of one end, in the sliding cavity, of the clamping rod, and the tail end of the fixing rod is arranged outside the lower wall of the bridge, and the tail end of the fixed rod is fixedly provided with a push block.
The utility model discloses further technical scheme:
preferably, the lateral wall of spacing groove is the arc setting, just fixed rubber protection pad that is equipped with on the diapire of spacing groove.
Preferably, one end of the rotating plate, which is far away from the rotating shaft, is arranged in an arc shape, and the side wall of the opening of the bridge is also arranged in a matched arc shape.
Preferably, the clamping rod and the fixing rod are integrally formed, and a smooth layer is arranged on the surface of the clamping rod.
Preferably, the push block is arranged in an ellipsoid shape, and a rubber protective sleeve is sleeved on the push block.
The utility model adopts the above technical scheme's beneficial effect is:
the utility model discloses through the mutual cooperation of pivot, commentaries on classics board and spacing groove, make when needing to take out and fix the cable, only need to rotate the commentaries on classics board, can joint the cable in the crane span structure and in the spacing groove on the commentaries on classics board, very convenient while, avoided heavy handling process to mount and crane span structure, practiced thrift a large amount of labours;
the utility model discloses a mutually supporting of joint pole, draw-in groove, smooth chamber, spring and ejector pad for the staff can be through promoting the ejector pad, makes the spring compressed, and the joint pole contracts, breaks away from in the draw-in groove, thereby makes the commentaries on classics board can rotate, and the installation and the dismantlement process of the cable of being convenient for carry out good spacing to the commentaries on classics board, and it is very convenient to open the mode simultaneously.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure at A in FIG. 1;
in the figure: the device comprises a wall body 1, a fixing frame 2, a bridge frame 3, a rotating shaft 4, a rotating plate 5, a limiting groove 6, a clamping rod 7, a clamping groove 8, a sliding cavity 9, a spring 10, a fixing rod 11 and a pushing block 12.
Detailed Description
Example 1
The embodiment provides a cable bridge convenient to mount and dismount, as shown in fig. 1-2, which comprises a wall 1 and two fixing frames 2 fixedly arranged on the lower wall of the wall 1, a bridge 3 is jointly erected on the two fixing frames 2, the lower wall of the bridge 3 is arranged in an opening shape, a rotating shaft 4 is fixedly arranged at the opening, a rotating plate 5 is fixedly arranged on the rotating shaft 4, one end of the rotating plate 5 far away from the rotating shaft 4 is arranged in an arc shape, the side wall of the opening of the bridge 3 is also arranged in a matched arc shape, through the mutual matching of the rotating shaft 4, the rotating plate 5 and the limiting groove 6, when a cable needs to be taken out and fixed, the cable can be clamped in the bridge 3 and the limiting groove 6 on the rotating plate 5 only by rotating the rotating plate 5, so that the cable bridge is convenient and fast, the heavy carrying process of the fixing frames 2 and 3 is avoided, a large amount of labor force is saved, and the rotating plate 5 is conveniently clamped on the bridge 3, meanwhile, the cable sealing device can perform a good sealing effect, a limiting groove 6 is fixedly arranged in the bridge frame 3, a plurality of limiting grooves 6 are also fixedly arranged on the upper wall of the rotating plate 5, the side wall of each limiting groove 6 is in an arc shape, a rubber protective pad is fixedly arranged on the bottom wall of each limiting groove 6, a good limiting effect can be performed on the cable, the cable is protected from being scratched and damaged due to the arrangement of the rubber protective pad, a clamping rod 7 is arranged at one end, far away from the rotating shaft 4, of the rotating plate 5, a matched clamping groove 8 is arranged in the side wall of the lower end of the bridge frame 3, a corresponding sliding cavity 9 is arranged in the rotating plate 5, one end, far away from the rotating shaft 4, of the clamping rod 7 is clamped in the clamping groove 8, the other end of the clamping rod 7 is arranged in the sliding cavity 9, a spring 10 is fixedly arranged between the bottom wall of the sliding cavity 9 and the clamping rod 7, a fixing rod 11 is fixedly arranged on the side wall of one end, in the sliding cavity 9, and the clamping rod 7 and the fixing rod 11 are integrally formed, and the surface of joint pole 7 is equipped with the smooth layer, when having increased the steadiness of structure, the slip process of joint pole 7 is comparatively smooth, the end of dead lever 11 sets up outside the lower wall of crane span structure 3, and the end of dead lever 11 is fixed and is equipped with ejector pad 12, the shape of ejector pad 12 is the setting of ellipsoid form, and the cover is equipped with the rubber lag on the ejector pad 12, be convenient for the staff when promoting it, prevent to produce the phenomenon of skidding and take place when promoting, through joint pole 7, draw-in groove 8, sliding chamber 9, mutually supporting of spring 10 and ejector pad 12, make the staff can be through promoting ejector pad 12, make spring 10 compressed, joint pole 7 contracts, break away from in the draw-in groove 8, thereby make rotor plate 5 can rotate, be convenient for the installation and the dismantlement process of cable, carry out good spacing to rotor plate 5, the mode of opening simultaneously is very convenient.
This embodiment staff can be through promoting ejector pad 12 when using, make spring 10 compressed, joint pole 7 shrink, break away from in the draw-in groove 8, thereby make and change board 5 and can rotate, when needs take out and fix the cable, only need to rotate board 5, will change board 5 and rotate outside crane span structure 3, can be with the spacing inslot 6 of cable joint in crane span structure 3 and the spacing inslot 6 on changeing board 5, can be convenient when installing the dismantlement to the cable, avoided the heavy handling of mount 2 and crane span structure 3, a large amount of labours have been practiced thrift.
The present invention is not limited to the above embodiment. All technical solutions formed by equivalent substitutions fall within the protection scope of the present invention.

