CN213874472U - Building site climbs a operating condition monitoring devices - Google Patents

Building site climbs a operating condition monitoring devices Download PDF

Info

Publication number
CN213874472U
CN213874472U CN202023243874.XU CN202023243874U CN213874472U CN 213874472 U CN213874472 U CN 213874472U CN 202023243874 U CN202023243874 U CN 202023243874U CN 213874472 U CN213874472 U CN 213874472U
Authority
CN
China
Prior art keywords
building site
safety cabinet
frame
environmental
monitor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023243874.XU
Other languages
Chinese (zh)
Inventor
杨勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu xinshengteng Technology Development Co.,Ltd.
Original Assignee
Jiangsu Xinshengteng Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xinshengteng Technology Development Co ltd filed Critical Jiangsu Xinshengteng Technology Development Co ltd
Priority to CN202023243874.XU priority Critical patent/CN213874472U/en
Application granted granted Critical
Publication of CN213874472U publication Critical patent/CN213874472U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Alarm Devices (AREA)

Abstract

The utility model discloses a building site climbs a state monitoring devices relates to construction technical field, for solving current building site and lacking effectual real-time supervision mechanism, leads to the problem that managers can't know building site environmental aspect and construction progress in real time. The upper end of supporting the bedplate is provided with environmental monitoring appearance, one side of environmental monitoring appearance is provided with the safety cabinet, the upper end of safety cabinet is provided with the containing box, the inside of safety cabinet and containing box is provided with pressure sensor and infrared distance meter respectively, and pressure sensor's monitoring end installs on the building cat ladder, environmental monitoring appearance's upper end is provided with air quality sensor, the surveillance camera head is installed to one side of air quality sensor, all be provided with the side extension board on environmental monitoring appearance's the both sides outer wall, and side extension board and environmental monitoring appearance's outer wall screw fixed mounting.

