CN213923485U - Pay-off rack for electric power construction - Google Patents

Pay-off rack for electric power construction Download PDF

Info

Publication number
CN213923485U
CN213923485U CN202022646381.4U CN202022646381U CN213923485U CN 213923485 U CN213923485 U CN 213923485U CN 202022646381 U CN202022646381 U CN 202022646381U CN 213923485 U CN213923485 U CN 213923485U
Authority
CN
China
Prior art keywords
screw
pay
stop
hole
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022646381.4U
Other languages
Chinese (zh)
Inventor
陈勇
周国平
陈瑜
陈臣
范大锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingtian County Zhenxin Electric Power Co ltd
Original Assignee
Qingtian County Zhenxin Electric Power Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingtian County Zhenxin Electric Power Co ltd filed Critical Qingtian County Zhenxin Electric Power Co ltd
Priority to CN202022646381.4U priority Critical patent/CN213923485U/en
Application granted granted Critical
Publication of CN213923485U publication Critical patent/CN213923485U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The utility model discloses a pay off rack for electric power construction, support column including the symmetry setting, the connecting axle has been installed in the rotation of support column upper end, and the connecting axle facial make-up is equipped with the connecting block, is equipped with the mounting groove on the connecting block, and the mounting groove interpolation is equipped with the double-screw bolt, and the double-screw bolt both sides embolia there is a briquetting, are equipped with the screw hole on the roof pressure piece, and the roof pressure piece passes through the screw hole rotation and installs on the double-screw bolt, is equipped with a plurality of silk hole on the roof pressure piece, and it has the lead screw to run through in the silk hole, and main rotating handle and briquetting have been installed respectively to the lead screw both sides. The jacking blocks are sleeved on two sides of the double-screw bolt and rotatably connected to the double-screw bolt through threaded holes, the inner sides of the jacking blocks are of conical structures, the wire coil is preliminarily fixed, a plurality of wire holes are formed in the jacking blocks, screw rods penetrate through the wire holes, pressing blocks are installed on the inner sides of the screw rods, the main rotating handle is used for rotating the friction blocks on the pressing blocks to extrude the wire coil, secondary fixing is performed on the wire coil, and the stabilizing effect of the wire coil in the using process is improved.

Description

Pay-off rack for electric power construction
Technical Field
The utility model belongs to the technical field of the pay off rack, concretely relates to pay off rack for electric power construction.
Background
The pay-off stand has various forms, generally is a pay-off stand for the wire and cable industry, and can be divided into an active pay-off stand and a passive pay-off stand according to power transmission; the device can be divided into a vertical pay-off rack, a horizontal pay-off rack and the like according to the style.
In current electric power work progress, because current building is more intelligent, consequently obtained further improvement to cable laying volume, because cable laying length is generally longer, the drum is placed on the cable conductor usually, when the cable conductor is laid to needs, only need place the drum on the pay off rack, operating personnel only need stimulate the cable and expose the roll-off that the end alright lasts the cable on the drum, avoided the cable to take place the phenomenon that the cable is criss-cross at laying process, the weak point of existence has: the existing partial pay-off rack is only used for simply placing the wire coil on the pay-off rack in the using process, when a cable is dragged, the wire coil can easily slide in an idling mode in a rotating shaft on the pay-off rack, so that part of the cable can slide on the ground in advance, electric power construction personnel are not convenient to lay the cable, and the problem of poor stability of the wire coil on the existing pay-off rack for electric power construction exists.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power is pay off rack for construction to solve the problem of the drum poor stability on the pay off rack for construction of electric power that exists among the prior art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pay off rack for electric power construction, includes the support column that the symmetry set up, the connecting axle has been installed in the rotation of support column upper end, the connecting axle facial make-up is equipped with the connecting block, be equipped with the mounting groove on the connecting block, the mounting groove interpolation is equipped with the double-screw bolt, the double-screw bolt both sides embolia there is a briquetting, be equipped with the screw hole on the roof pressure piece, the roof pressure piece passes through the screw hole rotation and installs on the double-screw bolt, be equipped with a plurality of silk hole on the roof pressure piece, it has the lead screw to run through in the silk hole, main knob and briquetting have been installed respectively to the lead screw both sides.
Preferably, the support column is provided with a groove, a bearing is arranged in the groove, and the connecting shaft is inserted in the bearing.
Preferably, a stop hole is formed in the inner wall of one end of the mounting groove, stop grooves are formed in the two side walls of the stud, a stop rod is inserted into the stop hole, the extending end of the stop rod is inserted into the stop groove, a pre-tightening spring is arranged on the stop hole, and the pre-tightening spring is sleeved on the stop rod.
Preferably, the inner side of the top pressing block is of a conical structure, a plurality of rotating handles are annularly arranged on the top pressing block, and a friction block is arranged on the outer wall of the pressing block.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model provides a pay off rack for electric power construction, through be equipped with the recess on the support column, the connecting axle rotates to be connected on the bearing in the recess, and the connecting axle facial make-up is equipped with the connecting block, and in the mounting groove of establishing on the connecting block was inserted to the double-screw bolt, the double-screw bolt was fixed through the locking lever in the mounting groove, and the later stage of being convenient for is changed the dismantlement of drum on to the double-screw bolt.
The utility model provides a pay off rack for electric power construction, through emboliaing the roof pressure piece in double-screw bolt both sides, the roof pressure piece passes through the screw hole and rotates to be connected on the double-screw bolt, the roof briquetting inboard is the toper structure, tentatively fix the wire coil, and be equipped with a plurality of silk hole on the roof pressure piece, the silk downthehole lead screw that has run through, the briquetting has been installed to the lead screw inboard, rotate the clutch extrusion wire coil on the lead screw messenger briquetting through main revolving, carry out the secondary to it and fix, improve the firm effect of wire coil in the use.
Drawings
FIG. 1 is a partially cut-away front view of the present invention;
FIG. 2 is a schematic top view of FIG. 1;
FIG. 3 is an enlarged view of a portion a of FIG. 1;
FIG. 4 is an enlarged schematic view of FIG. 1 at b;
FIG. 5 is an enlarged schematic view of FIG. 1 at c;
fig. 6 is an enlarged schematic view of fig. 3 at d.
In the figure: the device comprises a support column 1, a connecting shaft 2, a connecting block 3, a mounting groove 4, a stud 5, a pressing block 6, a threaded hole 7, a threaded hole 8, a screw rod 9, a main knob 10, a pressing block 11, a groove 12, a bearing 13, a stopping hole 14, a stopping groove 15, a stopping rod 16, a pre-tightening spring 17, a rotating handle 18 and a friction block 19.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1, 2, 3 and 6, a pay-off stand for electric power construction includes a support column 1 symmetrically disposed, the upper end of the support column 1 is rotatably connected with a connecting shaft 2, the support column 1 is provided with a groove 12, a bearing 13 is arranged in the groove 12 in an interference fit manner, the model of the bearing 13 is 628/7-2RS/P63, the connecting shaft 2 is arranged on an inner ring of the bearing 13 in an interference fit manner, the connecting shaft 2 is welded with a connecting block 3, the connecting block 3 is provided with an installation groove 4, a stud 5 is inserted into the installation groove 4, a stop hole 14 is arranged on the inner wall of the upper end of the installation groove 4, stop grooves 15 are arranged on two side walls of the stud 5, a stop rod 16 is inserted into the stop hole 14, the stop rod 16 fixes the stud 5, a pre-tightening spring 17 is welded on the stop hole 14, the pre-tightening spring 17 is in an initial state, the initial spring force of the pre-tightening spring 17 is 20N, the outer wall of the stop rod 16 is welded with a pre-tightening spring 17, and the pre-tightening spring 17 generates inward spring thrust on the stop rod 16, so that the stop rod 16 is stably inserted into the stop groove 15, and the fixing effect on the stud 5 is improved.
Referring to fig. 1, 2, 4 and 5, two sides of a stud 5 are sleeved with jacking blocks 6, each jacking block 6 is provided with a threaded hole 7, each jacking block 6 is rotatably connected to the stud 5 through the threaded hole 7, each jacking block 6 is provided with 2 screw holes 8, each screw thread in each screw hole 8 is connected with a screw rod 9, two sides of each screw rod 9 are respectively welded with a main knob 10 and a pressing block 11, each main knob 10 is convenient to rotate the screw rod 9, the inner side of each jacking block 6 is of a conical structure, the conical end face of each jacking block 6 can be inserted into a reserved hole in a wire coil by the arrangement, the fixing effect of the wire coil is improved, 4 rotating knobs 18 are axially welded on each jacking block 6, each rotating knob 18 is convenient to rotate the jacking blocks 6, friction blocks 19 are adhesively connected to the outer wall of each pressing block 11, each friction block 19 is made of hard rubber, the friction force of the wire coil is improved, and the wire coil is further stable when the wire coil rotates.
When the wire coil needs to be installed and used, an operator penetrates a stud 5 into a preformed hole of the wire coil, two pressing blocks 6 are in threaded connection with two sides of the stud 5 through a threaded hole 7, the conical end face of each pressing block 6 is in an inner side position, the two pressing blocks 6 are positioned on two sides of the installed wire coil, the end faces on two sides of the stud 5 are lifted into an installation groove 4 on a connecting block 3, meanwhile, the operator needs to hold a stop rod 16 by hand to pull out a distance outwards, the stop rod 16 returns to the stop hole 14, after the stud 5 is inserted into the installation groove 4, the stop groove 15 on the stud 5 and the stop hole 14 on the upper end face of the installation groove 4 are on the same vertical line, the hand holding the stop rod 16 is released, the stop rod 16 is stably inserted into the stop groove 15 on the stud 5 under the action of spring thrust generated by a pre-tightening spring 17 to fix the stud 5, and further, the operator fixes the wire coil, the rotating handle 18 is held by a hand to rotate the jacking pressing block 6, so that the jacking pressing block 6 moves inwards, the conical end face of the jacking pressing block 6 is inserted into the preformed hole of the wire coil to clamp and fix the wire coil, further, an operator holds the main rotating handle 10 by a hand to rotate, the main rotating handle 10 drives the screw rod 9 to rotate in the wire hole 8, the screw rod 9 pushes the friction block 19 on the pressing block 11 to extrude the wire coil, the fixing effect of the wire coil is improved, and the stability of the wire coil in use is improved.

Claims (4)

1. The utility model provides a pay off rack for electric power construction, includes support column (1) that the symmetry set up, its characterized in that: the supporting column is characterized in that the upper end of the supporting column (1) is rotated to be provided with a connecting shaft (2), a connecting block (3) is arranged on the connecting shaft (2), a mounting groove (4) is formed in the connecting block (3), a stud (5) is inserted into the mounting groove (4), pressing blocks (6) are sleeved on two sides of the stud (5), a threaded hole (7) is formed in each pressing block (6), each pressing block (6) is rotatably arranged on the stud (5) through the threaded hole (7), a plurality of wire holes (8) are formed in each pressing block (6), a screw rod (9) penetrates through each wire hole (8), and main rotating handles (10) and pressing blocks (11) are respectively arranged on two sides of each screw rod (9).
2. The pay-off rack for power construction according to claim 1, characterized in that: the supporting column (1) is provided with a groove (12), a bearing (13) is arranged in the groove (12), and the connecting shaft (2) is inserted in the bearing (13).
3. The pay-off rack for power construction according to claim 1, characterized in that: the anti-theft bolt is characterized in that a stop hole (14) is formed in the inner wall of one end of the mounting groove (4), stop grooves (15) are formed in the two side walls of the stud (5), a stop rod (16) is inserted into the stop hole (14), the end, extending out of the stop rod (16), of the stop rod is inserted into the stop groove (15), a pre-tightening spring (17) is arranged on the stop hole (14), and the pre-tightening spring (17) is sleeved on the stop rod (16).
4. The pay-off rack for power construction according to claim 1, characterized in that: the inner side of the top pressing block (6) is of a conical structure, a plurality of rotating handles (18) are arranged on the top pressing block (6) in the circumferential direction, and a friction block (19) is arranged on the outer wall of the pressing block (11).
CN202022646381.4U 2020-11-16 2020-11-16 Pay-off rack for electric power construction Expired - Fee Related CN213923485U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022646381.4U CN213923485U (en) 2020-11-16 2020-11-16 Pay-off rack for electric power construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022646381.4U CN213923485U (en) 2020-11-16 2020-11-16 Pay-off rack for electric power construction

Publications (1)

Publication Number Publication Date
CN213923485U true CN213923485U (en) 2021-08-10

Family

ID=77169472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022646381.4U Expired - Fee Related CN213923485U (en) 2020-11-16 2020-11-16 Pay-off rack for electric power construction

Country Status (1)

Country Link
CN (1) CN213923485U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114038626A (en) * 2021-11-03 2022-02-11 欧耐特线缆集团有限公司 Branching platform and method for high-voltage cable production

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114038626A (en) * 2021-11-03 2022-02-11 欧耐特线缆集团有限公司 Branching platform and method for high-voltage cable production
CN114038626B (en) * 2021-11-03 2023-11-17 欧耐特线缆集团有限公司 Branching platform and branching method for high-voltage cable production

Similar Documents

Publication Publication Date Title
CN213923485U (en) Pay-off rack for electric power construction
CN206705416U (en) A kind of electronic three tunnels synchronization take-up and pay-off device
CN210608313U (en) Cable laying auxiliary device
CN219321954U (en) Cable laying auxiliary equipment for power engineering
CN112383010A (en) Power wire fixing device
CN212012072U (en) Cable rack for power distribution network operation
CN215733322U (en) Cable suspension device
CN212402934U (en) Cable paying-off cutting device for municipal engineering
CN213326176U (en) Cable traction device for electric power transformation construction
CN211743899U (en) Construction tool for cable stay wire in building electrical engineering
CN209860527U (en) Winding displacement box for electric power construction
CN219458500U (en) Support frame for power engineering construction
CN217711110U (en) Steel structure fastening device
CN217377105U (en) Material hoisting device for outer wall transformation construction
CN209785703U (en) Dry-type power transformer
CN212687262U (en) Winding device for electric power engineering construction
CN217956149U (en) Electric power ground connection stake of electric power construction usefulness
CN210989175U (en) Portable drawing frame for architectural design
CN212182976U (en) Line arranging device for building line installation
CN215528433U (en) Tool for installing cable hook
CN216212572U (en) Fixing device for wire winding
CN219314223U (en) Wire and cable's wiring device
CN211444584U (en) Cable winding and unwinding devices for power maintenance
CN220247818U (en) Green construction noise reduction device
CN220078134U (en) Wire unreeling device for electric power construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210810