Building site climbs a operating condition monitoring devices
Technical Field
The utility model relates to a construction technical field specifically is a building site climbs frame operating condition monitoring devices.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The construction work place is called a "construction site" or a "construction site", also called a construction site, and the construction work is a production movement performed by people to construct various building products in a certain space and time according to a specific design blueprint by using various building materials and mechanical equipment. The method comprises the whole production process from construction preparation, earth breaking and engineering completion acceptance. In the process, construction preparation, construction organization design and management, earthwork engineering, blasting engineering, foundation engineering, reinforcing steel bar engineering, template engineering, scaffold engineering, concrete engineering, prestressed concrete engineering, masonry engineering, steel structure engineering, wood structure engineering, structure installation engineering and the like are carried out.
The existing building site lacks an effective real-time monitoring mechanism, so that a manager cannot know the environmental condition and the construction progress of the building site in real time, and therefore the building site climbing frame working state monitoring device is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building site climbs a operating condition monitoring devices to current building site who provides in solving above-mentioned background art lacks effectual real-time supervision mechanism, leads to the problem that managers can't know building site environmental aspect and construction progress in real time.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building site climbs frame operating condition monitoring devices, includes the support bedplate, the upper end of support bedplate is provided with environmental monitor, one side of environmental monitor is provided with the safety cabinet, the upper end of safety cabinet is provided with the containing box, the inside of safety cabinet and containing box is provided with pressure sensor and infrared distance meter respectively, and pressure sensor's monitoring end installs on the building cat ladder, environmental monitor's upper end is provided with air quality sensor, the surveillance camera head is installed to one side of air quality sensor.
Preferably, all be provided with the side extension board on environmental monitor's the both sides outer wall, and the outer wall screw fixed mounting of side extension board and environmental monitor, two wind speed monitor and wind direction monitor are installed respectively to the upper end of side extension board, and wind speed monitor and wind direction monitor all are connected with environmental monitor through the data line.
Preferably, a rear-mounted sealing plate is arranged on the rear end face of the safety cabinet and is integrally formed with the safety cabinet, and a wire outlet frame is arranged inside the rear-mounted sealing plate and is integrally formed with the rear-mounted sealing plate.
Preferably, both ends of the outgoing line frame are provided with drawing grooves, the drawing grooves and the outgoing line frame are integrally formed, drawing plates are arranged inside the two drawing grooves, and the two drawing plates are symmetrically distributed about a vertical center line of the outgoing line frame.
Preferably, one end of each of the two pull plates is provided with a pull ring, the pull rings and the pull plates are integrally formed, the pull rings are located outside the wire outlet frame, and the size of each pull ring is larger than the caliber of each pull groove.
Preferably, the wire outlet frame is internally provided with wire passing holes, the wire passing holes and the wire outlet frame are integrally formed, and seven wire passing holes are formed in the wire passing holes and are all located on the same horizontal line.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an infrared distance meter and pressure sensor control climb a lifting height, calculate engineering construction progress and preceding construction floor after carrying out data correction according to the measurement height, and calculate the receivable of engineering according to the construction progress, can remind the staff in time to chase after the engineering money, through surveillance camera head and environmental monitoring appearance real time monitoring job site environment, thereby reach the purpose of carrying out the real-time supervision management to building site's environmental aspect and construction progress, overcome current building site and lack effectual real-time monitoring mechanism, lead to the problem that the managers can't know building site environmental aspect and construction progress in real time.