Claims (5)

1. A cable bridge convenient to mount and dismount comprises a wall body (1) and two fixing frames (2) fixedly arranged on the lower wall of the wall body (1), wherein a bridge (3) is erected on the two fixing frames (2) together, and is characterized in that the lower wall of the bridge (3) is in an open shape, a rotating shaft (4) is fixedly arranged at the opening, a rotating plate (5) is fixedly arranged on the rotating shaft (4), a limiting groove (6) is fixedly arranged in the bridge (3), a plurality of limiting grooves (6) are also fixedly arranged on the upper wall of the rotating plate (5), a clamping and connecting rod (7) is arranged at one end, far away from the rotating shaft (4), of the rotating plate (5), a clamping groove (8) which is matched with the side wall of the lower end of the bridge (3) is arranged in the side wall of the rotating plate (5), a corresponding sliding cavity (9) is arranged in the rotating plate (5), one end, far away from the rotating shaft (4), of the clamping and connecting rod (7) is clamped in the clamping groove (8), the other end of joint pole (7) sets up in smooth chamber (9), it is fixed between the diapire of smooth chamber (9) and joint pole (7) to be equipped with spring (10), fixed dead lever (11) that are equipped with is gone up in one end lateral wall of smooth chamber (9) in joint pole (7), the end of dead lever (11) sets up outside the lower wall of crane span structure (3), just the end of dead lever (11) is fixed and is equipped with ejector pad (12).
2. The cable bridge convenient to mount and dismount as claimed in claim 1, wherein the side walls of the limiting groove (6) are arc-shaped, and a rubber protection pad is fixedly arranged on the bottom wall of the limiting groove (6).
3. The cable bridge convenient to mount and dismount as claimed in claim 1, wherein an end of the rotating plate (5) far away from the rotating shaft (4) is arc-shaped, and side walls at the opening of the bridge (3) are also arc-shaped in a matching manner.
4. The cable tray convenient for installation and disassembly as claimed in claim 1, wherein the clamping rods (7) and the fixing rods (11) are integrally formed, and the surfaces of the clamping rods (7) are provided with smooth layers.
5. The cable bridge convenient to install and detach as claimed in claim 1, wherein the pushing blocks (12) are arranged in an ellipsoidal shape, and rubber protective sleeves are sleeved on the pushing blocks (12).
CN202022727834.6U 2020-11-23 2020-11-23 Cable bridge convenient to installation is dismantled Active CN213937288U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022727834.6U CN213937288U (en) 2020-11-23 2020-11-23 Cable bridge convenient to installation is dismantled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022727834.6U CN213937288U (en) 2020-11-23 2020-11-23 Cable bridge convenient to installation is dismantled

Publications (1)

Publication Number Publication Date
CN213937288U true CN213937288U (en) 2021-08-10

Family

ID=77171593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022727834.6U Active CN213937288U (en) 2020-11-23 2020-11-23 Cable bridge convenient to installation is dismantled

Country Status (1)

Country Link
CN (1) CN213937288U (en)

Similar Documents

Publication Publication Date Title
CN201323409Y (en) Tool for live line replacing of high voltage transmission line V-shaped insulator chain
CN202550392U (en) Wire connecting plate clamp for replacing V-type insulator of compact 500kV line
CN205583577U (en) Novel cable bridge
CN213937288U (en) Cable bridge convenient to installation is dismantled
CN204258711U (en) The frame of photovoltaic module, photovoltaic module and solar power plant
CN201247823Y (en) Antenna subsystem, antenna unit and radio frequency zooming unit
CN207939175U (en) A kind of novel transformer substation cable cover
CN105538277A (en) Multifunctional electric power tool storage bracket
CN203549127U (en) Triangular fixing frame for cables
CN213185346U (en) High-stability combined cable bridge
CN210866997U (en) Full-automatic optical cable paying-off and bundling machine
CN204297936U (en) A kind of detachable mast-up
CN105152035B (en) Assembly and disassembly methods based on cantilevered optical crystal component
CN208226493U (en) A kind of column facilitating cabling
CN220510672U (en) Cable bridge with built-in fixing structure
CN205562903U (en) Connecting wire device
CN206250701U (en) A kind of many cable installation racks
CN213937286U (en) Cable bridge convenient to overhaul
CN216038170U (en) Building construction hoist and mount frame
CN220341967U (en) Cable hanger of electric power push pipe
CN211629761U (en) Fixing frame for communication cable
CN218386647U (en) Cable bridge support device
CN217282011U (en) Cable installation adjusting frame for electric power engineering construction
CN207459673U (en) A kind of power cable antishock device
CN210219147U (en) Pitching support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant