CN213897804U - Steel construction stand rapid Assembly device - Google Patents

Steel construction stand rapid Assembly device Download PDF

Info

Publication number
CN213897804U
CN213897804U CN202021966623.1U CN202021966623U CN213897804U CN 213897804 U CN213897804 U CN 213897804U CN 202021966623 U CN202021966623 U CN 202021966623U CN 213897804 U CN213897804 U CN 213897804U
Authority
CN
China
Prior art keywords
steel structure
plate
structure stand
steel
stand column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021966623.1U
Other languages
Chinese (zh)
Inventor
易新河
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huayu Construction Engineering Co ltd
Original Assignee
Shenzhen Huayu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Huayu Construction Engineering Co ltd filed Critical Shenzhen Huayu Construction Engineering Co ltd
Priority to CN202021966623.1U priority Critical patent/CN213897804U/en
Application granted granted Critical
Publication of CN213897804U publication Critical patent/CN213897804U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a steel structure stand column rapid assembly device, which belongs to the technical field of steel structures and comprises a transverse plate, wherein steel structure stand columns are arranged on two sides of the transverse plate, one end of the steel structure stand column close to the transverse plate is provided with two fixing plates, a connecting plate is arranged between the two fixing plates, the utility model discloses a plurality of round pins are arranged on the connecting plate, and a sliding chute corresponding to the connecting plate is arranged in the steel structure stand column, so that the distance between the two connecting plates can be adjusted through the distance between the steel structure stand columns, thereby the steel structure stand columns are connected through the transverse plate, the utility model discloses a bottom plate is arranged at the lower end of the steel structure stand column, a level meter is arranged on the bottom plate, when the steel structure stand column is installed, the second fixing bolts on the two sides of the bottom plate are fixed on the ground, the levelness of the steel structure stand column is adjusted through observing the level meter, the accuracy of the installation of the steel structure upright post can be ensured.

Description

Steel construction stand rapid Assembly device
Technical Field
The utility model belongs to the technical field of the steel construction, concretely relates to steel construction stand rapid Assembly device.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, and all the members or parts are usually connected by welding seams, bolts or rivets. Because of its light dead weight, and construction is simple and convenient, widely apply to fields such as large-scale factory building, venue, superelevation layer.
The prior art has the following problems: the existing steel structure stand column rapid assembly device is inconvenient to the steel structure stand column connection method, and meanwhile, the installation horizontality cannot be guaranteed for installing the steel structure stand column, and the installation quality is low.
SUMMERY OF THE UTILITY MODEL
For solving the problem that proposes among the above-mentioned background art, the utility model provides a steel construction stand rapid Assembly device has simple to operate, can connect according to the distance between the stand, can guarantee the characteristics of the horizontality of installation simultaneously.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steel construction stand rapid Assembly device, includes the diaphragm, the both sides of diaphragm are provided with the steel construction stand, the steel construction stand is close to the one end both sides setting and the fixed plate of diaphragm, two be provided with the connecting plate between the fixed plate, be provided with a plurality of round pins on the connecting plate, it is fixed through first fixing bolt connection between connecting plate and the fixed plate.
Preferably, the lower end of the steel structure upright post is provided with a bottom plate, and two sides of the upper end of the bottom plate are provided with second fixing bolts.
Preferably, a level gauge is arranged on one side surface of the bottom plate.
Preferably, the bottom plate and the steel structure upright post are both steel structures and are welded and fixed through pressure welding.
Preferably, the steel structure upright post is provided with a sliding chute corresponding to the connecting plate.
Preferably, a rubber pad is arranged on the surface of one side, close to the connecting plate, of the fixing plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a set up a plurality of round pins on the connecting plate to set up the spout that corresponds with the connecting plate in the steel construction stand, make the distance between two connecting plates accessible steel construction stands distance between and adjust, thereby connect the steel construction stand through the diaphragm.
2. The utility model discloses a set up the bottom plate at steel construction stand lower extreme to set up the spirit level on the bottom plate, when installing the steel construction stand, through with the second fixing bolt of both sides on the bottom plate fix subaerial, through observing the levelness of spirit level adjustment steel construction stand, can guarantee the accuracy to steel construction column mouting.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the connection plate of the present invention viewed from above;
fig. 3 is a schematic structural view of fig. 1 at a according to the present invention;
in the figure: 1. a steel structure column; 2. a connecting plate; 3. a fixing plate; 4. a transverse plate; 5. a base plate; 6. a first fixing bolt; 7. a round pin; 8. a second fixing bolt; 9. a level gauge.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides the following technical solutions: the utility model provides a steel structure stand rapid Assembly device, includes diaphragm 4, and the both sides of diaphragm 4 are provided with steel structure stand 1, and steel structure stand 1 is close to diaphragm 4's one end both sides setting and fixed plate 3, is provided with connecting plate 2 between two fixed plates 3, is provided with a plurality of round pins 7 on the connecting plate 2, is connected fixedly between connecting plate 2 and the fixed plate 3 through first fixing bolt 6.
Specifically, the lower extreme of steel construction stand 1 is provided with bottom plate 5, and the upper end both sides of bottom plate 5 are provided with second fixing bolt 8.
Through adopting above-mentioned technical scheme, conveniently install steel construction stand 1 fast.
Specifically, a side surface of the bottom plate 5 is provided with a level 9.
Through adopting above-mentioned technical scheme, can guarantee the horizontality of steel construction stand 1 installation according to spirit level 9, improve the installation quality.
Specifically, the bottom plate 5 and the steel structure upright post 1 are both steel structures and are welded and fixed through pressure welding.
Through adopting above-mentioned technical scheme, the steel construction is more firm, improves device stability.
Specifically, the steel structure upright post 1 is provided with a sliding groove corresponding to the connecting plate 2.
Through adopting above-mentioned technical scheme, can pull out the extension to connecting plate 2.
Specifically, a rubber pad is arranged on the surface of one side, close to the connecting plate 2, of the fixing plate 3.
Through adopting above-mentioned technical scheme, the rubber pad on the fixed plate 3 plays anti-skidding effect to connecting plate 2.
The utility model discloses well steel construction stand 1, connecting plate 2, diaphragm 4 and round pin 7's structure and theory of operation have disclosed in the rapid Assembly formula steel construction that chinese patent application number is CN107795014A discloses.
The utility model discloses a theory of operation and use flow: the utility model discloses during the use, install the device in suitable position, adjust suitable position according to the distance between steel structure stand 1 with the distance between connecting plate 2, and fix connecting plate 2 on fixed plate 3 through first fixing bolt 6, later connect two steel structure stand 1 through round pin 7 through diaphragm 4 and fix, through setting up bottom plate 5 at 1 lower extreme of steel structure stand, and set up spirit level 9 on bottom plate 5, when installing steel structure stand 1, fix subaerial through the second fixing bolt 8 with both sides on bottom plate 5, through the levelness of observing 9 adjustment steel structure stand 1 of spirit level, can guarantee the accuracy of installation to steel structure stand 1.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a steel construction stand rapid Assembly device, includes diaphragm (4), its characterized in that: the steel structure fixing device is characterized in that steel structure stand columns (1) are arranged on two sides of the transverse plate (4), one end, close to the transverse plate (4), of each steel structure stand column (1) is arranged on two sides of the fixing plate (3), a connecting plate (2) is arranged between the fixing plates (3), a plurality of round pins (7) are arranged on the connecting plate (2), and the connecting plate (2) and the fixing plates (3) are fixedly connected through first fixing bolts (6).
2. The steel structure stand column rapid assembly device of claim 1, which is characterized in that: the lower extreme of steel construction stand (1) is provided with bottom plate (5), the upper end both sides of bottom plate (5) are provided with second fixing bolt (8).
3. The steel structure stand column rapid assembly device of claim 2, which is characterized in that: a level gauge (9) is arranged on the surface of one side of the bottom plate (5).
4. The steel structure stand column rapid assembly device of claim 2, which is characterized in that: the bottom plate (5) and the steel structure upright post (1) are both steel structures and are welded and fixed through pressure welding.
5. The steel structure stand column rapid assembly device of claim 1, which is characterized in that: and the steel structure upright post (1) is provided with a sliding chute corresponding to the connecting plate (2).
6. The steel structure stand column rapid assembly device of claim 1, which is characterized in that: and a rubber pad is arranged on the surface of one side, close to the connecting plate (2), of the fixing plate (3).
CN202021966623.1U 2020-09-09 2020-09-09 Steel construction stand rapid Assembly device Active CN213897804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021966623.1U CN213897804U (en) 2020-09-09 2020-09-09 Steel construction stand rapid Assembly device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021966623.1U CN213897804U (en) 2020-09-09 2020-09-09 Steel construction stand rapid Assembly device