Description

Building site climbs a operating condition monitoring devices
Technical Field
The utility model relates to a construction technical field specifically is a building site climbs frame operating condition monitoring devices.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The construction work place is called a "construction site" or a "construction site", also called a construction site, and the construction work is a production movement performed by people to construct various building products in a certain space and time according to a specific design blueprint by using various building materials and mechanical equipment. The method comprises the whole production process from construction preparation, earth breaking and engineering completion acceptance. In the process, construction preparation, construction organization design and management, earthwork engineering, blasting engineering, foundation engineering, reinforcing steel bar engineering, template engineering, scaffold engineering, concrete engineering, prestressed concrete engineering, masonry engineering, steel structure engineering, wood structure engineering, structure installation engineering and the like are carried out.
The existing building site lacks an effective real-time monitoring mechanism, so that a manager cannot know the environmental condition and the construction progress of the building site in real time, and therefore the building site climbing frame working state monitoring device is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building site climbs a operating condition monitoring devices to current building site who provides in solving above-mentioned background art lacks effectual real-time supervision mechanism, leads to the problem that managers can't know building site environmental aspect and construction progress in real time.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building site climbs frame operating condition monitoring devices, includes the support bedplate, the upper end of support bedplate is provided with environmental monitor, one side of environmental monitor is provided with the safety cabinet, the upper end of safety cabinet is provided with the containing box, the inside of safety cabinet and containing box is provided with pressure sensor and infrared distance meter respectively, and pressure sensor's monitoring end installs on the building cat ladder, environmental monitor's upper end is provided with air quality sensor, the surveillance camera head is installed to one side of air quality sensor.
Preferably, all be provided with the side extension board on environmental monitor's the both sides outer wall, and the outer wall screw fixed mounting of side extension board and environmental monitor, two wind speed monitor and wind direction monitor are installed respectively to the upper end of side extension board, and wind speed monitor and wind direction monitor all are connected with environmental monitor through the data line.
Preferably, a rear-mounted sealing plate is arranged on the rear end face of the safety cabinet and is integrally formed with the safety cabinet, and a wire outlet frame is arranged inside the rear-mounted sealing plate and is integrally formed with the rear-mounted sealing plate.
Preferably, both ends of the outgoing line frame are provided with drawing grooves, the drawing grooves and the outgoing line frame are integrally formed, drawing plates are arranged inside the two drawing grooves, and the two drawing plates are symmetrically distributed about a vertical center line of the outgoing line frame.
Preferably, one end of each of the two pull plates is provided with a pull ring, the pull rings and the pull plates are integrally formed, the pull rings are located outside the wire outlet frame, and the size of each pull ring is larger than the caliber of each pull groove.
Preferably, the wire outlet frame is internally provided with wire passing holes, the wire passing holes and the wire outlet frame are integrally formed, and seven wire passing holes are formed in the wire passing holes and are all located on the same horizontal line.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an infrared distance meter and pressure sensor control climb a lifting height, calculate engineering construction progress and preceding construction floor after carrying out data correction according to the measurement height, and calculate the receivable of engineering according to the construction progress, can remind the staff in time to chase after the engineering money, through surveillance camera head and environmental monitoring appearance real time monitoring job site environment, thereby reach the purpose of carrying out the real-time supervision management to building site's environmental aspect and construction progress, overcome current building site and lack effectual real-time monitoring mechanism, lead to the problem that the managers can't know building site environmental aspect and construction progress in real time.
2. The line-passing holes formed in the wire outgoing frame are used for facilitating the external connection of the lines of the pressure sensor, the drawing grooves formed in the two ends of the wire outgoing frame are used for facilitating the drawing and pulling of the drawing and pulling plate, only the proper drawing and pulling plate is needed when the line passes, and the monitoring end of the pressure sensor is installed on the building ladder stand to monitor the pressure received by the ladder stand in real time.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the unfolding structure of the safety cabinet and the storage box of the present invention;
fig. 3 is a schematic structural view of the rear closing plate of the present invention;
fig. 4 is a schematic view of the working flow of the present invention;
in the figure: 1. a support base plate; 2. an environmental monitor; 3. a safety cabinet; 4. a storage box; 5. a side support plate; 6. a wind speed monitor; 7. a wind direction monitor; 8. an air quality sensor; 9. a surveillance camera; 10. a pressure sensor; 11. an infrared range finder; 12. a rear sealing plate; 13. a drawing plate; 14. a pull ring; 15. a wire outlet frame; 16. drawing the groove; 17. and a wire passing hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, the present invention provides an embodiment: the utility model provides a building site climbs frame operating condition monitoring devices, including supporting seat board 1, the upper end of supporting seat board 1 is provided with environmental monitor 2, one side of environmental monitor 2 is provided with safety cabinet 3, the upper end of safety cabinet 3 is provided with containing box 4, the inside of safety cabinet 3 and containing box 4 is provided with pressure sensor 10 and infrared distance meter 11 respectively, and pressure sensor 10's monitoring end installs on the building cat ladder, the upper end of environmental monitor 2 is provided with air quality sensor 8, surveillance camera 9 is installed to one side of air quality sensor 8.
Further, all be provided with side extension board 5 on the both sides outer wall of environmental monitor 2, and side extension board 5 and environmental monitor 2's outer wall screw fixed mounting, wind speed monitor 6 and wind direction monitor 7 are installed respectively to two side extension board 5's upper end, and wind speed monitor 6 and wind direction monitor 7 all are connected with environmental monitor 2 through the data line, the side extension board 5 that all sets up on the both sides outer wall of environmental monitor 2 plays the effect of supporting installation wind speed monitor 6 and wind direction monitor 7.
Further, a rear sealing plate 12 is arranged on the rear end face of the safety cabinet 3, the rear sealing plate 12 and the safety cabinet 3 are integrally formed, an outlet frame 15 is arranged inside the rear sealing plate 12, the outlet frame 15 and the rear sealing plate 12 are integrally formed, and the rear sealing plate 12 arranged on the rear end face of the safety cabinet 3 plays a role in bearing the outlet frame 15.
Furthermore, both ends of the outgoing line frame 15 are provided with drawing grooves 16, the drawing grooves 16 and the outgoing line frame 15 are integrally formed, drawing plates 13 are arranged inside the two drawing grooves 16, the two drawing plates 13 are symmetrically distributed about the vertical center line of the outgoing line frame 15, and the drawing grooves 16 arranged at both ends of the outgoing line frame 15 play a role in facilitating drawing movement of the drawing plates 13.
Furthermore, one end of each of the two pull plates 13 is provided with a pull ring 14, the pull rings 14 and the pull plates 13 are integrally formed, the pull rings 14 are located outside the wire outlet frame 15, the size of each pull ring 14 is larger than the caliber of the pull groove 16, and the pull rings 14 arranged at one end of each of the two pull plates 13 play a role in facilitating the pushing and pulling of the pull plates 13.
Further, the inside of the outlet frame 15 is provided with the wire passing hole 17, the wire passing hole 17 and the outlet frame 15 are integrally formed, seven wire passing holes 17 are formed in the wire passing hole 17, the seven wire passing holes 17 are all located on the same horizontal line, and the wire passing hole 17 formed in the inside of the outlet frame 15 plays a role in facilitating the external connection of the pressure sensor 10.
The working principle is as follows: through infrared distance meter 11 and pressure sensor 10 control climbing frame lifting height, calculate engineering construction progress and preceding construction floor after carrying out data correction according to the measurement height, and calculate the accounts receivable of engineering according to the construction progress, can remind the staff in time to chase after the engineering money, through monitoring camera 9 and environmental monitor 2 real time monitoring job site environment, thereby reach the purpose of carrying out real time monitoring management to the environmental aspect and the construction progress of building site, accomplish building site climbing frame operating condition monitoring devices's use work.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a building site climbs frame operating condition monitoring devices, includes supporting seat board (1), its characterized in that: the upper end of support bedplate (1) is provided with environmental monitoring appearance (2), one side of environmental monitoring appearance (2) is provided with safety cabinet (3), the upper end of safety cabinet (3) is provided with containing box (4), the inside of safety cabinet (3) and containing box (4) is provided with pressure sensor (10) and infrared distance meter (11) respectively, and the monitoring end of pressure sensor (10) installs on the building cat ladder, the upper end of environmental monitoring appearance (2) is provided with air quality sensor (8), surveillance camera (9) are installed to one side of air quality sensor (8).
2. The building site climbing frame working state monitoring device according to claim 1, characterized in that: all be provided with side extension board (5) on the both sides outer wall of environmental monitor (2), and the outer wall screw fixed mounting of side extension board (5) and environmental monitor (2), two wind speed monitor (6) and wind direction monitor (7) are installed respectively to the upper end of side extension board (5), and wind speed monitor (6) and wind direction monitor (7) all are connected with environmental monitor (2) through the data line.
3. The building site climbing frame working state monitoring device according to claim 1, characterized in that: the safety cabinet is characterized in that a rear sealing plate (12) is arranged on the rear end face of the safety cabinet (3), the rear sealing plate (12) and the safety cabinet (3) are integrally formed, an outlet frame (15) is arranged inside the rear sealing plate (12), and the outlet frame (15) and the rear sealing plate (12) are integrally formed.
4. The building site climbing frame working state monitoring device according to claim 3, characterized in that: drawing grooves (16) are formed in two ends of the wire outlet frame (15), the drawing grooves (16) and the wire outlet frame (15) are integrally formed, drawing plates (13) are arranged inside the two drawing grooves (16), and the two drawing plates (13) are symmetrically distributed about a vertical center line of the wire outlet frame (15).
5. The building site climbing frame working state monitoring device according to claim 4, characterized in that: one end of each of the two pull plates (13) is provided with a pull ring (14), the pull rings (14) and the pull plates (13) are integrally formed, the pull rings (14) are located outside the wire outlet frame (15), and the size of each pull ring (14) is larger than the caliber of each pull groove (16).
6. The building site climbing frame working state monitoring device according to claim 3, characterized in that: the wire outgoing frame is characterized in that wire passing holes (17) are formed in the wire outgoing frame (15), the wire passing holes (17) and the wire outgoing frame (15) are integrally formed, seven wire passing holes (17) are formed, and the seven wire passing holes (17) are located on the same horizontal line.
CN202023243874.XU 2020-12-29 2020-12-29 Building site climbs a operating condition monitoring devices Active CN213874472U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023243874.XU CN213874472U (en) 2020-12-29 2020-12-29 Building site climbs a operating condition monitoring devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023243874.XU CN213874472U (en) 2020-12-29 2020-12-29 Building site climbs a operating condition monitoring devices

Publications (1)

Publication Number Publication Date
CN213874472U true CN213874472U (en) 2021-08-03

Family

ID=77043857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023243874.XU Active CN213874472U (en) 2020-12-29 2020-12-29 Building site climbs a operating condition monitoring devices

Country Status (1)

Country Link
CN (1) CN213874472U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114659559A (en) * 2022-03-28 2022-06-24 江苏鑫昇腾科技发展股份有限公司 Intelligent building climbing frame working state monitoring system and method based on Internet of things

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114659559A (en) * 2022-03-28 2022-06-24 江苏鑫昇腾科技发展股份有限公司 Intelligent building climbing frame working state monitoring system and method based on Internet of things
CN114659559B (en) * 2022-03-28 2022-12-09 江苏鑫昇腾科技发展股份有限公司 Intelligent building climbing frame working state monitoring system and method based on Internet of things

Similar Documents

Publication Publication Date Title
CN213874472U (en) Building site climbs a operating condition monitoring devices
CN106121255A (en) Apparatus installed by a kind of Super High glass curtain wall
CN113187247A (en) Construction method of cast-in-situ cup-mouth foundation steel structure
CN110886488A (en) Intelligent integrated high-rise building machine
CN202017335U (en) Hydraulic mutual-climbing type lifting scaffold
CN215101404U (en) Construction elevator mounting structure in well
CN215484618U (en) A pour template structure for assembled shear force wall and post
CN212867003U (en) Building engineering template fixing device
CN210979270U (en) Wisdom building site tower crane monitoring device based on building information model
CN208684250U (en) One kind being based on the quick detachable boom hoisting of major structure of construction
CN211338714U (en) Lifting device convenient for decoration
CN214423943U (en) Can be convenient in high-rise building construction through climbing frame of attaching wall spare
CN209780200U (en) Operation platform for construction of steel structure roof suspended ceiling plate
CN112523497A (en) Aluminum mold system for walls on two sides of deformation joint of main structure
CN218990828U (en) Scaffold for building engineering
CN111907642A (en) Self-balancing floating hydrological monitoring device
CN106760530B (en) A kind of operating platform and its construction method for the dismounting of tower crane wall attaching rod
CN210685387U (en) Large-section inclined column template construction structure for constructional engineering
CN210127437U (en) A raise dust suppression device for earthwork operation
CN215721823U (en) Construction project is with on-spot safety and quality monitoring device
CN210396067U (en) Special bearing stores pylon of civil engineering
CN217812279U (en) Electric climbing equipment for high-rise residence
CN211949481U (en) Novel scaffold for building construction
CN214402821U (en) Quality control construction device for flatness of external wall
CN212176502U (en) Hanging basket for construction of corner position of outer vertical surface of ultrahigh-rise building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 211100 room 1102, block a, Mingjia science and technology building, 99 Shengli Road, Jiangning District, Nanjing, Jiangsu Province (Jiangning Development Zone)

Patentee after: Jiangsu xinshengteng Technology Development Co.,Ltd.

Address before: 211100 room 704, building 9, No. 11, mozhou East Road, Jiangning District, Nanjing City, Jiangsu Province

Patentee before: Jiangsu xinshengteng Technology Development Co.,Ltd.

CP03 Change of name, title or address
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A working state monitoring device for climbing frame in construction site

Effective date of registration: 20220429

Granted publication date: 20210803

Pledgee: Jiangsu bank Limited by Share Ltd. Lishui branch

Pledgor: Jiangsu xinshengteng Technology Development Co.,Ltd.

Registration number: Y2022980005051

PE01 Entry into force of the registration of the contract for pledge of patent right