2. The line-passing holes formed in the wire outgoing frame are used for facilitating the external connection of the lines of the pressure sensor, the drawing grooves formed in the two ends of the wire outgoing frame are used for facilitating the drawing and pulling of the drawing and pulling plate, only the proper drawing and pulling plate is needed when the line passes, and the monitoring end of the pressure sensor is installed on the building ladder stand to monitor the pressure received by the ladder stand in real time.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the unfolding structure of the safety cabinet and the storage box of the present invention;
fig. 3 is a schematic structural view of the rear closing plate of the present invention;
fig. 4 is a schematic view of the working flow of the present invention;
in the figure: 1. a support base plate; 2. an environmental monitor; 3. a safety cabinet; 4. a storage box; 5. a side support plate; 6. a wind speed monitor; 7. a wind direction monitor; 8. an air quality sensor; 9. a surveillance camera; 10. a pressure sensor; 11. an infrared range finder; 12. a rear sealing plate; 13. a drawing plate; 14. a pull ring; 15. a wire outlet frame; 16. drawing the groove; 17. and a wire passing hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, the present invention provides an embodiment: the utility model provides a building site climbs frame operating condition monitoring devices, including supporting seat board 1, the upper end of supporting seat board 1 is provided with environmental monitor 2, one side of environmental monitor 2 is provided with safety cabinet 3, the upper end of safety cabinet 3 is provided with containing box 4, the inside of safety cabinet 3 and containing box 4 is provided with pressure sensor 10 and infrared distance meter 11 respectively, and pressure sensor 10's monitoring end installs on the building cat ladder, the upper end of environmental monitor 2 is provided with air quality sensor 8, surveillance camera 9 is installed to one side of air quality sensor 8.
Further, all be provided with side extension board 5 on the both sides outer wall of environmental monitor 2, and side extension board 5 and environmental monitor 2's outer wall screw fixed mounting, wind speed monitor 6 and wind direction monitor 7 are installed respectively to two side extension board 5's upper end, and wind speed monitor 6 and wind direction monitor 7 all are connected with environmental monitor 2 through the data line, the side extension board 5 that all sets up on the both sides outer wall of environmental monitor 2 plays the effect of supporting installation wind speed monitor 6 and wind direction monitor 7.
Further, a rear sealing plate 12 is arranged on the rear end face of the safety cabinet 3, the rear sealing plate 12 and the safety cabinet 3 are integrally formed, an outlet frame 15 is arranged inside the rear sealing plate 12, the outlet frame 15 and the rear sealing plate 12 are integrally formed, and the rear sealing plate 12 arranged on the rear end face of the safety cabinet 3 plays a role in bearing the outlet frame 15.
Furthermore, both ends of the outgoing line frame 15 are provided with drawing grooves 16, the drawing grooves 16 and the outgoing line frame 15 are integrally formed, drawing plates 13 are arranged inside the two drawing grooves 16, the two drawing plates 13 are symmetrically distributed about the vertical center line of the outgoing line frame 15, and the drawing grooves 16 arranged at both ends of the outgoing line frame 15 play a role in facilitating drawing movement of the drawing plates 13.
Furthermore, one end of each of the two pull plates 13 is provided with a pull ring 14, the pull rings 14 and the pull plates 13 are integrally formed, the pull rings 14 are located outside the wire outlet frame 15, the size of each pull ring 14 is larger than the caliber of the pull groove 16, and the pull rings 14 arranged at one end of each of the two pull plates 13 play a role in facilitating the pushing and pulling of the pull plates 13.
Further, the inside of the outlet frame 15 is provided with the wire passing hole 17, the wire passing hole 17 and the outlet frame 15 are integrally formed, seven wire passing holes 17 are formed in the wire passing hole 17, the seven wire passing holes 17 are all located on the same horizontal line, and the wire passing hole 17 formed in the inside of the outlet frame 15 plays a role in facilitating the external connection of the pressure sensor 10.
The working principle is as follows: through infrared distance meter 11 and pressure sensor 10 control climbing frame lifting height, calculate engineering construction progress and preceding construction floor after carrying out data correction according to the measurement height, and calculate the accounts receivable of engineering according to the construction progress, can remind the staff in time to chase after the engineering money, through monitoring camera 9 and environmental monitor 2 real time monitoring job site environment, thereby reach the purpose of carrying out real time monitoring management to the environmental aspect and the construction progress of building site, accomplish building site climbing frame operating condition monitoring devices's use work.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.