Publications (1)

Publication Number Publication Date
CN213897804U true CN213897804U (en) 2021-08-06

Family

ID=77109350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021966623.1U Active CN213897804U (en) 2020-09-09 2020-09-09 Steel construction stand rapid Assembly device

Country Status (1)

Country Link
CN (1) CN213897804U (en)

Similar Documents

Publication Publication Date Title
CN202031179U (en) Centre line aligning and elevation adjusting device of basic embedded bolts
CN203640309U (en) Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame
CN205852606U (en) Three dimensions tubular truss assembly moulding bed
CN213897804U (en) Steel construction stand rapid Assembly device
CN111238756B (en) Device for simulating differential settlement of foundation in earthquake simulation shaking table test
CN111535196B (en) Bridge building templates link for civil engineering
CN204624885U (en) A kind of standard knot support chassis of elevator
CN210086491U (en) Supporting device is strengthened in building jacking control
CN208934394U (en) One kind can turnover type hydraulic climbing formwork wall-attaching equipment
CN202839658U (en) Photovoltaic support with adjustable inclination angle
CN210177987U (en) Shock insulation support installation locating rack
CN209949014U (en) Dead weight formula photovoltaic support
CN208155335U (en) Adhesion type measures bracket
CN207277373U (en) A kind of riding track being used in foundation pit construction
CN215374033U (en) Attached measuring support for super high-rise steel column
CN207079615U (en) A kind of roller-coaster built-in fitting support system
CN215670073U (en) H-shaped steel connecting structure
CN210031468U (en) Steel plate bridge support frame convenient to adjust
CN214146825U (en) Support for pipeline installation
CN220978043U (en) Novel steel corbel suitable for deep basal pit supports
CN214942760U (en) Support for civil engineering with adjustable multipurpose
CN211405939U (en) Photovoltaic support stand column adapter with height-adjustable cross beam and connecting structure thereof
CN204040496U (en) A kind of steel column temporary fixing structure
CN112681718B (en) A novel pre-buried expansion bolts even wall spare for fixing overhanging type scaffold
CN219327299U (en) H-shaped steel member

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant